\\vhb\proj\Wat-LD\11822.00\docs\memos\Response to CCC Response to Bayside Comments-8-12-13.doc Transportation Land Development Environmental S e r v i c e s 101 Walnut Street P. O. Box 9151 Watertown, MA 02471-9151 617 924 1770 FAX 617 924 2286 Memorandum To: Ms. Andrea Adams Cape Cod Commission 3225 Main Street P.O. Box 226 Barnstable, Massachusetts 02630 Date: August 12, 2013 Project No.: 11822.00 From: Randall C. Hart Director of Transportation Planning and Engineering Land Development Matthew Kealey, P.E., PTOE Project Manager Re: Response To CCC Staff Report Letter Proposed Lowe’s Dennis, Massachusetts INTRODUCTION This document has been prepared to respond to comments raised in a letter from the Cape Cod Commission dated July 30, 2013 regarding the transportation comments received in the Bayside Engineering comment letter for the proposed Lowe’s in Dennis, Massachusetts. The Bayside Engineering letter was submitted to the Commission on July 6, 2013. The following text summarizes our responses to the Commission staff’s responses to Bayside Engineering’s comments. Comments No. 1, 2, 4, 8, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 24, 25, 27, 28, 29, 30, 32, 33, 34, 35, 36, 37, 38, 41, 42, 43, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 58, 59, 61, 62, 63, 64, 65, 69, 70, 71, 72, 73, 74, 75, 77, 78, 79, 80, 81, 82, 83, 84, 85, 86, 88, 89, 91, 92, 93, 96, 97 & 99 – The Applicant agrees with the Commission’s response to these comments. No further response is required. Comment No. 3 Bayside Comment: “A review of the automatic traffic recorder counts indicates that the weekday peak hour occurs earlier than the time period evaluated for weekday conditions.” CCC Response : “The greatest impacts of the project occur during the Saturday midday peak hour; therefore, congestion mitigation analysis is based on this period. Revisions to the weekday afternoon peak hour analysis period will not affect the mitigation responsibilities of the applicant. Regarding the selection of the weekday afternoon peak hour, Commission Transportation staff suggests that, unless extraordinary circumstances dictate, weekday afternoon peak hour analysis should always occur within the 4:00PM-6:00PM window. This guidance is based on historical Cape Cod year-round traffic patterns (see Cape Cod Commission 2012 Annual Traffic Counting Report) and typical development trip generation patterns. For this specific development, based on trip generation guidance for the Institute of Transportation Engineers Trip Generation, 9th Edition for Home Improvement Superstores (ITE Land Use Code 862) and considering existing year-round and summer traffic patterns in the area, Commission Transportation staff suggests that 4:00 PM – 5:00 PM is the appropriate weekday afternoon peak hour for analysis. The fact that the afternoon peak hour of background traffic on some of the surrounding roadways measured during the 72- hour period of the August 2012 data collection was earlier than 4:00 PM – 5:00 PM does not impact the appropriateness of the analysis hour.”

Upload: lenhi

Post on 05-Jul-2019

216 views

Category:

Documents


0 download

TRANSCRIPT

\\vhb\proj\Wat-LD\11822.00\docs\memos\Response to CCC Response to Bayside Comments-8-12-13.doc

Transportation Land Development

Environmental S e r v i c e s

101 Walnut Street

P. O. Box 9151

Watertown, MA 02471-9151

617 924 1770

FAX 617 924 2286

Memorandum To: Ms. Andrea Adams Cape Cod Commission 3225 Main Street P.O. Box 226 Barnstable, Massachusetts 02630

Date: August 12, 2013

Project No.: 11822.00

From: Randall C. Hart Director of Transportation Planning and Engineering Land Development

Matthew Kealey, P.E., PTOE Project Manager

Re: Response To CCC Staff Report Letter Proposed Lowe’s Dennis, Massachusetts

INTRODUCTION

This document has been prepared to respond to comments raised in a letter from the Cape Cod Commission dated July 30, 2013 regarding the transportation comments received in the Bayside Engineering comment letter for the proposed Lowe’s in Dennis, Massachusetts. The Bayside Engineering letter was submitted to the Commission on July 6, 2013. The following text summarizes our responses to the Commission staff’s responses to Bayside Engineering’s comments. Comments No. 1, 2, 4, 8, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 24, 25, 27, 28, 29, 30, 32, 33, 34, 35, 36, 37, 38, 41, 42, 43, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 58, 59, 61, 62, 63, 64, 65, 69, 70, 71, 72, 73, 74, 75, 77, 78, 79, 80, 81, 82, 83, 84, 85, 86, 88, 89, 91, 92, 93, 96, 97 & 99 – The Applicant agrees with the Commission’s response to these comments. No further response is required. Comment No. 3

Bayside Comment: “A review of the automatic traffic recorder counts indicates that the weekday peak hour occurs earlier than the time period evaluated for weekday conditions.”

CCC Response: “The greatest impacts of the project occur during the Saturday midday peak hour; therefore, congestion mitigation analysis is based on this period. Revisions to the weekday afternoon peak hour analysis period will not affect the mitigation responsibilities of the applicant.

Regarding the selection of the weekday afternoon peak hour, Commission Transportation staff suggests that, unless extraordinary circumstances dictate, weekday afternoon peak hour analysis should always occur within the 4:00PM-6:00PM window. This guidance is based on historical Cape Cod year-round traffic patterns (see Cape Cod Commission 2012 Annual Traffic Counting Report) and typical development trip generation patterns. For this specific development, based on trip generation guidance for the Institute of Transportation Engineers Trip Generation, 9th Edition for Home Improvement Superstores (ITE Land Use Code 862) and considering existing year-round and summer traffic patterns in the area, Commission Transportation staff suggests that 4:00 PM – 5:00 PM is the appropriate weekday afternoon peak hour for analysis. The fact that the afternoon peak hour of background traffic on some of the surrounding roadways measured during the 72-hour period of the August 2012 data collection was earlier than 4:00 PM – 5:00 PM does not impact the appropriateness of the analysis hour.”

Date: August 12, 2013 Project No.: 11822.00

2

\\Mawald\ld\11822.00\docs\memos\Response to CCC Response to Bayside Comments-8-12-13

Response: In order to analyze the peak hour of data for an entire network, the intersections were split into clusters made up of closely spaced intersections. The average peak hour for each of these groups of intersections was used as the peak hour for all of the intersections within the cluster. With the exception of the intersections of Route 134 at Upper County Road and Main Street at Highbank Road, the peak hour for all of the study area intersection clusters was 4:00 – 5:00 PM. This is common practice and the most accurate way to evaluate intersections located in close proximity. In analyzing the Route 134 ATR data, it is not practical to determine different peak hours for the northbound and southbound directions. As traffic volumes do fluctuate depending on the directional distribution, it is more practical to look at the combined northbound and southbound volumes on Route 134. When the two directions on Route 134 are summed, the peak hour results are 4:00 – 5:00 PM on Thursday, 3:45 – 4:45 PM on Friday and 4:00 – 5:00 PM on Monday. These ATR volume peak hours are equivalent to the 4:00 – 5:00 PM peak hour was the used for the weekday evening peak hour analysis. As the majority of the study area intersections are on Route 134, it is natural that the peak hour along Route 134 would dictate the peak hour for all of the study area intersection clusters. Comment No. 5 & 6

Bayside Comment: “At the intersection of Route 134, Upper County Road and Duck Pond Road it appears that the counted traffic volumes for both peak hours (weekday day evening and Saturday midday) were decreased with no explanation provided.” “At the intersection of Main Street, upper County Road and Highbank Road, it appears that the counted traffic volumes for the Saturday midday . . . do not match the volumes shown in Figure 5 of the May 10, 2013 TIAS.”

CCC Response: “In order to determine compliance with the RPP, the Applicant should review the traffic volumes at the following intersections and revised level of service analyses as necessary to reflect correct traffic volumes:

o Route 134, Upper County Road and Duck Pond Road

o Main Street, Upper County Road, and Highbank Road”

Response: As described above under Comment No. 3, the peak hours used within the analysis were overall network peak hours for a cluster of closely spaced intersections. In both of these instances, the overall network peak hour used for the analysis was slightly different from the intersection’s individual peak hour. In each of these cases the difference in traffic volumes between the network peak hour and individual intersection peak hour was 39 vehicles or less overall for the entire intersection, which would not have a significant influence on the overall intersection operations. Comment No. 7

Bayside Comment: “As the manual turning movement counts were conducted in 2012, and it does not appear that any growth has been applied, the networks are inaccurate in describing themselves as 2013 Existing Conditions and 2018 No-Build Conditions.”

CCC Response: “In order to determine compliance with the RPP, the Applicant should demonstrate that use of 2012 data in a 2013 analysis is justifiable giving the traffic patterns in the area or reevaluate their analysis assumptions.” Response: As part of the preparation of the TIAS, VHB conducted research to determine the historic growth rate for traffic in this area as well. Based on information contained in the Cape Cod 2012 Traffic Counting Report, traffic has decreased at a rate of -0.74 percent per year Cape-wide over the last ten years (2002 –

Date: August 12, 2013 Project No.: 11822.00

3

\\Mawald\ld\11822.00\docs\memos\Response to CCC Response to Bayside Comments-8-12-13

2012). Within the Mid Cape region, which the Town of Dennis is considered to be a part of, traffic decreased at a rate of -1.06 percent per year between 2002 and 2012. To provide a conservative analysis, the count data from 2012 was not decreased to reflect 2013 conditions. A growth rate of 0.5 percent per year for five years was applied to the existing conditions volumes to project them to No Build and Build conditions, resulting in a conservative increase of 2.5 percent.

Comment No. 9, 66 & 76

Bayside Comment: “The Applicant has stated that as part of the project, the Applicant will work with the [Cape Cod Regional Transit Authority] CCRTA to provide transit service to the site. As this is a key component in affecting the Applicant's traffic generation, the status of discussions with the CCRTA should be provided.” “A location for the transit stop on the site should be identified.”

CCC Response: “As noted in the June 27, 2013 Memorandum from Mr. Randall Hart to Ms. Andrea Adams, the Applicant’s transportation engineer “VHB has already contacted the CCRTA and discussed the desire to locate a transit stop for the H2O Line on the proposed site. VHB will continue to coordinate with CCRTA and will relay progress updates to CCC staff.” An update was provided in the July 29, 2013 Memorandum from Mr. Randall Hart to Ms. Andrea Adams including a letter from CCRTA Administrator Mr. Thomas Cahir noting that pending the Applicant’s “ability to obtain all state and local approvals for the proposed project, and assuming that Lowe’s moves forward with construction of the project, CCRTA will extend existing bus routes to include a bus stop on the Lowes site as it would be in public’s interest to have one there.” If a transit stop is to be located on the site selection of the location should be done in consultation with CCRTA.”

Response: As indicated by the Commission, the Proponent has requested and received a letter from the CCRTA stating intent to create a bus stop onsite and reroute existing buses already in this area through the site, provided the project is approved and constructed. The Proponent will continue existing coordination with the CCRTA as the project progresses, including discussion of a location for the CCRTA bus stop.

Comment No. 23 & 57

Bayside Comment: “The TIAS states that the 85th percentile speed on Theophilus F. Smith Road is 26 mph for eastbound vehicles and 24 mph for westbound vehicles. This data is based on an ATR conducted in February 2012. The February 2012 ATR data should be provided.”

CCC Response: “In order to determine compliance with the RPP, the Applicant should provide the data from the February 2012 speed measurements that justify the observed 85th percentile speeds used in the site distance calculations.”

Response: As requested, the February ATR count data, including speeds, has been provided in the Appendix.

Comment No. 26, 56, 67 & 68

Bayside Comment: “Relating to the proposed signalization of Theophilus F. Smith Road, the westerly site drive, and Enterprise Road, the letter states that “sidewalks and appropriate crosswalks should be provided on Enterprise Drive as it connects to Patriot Square.”

CCC Response: “As presented on the Site Plans dated 5/3/13, sidewalks are proposed on Enterprise Road as part of the signal installation. Based on further review of the project, in order to ensure compliance with the RPP, Commission Transportation staff suggests the Applicant should include a crosswalk across Enterprise Road, with proper sidewalk connections, to allow a safe connection to businesses in Patriot Square.”

Date: August 12, 2013 Project No.: 11822.00

4

\\Mawald\ld\11822.00\docs\memos\Response to CCC Response to Bayside Comments-8-12-13

Response: The proposed improvement plan provides safe and efficient pedestrian connections between the Lowe’s site and Patriot Square via an actuated traffic signal and crosswalk system. As proposed, there will be sidewalk provided along the entire site frontage, pedestrian crosswalk across TFS Road and a sidewalk along the west side of Enterprise Road allowing pedestrians to enter Patriot Square through a controlled condition. The realignment of Enterprise Road (to the east) has impacted the layout and parking area within the existing center and further widening in this area is not practical or necessary. There is no sidewalk on the north side of TFS Road today or on the east side of Enterprise Road, nor is any proposed as it would be redundant. Therefore, implementing a crosswalk as part of this project is not practical.

Comment No. 31

Bayside Comment: “Regarding the proposed configuration changes at the intersection of Route 134 and Theophilus F. Smith Road, the letter states that “further, the proposed design should be assessed to determine if there is adequate width on the Route 134 southbound departure leg to receive two lanes of turning traffic safely.””

CCC Response: “As detailed in the July 9, 2013 Staff Report, Commission Transportation staff have concerns relating to the proposed lane configuration and other elements of the proposed mitigation at the intersection of Theophilus F. Smith Road at Route 134. The Applicant presented additional information on proposed mitigation at this intersection in the July 29, 2013 Memorandum from VHB. This document is currently under review by Commission staff.”

Response: As indicated, additional information has been provided to the Commission related to the proposed mitigation at the intersection of Route 134 and Theophilus F. Smith Road. The Proponent will continue to work on the proposed design at this location based upon comments from the Commission and in coordination with the Commission and the Town of Dennis.

Comment No. 39, 40, 60 & 98

Bayside Comment: “Relating to the proposed signalization of Theophilus F. Smith Road, the westerly site drive, and Enterprise Road, the letter states that the proposed improvement is “essentially the 'front door' for the project” and should “not be included in the overall costs associated with the mitigation of the projects traffic impacts.” The letter additionally states that “the Applicant should show that they have the rights to re-align Enterprise Road.””

CCC Response: “Commission Transportation staff agrees that proposed signalization of the Westerly Site Drive / Enterprise Road on Theophilus F. Smith Road should not be considered as part of the mitigation package as the installation primarily serves the Applicant’s access needs. Regarding the right to re-align Enterprise Road, the Applicant has proposed this improvement and it is their responsibility to ensure it is feasible. If such an improvement were infeasible they would be unable to meet the requirements of the potential decision and therefore be unable to move the development project forward.” Response: While the Westerly Site Driveway / Enterprise Road at Theophilus F. Smith Road serves as the primary access to the site, the design also fulfills the Town’s desires to maximize the spacing between Route 134 and Enterprise Road and improve the interaction of traffic at the driveways to Cumberland Farms/ Cranberry Square and the proposed Westerly Site Driveway. The layout of this intersection was the subject of extensive discussions with the Town of Dennis prior to the submission of the DRI application and numerous alternatives were evaluated at the Town’s request. It should also be noted that there is some common ownership between the Lowe’s site and the land required to realign Enterprise Road. As such, the owners are well aware of the property impacts of the proposed realignment and are supportive of the plan.

Date: August 12, 2013 Project No.: 11822.00

5

\\Mawald\ld\11822.00\docs\memos\Response to CCC Response to Bayside Comments-8-12-13

Comment No. 44 & 87

Bayside Comment: “The Applicant should re-visit the potential of this mitigation measure. Based on the data in the Appendix, the total cost for this measure is approximately $51,000 and there are no right-of-way impacts. As this will improve the intersection per MPS TR3.4, this mitigation measure should be fully funded.”

CCC Response: “As detailed in the July 9, 2013 Staff Report, Commission Transportation staff suggests that the mitigation proposed at the intersection of Theophilus F. Smith Road at Route 134 is currently insufficient. Commission Transportation staff suggests the Applicant revise their approach to mitigating safety and congestion impacts at this intersection to ensure compliance with the RPP.

The Applicant presented additional information on proposed mitigation at this intersection in the July 29, 2013 Memorandum from VHB. This document is currently under review by Commission staff.”

Response: As indicated, additional information has been provided to the Commission related to the proposed mitigation at the intersection of Route 134 and Theophilus F. Smith Road. The Proponent will continue to work on the proposed design at this location based upon comments from the Commission and in coordination with the Commission and the Town of Dennis.

Comment No. 90

Bayside Comment: “The Applicant states 'The off-site mitigation measures proposed as part of this project will maintain or improve upon the existing level of pedestrian and bicycle accommodations ' To respond appropriately, these measures should be identified here.”

CCC Response: “Commission Transportation staff suggests that the off-site mitigation measures currently proposed will maintain or improve upon existing level of pedestrian and bicycle accommodations. However, as previously discussed, in order to ensure compliance with the RPP, Commission Transportation staff suggests that additional accommodations should be provided at the proposed new signal at the intersection of Theophilus F. Smith Road, the westerly site drive, and Enterprise Road.”

Response: Please refer to the response to Comments No. 26, 56, 67 & 68.

Comment No. 94 & 95

Bayside Comment: “The Applicant states 'While the construction of a traffic signal is proposed as part of this project, the traffic signal will serve the project needs and improve on existing operations along this corridor. Therefore the improvement is a benefit and demonstrates access management along this corridor.' The proposed traffic signal is designed to primarily provide access to the proposed project. As such, the maintenance and operating costs should be borne by the Applicant.” “Count station equipment should be included in the proposed traffic signal and costs for maintenance should be paid for by the Applicant.”

CCC Response: “As presented in the July 9, 2013 Staff Report, Commission Transportation staff noted that, if deemed appropriate by the Commission, the Applicant should revise their mitigation approach to address MPS TR3.13 (Operation and Maintenance Costs) and MPS TR3.14 (Traffic-Monitoring Devices).

Additional comments from the public brought to light concerns which Commission Transportation staff would like to address:

1. The Applicant should provide design details on the proposed improvements at the Route 6 Eastbound Off-Ramp that are referenced in Figure 11 of the May 2013 TIAS but not included in the Appendix.

Date: August 12, 2013 Project No.: 11822.00

6

\\Mawald\ld\11822.00\docs\memos\Response to CCC Response to Bayside Comments-8-12-13

2. Public concern was voiced over letting the Applicant “buy their way” out of traffic impacts. To avoid any confusion, Commission Transportation staff notes that the RPP allows only physical improvements to address safety impacts and not payments.”

Response: The Proponent will agree to provide the operations and maintenance costs and traffic monitoring equipment when it is deemed necessary by the Commission. The Proponent will coordinate with CCC Transportation staff on the details of those commitments. (1) As requested, the 40-Scale version of the Route 6 Eastbound Off-Ramp improvements figure from the May 2013 TIAS has been provided again in the Appendix.

\\mawald\ld\11822.00\docs\memos\Response to CCC Memo on Bayside Appendix\TrafAppendix.docx Appendix

Appendix

February 2013 Observed Count Data

Figure 1: Route 6 Eastbound Off-Ramp Improvements

\\mawald\ld\11822.00\docs\memos\Response to CCC Memo on Bayside Appendix\TrafAppendix.docx Appendix

February 2013 Observed Count Data

Page 1

Theophilis F. Smith Roadeast of East-West Dennis Road (Route 134)City, State: Dennis, MAClient: VHB/ M. Kealey

122804 B volumeSite Code: 11822

Start WB EB Combined 10-Feb-12Time A.M. P.M. A.M. P.M. A.M. P.M. Fri

12:00 3 82 4 67 7 14912:15 3 87 7 72 10 15912:30 1 74 2 87 3 16112:45 2 9 66 309 3 16 76 302 5 25 142 61101:00 6 90 3 81 9 17101:15 0 76 2 65 2 14101:30 0 82 1 62 1 14401:45 1 7 82 330 2 8 77 285 3 15 159 61502:00 0 88 2 94 2 18202:15 0 76 1 76 1 15202:30 0 69 1 81 1 15002:45 0 0 72 305 1 5 91 342 1 5 163 64703:00 0 95 1 75 1 17003:15 0 79 0 72 0 15103:30 0 97 2 89 2 18603:45 1 1 79 350 3 6 78 314 4 7 157 66404:00 4 90 1 65 5 15504:15 2 95 1 56 3 15104:30 2 98 5 62 7 16004:45 1 9 73 356 5 12 65 248 6 21 138 60405:00 8 83 4 46 12 12905:15 6 66 9 47 15 11305:30 5 56 14 56 19 11205:45 11 30 41 246 16 43 42 191 27 73 83 43706:00 15 53 13 61 28 11406:15 24 51 21 29 45 8006:30 18 54 33 56 51 11006:45 30 87 52 210 45 112 55 201 75 199 107 41107:00 30 62 48 57 78 11907:15 48 37 49 36 97 7307:30 33 23 51 24 84 4707:45 44 155 18 140 78 226 15 132 122 381 33 27208:00 51 26 55 14 106 4008:15 52 21 55 23 107 4408:30 67 38 56 33 123 7108:45 67 237 28 113 47 213 25 95 114 450 53 20809:00 60 44 68 21 128 6509:15 79 45 57 23 136 6809:30 73 30 60 22 133 5209:45 45 257 11 130 77 262 12 78 122 519 23 20810:00 62 6 51 6 113 1210:15 60 7 74 10 134 1710:30 65 11 72 8 137 1910:45 58 245 14 38 62 259 11 35 120 504 25 7311:00 53 10 57 6 110 1611:15 79 13 55 6 134 1911:30 74 9 67 7 141 1611:45 62 268 8 40 90 269 4 23 152 537 12 63Total 1305 2567 1431 2246 2736 4813

Percent 47.7% 53.3% 52.3% 46.7%

Day Total 3872 3677 7549

Peak 08:45 03:45 09:45 02:00 11:00 02:45 Vol. 279 362 274 342 537 670

P.H.F. 0.883 0.923 0.890 0.910 0.883 0.901

PRECISIOND A T AINDUSTRIES, LLC

P.O. Box 301 Berlin, MA 01503Office: 508.481.3999 Fax: 508.545.1234

Email: [email protected]

Page 2

Theophilis F. Smith Roadeast of East-West Dennis Road (Route 134)City, State: Dennis, MAClient: VHB/ M. Kealey

122804 B volumeSite Code: 11822

Start WB EB Combined 11-Feb-12Time A.M. P.M. A.M. P.M. A.M. P.M. Sat

12:00 14 63 6 66 20 12912:15 4 51 3 56 7 10712:30 3 39 4 53 7 9212:45 2 23 53 206 2 15 59 234 4 38 112 44001:00 1 55 3 57 4 11201:15 2 54 2 36 4 9001:30 0 42 2 40 2 8201:45 1 4 46 197 4 11 65 198 5 15 111 39502:00 5 62 1 58 6 12002:15 2 50 1 67 3 11702:30 1 69 1 53 2 12202:45 1 9 64 245 2 5 50 228 3 14 114 47303:00 1 53 1 42 2 9503:15 3 62 3 46 6 10803:30 0 47 1 40 1 8703:45 1 5 47 209 0 5 48 176 1 10 95 38504:00 3 40 3 46 6 8604:15 2 74 0 57 2 13104:30 3 52 1 54 4 10604:45 2 10 34 200 2 6 31 188 4 16 65 38805:00 3 25 2 23 5 4805:15 3 33 2 20 5 5305:30 2 51 4 24 6 7505:45 3 11 20 129 3 11 27 94 6 22 47 22306:00 5 31 4 31 9 6206:15 5 35 6 25 11 6006:30 8 34 8 36 16 7006:45 9 27 60 160 20 38 33 125 29 65 93 28507:00 13 33 23 36 36 6907:15 22 21 38 25 60 4607:30 15 28 29 17 44 4507:45 20 70 21 103 25 115 17 95 45 185 38 19808:00 38 17 33 13 71 3008:15 29 13 38 9 67 2208:30 31 17 44 15 75 3208:45 54 152 22 69 48 163 16 53 102 315 38 12209:00 37 22 50 18 87 4009:15 41 46 39 22 80 6809:30 53 39 53 15 106 5409:45 52 183 10 117 59 201 5 60 111 384 15 17710:00 61 17 69 13 130 3010:15 68 13 64 12 132 2510:30 43 4 54 9 97 1310:45 48 220 3 37 56 243 10 44 104 463 13 8111:00 63 7 72 5 135 1211:15 61 16 68 9 129 2511:30 55 8 59 2 114 1011:45 91 270 6 37 60 259 7 23 151 529 13 60Total 984 1709 1072 1518 2056 3227

Percent 47.9% 53.0% 52.1% 47.0%

Day Total 2693 2590 5283

Peak 11:00 02:30 11:00 01:45 11:00 02:00 Vol. 270 248 259 243 529 473

P.H.F. 0.742 0.899 0.899 0.907 0.876 0.969

PRECISIOND A T AINDUSTRIES, LLC

P.O. Box 301 Berlin, MA 01503Office: 508.481.3999 Fax: 508.545.1234

Email: [email protected]

Page 1

Theophilis F. Smith Roadeast of East-West Dennis Road (Route 134)City, State: Dennis, MAClient: VHB/ M. Kealey

122804 B classSite Code: 11822

WBStart Cars & 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Time Bikes Trailers Long Buses 6 Tire Single Single Double Double Double Multi Multi Multi Total

02/10/12 0 8 1 0 0 0 0 0 0 0 0 0 0 9

01:00 0 7 0 0 0 0 0 0 0 0 0 0 0 702:00 0 0 0 0 0 0 0 0 0 0 0 0 0 003:00 0 1 0 0 0 0 0 0 0 0 0 0 0 104:00 0 5 3 0 1 0 0 0 0 0 0 0 0 905:00 1 12 7 0 8 2 0 0 0 0 0 0 0 3006:00 0 50 15 1 16 3 0 0 2 0 0 0 0 8707:00 3 82 36 3 21 3 0 6 1 0 0 0 0 15508:00 1 162 57 1 13 3 0 0 0 0 0 0 0 23709:00 1 189 53 2 8 4 0 0 0 0 0 0 0 25710:00 0 174 51 3 10 5 0 1 1 0 0 0 0 24511:00 0 192 60 2 7 6 0 1 0 0 0 0 0 268

12 PM 1 242 45 0 17 1 0 2 1 0 0 0 0 30913:00 2 229 76 0 14 5 0 0 4 0 0 0 0 33014:00 3 232 54 0 12 1 0 3 0 0 0 0 0 30515:00 1 266 66 1 14 2 0 0 0 0 0 0 0 35016:00 1 269 68 0 14 1 0 3 0 0 0 0 0 35617:00 1 190 49 0 5 0 0 0 1 0 0 0 0 24618:00 0 174 32 0 2 2 0 0 0 0 0 0 0 21019:00 0 115 23 0 2 0 0 0 0 0 0 0 0 14020:00 0 94 16 0 2 0 0 1 0 0 0 0 0 11321:00 0 101 26 0 3 0 0 0 0 0 0 0 0 13022:00 0 28 9 0 0 0 0 0 1 0 0 0 0 3823:00 0 34 6 0 0 0 0 0 0 0 0 0 0 40Total 15 2856 753 13 169 38 0 17 11 0 0 0 0 3872

Percent 0.4% 73.8% 19.4% 0.3% 4.4% 1.0% 0.0% 0.4% 0.3% 0.0% 0.0% 0.0% 0.0% AM

Peak07:00 09:00 08:00 07:00 07:00 09:00 07:00 06:00 09:00

Vol. 3 189 57 3 21 4 6 2 257Midday

Peak14:00 12:00 13:00 11:00 12:00 11:00 14:00 13:00 13:00

Vol. 3 242 76 2 17 6 3 4 330PM

Peak15:00 16:00 16:00 15:00 15:00 15:00 16:00 17:00 16:00

Vol. 1 269 68 1 14 2 3 1 356

PRECISIOND A T AINDUSTRIES, LLC

P.O. Box 301 Berlin, MA 01503Office: 508.481.3999 Fax: 508.545.1234

Email: [email protected]

Page 2

Theophilis F. Smith Roadeast of East-West Dennis Road (Route 134)City, State: Dennis, MAClient: VHB/ M. Kealey

122804 B classSite Code: 11822

WBStart Cars & 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Time Bikes Trailers Long Buses 6 Tire Single Single Double Double Double Multi Multi Multi Total

02/11/12 0 22 1 0 0 0 0 0 0 0 0 0 0 23

01:00 0 4 0 0 0 0 0 0 0 0 0 0 0 402:00 0 6 3 0 0 0 0 0 0 0 0 0 0 903:00 0 4 1 0 0 0 0 0 0 0 0 0 0 504:00 0 4 6 0 0 0 0 0 0 0 0 0 0 1005:00 0 6 2 0 3 0 0 0 0 0 0 0 0 1106:00 0 14 8 0 4 1 0 0 0 0 0 0 0 2707:00 1 42 19 0 7 1 0 0 0 0 0 0 0 7008:00 0 101 29 2 18 1 0 0 1 0 0 0 0 15209:00 0 142 37 0 3 1 0 0 0 0 0 0 0 18310:00 1 166 47 0 4 2 0 0 0 0 0 0 0 22011:00 1 133 97 1 37 1 0 0 0 0 0 0 0 270

12 PM 0 83 81 2 39 1 0 0 0 0 0 0 0 20613:00 1 131 58 0 4 3 0 0 0 0 0 0 0 19714:00 1 186 47 1 10 0 0 0 0 0 0 0 0 24515:00 1 171 36 0 1 0 0 0 0 0 0 0 0 20916:00 3 159 31 2 3 2 0 0 0 0 0 0 0 20017:00 0 93 31 0 5 0 0 0 0 0 0 0 0 12918:00 0 134 23 0 2 1 0 0 0 0 0 0 0 16019:00 1 92 9 0 1 0 0 0 0 0 0 0 0 10320:00 0 59 9 0 1 0 0 0 0 0 0 0 0 6921:00 0 99 15 0 2 1 0 0 0 0 0 0 0 11722:00 0 34 3 0 0 0 0 0 0 0 0 0 0 3723:00 0 30 7 0 0 0 0 0 0 0 0 0 0 37Total 10 1915 600 8 144 15 0 0 1 0 0 0 0 2693

Percent 0.4% 71.1% 22.3% 0.3% 5.3% 0.6% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% AM

Peak07:00 09:00 09:00 08:00 08:00 06:00 08:00 09:00

Vol. 1 142 37 2 18 1 1 183Midday

Peak11:00 14:00 11:00 12:00 12:00 13:00 11:00

Vol. 1 186 97 2 39 3 270PM

Peak16:00 15:00 15:00 16:00 17:00 16:00 15:00

Vol. 3 171 36 2 5 2 209

PRECISIOND A T AINDUSTRIES, LLC

P.O. Box 301 Berlin, MA 01503Office: 508.481.3999 Fax: 508.545.1234

Email: [email protected]

Page 3

Theophilis F. Smith Roadeast of East-West Dennis Road (Route 134)City, State: Dennis, MAClient: VHB/ M. Kealey

122804 B classSite Code: 11822

EBStart Cars & 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Time Bikes Trailers Long Buses 6 Tire Single Single Double Double Double Multi Multi Multi Total

02/10/12 0 16 0 0 0 0 0 0 0 0 0 0 0 16

01:00 0 7 1 0 0 0 0 0 0 0 0 0 0 802:00 0 3 1 0 1 0 0 0 0 0 0 0 0 503:00 0 4 1 0 1 0 0 0 0 0 0 0 0 604:00 0 5 6 0 1 0 0 0 0 0 0 0 0 1205:00 0 27 11 1 4 0 0 0 0 0 0 0 0 4306:00 0 70 34 0 5 1 0 1 1 0 0 0 0 11207:00 1 146 62 3 10 3 0 1 0 0 0 0 0 22608:00 0 152 50 0 8 3 0 0 0 0 0 0 0 21309:00 1 187 51 2 17 3 0 0 1 0 0 0 0 26210:00 1 196 44 1 14 1 0 2 0 0 0 0 0 25911:00 1 193 53 2 14 2 0 4 0 0 0 0 0 269

12 PM 1 224 54 1 17 4 0 1 0 0 0 0 0 30213:00 3 213 61 0 6 1 0 1 0 0 0 0 0 28514:00 3 267 54 1 12 0 0 4 1 0 0 0 0 34215:00 0 242 45 1 22 0 0 4 0 0 0 0 0 31416:00 3 180 43 1 16 1 0 4 0 0 0 0 0 24817:00 2 151 27 0 11 0 0 0 0 0 0 0 0 19118:00 0 158 32 0 10 0 0 0 0 0 1 0 0 20119:00 2 103 21 0 6 0 0 0 0 0 0 0 0 13220:00 0 74 14 0 7 0 0 0 0 0 0 0 0 9521:00 0 67 9 0 2 0 0 0 0 0 0 0 0 7822:00 0 29 6 0 0 0 0 0 0 0 0 0 0 3523:00 0 21 2 0 0 0 0 0 0 0 0 0 0 23Total 18 2735 682 13 184 19 0 22 3 0 1 0 0 3677

Percent 0.5% 74.4% 18.5% 0.4% 5.0% 0.5% 0.0% 0.6% 0.1% 0.0% 0.0% 0.0% 0.0% AM

Peak07:00 09:00 07:00 07:00 09:00 07:00 06:00 06:00 09:00

Vol. 1 187 62 3 17 3 1 1 262Midday

Peak13:00 14:00 13:00 11:00 12:00 12:00 11:00 14:00 14:00

Vol. 3 267 61 2 17 4 4 1 342PM

Peak16:00 15:00 15:00 15:00 15:00 16:00 15:00 18:00 15:00

Vol. 3 242 45 1 22 1 4 1 314

PRECISIOND A T AINDUSTRIES, LLC

P.O. Box 301 Berlin, MA 01503Office: 508.481.3999 Fax: 508.545.1234

Email: [email protected]

Page 4

Theophilis F. Smith Roadeast of East-West Dennis Road (Route 134)City, State: Dennis, MAClient: VHB/ M. Kealey

122804 B classSite Code: 11822

EBStart Cars & 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Time Bikes Trailers Long Buses 6 Tire Single Single Double Double Double Multi Multi Multi Total

02/11/12 0 14 1 0 0 0 0 0 0 0 0 0 0 15

01:00 0 11 0 0 0 0 0 0 0 0 0 0 0 1102:00 0 5 0 0 0 0 0 0 0 0 0 0 0 503:00 0 3 1 0 1 0 0 0 0 0 0 0 0 504:00 0 3 3 0 0 0 0 0 0 0 0 0 0 605:00 0 7 3 0 1 0 0 0 0 0 0 0 0 1106:00 0 28 9 0 0 1 0 0 0 0 0 0 0 3807:00 0 71 39 0 4 0 0 0 1 0 0 0 0 11508:00 0 113 38 1 9 1 0 1 0 0 0 0 0 16309:00 0 147 44 0 9 1 0 0 0 0 0 0 0 20110:00 2 170 57 0 11 3 0 0 0 0 0 0 0 24311:00 0 126 90 0 40 1 0 2 0 0 0 0 0 259

12 PM 1 45 110 2 75 1 0 0 0 0 0 0 0 23413:00 2 129 44 0 22 1 0 0 0 0 0 0 0 19814:00 0 179 36 0 11 2 0 0 0 0 0 0 0 22815:00 0 132 36 0 7 1 0 0 0 0 0 0 0 17616:00 0 135 37 0 12 4 0 0 0 0 0 0 0 18817:00 0 69 17 0 7 1 0 0 0 0 0 0 0 9418:00 0 96 18 0 11 0 0 0 0 0 0 0 0 12519:00 0 70 14 0 11 0 0 0 0 0 0 0 0 9520:00 0 37 11 0 5 0 0 0 0 0 0 0 0 5321:00 0 52 6 1 1 0 0 0 0 0 0 0 0 6022:00 0 39 5 0 0 0 0 0 0 0 0 0 0 4423:00 0 19 3 0 1 0 0 0 0 0 0 0 0 23Total 5 1700 622 4 238 17 0 3 1 0 0 0 0 2590

Percent 0.2% 65.6% 24.0% 0.2% 9.2% 0.7% 0.0% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% AM

Peak 09:00 09:00 08:00 08:00 06:00 08:00 07:00 09:00

Vol. 147 44 1 9 1 1 1 201Midday

Peak13:00 14:00 12:00 12:00 12:00 14:00 11:00 11:00

Vol. 2 179 110 2 75 2 2 259PM

Peak 16:00 16:00 21:00 16:00 16:00 16:00

Vol. 135 37 1 12 4 188

PRECISIOND A T AINDUSTRIES, LLC

P.O. Box 301 Berlin, MA 01503Office: 508.481.3999 Fax: 508.545.1234

Email: [email protected]

Page 1

Theophilis F. Smith Roadeast of East-West Dennis Road (Route 134)City, State: Dennis, MAClient: VHB/ M. Kealey

122804 B speedSite Code: 11822

WBStart 1 4 7 10 13 16 19 22 25 28 31 34 37 40 85th AVETime 3 6 9 12 15 18 21 24 27 30 33 36 39 999 Total % ile MPH02/10/

12 0 0 0 0 0 1 3 2 3 0 0 0 0 0 9 25 2201:00 0 0 0 0 1 3 1 1 0 1 0 0 0 0 7 21 2002:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * *03:00 0 0 0 0 0 1 0 0 0 0 0 0 0 0 1 16 1704:00 0 0 0 0 0 1 4 1 2 1 0 0 0 0 9 26 2205:00 0 0 0 3 3 5 6 8 3 2 0 0 0 0 30 24 2006:00 0 1 1 2 16 18 22 18 7 2 0 0 0 0 87 23 1907:00 0 0 2 12 27 29 39 21 17 6 2 0 0 0 155 24 1908:00 0 0 3 4 24 53 51 65 29 6 2 0 0 0 237 24 2009:00 0 0 1 10 24 53 69 64 27 7 2 0 0 0 257 24 2010:00 0 0 4 7 14 47 78 52 35 7 1 0 0 0 245 24 2011:00 0 0 1 7 25 44 81 65 37 7 1 0 0 0 268 24 21

12 PM 0 1 5 12 34 63 78 85 26 5 0 0 0 0 309 23 2013:00 0 1 4 21 46 72 110 44 29 2 0 0 1 0 330 22 1914:00 0 1 7 14 33 53 79 65 41 9 3 0 0 0 305 24 2015:00 1 4 4 19 40 60 106 62 42 10 2 0 0 0 350 24 2016:00 0 0 8 14 54 64 94 73 36 13 0 0 0 0 356 24 1917:00 0 0 1 7 31 51 77 43 30 6 0 0 0 0 246 24 2018:00 0 1 3 11 25 41 52 44 26 7 0 0 0 0 210 24 2019:00 0 0 1 2 16 37 31 31 15 7 0 0 0 0 140 24 2020:00 0 0 0 2 14 26 27 25 15 4 0 0 0 0 113 24 2021:00 0 0 1 2 15 46 39 19 6 1 1 0 0 0 130 22 1922:00 0 0 0 1 3 7 7 11 7 2 0 0 0 0 38 25 2123:00 0 0 1 2 3 9 12 9 2 2 0 0 0 0 40 23 20Total 1 9 47 152 448 784 1066 808 435 107 14 0 1 0 3872

% 0.0% 0.2% 1.2% 3.9% 11.6% 20.2% 27.5% 20.9% 11.2% 2.8% 0.4% 0.0% 0.0% 0.0% AM

Peak 06:00 08:00 07:00 07:00 08:00 09:00 08:00 08:00 09:00 07:00 09:00

Vol. 1 3 12 27 53 69 65 29 7 2 257 Midda

y Peak 12:00 14:00 13:00 13:00 13:00 13:00 12:00 14:00 14:00 14:00 13:00 13:00

Vol. 1 7 21 46 72 110 85 41 9 3 1 330 PM

Peak15:00 15:00 16:00 15:00 16:00 16:00 15:00 16:00 15:00 16:00 15:00 16:00

Vol. 1 4 8 19 54 64 106 73 42 13 2 356 %iles 15th Percentile : 14 MPH

50th Percentile : 19 MPH85th Percentile : 24 MPH95th Percentile : 26 MPH

Stats 10 MPH Pace Speed : 16-25 MPHNumber in Pace : 2766Percent in Pace : 71.4%

Number of Vehicles > 20 MPH : 1720Percent of Vehicles > 20 MPH : 44.4%

Mean Speed(Average) : 20 MPH

PRECISIOND A T AINDUSTRIES, LLC

P.O. Box 301 Berlin, MA 01503Office: 508.481.3999 Fax: 508.545.1234

Email: [email protected]

Page 2

Theophilis F. Smith Roadeast of East-West Dennis Road (Route 134)City, State: Dennis, MAClient: VHB/ M. Kealey

122804 B speedSite Code: 11822

WBStart 1 4 7 10 13 16 19 22 25 28 31 34 37 40 85th AVETime 3 6 9 12 15 18 21 24 27 30 33 36 39 999 Total % ile MPH02/11/

12 0 0 0 0 3 8 8 4 0 0 0 0 0 0 23 21 1901:00 0 1 1 0 0 1 1 0 0 0 0 0 0 0 4 18 1202:00 0 0 0 0 2 1 3 1 1 0 1 0 0 0 9 24 2103:00 0 0 3 0 0 1 1 0 0 0 0 0 0 0 5 18 1204:00 0 0 0 1 0 2 0 3 3 0 1 0 0 0 10 26 2205:00 0 0 1 0 1 2 1 2 0 3 1 0 0 0 11 29 2206:00 0 0 0 0 2 4 7 5 6 3 0 0 0 0 27 26 2207:00 0 0 0 2 12 17 15 16 7 0 1 0 0 0 70 23 1908:00 0 0 1 3 22 29 36 38 19 4 0 0 0 0 152 24 2009:00 0 0 2 8 30 42 52 38 11 0 0 0 0 0 183 22 1910:00 0 1 3 11 36 47 63 42 16 1 0 0 0 0 220 22 1911:00 0 0 2 6 32 37 64 64 45 17 2 1 0 0 270 25 21

12 PM 0 0 1 1 13 31 46 58 28 21 3 3 1 0 206 26 2213:00 0 0 1 8 28 44 45 42 21 6 2 0 0 0 197 24 2014:00 0 0 3 12 36 50 69 54 15 6 0 0 0 0 245 23 1915:00 0 0 2 6 29 49 52 37 31 3 0 0 0 0 209 24 2016:00 0 1 3 9 27 57 61 26 14 1 1 0 0 0 200 22 1917:00 0 0 1 4 15 24 46 24 12 2 1 0 0 0 129 23 2018:00 0 0 1 5 31 40 52 23 7 0 1 0 0 0 160 21 1819:00 0 1 3 6 14 19 26 22 11 1 0 0 0 0 103 23 1920:00 0 0 0 1 5 19 25 15 3 1 0 0 0 0 69 22 2021:00 0 0 1 7 24 38 25 14 5 2 1 0 0 0 117 21 1822:00 0 0 0 2 9 5 9 10 2 0 0 0 0 0 37 22 1923:00 0 0 0 0 7 11 4 7 7 1 0 0 0 0 37 24 20Total 0 4 29 92 378 578 711 545 264 72 15 4 1 0 2693

% 0.0% 0.1% 1.1% 3.4% 14.0% 21.5% 26.4% 20.2% 9.8% 2.7% 0.6% 0.1% 0.0% 0.0% AM

Peak 01:00 03:00 09:00 09:00 09:00 09:00 08:00 08:00 08:00 02:00 09:00

Vol. 1 3 8 30 42 52 38 19 4 1 183 Midda

y Peak 14:00 14:00 14:00 14:00 14:00 11:00 11:00 12:00 12:00 12:00 12:00 11:00

Vol. 3 12 36 50 69 64 45 21 3 3 1 270 PM

Peak 16:00 16:00 16:00 18:00 16:00 16:00 15:00 15:00 15:00 16:00 15:00

Vol. 1 3 9 31 57 61 37 31 3 1 209 %iles 15th Percentile : 14 MPH

50th Percentile : 19 MPH85th Percentile : 23 MPH95th Percentile : 26 MPH

Stats 10 MPH Pace Speed : 15-24 MPHNumber in Pace : 1929Percent in Pace : 71.6%

Number of Vehicles > 20 MPH : 1138Percent of Vehicles > 20 MPH : 42.3%

Mean Speed(Average) : 20 MPH

PRECISIOND A T AINDUSTRIES, LLC

P.O. Box 301 Berlin, MA 01503Office: 508.481.3999 Fax: 508.545.1234

Email: [email protected]

Page 3

Theophilis F. Smith Roadeast of East-West Dennis Road (Route 134)City, State: Dennis, MAClient: VHB/ M. Kealey

122804 B speedSite Code: 11822

EBStart 1 4 7 10 13 16 19 22 25 28 31 34 37 40 85th AVETime 3 6 9 12 15 18 21 24 27 30 33 36 39 999 Total % ile MPH02/10/

12 0 0 0 0 0 1 2 3 8 2 0 0 0 0 16 27 2501:00 0 0 0 0 0 2 2 1 3 0 0 0 0 0 8 25 2202:00 0 0 0 0 0 1 2 1 1 0 0 0 0 0 5 24 2103:00 0 0 0 0 0 1 0 2 1 2 0 0 0 0 6 28 2504:00 0 0 0 0 0 1 1 8 2 0 0 0 0 0 12 24 2305:00 0 0 0 0 1 3 5 10 16 4 3 1 0 0 43 28 2506:00 0 0 0 1 1 7 22 38 30 12 1 0 0 0 112 26 2307:00 0 0 4 0 6 23 59 74 48 11 0 1 0 0 226 25 2208:00 0 0 2 4 14 21 52 68 32 16 3 1 0 0 213 25 2209:00 0 1 3 6 4 36 77 68 56 5 4 2 0 0 262 25 2210:00 0 0 2 3 12 29 60 92 49 12 0 0 0 0 259 25 2211:00 0 0 1 5 9 26 84 88 44 10 2 0 0 0 269 25 22

12 PM 0 0 2 7 14 45 86 86 51 10 1 0 0 0 302 25 2113:00 0 0 5 3 21 43 97 61 42 10 1 2 0 0 285 24 2114:00 0 0 3 11 21 44 115 81 56 8 2 1 0 0 342 24 2115:00 0 1 4 1 7 45 90 98 52 13 3 0 0 0 314 25 2216:00 0 0 2 5 18 34 83 77 22 7 0 0 0 0 248 23 2117:00 0 0 0 1 11 23 58 65 23 10 0 0 0 0 191 24 2118:00 0 1 0 0 12 32 63 51 35 4 3 0 0 0 201 25 2119:00 0 0 0 1 1 24 47 32 23 4 0 0 0 0 132 24 2120:00 0 0 0 0 1 9 24 29 18 12 1 1 0 0 95 27 2321:00 0 0 0 0 0 9 18 22 25 3 1 0 0 0 78 26 2322:00 0 0 0 0 0 0 6 12 12 5 0 0 0 0 35 27 2423:00 0 0 0 0 0 0 7 7 5 3 1 0 0 0 23 27 24Total 0 3 28 48 153 459 1060 1074 654 163 26 9 0 0 3677

% 0.0% 0.1% 0.8% 1.3% 4.2% 12.5% 28.8% 29.2% 17.8% 4.4% 0.7% 0.2% 0.0% 0.0% AM

Peak 09:00 07:00 09:00 08:00 09:00 09:00 07:00 09:00 08:00 09:00 09:00 09:00

Vol. 1 4 6 14 36 77 74 56 16 4 2 262 Midda

y Peak 13:00 14:00 13:00 12:00 14:00 11:00 14:00 11:00 11:00 13:00 14:00

Vol. 5 11 21 45 115 88 56 10 2 2 342 PM

Peak 15:00 15:00 16:00 16:00 15:00 15:00 15:00 15:00 15:00 15:00 20:00 15:00

Vol. 1 4 5 18 45 90 98 52 13 3 1 314 %iles 15th Percentile : 17 MPH

50th Percentile : 21 MPH85th Percentile : 25 MPH95th Percentile : 27 MPH

Stats 10 MPH Pace Speed : 18-27 MPHNumber in Pace : 2886Percent in Pace : 78.5%

Number of Vehicles > 20 MPH : 2279Percent of Vehicles > 20 MPH : 62.0%

Mean Speed(Average) : 22 MPH

PRECISIOND A T AINDUSTRIES, LLC

P.O. Box 301 Berlin, MA 01503Office: 508.481.3999 Fax: 508.545.1234

Email: [email protected]

Page 4

Theophilis F. Smith Roadeast of East-West Dennis Road (Route 134)City, State: Dennis, MAClient: VHB/ M. Kealey

122804 B speedSite Code: 11822

EBStart 1 4 7 10 13 16 19 22 25 28 31 34 37 40 85th AVETime 3 6 9 12 15 18 21 24 27 30 33 36 39 999 Total % ile MPH02/11/

12 0 0 0 0 0 1 1 6 5 1 1 0 0 0 15 27 2401:00 0 0 0 0 0 0 2 4 3 2 0 0 0 0 11 27 2402:00 0 0 0 0 0 1 2 1 1 0 0 0 0 0 5 24 2103:00 0 0 0 0 1 0 1 1 2 0 0 0 0 0 5 25 2204:00 0 0 0 0 0 0 2 1 1 2 0 0 0 0 6 28 2505:00 0 0 0 0 0 1 3 5 1 1 0 0 0 0 11 25 2206:00 0 0 0 0 0 4 7 17 5 4 1 0 0 0 38 26 2307:00 0 0 0 1 3 5 30 46 23 5 2 0 0 0 115 25 2308:00 0 0 0 1 1 10 43 65 36 7 0 0 0 0 163 25 2309:00 0 0 1 2 9 21 64 62 31 11 0 0 0 0 201 25 2210:00 0 0 2 1 7 20 74 79 45 13 1 1 0 0 243 25 2211:00 0 0 1 3 2 20 52 91 46 27 9 8 0 0 259 27 24

12 PM 0 0 0 1 2 5 19 39 67 49 35 15 2 0 234 31 2713:00 0 0 0 2 4 23 45 62 41 19 2 0 0 0 198 26 2314:00 0 0 0 1 7 34 89 55 31 11 0 0 0 0 228 24 2115:00 0 0 0 0 1 12 40 58 46 15 3 1 0 0 176 26 2316:00 0 0 0 4 6 29 54 53 32 8 2 0 0 0 188 25 2217:00 0 0 0 0 1 16 31 26 15 2 3 0 0 0 94 25 2218:00 0 0 0 0 4 17 43 41 13 7 0 0 0 0 125 24 2219:00 0 0 0 0 1 16 28 31 16 1 0 2 0 0 95 24 2220:00 0 0 0 0 1 5 16 18 5 5 3 0 0 0 53 26 2321:00 0 0 0 0 0 5 20 18 9 7 1 0 0 0 60 26 2322:00 0 0 0 1 0 2 11 10 11 9 0 0 0 0 44 27 2423:00 0 0 0 0 0 1 3 8 3 8 0 0 0 0 23 28 25Total 0 0 4 17 50 248 680 797 488 214 63 27 2 0 2590

% 0.0% 0.0% 0.2% 0.7% 1.9% 9.6% 26.3% 30.8% 18.8% 8.3% 2.4% 1.0% 0.1% 0.0% AM

Peak 09:00 09:00 09:00 09:00 09:00 08:00 08:00 09:00 07:00 09:00

Vol. 1 2 9 21 64 65 36 11 2 201 Midda

y Peak 11:00 11:00 14:00 14:00 14:00 11:00 12:00 12:00 12:00 12:00 12:00 11:00

Vol. 1 3 7 34 89 91 67 49 35 15 2 259 PM

Peak 16:00 16:00 16:00 16:00 15:00 15:00 15:00 15:00 19:00 16:00

Vol. 4 6 29 54 58 46 15 3 2 188 %iles 15th Percentile : 18 MPH

50th Percentile : 22 MPH85th Percentile : 26 MPH95th Percentile : 29 MPH

Stats 10 MPH Pace Speed : 18-27 MPHNumber in Pace : 2018Percent in Pace : 77.9%

Number of Vehicles > 20 MPH : 1817Percent of Vehicles > 20 MPH : 70.2%

Mean Speed(Average) : 23 MPH

PRECISIOND A T AINDUSTRIES, LLC

P.O. Box 301 Berlin, MA 01503Office: 508.481.3999 Fax: 508.545.1234

Email: [email protected]

\\mawald\ld\11822.00\docs\memos\Response to CCC Memo on Bayside Appendix\TrafAppendix.docx Appendix

Figure 1: Route 6 Eastbound Off-Ramp Improvements

Vanasse Hangen Brustlin, Inc.

\\mawald\ld\11822.00\graphics\FIGURES\Route132-rev1.dwg

Proposed Roadway ImprovementsRoute 134 at Route 6Proposed Lowe's Home Improvement CenterDennis, Massachusetts

Figure 1