TRIDYNE PROJECTS C O R P O R A T I O N Selected Projects: Engineering, Procurement & Construction Management for the Energy Industry Whether Tridyne can fill your Midstream Project requirements, whether that means large or small diameter Pipelines. Tridyne’s demonstrated ability to successfully complete pipeline projects means we can meet your sizing, design, scheduling and construction management needs. Tridyne can also provide integration of your pipeline transmission requirements from compression, tie-ins to existing infrastructure to development of full scale facilities. Choosing Tridyne for you next green field midstream system, system upgrade or de-bottlenecking project will have you working with dedicated individuals striving to deliver an on-time and on-budget experience that satisfies your project’s goals and expectations. Hot Bitumen Import Project This project included the installation of pump- ing and blending facilities at the initiation station, 5 km of 12” pipeline and a measure- ment and pressure letdown station at the receiving terminal. Basal Water Aquifer Project This project included the depressurization of the south pit area including 5 depressurization wells, interconnecting pipeline and 10 re-injection wells. Transfer, Recovery and Disposal Plant The project included the green field design and construction of a new plant that included site/ civil development, truck unloading and meter- ing of heavy oil, condensate and water, value added solid and liquid waste processing, storage and automated blendng of heavy oil, butane and condensate for sales oil. This project was completed using a modular approach to the entire plant. Two pipelines were installed to complete tie-ins to an existing oil pipeline with custody transfer sampling and an existing disposal well. Transfer, Recovery and Disposal Plant Another project that included the green field design and construction of a new plant that included site/civil development, truck unload- ing and metering, value added solid and liquid waste processing, storage and automated blending of heavy oil, butane and condensate for sales oil, along with tie-ins to an existing oil pipeline with custody transfer sampling and an existing disposal well. Project scheduling was developed to align with the shut down and decommissioning of an existing facility. Project: Scope: Project: Scope: Project: Scope: Project: Scope: MIDSTREAM SYSTEMS (continued over)

Upload: others

Post on 09-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TRIDYNE PROJECTS Engineering, Procurement & Construction ... · Hot Bitumen Import Project This project included the installation of pump-ing and blending facilities at the initiation

TRIDYNE PROJECTSC O R P O R A T I O N

Selected Projects:

Engineering, Procurement & Construction Managementfor the Energy Industry

Whether Tridyne can fill your Midstream Project requirements, whether that means large or small diameter Pipelines. Tridyne’s demonstrated ability to successfully complete pipeline projects means we can meet your sizing, design, scheduling and construction management needs. Tridyne can also provide integration of your pipeline transmission requirements from compression, tie-ins to existing infrastructure to development of full scale facilities.

Choosing Tridyne for you next green field midstream system, system upgrade or de-bottlenecking project will have you working with dedicated individuals striving to deliver an on-time and on-budget experience that satisfies your project’s goals and expectations.

Hot Bitumen Import Project This project included the installation of pump-ing and blending facilities at the initiation station, 5 km of 12” pipeline and a measure-ment and pressure letdown station at the receiving terminal.

Basal Water Aquifer Project This project included the depressurization of the south pit area including 5 depressurization wells, interconnecting pipeline and 10 re-injection wells.

Transfer, Recovery and Disposal Plant The project included the green field design and construction of a new plant that included site/ civil development, truck unloading and meter-ing of heavy oil, condensate and water, value added solid and liquid waste processing, storage and automated blendng of heavy oil,

butane and condensate for sales oil. This project was completed using a modular approach to the entire plant. Two pipelines were installed to complete tie-ins to an existing oil pipeline with custody transfer sampling and an existing disposal well.

Transfer, Recovery and Disposal PlantAnother project that included the green field design and construction of a new plant that included site/civil development, truck unload-ing and metering, value added solid and liquid waste processing, storage and automated blending of heavy oil, butane and condensate for sales oil, along with tie-ins to an existing oil pipeline with custody transfer sampling and an existing disposal well. Project scheduling was developed to align with the shut down and decommissioning of an existing facility.

Project:Scope:

Project:Scope:

Project:Scope:

Project:Scope:

MIDSTREAM SYSTEMS

(continued over)

Page 2: TRIDYNE PROJECTS Engineering, Procurement & Construction ... · Hot Bitumen Import Project This project included the installation of pump-ing and blending facilities at the initiation

Tridyne uses familiar industry standard modeling programs to ensure your Midstream project is optimized for cost, design criteria and future expansion. We also have an extensive library of pump and compressor station designs to establish a prompt turnaround on construction drawing packages.

c Tridyne Projects Corporation 2009. Contact: Dave Kondics, President: (403) 206-9350 • [email protected]

The shipping of products in the industry demands attention to product identification and measurement accuracy. This can be applied to our everyday lives by ensuring we follow all rules and guidelines for the transportation of dangerous goods and properly secure all loads and tanks. A small propane tank used for BBQ’s may rupture violently if mishandled, becoming a dangerous projectile; if a neck of a pressurized cylinder should be accidentally broken off, the energy released would be sufficient to propel the cylinder to over three-quarters of a mile in height.

Selected Projects (continued):

Tools:

• Pipeline systems for the integration of remote SAGD wellpads to the central processing facility

• FEED Study for a 1200 km large diameter pipeline.

• Numerous pipeline support projects ranging from caustic injection systems to LACT and line balance projects.

• The co-ordination of 37 tie-in projects to a single pipeline project

• Several truck and rail loading and unloading stations.

• Various pump and compressor station upgrades and modification projects.

Tridyne Safety Tip: