Building Submission and Occupation Permit Procedure
Production drawings and specification
-
7/30/2019 Tris Kee Arch4003 Ppi
3/107
BO objectives = Provide for theplanning, design and construction of buildings and associated works;to make provision for the rendering safe of dangerous buildings and land;
to make provision for regular inspections of buildings and the associatedrepairs to prevent the buildings from becoming unsafe; andto make provision for matters connected therewith.
-
7/30/2019 Tris Kee Arch4003 Ppi
4/107
-
7/30/2019 Tris Kee Arch4003 Ppi
5/107
What happened in the 1940s and 1950s?
-
7/30/2019 Tris Kee Arch4003 Ppi
6/107
The fire reflected the urgent need for aconsolidated ordinance for regulatingbuilding development
-
7/30/2019 Tris Kee Arch4003 Ppi
7/107
Some early public housing in HK
Mark II Residential Block since 1950s
Mark II residential blocks resemble thecharacter
Wang Tau HomEstate, Wong Tai Sin
-
7/30/2019 Tris Kee Arch4003 Ppi
8/107
register() means a register maintained under this Ordinance and includes a sub-register;
registered architect () means a person whose name is on the register of registered architects establishedand maintained under section 8 of the Architects Registration Ordinance
registered general building contractor() means a person whose name is for the time being onthe register of general building contractors;
registered geotechnical engineer() means a person whose name is for the time being on thegeotechnical engineers' register
registered inspector() means a person whose name is for the time being on the inspectors' register
registered minor works contractor() means a person whose name is for the time being on theregister or provisional register of minor works contractors
registered professional engineer() means a person whose name is on the register of registeredprofessional engineers established and maintained under section 7 of the Engineers Registration Ordinance
registered professional surveyor() means a person whose name is on the register of registeredprofessional surveyors established and maintained under section 7 of the Surveyors Registration Ordinance
registered specialist contractor() means a person whose name is for the time being on the register
of specialist contractors
registered structural engineer() means a person whose name is for the time being on the structuralengineers' register
Under Building Ordinance
-
7/30/2019 Tris Kee Arch4003 Ppi
9/107
Registration Committee ()
meansAuthorized Persons Registration Committee,a Structural Engineers Registration Committee,a Geotechnical Engineers Registration Committee,an Inspectors Registration Committee or a Contractors
Registration Committee, as the case requires;
-
7/30/2019 Tris Kee Arch4003 Ppi
10/107
An Authorized Persons Registration Committee consists of(a) 4 authorized persons nominated by the Architects Registration Board from the list ofarchitects in theauthorized persons' register;(b) 2 authorized persons nominated by the Engineers Registration Board from the list ofengineers in theauthorized persons' register;(c) 1 authorized person nominated by the Surveyors Registration Board from the list ofsurveyors in theauthorized persons' register;
(d) an Assistant Director of Buildings nominated by the Building Authority; and(e) 1 person selected by the Building Authority from among the persons nominated inaccordance withsubsection (5E).
-
7/30/2019 Tris Kee Arch4003 Ppi
11/107
Appointment and duties of authorized person, registered
structural engineer or registered geotechnical engineer
Subject to subsection (1A), every person for whom building works or streetworks are to be carried out shall appoint
(a) an authorized person as the co-ordinator of such building works or streetworks;(b) a registered structural engineer for the structural elements of suchbuilding works or street works if so
required under this Ordinance;(c) a registered geotechnical engineer for the geotechnical elements of suchbuilding works or street works
-
7/30/2019 Tris Kee Arch4003 Ppi
12/107
Approval and consent required for commencement of
building works
no person shall commence or carry out any building works or street works
withouthaving first obtained from the Building Authority(a) his approval in writing of documents submitted to him in accordancewith the regulations; and(b) his consent in writing for the commencement of the building works or
street works shown in the approvedplan.
Approval and consent process
No retrospective approval!
UBW
-
7/30/2019 Tris Kee Arch4003 Ppi
13/107
neither the approval of any plans nor the consent to the commencement of anybuilding works or street works shall be deemed
(a) to confer any title to land;(b) to act as a waiver of any term in any lease or licence; or(c) to grant any exemption from or to permit any contravention of any of theprovisions of this Ordinance or of any other enactment.
-
7/30/2019 Tris Kee Arch4003 Ppi
14/107
Building Authority not deemed to consent if supervision
plan not lodged
The Building Authority is not deemed to have consented, if the authorizedperson has NO supervision plan for the building works or street works.
-
7/30/2019 Tris Kee Arch4003 Ppi
15/107
Grounds on which approval or consent may be refused
Clause 16
Not as prescribed by regulationNot approved by FSDNot specified form
Not approved by TPBNo feeWrong documentsDd an H not compatible with neighborBuilding work dangerous
Further particular not sufficient etc etc.
-
7/30/2019 Tris Kee Arch4003 Ppi
16/107
Occupation of new building
On receiving an application in the
appropriate specified form,
the Building Authority may issue
(a) an occupation permit in respect of the
new building which is the subject of suchapplication; or(b) a temporary occupation permit inrespect of the whole or any part of a newbuilding which is completed and
which is the subject of the application.
-
7/30/2019 Tris Kee Arch4003 Ppi
17/107
-
7/30/2019 Tris Kee Arch4003 Ppi
18/107
On the issue of a temporary occupation permit:
The Building Authority may impose such conditions as he may considernecessary including a condition limiting the duration of the temporary
occupation permit to such period as he may consider necessary andmay revoke a temporary occupation permit for breach of any suchconditionby the service on the building owner of notice of revocation in writing.
-
7/30/2019 Tris Kee Arch4003 Ppi
19/107
The Building Authority may refuse OP:
section where(a) any part of the building works has been carried out in contravention of BO(b) street or any access road, on to which the building abuts or fronts or by which access isobtained, remain to be completed;(c) a lift has not yet been installed therein, unless theliftway has been protected to the satisfaction of the Building Authority in such manner as to
avoid any danger to persons using the building;(d) X Director of Fire Services in the terms fire service installations and equipment(e) in the case of a building to which by regulations a supply of water is required to beconnected
-
7/30/2019 Tris Kee Arch4003 Ppi
20/107
BD
Upon the expiration of14 days from the date of receipt bythe Building Authority of an application in theappropriate specified form, for a temporary occupationpermit or for an occupation permit, such permit shall be
deemed to have been granted unless the Building Authorityhas by notice in writing served on the buildingowner refused to issue such permit, specifying the groundfor such refusal.
Q? What will BD inspector check?
-
7/30/2019 Tris Kee Arch4003 Ppi
21/107
Check GFA,Check lighting and ventilation requirementsCheck FSICheck MOE, width of door, fire alarmCheck refuge floorCheck MOA, Fire Rescue StairwayCheck FRP, 4 hour rated walls , fire shutter, fire damper, fire sealCheck GFA concession
GFA
-
7/30/2019 Tris Kee Arch4003 Ppi
22/107
Building Plan / Production Drawings
Learning objectives
1. How to read a Buildings Plan, Elevation, Section2. How to communicate though drawings
3. Reflected Ceiling Plan4. Legend5. Scale6. Title block7. Grid
-
7/30/2019 Tris Kee Arch4003 Ppi
23/107
Building Plan
Purpose of Building Drawings
Purpose of drawings ?
1. Communication
2. BD, FSD Submission
3. Contractor
4. Construction
5. Building Management
6. Future A&A works
7. Lease
8. Salable areas
-
7/30/2019 Tris Kee Arch4003 Ppi
24/107
Building Plan
Means of Communication!!
1. Clarity
2. Accuracy
3. Dimensions / size
4. Indication of materials
5. Specifications
-
7/30/2019 Tris Kee Arch4003 Ppi
25/107
-
7/30/2019 Tris Kee Arch4003 Ppi
26/107
-
7/30/2019 Tris Kee Arch4003 Ppi
27/107
How to translate the designconcept to working drawingswhere the physicality of aproject is communicated
-
7/30/2019 Tris Kee Arch4003 Ppi
28/107
-
7/30/2019 Tris Kee Arch4003 Ppi
29/107
Building Plan
Purpose of Building Drawings
1. Contract documentation
2. Tender purpose
3. Construction purpose
4. Communication between
Client, Architect,Contractor andSuppliers
-
7/30/2019 Tris Kee Arch4003 Ppi
30/107
-
7/30/2019 Tris Kee Arch4003 Ppi
31/107
-
7/30/2019 Tris Kee Arch4003 Ppi
32/107
-
7/30/2019 Tris Kee Arch4003 Ppi
33/107
-
7/30/2019 Tris Kee Arch4003 Ppi
34/107
-
7/30/2019 Tris Kee Arch4003 Ppi
35/107
-
7/30/2019 Tris Kee Arch4003 Ppi
36/107
-
7/30/2019 Tris Kee Arch4003 Ppi
37/107
-
7/30/2019 Tris Kee Arch4003 Ppi
38/107
-
7/30/2019 Tris Kee Arch4003 Ppi
39/107
-
7/30/2019 Tris Kee Arch4003 Ppi
40/107
-
7/30/2019 Tris Kee Arch4003 Ppi
41/107
-
7/30/2019 Tris Kee Arch4003 Ppi
42/107
-
7/30/2019 Tris Kee Arch4003 Ppi
43/107
-
7/30/2019 Tris Kee Arch4003 Ppi
44/107
Other information
Legend
-
7/30/2019 Tris Kee Arch4003 Ppi
45/107
Elevation
-
7/30/2019 Tris Kee Arch4003 Ppi
46/107
-
7/30/2019 Tris Kee Arch4003 Ppi
47/107
Reflected Ceiling Plan
-
7/30/2019 Tris Kee Arch4003 Ppi
48/107
Reflected Ceiling Plan
-
7/30/2019 Tris Kee Arch4003 Ppi
49/107
-
7/30/2019 Tris Kee Arch4003 Ppi
50/107
-
7/30/2019 Tris Kee Arch4003 Ppi
51/107
-
7/30/2019 Tris Kee Arch4003 Ppi
52/107
-
7/30/2019 Tris Kee Arch4003 Ppi
53/107
-
7/30/2019 Tris Kee Arch4003 Ppi
54/107
Homework pls submit on Moodle
-
7/30/2019 Tris Kee Arch4003 Ppi
55/107
Pls form a group of 3 students
Identify an approved building plans from existing housing developments in HK.
Go to the Buildings Department / internet / site to search for critical elements tocomplete the buildings plan.
Scale, critical dimensions, grid, size, orientation, width, block plan etc.
Pls go to web site to select one building blocks you prefer to work with:
http://www.housingauthority.gov.hk/common/pdf/global-elements/estate-locator/standard-block-typical-floor-plans/11-SingleI.pdf
-
7/30/2019 Tris Kee Arch4003 Ppi
56/107
Building Plans
Due date : Dec 6, 2012Pls submit work directly on moodle
Please form a group of 2-3 studentsBased on the web site below, identify one housing type and produce
a Typical Floor Building Plan in AutoCad.A typical building plan should include key dimensions, scale, grid,unit size, orientation, width, areas of key units etc.Other than the Housing Authority web page, you are encouraged tosearch drawings from the Buildings Department, or visit the sites by
yourselves.Please submit 1 typical floor plan of any existing housing blocks andupload a J PEG (min 300 dpi) to moodle.
http://www.housingauthority.gov.hk/en/global-elements/estate-
locator/standard-block-typical-floor-plans/index.html
-
7/30/2019 Tris Kee Arch4003 Ppi
57/107
-
7/30/2019 Tris Kee Arch4003 Ppi
58/107
-
7/30/2019 Tris Kee Arch4003 Ppi
59/107
-
7/30/2019 Tris Kee Arch4003 Ppi
60/107
-
7/30/2019 Tris Kee Arch4003 Ppi
61/107
-
7/30/2019 Tris Kee Arch4003 Ppi
62/107
-
7/30/2019 Tris Kee Arch4003 Ppi
63/107
-
7/30/2019 Tris Kee Arch4003 Ppi
64/107
-
7/30/2019 Tris Kee Arch4003 Ppi
65/107
-
7/30/2019 Tris Kee Arch4003 Ppi
66/107
-
7/30/2019 Tris Kee Arch4003 Ppi
67/107
-
7/30/2019 Tris Kee Arch4003 Ppi
68/107
-
7/30/2019 Tris Kee Arch4003 Ppi
69/107
-
7/30/2019 Tris Kee Arch4003 Ppi
70/107
-
7/30/2019 Tris Kee Arch4003 Ppi
71/107
-
7/30/2019 Tris Kee Arch4003 Ppi
72/107
-
7/30/2019 Tris Kee Arch4003 Ppi
73/107
-
7/30/2019 Tris Kee Arch4003 Ppi
74/107
-
7/30/2019 Tris Kee Arch4003 Ppi
75/107
-
7/30/2019 Tris Kee Arch4003 Ppi
76/107
-
7/30/2019 Tris Kee Arch4003 Ppi
77/107
-
7/30/2019 Tris Kee Arch4003 Ppi
78/107
-
7/30/2019 Tris Kee Arch4003 Ppi
79/107
-
7/30/2019 Tris Kee Arch4003 Ppi
80/107
-
7/30/2019 Tris Kee Arch4003 Ppi
81/107
-
7/30/2019 Tris Kee Arch4003 Ppi
82/107
-
7/30/2019 Tris Kee Arch4003 Ppi
83/107
-
7/30/2019 Tris Kee Arch4003 Ppi
84/107
-
7/30/2019 Tris Kee Arch4003 Ppi
85/107
-
7/30/2019 Tris Kee Arch4003 Ppi
86/107
-
7/30/2019 Tris Kee Arch4003 Ppi
87/107
-
7/30/2019 Tris Kee Arch4003 Ppi
88/107
-
7/30/2019 Tris Kee Arch4003 Ppi
89/107
-
7/30/2019 Tris Kee Arch4003 Ppi
90/107
-
7/30/2019 Tris Kee Arch4003 Ppi
91/107
-
7/30/2019 Tris Kee Arch4003 Ppi
92/107
-
7/30/2019 Tris Kee Arch4003 Ppi
93/107
-
7/30/2019 Tris Kee Arch4003 Ppi
94/107
-
7/30/2019 Tris Kee Arch4003 Ppi
95/107
-
7/30/2019 Tris Kee Arch4003 Ppi
96/107
-
7/30/2019 Tris Kee Arch4003 Ppi
97/107
-
7/30/2019 Tris Kee Arch4003 Ppi
98/107
-
7/30/2019 Tris Kee Arch4003 Ppi
99/107
-
7/30/2019 Tris Kee Arch4003 Ppi
100/107
-
7/30/2019 Tris Kee Arch4003 Ppi
101/107
-
7/30/2019 Tris Kee Arch4003 Ppi
102/107
-
7/30/2019 Tris Kee Arch4003 Ppi
103/107
-
7/30/2019 Tris Kee Arch4003 Ppi
104/107
-
7/30/2019 Tris Kee Arch4003 Ppi
105/107
-
7/30/2019 Tris Kee Arch4003 Ppi
106/107
-
7/30/2019 Tris Kee Arch4003 Ppi
107/107