Presentation to the Presentation to the ACChamber of Commerce ACChamber of Commerce July 15, 2010 Tropicana Hotel & Resort, AtlanticCity, NJ

Upload: others

Post on 23-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TropicanaHotel & Resort, Atlantic City, NJbloximages.chicago2.vip.townnews.com/pressofatlanticcity.com/con… · TropicanaHotel & Resort, Atlantic City, NJ. Why the AC Regional Transportation

Presentation to thePresentation to theAC Chamber of CommerceAC Chamber of Commerce

July 15, 2010Tropicana Hotel & Resort, Atlantic City, NJ

Page 2: TropicanaHotel & Resort, Atlantic City, NJbloximages.chicago2.vip.townnews.com/pressofatlanticcity.com/con… · TropicanaHotel & Resort, Atlantic City, NJ. Why the AC Regional Transportation

Why the AC Regional Transportation PlanWhy the AC Regional Transportation Plan

•A comprehensive and forward-thinkingtransportation program for the South JerseyRegion.

•A roadmap for addressing existing needswhile preserving alternatives of future growthand environmental stability.

•Support for the travel and tourism industry inAtlantic City and other South Jersey shoredestinations.

Atlantic City Regional Transportation Plan –Update to the AC Chamber of Commerce

Page 3: TropicanaHotel & Resort, Atlantic City, NJbloximages.chicago2.vip.townnews.com/pressofatlanticcity.com/con… · TropicanaHotel & Resort, Atlantic City, NJ. Why the AC Regional Transportation

Major Plans Announced for Growth andExpansion by the Casino Industry

Pro-active Public Sector

A Need for Transportation Improvements inthe Region Based on Existing Conditions

Planning and Design Time Needed toComplete Infrastructure Improvements

Initial CatalystsInitial Catalysts thatthat Guided the ACRTPGuided the ACRTP

Atlantic City Regional Transportation Plan –Update to the AC Chamber of Commerce

Page 4: TropicanaHotel & Resort, Atlantic City, NJbloximages.chicago2.vip.townnews.com/pressofatlanticcity.com/con… · TropicanaHotel & Resort, Atlantic City, NJ. Why the AC Regional Transportation

FiveFive key guiding principleskey guiding principles of the ACRTPof the ACRTP

Provide improvements only when and where needed

Use transportation to support the regional economywith emphasis on Atlantic City

Incorporate smart growth land use principles

Employ innovative financing techniquesto ensure timely implementation

Evolve and modify as needed to reflect changingconditions and local, regional and state needs.

Atlantic City Regional Transportation Plan –Update to the AC Chamber of Commerce

Page 5: TropicanaHotel & Resort, Atlantic City, NJbloximages.chicago2.vip.townnews.com/pressofatlanticcity.com/con… · TropicanaHotel & Resort, Atlantic City, NJ. Why the AC Regional Transportation

Original ACRTP Implementation PlanOriginal ACRTP Implementation PlanEarly Initiatives Phase I Phase II Phase III

1. Mississippi Ave. Improvements

2. Mississippi Ave. Parking Garage

3. Connecticut Avenue Improvements

4. Pacific-Atlantic Avenue One-WayPair Corridor

5. Pacific-Atlantic Ave. SignalImprovements

6. Signal Improvements for Rest of AC

7. Local Transit Rationalization

8. ACBC Signage Improvements

9. Regional Traffic Operations Center

10.WB ACE Widening

11.New ACRL Airport Station

12.Direct Connection between ACE-ACY

13.ACY Airport ExpansionImprovements

14.Linking Land-Use/Worker Housingto Transportation

15.Interagency Implementation Team

16.City Traffic Engineering Staff

1. ACE-GSP InterchangeImprovement

2. GSP Exit 44 Full Interchange

3. Absecon Blvd. ElevatedRoadway Section

4. Albany Avenue CorridorImprovements

5. Corridor Pedestrian Crossing

6. Bikeway on the Boardwalk

1. Enhanced ACRL Service

2. Atlantic City Transit Hub

3. Enhanced Bus Service (GSP,ACE)

4. BRT on Newfield Branch

5. Pleasantville GatewayTransportation Center

6. Regional IntersectionUpgrades

7. GSP Widening

8. Expanded/New Interchangesfor GSP

1. Regional MultimodalTransportation Center

2. Regional MultimodalTransportation CenterAccess Improvements

3. Fixed Guideway Systembetween ACY and AtlanticCity

4. Pacific-Atlantic TransitEnhanced One-wayCorridor

5. Water Taxi Service

6. Citywide Greenways

Atlantic City Regional Transportation Plan –Update to the AC Chamber of Commerce

Page 6: TropicanaHotel & Resort, Atlantic City, NJbloximages.chicago2.vip.townnews.com/pressofatlanticcity.com/con… · TropicanaHotel & Resort, Atlantic City, NJ. Why the AC Regional Transportation

Current State of PlayCurrent State of Play --Changing ConditionsChanging Conditions

Gaming competition from Pennsylvania & Delawareand the economicrecession

Financial market crisis

Traditional sources of transportation funding have dried up

ACY’s strategic importance to the regioncontinues to expand

Atlantic City Regional Transportation Plan –Update to the AC Chamber of Commerce

Page 7: TropicanaHotel & Resort, Atlantic City, NJbloximages.chicago2.vip.townnews.com/pressofatlanticcity.com/con… · TropicanaHotel & Resort, Atlantic City, NJ. Why the AC Regional Transportation

Changing Catalysts HaveChanging Catalysts Have InfluencedInfluenced NearNear--TermTermACRTP Implementation by Emphasizing Projects that:ACRTP Implementation by Emphasizing Projects that:

New Initiatives

•Addressexisting regional transportation needs•Focus on anticipated growth of the ACY and Next GenResearch Park as well as the casino and seasonaltourism industries

•Create near-term employment opportunities•Enhance visitor and resident perception of the region•Stimulate the region’s economic growth

Atlantic City Regional Transportation Plan –Update to the AC Chamber of Commerce

Page 8: TropicanaHotel & Resort, Atlantic City, NJbloximages.chicago2.vip.townnews.com/pressofatlanticcity.com/con… · TropicanaHotel & Resort, Atlantic City, NJ. Why the AC Regional Transportation

ACRTPACRTP ProjectsProjects Currently In the Construction PhaseCurrently In the Construction Phase

Changed Focus/Scope

New Initiatives

Atlantic City Regional Transportation Plan –Update to the AC Chamber of Commerce

Page 9: TropicanaHotel & Resort, Atlantic City, NJbloximages.chicago2.vip.townnews.com/pressofatlanticcity.com/con… · TropicanaHotel & Resort, Atlantic City, NJ. Why the AC Regional Transportation

Mississippi Avenue TwoMississippi Avenue Two--Way ConversionWay Conversion

Strategy : Provide for two-way operationof Mississippi Ave. from Pacific Ave. toFairmount Ave.

Benefits:• Better access to and from the Atlantic CityBrigantine Connector , the ACE andBoardwalk Hall, especially during specialevents

•Easier local and visitor circulation from thedowntown to the marina area;

Project Status•Final Design and right of way acquisitioncomplete

•Project Demolition currently underway

•SJTA awarded the contract in April withwork expected to begin in late August 2010.of 2010.

Atlantic City Regional Transportation Plan –Update to the AC Chamber of Commerce

Page 10: TropicanaHotel & Resort, Atlantic City, NJbloximages.chicago2.vip.townnews.com/pressofatlanticcity.com/con… · TropicanaHotel & Resort, Atlantic City, NJ. Why the AC Regional Transportation

Mississippi Avenue GarageMississippi Avenue Garage

Strategy: : Construct a solar powered 1,200 parking garage in the AC Downtown near theWalk Retail Stores, the Convention Center and Boardwalk Casinos.

Benefits• Provides needed parking supply for large events and for shoppers at the Walk retail stores;•Will create 250 construction jobs in 2010 and 2011•Will provide electric power hook-ups for alternative energy vehicles

Project Status•Final Design Complete•Construction contract awarded pending legal review•Construction completion 14 months from contract award

Atlantic City Regional Transportation Plan –Update to the AC Chamber of Commerce

Page 11: TropicanaHotel & Resort, Atlantic City, NJbloximages.chicago2.vip.townnews.com/pressofatlanticcity.com/con… · TropicanaHotel & Resort, Atlantic City, NJ. Why the AC Regional Transportation

South Inlet Transportation ImprovementsSouth Inlet Transportation Improvements

Strategy : Provide for two-way enhancedoperation of Melrose and Connecticut Aves.

Benefits:• Better access to and from the South Inlet

area of the City;

• Additional roadway capacity to handlethe increased traffic in the area from theRevel Hotel and Casino Resort and otherretail and residential growth;

• Creation of approximately 60construction jobs during the life of theproject.

Project Status:• Final Design and right of way acquisit ion

complete

• Construction contract in the bid stage

• Once awarded will take 14 months toconstruct.

Atlantic City Regional Transportation Plan –Update to the AC Chamber of Commerce

Page 12: TropicanaHotel & Resort, Atlantic City, NJbloximages.chicago2.vip.townnews.com/pressofatlanticcity.com/con… · TropicanaHotel & Resort, Atlantic City, NJ. Why the AC Regional Transportation

Martin Luther King Boulevard ImprovementsMartin Luther King Boulevard ImprovementsStrategy : Provide for two-way operation ofMartin Luther King Boulevard from PacificAve. to AtlanticAve.Benefits:• Providesdirect access to and from Absecon

Boulevard and the AC Brigantine Connectorto Pacific Ave. and boardwalk casinos viaMLK Boulevard.

• Creation of approximately 60construction jobs during the life of theproject.

• Easier local and visitor circulation from thedowntown to the marina area;

Project Status• Final design and right of way acquisition

complete• Project Demolition currently underway• Construction contract in the bid process,

with project slated for completion within3 months of award.

Atlantic City Regional Transportation Plan –Update to the AC Chamber of Commerce

Page 13: TropicanaHotel & Resort, Atlantic City, NJbloximages.chicago2.vip.townnews.com/pressofatlanticcity.com/con… · TropicanaHotel & Resort, Atlantic City, NJ. Why the AC Regional Transportation

Additional ACRTPAdditional ACRTP ProjectsProjects in Construction Phasein Construction Phase

Changed Focus/Scope

New Initiatives

•Westbound Atlantic City Expresswaylane addition from MP 8 to MP 42

•Atlantic City International AirportExpansion Improvements

Atlantic City Regional Transportation Plan –Update to the AC Chamber of Commerce

Page 14: TropicanaHotel & Resort, Atlantic City, NJbloximages.chicago2.vip.townnews.com/pressofatlanticcity.com/con… · TropicanaHotel & Resort, Atlantic City, NJ. Why the AC Regional Transportation

ACRTPACRTP Projects Currently UndergoingProjects Currently UndergoingPreliminary andPreliminary and Final DesignFinal Design

Changed Focus/Scope

New Initiatives

•Atlantic and Pacific Avenue Optimized•Interim Traffic Operations Center

Atlantic City Regional Transportation Plan –Update to the AC Chamber of Commerce

Page 15: TropicanaHotel & Resort, Atlantic City, NJbloximages.chicago2.vip.townnews.com/pressofatlanticcity.com/con… · TropicanaHotel & Resort, Atlantic City, NJ. Why the AC Regional Transportation

ACRTP Projects Currently InACRTP Projects Currently InPlanning and Conceptual Design PhasePlanning and Conceptual Design Phase

Changed Focus/Scope

New Initiatives

•Citywide Way-finding Signage Program•AC Expressway Direct Connect to ACY•Absecon Blvd. Elevated Section•Route 40/322 Improvements

Atlantic City Regional Transportation Plan –Update to the AC Chamber of Commerce

Page 16: TropicanaHotel & Resort, Atlantic City, NJbloximages.chicago2.vip.townnews.com/pressofatlanticcity.com/con… · TropicanaHotel & Resort, Atlantic City, NJ. Why the AC Regional Transportation

ACRTP is a Living DocumentACRTP is a Living Document

Early Initiatives Phase I Phase II Phase III

1. ACE-GSP InterchangeImprovement

2. GSP Exit 44 Full Interchange

3. Absecon Blvd. ElevatedRoadway Section

4. Albany Avenue CorridorImprovements

5. Corridor Pedestrian Crossing

6. Bikeway on the Boardwalk

1. Enhanced ACRL Service

2. Atlantic City Transit Hub

3. Enhanced Bus Service(GSP, ACE)

4. BRT on Newfield Branch

5. Pleasantville GatewayTransportation Center

6. Regional IntersectionUpgrades

7. GSP Widening

8. Expanded/NewInterchanges for GSP

1. Regional MultimodalTransportation Center

2. Regional MultimodalTransportation CenterAccess Improvements

3. Fixed Guideway Systembetween ACY-AC

4. Pacific-Atlantic TransitEnhanced One-wayCorridor

5. Water Taxi Service

6. Citywide Greenways

7. Regional TrafficOperations Center

1. Mississippi Ave. Improvements

2. Mississippi Ave. Parking Garage

3. South Inlet/ Connecticut AvenueImprovements

4. Pacific-Atlantic One-Way Pair Corridor

5. Pacific-Atlantic Signal Improvements

6. Signal Improvements for Rest of AC

7. Local Transit Rationalization

8. ACBC Signage ImprovementsCity-wide Signage Improvement

9. Regional Traffic Operations CenterInterim Traffic Operations Center

10. WB ACE Widening

11. New ACRL Airport Station

12. Direct Connection between ACE-ACY

13. ACY Airport Expansion Improvements

14. Transportation - Land-Use/WorkerHousing Linkage

15. Interagency Implementation Team

16. City Traffic Engineering Staff

Move to later phases

Changed Focus/Scope

New Initiatives

Atlantic City Regional Transportation Plan –Update to the AC Chamber of Commerce