Page 1: TRYON CENTER - NYC

A PROPOSAL BYQUADRIAD REALTY PARTNERS, NEW YORK

to

COMMUNITY BOARD 12, MANHATTAN

Memorandum: Community Board 12, Manhattan: Land Use Sub-Committee Meeting No.

306 April 2011

TRYON CENTER

Page 2: TRYON CENTER - NYC

page 1

PRESENTATION No. 2

T R Y O N C E N T E R6 APRIL 2011

QUADRIAD REALTY PARTNERS, NEW YORKTO

COMMUNITY BOARD 12, MANHATTAN

CHAIR:PAMELA PALANQUE-NORTH

DISTRICT MANAGER:EBENEEZER SMITH

COMMUNITY BOARD 12, MANHATTAN, LAND-USE COMMITTEE:CHAIR:

WAYNE BENJAMIN, AIA

ASSISTANT CHAIR: ANITA BARBERIS ASSISTANT CHAIR: RICHARD ALLMANJAMES BERLIN ISAIAH BING TAMARA RIVERA STEVE SIMON

PRESENTING FOR QUADRIAD:QUADRIAD REALTY PARTNERSHENRY WOLLMAN, PRESIDENT

DEVELOPMENT PLANNING & DESIGN INC.EVELYN KALKA, PRESIDENT

Page 3: TRYON CENTER - NYC

page 2

PRESENTATION No. 2

T R Y O N C E N T E R6 APRIL 2011

CONTENTS

I

INTRODUCTION1

LOCATION2

THE PROPOSED AS-OF-RIGHT3

1920’s DENSITY: A THOUGHT EXPERIMENT4

NEW-STRATEGY: BRIEF REVIEW OF THE INITIALLY PROPOSED NEW-STRATEGY SCHEME

IINEW-STRATEGY BULK ANALYSIS

5 SCHEMES AND ALTERNATE SCHEMES

6 ISSUE WITH SCHEME 1D

7ANALYSIS WRAP-UP

IIICONTEXT IMAGES

9REVIEW OF ALL DISCUSSED SCHEMES / IMAGES IN CONTEXT

PAGE 3 PAGE 4 PAGE 5-12

PAGE 13-15

PAGE 16 PAGE 27-29

PAGE 30-33

PAGE 34-53

Page 4: TRYON CENTER - NYC

page 3

1INTRODUCTION

Location

Satellite image from: www.maps.google.com

PHASE 1 SITE

GORMAN PARK

BRO

AD

WAY

BRO

AD

WAY

FAIRVIEW AVE.

FAIRVIEW AVE.

PHASE 2SITE

Page 5: TRYON CENTER - NYC

page 4

1INTRODUCTION

The Proposed As-Of-Right Scheme

-x

+x

-y

+y

-z

+z

28 Floors

image: development planning & design inc.

The previously proposed As-Of-Right scheme.

Page 6: TRYON CENTER - NYC

page 5

1INTRODUCTION

Analysis Context Density / 1920’s Zoning: A Thought Experiment

BROA

DWAY

BENN

ET A

VE.

FAIRVIEW AVE

WAD

SWOR

TH A

VE

WEST 189TH STREET

WEST 190TH STREET

WEST 192TH STREET

GORMAN PARK

image: development planning & design inc.

As an example, let’s take a closer look at a building very typical for this neigh-borhood: The building at Broadway and West 189th Street, shown on the map in gray, was build in 1928. It is a six story residential building and has an addi-tional story of retail along Broadway.The build FAR is 4.8, the maximum allowed FAR for this site today it: 3.44.Much has changed since 1928. The building could not be build like this today:a) the total FAR build is higher than allowed for a residential building on this site;b)assuming one were al-lowed to build the same FAR again on this site: the new building would be much taller since contem-porary setback-, court-yard- and open space requirements would lead to a building less dense per floor and subsequently much higher.

Page 7: TRYON CENTER - NYC

page 6

1INTRODUCTION

Analysis Context Density / 1920’s Zoning: A Thought Experiment

BROA

DWAY

BENN

ET A

VE.

FAIRVIEW AVE

WAD

SWOR

TH A

VE

WEST 189TH STREET

WEST 190TH STREET

WEST 192TH STREET

GORMAN PARK

1313

image: development planning & design inc.

As a thought experiment:if we would build a similar building as the one discussed on the previous page on our phase one site (which would, as men-tioned, not comply with the contemporary building code) ....

Page 8: TRYON CENTER - NYC

page 7

1INTRODUCTION

Analysis Context Density / 1920’s Zoning: A Thought Experiment

BROA

DWAY

BENN

ET A

VE.

FAIRVIEW AVE

WAD

SWOR

TH A

VE

WEST 189TH STREET

WEST 190TH STREET

WEST 192TH STREET

GORMAN PARK

1313

image: development planning & design inc.

....it could lead to a building as illustrated here: very dense and compact (much too dense and compact for today’s standards), an FAR of 4.8 in a six, partially seven story tall building.

Page 9: TRYON CENTER - NYC

page 8

1INTRODUCTION

Analysis Context Density / 1920’s Zoning: A Thought Experiment

image: development planning & design inc.

Here the experimental “1928-style-building” from the previous page seen in context.

Page 10: TRYON CENTER - NYC

page 9

1INTRODUCTION

Analysis Context Density / 1920’s Zoning: A Thought Experiment

image: development planning & design inc.

....compared to the contemporary As-Of-Right building contain-ing residential units, retail space, and a community facility.

Page 11: TRYON CENTER - NYC

page 10

1INTRODUCTION

Analysis Context Density / 1920’s Zoning: A Thought Experiment

image: development planning & design inc.

This illustration shows the full New-strategy FAR in a (non-code-complyant) experimental “1928-style-building”: it would be 19 stories tall. ...

Page 12: TRYON CENTER - NYC

page 11

1INTRODUCTION

Analysis Context Density / 1920’s Zoning: A Thought Experiment

image: development planning & design inc.

...compared to the same FAR in a contemporary scheme: overall taller, but more light, air, and open-space at each individual level of the resi-dential towers.

Page 13: TRYON CENTER - NYC

page 12

1INTRODUCTION

Analysis Context Density / 1920’s Zoning: A Thought Experiment

Page 14: TRYON CENTER - NYC

page 13

1INTRODUCTION

New-strategy / Initially Proposed Scheme

-x

+x

-y

+y

-z

+z

image: development planning & design inc.

This illustration repeats the initially (Community Board meeting Jan 2011) proposed New-strategy scheme: The up-zoned residential FAR which makes a 70/30 split of market rate to middle-income housing possible; a community facility; retail and parking; in a three tower scheme.

Page 15: TRYON CENTER - NYC

page 14

1INTRODUCTION

New-strategy / Initially Proposed Scheme / Slender Towers: Creating A New Park And Connecting To The Existing Revitalized Park

image: development planning & design inc.

....this previ-ously proposed scheme would revitalize the ex-isting neighboring park and connect it to a new park created on the site.

Page 16: TRYON CENTER - NYC

page 15

1INTRODUCTION

New-strategy / Initially Proposed Scheme / Slender Towers: Quality of Residential Units

302 SF

1 BR

StudioStudio

1 BRStudio

Studio

StudioStudio

1 BR1 BR

400 SF

537 SF

400 SF

537 SFEXAMPLE

STRATEGY:  GIVE-AND-TAKE

BR Living

11'-0"

11'-8"

14'-9"

18'-6"

8'-0"

CL

8'-7"

13'-3"

21'-2"

14'-8"

CL

CL

STRATEGY:  CUSTOM THOUGHT, CUSTOM BUILD-INS

image: development planning & design inc.

....slender towers rather than a deep footprint also leads to residential units which are not deep, and offer therefore large amounts of windows: light , air and views.

Page 17: TRYON CENTER - NYC

page 16

IINEW-STRATEGY BULK ANALYSIS

Analysis Of Basic Options / Overview-Matrix

-y

A1

B1

C1

D1

E1

image: development planning & design inc.

tower heights: 33-37-42

tower heights: 36-37-37 tower heights: 36-36tower height: 33

tower height: 28

tower heights given in number of floors

THE AS-OF-RIGHT SCHEMENEW-STRATEGY SCHEME / VARIATIONS

A1 = the previously proposed new-strategy schemeB1, C1, D1 = variations on the initial scheme with the same overall build SF: Three equal towers, two towers and a single-mass scheme.

Page 18: TRYON CENTER - NYC

page 17

IINEW-STRATEGY BULK ANALYSIS

Analysis Of Basic Options / Overview-Matrix

-y-y

A2

B2

C2

B3

C3

A1

B1

C1

D1

E1

image: development planning & design inc.

tower heights: 33-37-42

tower heights: 20-32-42

tower heights: 36-37-37

tower heights: 33-33-33

tower heights: 29-33-37

tower heights: 36-36tower height: 33

tower height: 28

tower heights: 34-35

tower heights: 31-32

THE AS-OF-RIGHT SCHEMENEW-STRATEGY SCHEME / VARIATIONS

A1 = the previously proposed new-strategy schemeB1, C1, D1 = variations on the initial scheme with same overall build SF.

Three Towers

Three Towers

Two Towers

Single Tower

A2, B2, B3, C2, C3 = THESE VARIATIONS TO THE NO 1 SCHEMES ABOVE, ARE EACH REDUCED IN SCOPE BY 40,000 SF. OF COURSE, A REDUCTION IN BUILD SF LEADS TO A REDUCTION IN HEIGHT. IN ORDER TO KEEP THE CROSS-SUBSIDY OF THE NEW-STRATEGY HOUSING COMPONENT IN TACT, WE INTEND TO TAKE THE SF REDUCTION FROM THE PLANNED COMMUNITY FACILITY RATHER THAN FROM THE RESIDENTIAL COMPONENT. tower heights given in number of floors

Page 19: TRYON CENTER - NYC

page 18

IINEW-STRATEGY BULK ANALYSIS

Analysis Of Basic Options / Scheme B1

-x

+x

-y

+y

-z

+z

image: development planning & design inc.

Page 20: TRYON CENTER - NYC

page 19

IINEW-STRATEGY BULK ANALYSIS

Analysis Of Basic Options / Scheme B2

-x

+x

-y

+y

-z

+z

image: development planning & design inc.

Page 21: TRYON CENTER - NYC

page 20

IINEW-STRATEGY BULK ANALYSIS

Analysis Of Basic Options / Scheme B3

-x

+x

-y

+y

-z

+z

image: development planning & design inc.

Page 22: TRYON CENTER - NYC

page 21

IINEW-STRATEGY BULK ANALYSIS

Analysis Of Basic Options / Overview-Matrix

-y-y

A2

B2

C2

B3

C3

A1

B1

C1

D1

E1

image: development planning & design inc.

tower heights: 33-37-42

tower heights: 20-32-42

tower heights: 36-37-37

tower heights: 33-33-33

tower heights: 29-33-37

tower heights: 36-36tower height: 33

tower height: 28

tower heights: 34-35

tower heights: 31-32

THE AS-OF-RIGHT SCHEMENEW-STRATEGY SCHEME / VARIATIONS

tower heights given in number of floors

Page 23: TRYON CENTER - NYC

page 22

IINEW-STRATEGY BULK ANALYSIS

Analysis Of Basic Options / Scheme C1

-x

+x

-y

+y

-z

+z

image: development planning & design inc.

Page 24: TRYON CENTER - NYC

page 23

IINEW-STRATEGY BULK ANALYSIS

Analysis Of Basic Options / Scheme C2

-x

+x

-y

+y

-z

+z

image: development planning & design inc.

Page 25: TRYON CENTER - NYC

page 24

IINEW-STRATEGY BULK ANALYSIS

Analysis Of Basic Options / Scheme C3

-x

+x

-y

+y

-z

+z

image: development planning & design inc.

Page 26: TRYON CENTER - NYC

page 25

IINEW-STRATEGY BULK ANALYSIS

Analysis Of Basic Options / Overview-Matrix

-y-y

A2

B2

C2

B3

C3

A1

B1

C1

D1

E1

image: development planning & design inc.

tower heights: 33-37-42

tower heights: 20-32-42

tower heights: 36-37-37

tower heights: 33-33-33

tower heights: 29-33-37

tower heights: 36-36tower height: 33

tower height: 28

tower heights: 34-35

tower heights: 31-32

THE AS-OF-RIGHT SCHEMENEW-STRATEGY SCHEME / VARIATIONS

tower heights given in number of floors

Page 27: TRYON CENTER - NYC

page 26

IINEW-STRATEGY BULK ANALYSIS

Analysis Of Basic Options / Scheme D1

-x

+x

-y

+y

-z

+z

image: development planning & design inc.

Scheme D1, which does not differentiate into a more slender footprint as it goes up has several issues. For one, it would be problematic to finance. Two more issues are discussed on the following three pages.

Page 28: TRYON CENTER - NYC

page 27

IINEW-STRATEGY BULK ANALYSIS

Analysis Of Basic Options / Scheme D1 / Issues With D1: Bulk Blocking Views

While scheme D1 is slender when seen from the north or the south .... ... the view form east or west is problematic, since the building remains wide as it goes up. We believe that the two or thee tower schemes are preferable, since they develop into more slender volumes as they go up.

Page 29: TRYON CENTER - NYC

page 28

IINEW-STRATEGY BULK ANALYSIS

Analysis Of Basic Options / Scheme D1 / Issues With D1: The Lost Park

-x

+x

-y

+y

-z

+z

-x

+x

-y

+y

-z

+z

As the massing of the D1 scheme wraps around to the south side of the building, it blocks the connection to the existing park. While it would be possible to cut out two floors so one would be able to connect to the park anyways, the character of the open space is too private as the residential wraps around it. It would function as private courtyard for the residents rather than become an extension of the existing public park, as the initially proposed three tower scheme would.

Page 30: TRYON CENTER - NYC

page 29

IINEW-STRATEGY BULK ANALYSIS

Analysis Of Basic Options / Scheme D1 / Issues With D1: Unit Quality Comparison

70'-0

"

60'-0"

STUDIO

STUDIO

STUDIO

3BR

3BR

1BR

1BR2BR

2BR

2BR

2BR

1BR

1BR1BR

STUDIO

STUDIO

1BR

2BR

2BR

60'-0"

60'-0

"

60'-0"

55'-0

"

60'-0"

55'-0

"

STUDIO1BR 2BR

3BRSTUDIO

1BR

1BR

60'-0"

STUDIO 1BR1BR

1BR

1BR

2BR

70'-0

"

60'-0"

STUDIO

STUDIO

STUDIO

3BR

3BR

1BR

1BR2BR

2BR

2BR

2BR

1BR

1BR1BR

STUDIO

STUDIO

1BR

2BR

2BR

60'-0"

60'-0

"

60'-0"

55'-0

"

60'-0"

55'-0

"

STUDIO1BR 2BR

3BRSTUDIO

1BR

1BR

60'-0"

STUDIO 1BR1BR

1BR

1BR

2BR

-x

+x

-y

+y

-z

+z

A look at the predominant unit types in Scheme D1:Almost all of the residential floors would be units to both sides of a long corridor. (see illustration b). There would be few units in corner locations - where you have an opportunity for double exposure (=windows towards more than one sun orientation). Compare this to the plans shown in c) - and ex-ample layout from a three tower scheme”: a much higher per-centage of units would have double exposure and in general, the unit here are less deep and have more window surface.

a)

b)

c)

Page 31: TRYON CENTER - NYC

page 30

IINEW-STRATEGY BULK ANALYSIS

Analysis Of Basic Options / Overview-Matrix

-y-y

A2

B2

C2

B3

C3

A1

B1

C1

D1

E1

image: development planning & design inc.

tower heights: 33-37-42

tower heights: 20-32-42

tower heights: 36-37-37

tower heights: 33-33-33

tower heights: 29-33-37

tower heights: 36-36tower height: 33

tower height: 28

tower heights: 34-35

tower heights: 31-32

THE AS-OF-RIGHT SCHEMENEW-STRATEGY SCHEME / VARIATIONS.

tower heights given in number of floors

Page 32: TRYON CENTER - NYC

page 31

IINEW-STRATEGY BULK ANALYSIS

Analysis Of Basic Options / Scheme E1: The As-Of-Right

-x

+x

-y

+y

-z

+z

28 Floors

image: development planning & design inc.

Page 33: TRYON CENTER - NYC

page 32

IINEW-STRATEGY BULK ANALYSIS

Analysis Of Basic Options / Scheme A1

-x

+x

-y

+y

-z

+z

image: development planning & design inc.

Page 34: TRYON CENTER - NYC

page 33

IINEW-STRATEGY BULK ANALYSIS

Analysis Of Basic Options / Scheme A2

-x

+x

-y

+y

-z

+z

image: development planning & design inc.

Page 35: TRYON CENTER - NYC

page 34

IIICONTEXT IMAGES

Review In Context / Scheme E1 - The As-Of-Right Scheme

image: development planning & design inc.

Page 36: TRYON CENTER - NYC

page 35

IIICONTEXT IMAGES

Review In Context / Scheme E1 - The As-Of-Right Scheme

image: development planning & design inc.

Page 37: TRYON CENTER - NYC

page 36

IIICONTEXT IMAGES

Review In Context / Scheme D1

image: development planning & design inc.

Page 38: TRYON CENTER - NYC

page 37

IIICONTEXT IMAGES

Review In Context / Scheme D1

image: development planning & design inc.

Page 39: TRYON CENTER - NYC

page 38

IIICONTEXT IMAGES

Review In Context / Scheme C1

image: development planning & design inc.

Page 40: TRYON CENTER - NYC

page 39

IIICONTEXT IMAGES

Review In Context / Scheme C2

image: development planning & design inc.

Page 41: TRYON CENTER - NYC

page 40

IIICONTEXT IMAGES

Review In Context / Scheme C3

image: development planning & design inc.

Page 42: TRYON CENTER - NYC

page 41

IIICONTEXT IMAGES

Review In Context / Scheme C1

image: development planning & design inc.

Page 43: TRYON CENTER - NYC

page 42

IIICONTEXT IMAGES

Review In Context / Scheme C2

image: development planning & design inc.

Page 44: TRYON CENTER - NYC

page 43

IIICONTEXT IMAGES

Review In Context / Scheme C3

image: development planning & design inc.

Page 45: TRYON CENTER - NYC

page 44

IIICONTEXT IMAGES

Review In Context / Scheme B1

image: development planning & design inc.

Page 46: TRYON CENTER - NYC

page 45

IIICONTEXT IMAGES

Review In Context / Scheme B2

image: development planning & design inc.

Page 47: TRYON CENTER - NYC

page 46

IIICONTEXT IMAGES

Review In Context / Scheme B3

image: development planning & design inc.

Page 48: TRYON CENTER - NYC

page 47

IIICONTEXT IMAGES

Review In Context / Scheme B1

image: development planning & design inc.

Page 49: TRYON CENTER - NYC

page 48

IIICONTEXT IMAGES

Review In Context / Scheme B2

image: development planning & design inc.

Page 50: TRYON CENTER - NYC

page 49

IIICONTEXT IMAGES

Review In Context / Scheme B3

image: development planning & design inc.

Page 51: TRYON CENTER - NYC

page 50

IIICONTEXT IMAGES

Review In Context / Scheme A1

image: development planning & design inc.

Page 52: TRYON CENTER - NYC

page 51

IIICONTEXT IMAGES

Review In Context / Scheme A2

image: development planning & design inc.

Page 53: TRYON CENTER - NYC

page 52

IIICONTEXT IMAGES

Review In Context / Scheme A1

image: development planning & design inc.

Page 54: TRYON CENTER - NYC

page 53

IIICONTEXT IMAGES

Review In Context / Scheme A2

image: development planning & design inc.