    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 3 of 35Confidential

    CONTENTS

    CHAPTERNO. DESCRIPTION PAGE NO.

    1 GENERAL INFORMATION 4

    2 SCOPE OF WORK 5

    3 TECHNICAL SPECIFICATION 7

    4 INSPECTION & TESTING 175 HSE REQUIREMENT 18

    6 DELIVERY 19

    7 PAINTING 19

    8 WORKMANSHIP & PERFORMANCE GUARANTEE 21

    9 SPECIAL INSTRUCTIONS TO SELLER 22

    10 DOCUMENTS TO BE SUPPLIED 23

    ANNEXURES

    I SITE CONDITIONS 25

    II FORMAT FOR DEVIATION FROM TENDER DOCUMENT 26

    III QUESTIONNAIRE TO BE FILLED IN AND SUBMITTEDWITH OFFER 27

    IV OVERALL SUPPLY & IMPLEMENTATION SCHEDULE 28

    V QUALITY ASSURANCE PLAN 29

    VI DATASHEETS 30

    VII TENDER QUALIFICATION CRITERION 34

    VIII P& ID 2 sheets

  • 7/29/2019 Ts for Plant Water System

    4/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 4 of 35Confidential

    01. GENERAL INFORMATION

    Essar Steel Limited, Vizag is planning to use treated water available from

    Sewage Treatment plant (STP) of Vizag Municipality. A water treatment plant is

    required to made available water from STP to use as a make up to Steel plant

    and Power plant.

    The site climatic conditions are given in annexure I.

  • 7/29/2019 Ts for Plant Water System

    5/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 5 of 35Confidential

    02.0 SCOPE OF WORK/SUPPLY AND EXCLUSIONS

    SCOPE OF WORK/SUPPLY

    The scope of work/supply shall comprise the following:

    1.) Pumps

    Supply of complete pump unit with bellows & motor

    Base frame, coupling & coupling guard

    Supply of companion flanges with gaskets and fasteners

    Foundation bolts & nuts

    2.) MGF

    Supply of Multi grade filter (MGF) vessel complete with internals

    Supply of frontal piping for MGF with necessary flow meter, pressuregauges and sampling points

    Supply of necessary valves for the system

    Pipe supports, etc

    Supply of companion flanges with gaskets and fasteners

    Foundation bolts & nuts

    3.) ACF

    Supply of Activated carbon filter (ACF) vessel complete with internals

    Supply of necessary media and activated carbon for ACF Supply of frontal piping for ACF with necessary flow meter, pressure

    gauges and sampling points

    Supply of necessary valves for the system

    Pipe supports, etc

    Supply of companion flanges with gaskets and fasteners

    Foundation bolts & nuts

    4.) CHLORINE DOSING SYSTEM

    Two (2) Chlorine Cylinders (one working and one standby) with isolationvalves and mounting arrangement for vacuum feed chlorinator.

    One (1) vacuum solutions feed gaseous chlorinators, Vacuum Regulatorsand all accessories

    Two (2) (each 100% capacity-1W+1S) chlorination booster pumps withdrive motors and all accessories

    One (1) Ejector assemblies with all other auxiliaries

    Pressure reducing and Vacuum Regulating valves for each chlorine gasline from outlet of each chlorinator

    Interconnecting piping, valves and piping for chlorine dosing

  • 7/29/2019 Ts for Plant Water System

    6/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 6 of 35Confidential

    All field instruments with mounting accessories, erection hardware &cabling up to System control panel

    All Motors, Control panel, Power and control cables with cabling and allaccessories from relevant equipment up to local junction box / Systemcontrol panel.

    Foundation bolts with nuts, Tonners roller supports, sleeves, shims,washers, embedment for equipment and pipe supports, companionflanges with gaskets and fasteners, etc.

    Safety Equipment as per international standard and local governmentrules and regulations

    All structural supports for piping

    Obtaining clearance/ approval from statutory bodies as required

    5.) GENERAL

    Documentation as per Clause No. 10

    Supply of spares for one year operation and maintenance

    Supply of spares for erection and commissioning (if any)

    Special tools for erection and commissioning (if any)

    Supervision of Erection and commissioning of system

    Scope of supply has been marked in preliminary P & ID attached with thisdocument as Annexure VIII.

    Any additional equipment, accessories, materials which are not specifically

    mentioned but are required to make the system complete in every respect for

    safe, smooth and reliable operation shall also be included in Sellers scope of

    supply/ work.

    EXCLUSIONS:

    Erection

    Civil / structural building works

  • 7/29/2019 Ts for Plant Water System

    7/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 7 of 35Confidential

    03.0 TECHNICAL SPECIFICATION

    03.1 TREATMENT SCHEME DESCRIPTION:

    Water available from Vizag Municipality STP plant is having higher Dissolved

    solids and Chlorides. Hence, following scheme is proposed for treatment of

    STP water.

    Treated Sewage water from the Vizag Municipality shall be stored in the

    storage tank. The capacity of the storage tank shall be capable to store at

    least 8 hrs of the total intake (2500 M3).

    Further the water from the storage tank shall be pumped through Multi-Grade

    Filters (MGF) where mostly suspended solids present in the sewage water

    shall be removed.

    The outlet of the MGF shall be passed through Activated Carbon Filters where

    odor and colour of the water shall be removed.

    The outlet of the ACF is further distributed in Pellet Plant and Power Plant

    based on the requirement of these units after necessary Chlorine dosing.

  • 7/29/2019 Ts for Plant Water System

    8/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 8 of 35Confidential

    1. STP TREATED WATER PARAMETER

    Table 3.1 indicates the quality parameters of the water available from STP of

    VIZAG Municipality.

    Table 3.1: Quality of available water

    Total 7500 m3/day treated STP water is made available at ESSAR Steel Vizag mainly for

    Pellet Plant and for Power Plant.

    STP OUTLET WATER QUALITY

    S.No Parameter unit Result

    1 Color and odor Hazen ,un objectionable Light greenish

    2 Suspended Solids mgpl 73

    3 Dissolved Solids mgpl 1180

    4 pH Value ------ 8.4

    5 Turbidity NTU 1.4

    6 total hardness mgpl 290

    7 Chlorides mgpl 250

    8 Sulphate mgpl 122

    9 Nitrates mgpl 49.5

    10 Calcium mgpl 130

    11 BOD mgpl 12

    12 COD mgpl 58

    13 Oil & grease Mgpl 2.2

    14 F-Coli & E- Coli -------- Present

    15 Bacteriological MPN 218

    Note: to have representative Analysis, more no. of composite Water samples shall becollected for Analysis

  • 7/29/2019 Ts for Plant Water System

    9/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 9 of 35Confidential

    2. TREATMENT SCHEME DESCRIPTION FOR TREATMENT OF STP WATER

    Water requirement for pellet plant shall be 3900 m3 per day while for power plant

    the water requirement shall be 3600 m3 per day. The acceptable water quality

    parameters required for pellet plant is mentioned in Table 3.2 and for power plant

    is shown in Table 3.3.

    Table 3.2 Water quality requirement for Pellet Plant

    Pellet Plant Make up water quality - Essential

    Sr. Parameter Value[ range]1 pH 6.5-8.52 Conductivity (s/cm)

  • 7/29/2019 Ts for Plant Water System

    10/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 10 of 35Confidential

    5 Total hardness(mg/lit) < 150

    6 Calcium Hardness(mg/lit) < 125

    7 P - Alkalinity(mg/lit) < 5

    8 M - Alkalinity(mg/lit) 50 - 100

    9 Chlorides(mg/lit) < 50

    10 Sulphates(mg/lit) < 50

    11 Nitrates(mg/lit) < 10

    12 Dissolved Iron(mg/lit) < 0.2

    13 Total iron(mg/lit) < 0.5

    14 BOD Nil

    15 COD < 5

    16 Silica(mg/lit) < 10

    03.2 DESIGN AND CONSTRUCTION OF PUMPS:

    9 The pumps shall be designed, manufactured and tested as per applicable

    international standards and shall be suitable for the duty conditions and capacities

    as indicated in the Annexure VI.

    9 Pumps with constant-speed drivers shall be capable of at least a 10-percent head

    increase at rated conditions by replacement of the impeller with one of larger diameter

    or by variable-speed capability.

    9 The required duty range for a pump shall be on stable portion of its head -capacity

    curve close to the best efficiency point.

    9 The installed impeller diameter shall be based on flow condition specified in the Pump

    Data Sheet.

    9 The rotating elements of the pumps shall be checked for critical speed in bending as

    well as torsion. The critical speeds shall be at least 30% away from the normal

  • 7/29/2019 Ts for Plant Water System

    11/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 11 of 35Confidential

    speeds for units with flexible shafts and at least 20% away from the maximum

    operating speed in case of stiff shafts.

    9 The direction of rotation shall be clearly marked either by incorporating it on the

    casing or by separate metal plate arrow securely fitted to the casing.

    9 A stainless steel nameplate shall be furnished and securely attached by stainless

    steel pins at an easily accessible point on the pump. The plate shall be stamped

    with the following minimum information:-

    - Buyers item no. or tag - at least 15mm high- Serial number of pump

    -Capacity in m3/hr.

    - Pumping head in meter of liquid column- Speed in revolutions per minute- Pump input power, kW

    Casing

    9 Casings shall be designed to permit removal of the rotor or inner element without

    disconnecting the suction or discharge piping or moving the driver (back pullout

    construction).

    9 Casings shall be provided with plugged vent and drain connections. Vent connection

    may be omitted for self-venting casings.

    Impeller

    9 Rated impeller diameter shall be selected such that 10% or 10mm (whichever is

    minimum) margin on both lower and upper diameter is available.

    9 Impellers shall be statically and dynamically balanced. Dynamic balancing will be at

    the operating speed of pump.

    9 The impeller shall be securely locked and keyed to the shaft in such a way that it is

    not loosened due to reverse rotation of pump.

    Shaft

    9 Shafts of all pumps shall be designed for critical speed. The ratio of critical speed

    to shaft speed shall be not less than 1.2.

  • 7/29/2019 Ts for Plant Water System

    12/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 12 of 35Confidential

    Bearings

    9 All bearings will be anti-friction type and will be designed for not less than 25,000hours minimum life (L-10) in the specific service with continuous operation atmaximum radial and axial loads at rated speed.

    9 Type of bearings to be used for pumps shall be roller or ball bearing.9 Bearings shall be grease lubricated.

    Couplings & Coupling Guards

    9 Couplings shall be flexible and of metallic type. They shall be selected for aminimum service factor of 2.

    9 For back pull out application, coupling shall be provided with spacer.9 Coupling guards shall be provided.

    03.3 DESIGN AND CONSTRUCTION OF MGF & ACF:

    Filters shall be designed, manufactured and tested as per approved

    drawings/ design codes and standards (latest editions).

    Filters shall be designed as per ASME SEC VIII DIV.I

    Material of shell & dished end shall be CS as per IS:2062 Gr. B

    2mm corrosion allowance shall be considered while selecting the

    thickness of shell and dished end

    Radiography of welds shall be considered

    M.O.C. of Piping from inlet of MGF to Outlet of ACF including frontal

    piping shall be of CS

    For chlorination one taping point with valve for chlorination dosing at the

    outlet of ACF will be provided by Seller. ACF shall be protected by air vent line.

    ACF vessel will be furnished with necessary lateral, strainer and water

    distribution headers as per manufacturer norms. MOC of lateral and

    strainer will be SS304.

  • 7/29/2019 Ts for Plant Water System

    13/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 13 of 35Confidential

    Seller shall complete the post weld heat treatment and stress relieving as

    required by material standard / manufacturing standard indicated in

    detailed manufacturing drawing and shall provide heating & cooling curve

    for stress relieving to purchaser.

    Seller shall conduct the necessary shop test for equipments as per test

    procedure / standard.

    Paint or ink for marking shall not contain any harmful metal or metal salts

    such as zinc, lead or copper which causes corrosive attack on heating.

    Equipments shall be protected from rust, corrosion and any mechanical

    damage during transportation, shipment and storage.

    Rust preventive on machined surfaces to be applied shall be easily

    removable with a petroleum solvent and not harmful to welding.

    03.4 DESIGN AND CONSTRUCTION OF CHLORINE DOSING SYSTEM:

    Chlorine solution shall be dosed in the treated water line (outlet from the ACF).

    The Chlorination System shall consist of two (2) x 100% vacuum solution feed

    type cylinder mounted chlorinators and 1x100% chlorine gas filter.

    The water shall be fed to the ejector through booster pumps and chlorine solution

    shall be dosed to the direct/indirect cooling water basin. Two (2 x 100%) booster

    pumps each capable of meeting 100% of the requirement shall be provided.

    a) Construction Features

    Chlorination System

    i) Chlorine Cylinders

    Chlorine cylinders should be mounted on skid.

    Chlorine cylinders and auxiliary cylinder valves shall be of a design approved by

    the Chief Controller of Explosives. Each item supplied shall be stamped /

    approved by CCE.

  • 7/29/2019 Ts for Plant Water System

    14/37

  • 7/29/2019 Ts for Plant Water System

    15/37

  • 7/29/2019 Ts for Plant Water System

    16/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 16 of 35Confidential

    For all the Instruments necessary erection hardware with mounting accessories

    will be in Sellers scope of supply.

    Following minimum Instruments are required for WTP plant. However, final

    quantity of the field instruments shall be decided during detail engineering as per

    the mutual agreement between Seller and Buyer.

    1. Online Chlourine Analyzer

    2. Flowmeters

    3. Pressure Gauges

    4. Pressure Transmitters5. Pressure Switches

    6. Level Switches

    7. ph meters

    8. Control Valves

    d) SAFETY EQUIPMENT

    Seller shall quote separately for the following safety equipment/ devices. In

    addition he may quote separately with unit rates, his suggested safety device

    other than those mentioned below:i. One Chlorine leak detector with two sensors for each chlorinator area and

    each chlorine storage area.

    ii. Canister type Gas Masks

    iii. One Eyewash and one Safety shower for each chlorine storage area and

    acid storage area

    iv. One Air breathing Apparatus for each chlorine storage area and acid

    storage area

    v. Emergency repair kit

    03.5 GENERAL

    Companion flanges, bolts, nuts & gaskets

    9 Flanges shall be shall conform to the ANSI B 16.5 standard.

  • 7/29/2019 Ts for Plant Water System

    17/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 17 of 35Confidential

    9 Hexagon head bolts and nuts conforming to ASTM a 193 Gr. B7 & ASTM a 194

    Gr. 2H respectively or equivalent shall be provided for fixing the companion

    flanges.

    9 Rubber gaskets conforming to ASME B 16.21 or equivalent shall be provided for

    fixing of companion flanges.

  • 7/29/2019 Ts for Plant Water System

    18/37

  • 7/29/2019 Ts for Plant Water System

    19/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 19 of 35Confidential

    All butt welded joints used for fabrication of chlorine pressure chambers shall be

    examined by 100% radiography as per UW-51 of ASME Section VIII Div.I.

    Individual items of equipment shall be tested as indicated in the following

    paragraphs.

    05. HSE REQUIREMENT

    All equipment should be designed, listed & certified as per the standards & localjurisdiction requirements.

    PollutionThe Seller shall offer a plant so as to meet the pollution control requirements ofstatutory authorities. Emissions and discharges of solid, liquid, gaseous and othereffluents from the area of the Sellers scope of work shall fully comply with allrequirements and limits specified in Environmental (Protection) Act, 1986, MinimumNational Standards (MINAS), along with all latest amendments to all of the aboverequirements, stipulations of the Gujarat Pollution Control Board (GPCB) andMinister of Environment and Forests (MoEF) and any other central or localStatutory requirements regarding environmental pollution and its abatement. Thehazardous waste material handling and disposal plan shall be submitted by theSeller as per the pollution control board norms.

    Noise ControlThe criterion for environmental noise is that the design of the station and itscomponents shall not exceed, in any continuous mode of operation, the levelstipulated by MoEF and/or Pollution Control Board at any point on the siteboundary.Presently the norm is such that the noise level shall not exceed 85 dBA at 1 mfrom the equipment surface and 50 dBA at the plant boundary.

    Safety equipment to be included in scope of supply as per clause no. 03.4 d).

  • 7/29/2019 Ts for Plant Water System

    20/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 20 of 35Confidential

    06. DELIVERY

    a) The delivery of all the equipment covered under this specification shall bedelivered at Essar Steel Ltd. Vizag site on door delivery freight pre paid basiswithin 3 months from the date of placement of order.

    b) All material shall be packed properly for prevention of damage duringtransit and deterioration during storage.

    07. PAINTING

    The following specification shall be applicable for all equipment covered underthis document.

    a) This specification covers the facilities and quality requirement for surfacepreparation and painting of structures, equipment, piping, etc. The term"painting" referred herein covers rust preventive and decorative coating alongwith surface protection.

    b) Surfaces made of aluminum, brass, bronze, stainless steel, cast iron andother corrosion resistant alloys are not required to be painted unless specifiedexcept for aesthetic purposes or for identification bands.

    c) All machined matching surfaces (e.g. flanges) shall be properly cleaned,greased and protected before dispatch.

    d) General compatibility between primer and finishing paints shall be certified bythe paint Seller supplying the paints.

    e) The machine finished surfaces shall be coated with white lead and coveredbefore shipment or before being put out into the open air.

    f) The colour code to be followed for the final coat shall be intimated to thesuccessful bidder.

    g) The complete paint system for any item includes the following activities

    i) Proper surface preparationii) Application of primer coatsiii) Application of intermediate coatsiv) Application of finished coats

  • 7/29/2019 Ts for Plant Water System

    21/37

  • 7/29/2019 Ts for Plant Water System

    22/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 22 of 35Confidential

    08. WORKMANSHIP AND PERFORMANCE GUARANTEE

    o The material used shall be new and best of its kind available and shallconform to relevant latest Indian and international standards.

    o The warrantee shall cover faulty design/ material / workmanship. Allrectifications or replacement under the warrantee shall be done by theSeller free of cost.

    o The Seller should study the specification and satisfy himself regarding theworkability of the proposed system and shall take full responsibility for thedesign, manufacture, quality of the material, workmanship, etc. of the

    entire system including utilities, electrics, instrumentation etc.

    o The approval of drawings and/or inspection by Buyer or their authorizedrepresentative does not absolve or relieve the Seller from any of hisobligations under this contract. The Seller is solely responsible andaccountable for any defects and subsequent delays in supply due todesign/inspection.

    o The Seller shall warrantee for satisfactory performance of the facilities for aperiod of 18 months from the date of receipt at site by the Buyer or 12months from the date of commissioning whichever is earlier.

    o Demonstration of performance guarantee is the most important clause

    binding the Seller.

  • 7/29/2019 Ts for Plant Water System

    23/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 23 of 35Confidential

    09.0 SPECIAL INSTRUCTIONS TO SELLER

    a) The Seller shall design the equipment considering the "site conditions"and for indoor installation.

    b) The Seller shall satisfy the Buyer that he possesses the necessarytechnical experience and qualification and that he has at his disposalsuitable modern facilities and staff of specialized employees to ensurethat his contract work is of best quality and workmanship, according to thelatest engineering practice. The seller shall furnish necessary particularsin this behalf with tender.

    c) The Seller will be fully responsible for both the product and its relevantcompliance with the present specification. All provisions included in thepresent specification will not be limitative to the scope of supply. TheSeller will provide for those further activities in order to improve the qualityof the product.

    d) In case the equipment mentioned in this specification use importedequipment, component & / or spares for installation of the equipment, theseller should indicate the foreign exchange component along with theexpenditure involved. In case of need, the seller shall make arrangementof foreign exchange for them.

    e) The successful seller shall communicate, prior to award of contract thenames of seller proposed to be engaged by him for approval by Buyer.The successful seller shall also intimate the Buyer the names of hispersonnel (including sub-contractors/Sellers) and their addresses withtelephone/telex number from whom information/data can be obtained byBuyer regarding progress of works, arrangement of inspection, testingand all other work in respect of the contract.

    f) In both cases where the equipment is to be procured from India orabroad, the successful Seller shall be responsible for design, generationof all data and design drawings required by him formanufacture/fabrication. No foreign exchange and import license for

    import of technical know-how or equipment, components, spares ormaterials will be arranged or provided by the Buyer.

  • 7/29/2019 Ts for Plant Water System

    24/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 24 of 35Confidential

    10.0 DOCUMENTS TO BE FURNISHED

    9 Documents to be submitted with Offer (Please note that without thesedocuments their offer will not be considered)

    Technical particulars

    Catalogues, Brochures for offered items

    Cross sectional drawings showing main components and their materials ofconstruction.

    Tender Qualification Criterion as per Annexure-VII

    Instrument and I/O list

    P&ID Calculation for proposed thickness of shell & dished end for ACF & MGF

    Operation philosophy Gas chlorination system.

    9 Documents to be submitted for Buyers approval/reference

    The Seller shall furnish 6 sets of the following data / documents / drawingsa). General arrangement drawing showing overall dimensions & weightb). Sectional drawing showing material of construction for various

    components indicating grades and standardsc). Data sheetsd). QAPe) Instrument and I/O listf) P&ID

    g) Instrument datasheets

    h) Details of PLC based control system

    g) Cable schedule with cable termination

    h) Instrument Hook-up drawings

    i) Instrument Location and cable routine drawings

    f). Civil data:

    Civil data as follows shall be supplied to enable Buyer to prepare detailedworking drawings for foundation:

    Complete foundation outline, plan and cross-section drawings for each

    equipment indicating load data (static & dynamic) and details of various

    types of inserts, openings, conduits, hole/anchor pockets and foundation

    bolt details and various levels and depth of foundation.

  • 7/29/2019 Ts for Plant Water System

    25/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 25 of 35Confidential

    9 Drawings/documents to be submitted before dispatch of equipment.a). Material test certificates for different componentsb) Shop performance test report as per QAPc) Operation and maintenance instruction manual. This instruction manual

    shall contain the following basic categories of information in practical,complete and comprehensive manner for use by operation and/ormaintenance personnel

    d) Instruction for initial installation of mechanical and electrical equipmente) Instruction for operation, maintenance and repairf) Recommended inspection points and period of inspectiong) Ordering information for all replaceable parts

    h) Lubrication charti) Chart for trouble shooting of problems normally encountered

    9 The information and documents shall be organized in a logical & orderlysequence. A general description of the equipment including significant technicalcharacteristic shall be included to familiarize operating and maintenancepersonnel with the equipment.

    9 Necessary drawings and/or other illustrations shall be included or copies ofappropriate certified drawings shall be bound in the manual. Test adjustment andcalibration information as appropriate shall be included and shall be identified tothe specific equipment. Safety and other warning notices and installation,maintenance and operating cautions shall be emphasized.

    9 The instruction manual shall include list of all special tools and tackles and shallbe furnished with complete drawings and instructions for use of such tools andtackles.

    9 On completion of work, the successful Seller shall supply one CD and 5 sets ofall drawings incorporating all changes that might have been affected during thecourse of the contract.

  • 7/29/2019 Ts for Plant Water System

    26/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 26 of 35Confidential

    Annexure-I

    SITE CONDITIONS

    1. Location Visakhapatnam (Andhra Pradesh)

    2. Elevation 4.75 m above mean sea level3. Temperature 45 to 15 Deg C

    4. Relative humidity Max 100 %

    5. Water temperature 40 Deg Max

  • 7/29/2019 Ts for Plant Water System

    27/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 27 of 35Confidential

    Annexure-II

    FORMAT FOR DEVIATIONS FROM TENDER DOCUMENT

    Sl. No. Clause No. Sellers Deviations Reason for Deviation

    The Seller hereby certifies that the above mentioned are the onlydeviations from the tender documents.

    Signature :

    Name :

    Designation :

    Company seal

  • 7/29/2019 Ts for Plant Water System

    28/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 28 of 35Confidential

    Annexure-III

    QUESTIONNAIRE TO BE SUBMITTED BY THE SELLER

    General:

    01. Seller's name and address.

    02. Quotation number and date.

    03. Total estimated transporting weight of items offered by Seller (in tone).

    04. Weight and dimension of the heaviest single package.

    05. Special transport requirement.

    06. Special storage requirement.

    07. Previous experience. List of similar plant/equipment supplied.

    08. Available manufacturing facility.

    09. Available spare capacity

    10. Seller's representative in India

  • 7/29/2019 Ts for Plant Water System

    29/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 29 of 35Confidential

    Annexure-IV

    OVERALL SUPPLY & IMPLEMENTATION SCHEDULE

    SR.No. WORK DESCRIPTIONWEEKS FROM

    Start Finish

    1.0 Design & Engineering

    2.0 Equipment Manufacture

    a Structural (for items fabricated at works)

    b Mechanical

    e Bought out items

    i) Ordering on sub Sellers

    ii)Manufacturing schedule & progress status

    iii) Delivery

    3.0 Equipment delivery at site

    a Structural (for items fabricated at works)

    b Mechanical

  • 7/29/2019 Ts for Plant Water System

    30/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 30 of 35Confidential

    Annexure-V

    Quality Assurance Plan (QAP)

    a) Seller shall furnish Quality Assurance Plan (QAP) for respective equipment aftercompletion of detailed engineering and finalisation of billing schedule and prior tostart of manufacturing.

    b) QAP shall be prepared and furnished by Seller for all components.

    c) Inspection and test requirements shall be decided with due consideration offactors like safety, duty cycle, operating conditions, equipment life, environment

    conditions, place of installation and statutory regulations, as applicable for aparticular equipment.

    d) QAP shall clearly indicate the followings through use of codes in the appropriatecolumns:

    I. Range of inspection & tests to be carried out by Seller and cross checkedduring manufacturing of equipment from raw materials to finishing stage.

    II. Suggestive check / hold points for Buyer inspection and witnessing of testsduring manufacturing and final product inspection.

    III. Details of test certificates, internal inspection reports and calibrationcertificates to be furnished by Seller to Buyer.

    IV. Inspection documents to be furnished by Seller to Buyer for reference during

    inspection along with acceptable norms as per codes / regulations.

    Test Certificates and Documents

    For each of the items being manufactured, following test certificates and documents inrequisite copies including original shall be submitted to inspection agency. All testcertificates must be endorsed by the manufacturer and Seller with linkage to project,purchase order and acceptance criteria.

    I. Details of stage wise inspectionII. Sellers material and performance / relevant test certificatesIII. Performance test certificate for all characteristicsIV. Calibration / acceptance / special certificates for electrical items

    V. Surface preparation and painting certificates

  • 7/29/2019 Ts for Plant Water System

    31/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 31 of 35Confidential

    Annexure-VIDATASHEETS

    DATA SHEET FOR STORAGE TANK

    No. of Tank 1 No.

    Capacity 2500 m3

    M.O.C Structural / RCC Tank

    Note: Storage tank is not in Sellers scope

    DATA SHEET FOR SEWAGE WATER TRANSFER PUMPS

    No. of Pumps 2 Nos. ( 1W+1SB)

    Type Centrifugal

    Construction Axial Split Casing Type

    MOCCasing CF8M

    Impeller CF8M

    Shaft SS 410

    Capacity 350 m3/hr

    Head 60 mWC

    Coupling Pin-bush coupling

    Prime Mover Motor

    DATA SHEET FOR MGF

    Quantity (No.) 1

    Capacity 350 m3/hr

  • 7/29/2019 Ts for Plant Water System

    32/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 32 of 35Confidential

    Operating hour per day 24 hours

    No. of Streams 1

    MOC Carbon steel IS : 2062 Gr B

    Operating Pressure Seller to specify

    Design Pressure Seller to specify

    Free board in the vessel 10%

    Backwash cycle After 24 hour operation

    Back wash water quantity & quality Seller to specify

    Manhole Size Dia(mm) 450

    Size (dia & height) Seller to specify

    Quantity of Media Seller to specify

    Chlorination point valve size & type Seller to specify

    MOC of lateral & strainer SS304

    DATA SHEET FOR ACF

    Quantity (No.) 1

    Capacity 350 m3/hr

    Operating hour per day 24 hours

    No. of Streams 1

    MOC Carbon steel IS : 2062 Gr B

    Operating Pressure Seller to specify

    Design Pressure Seller to specify

    Free board in the vessel 10%

    Backwash cycle After 24 hour operationBack wash water quantity & quality Seller to specify

    Manhole Size Dia(mm) 450

  • 7/29/2019 Ts for Plant Water System

    33/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 33 of 35Confidential

    Size (dia & height) Seller to specify

    Quantity of Media Seller to specify

    Chlorination point valve size & type Seller to specify

    MOC of lateral & strainer SS304

    REQUIRED QUALITY AFTER ACF

    DATASHEET FOR CHLORINATION PLANT

    1.0 Chlorinators

    a) Number Required 1

    b) Capacity 1.4 kg/hr

    c) Type Vacuum operated solution feed type

    d)Inlet chlorine pressurereducing valve

    Required

    e) Chlorine feed rate adjuster Required

    f)Automatic pressure vacuumrelief valve

    Required

    2.0 Chlorinator Water Supply Pumps

    a) Number Required Two (2) (1 W +1S)

    b) Capacity and total HeadEach pump shall have capacity meetingthe requirement of one Chlorinator and

    head as required

    c) Suction condition Flooded (available head-35 mWC)

    d)Maximum allowable chlorineconcentration in chlorine

    2000 ppm

    Sr. No. Parameter Quality1. pH Same as feed water

    2. TSS

  • 7/29/2019 Ts for Plant Water System

    34/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 34 of 35Confidential

    solution

    e) Type Diaphragm type

    f)Design temperature of fluidfor design of pump capacity

    40C

    g)Design temperature for pumpcomponents

    60C

    h) Material of Construction

    i) Diaphragm PTFE

    i) Pressure gauge One per pump at pump discharge

    j) Pressuretransmitter/Pressure Switch One at the header for low pressure alarmand interlock

  • 7/29/2019 Ts for Plant Water System

    35/37

    ESSAR STEEL LTD., VIZAG

    TECHNICAL SPECIFICATION FOR

    WATER TREATMENT PLANT

    TS No. : 2106-H000-A00390-0006-0601-0001-R0

    ESSAR ENGINEERINGSERVICES LTD.

    TS NO: 2106-H000-A00390-0006-0601-0001-R0 Page 35 of 35Confidential

    ANNEXURE-VII

    TENDER QUALIFICATION CRITERION

    To Be Filled By Indenter

    Purchase Requisition No: Release Date :

    Tender No. : Issued Date :

    Technical Specification No:

    Package Type :

    Short Description :

    Key / Specific Technical Requirement :

    Expected Delivery :

    To Be Filled By Seller

    Seller Name

    Contact Person & Contact Detail

    Manufacturer/Trader

    Last Years Turnover:No of Employees in your organization

    Have you supplied similar items previously ofsimilar operating capacity

    Confirmation to the Key / Specific TechnicalRequirement

    Major deviation in the type & capacity ofequipment offered:

    Delivery Offered:

    References details:

    Also attach copy of certificate from client.

    Domestic: Foreign:

    Have you supplied similar items to Essar Yes/No: If Yes Give Reference PO No:

    Are you a registeredSeller of ESSAR?

    Yes/No: Your Seller Code:

    Remarks:

  • 7/29/2019 Ts for Plant Water System

    36/37

  • 7/29/2019 Ts for Plant Water System

    37/37