ttlf
TRANSCRIPT
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 1/28
PREPARED BY:
GOVIND YADAV(GET-INST)
Temporary Truck Loading Facility
(TTLF)
.
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 2/28
Design Basis
Loading flow rate (max , normal , min):
(41040 ,20400, 2040) kg/hr
Recirculaton flow rate (normal ) :400 kg /hr.
Operating pressure : 9.5 barg for recirculation/ 1 barg for vapour line.
Operating temperature : -165°C
System design pressure:18.5 barg for supply/7 bargfor vapore line
System design (max,min temperature): -165/60 °C
2
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 3/28
TTLF
LNG TERMINAL WITH ROAD TANKER
SHIPLNG TANK
LP
PUMP HPPUMP
R
E
C
O
N
D
E
N
S
O
R
BOG
COMP.
UNLOADING/ VAPOR
RETURN ARMS
TRUCK
STV & SCVCooling Down Lines
Drain Return Line
Drain Drum
V-903
Pump
VAPOR LINE
FEED LINE
RETURN LINE
To Vaporiser
MOV 13001
MOV 13002
HIC
13001
HIC
13003
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 4/28
TRUCK LOADING SKID CONSISTS OF
• Skid
• Weigh bridge
• The Weigh bridge room with PLC
• Human machine interface
4
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 5/28
The skid
4″ main feed line, tapped from 16″ LP header.
3″ line tapped from 4″ main feed line to LNG loading arm.
4″ Recirculation line provided.
3″ Vapor return line provided
Loading & vapor return arm(3″ size) designed for 18.5 barg
5
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 6/28
The Weigh bridge
Consists of mechanical platform,load cells, junction box, weighing
electronics..
Robust in construction, steel
fabricated.
Top plate of MS steel, with anti skidproperties.
Capacity 0 – 50 tonnes
Pit less type
Make up-Strategic weightingsystems limited.
Platform size : 18m X 3m
6
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 7/28
Operating principle
Electronic configuration: Wheatstone bridge(a measuring instrument).
Used to measure an unknown resistance by balancing two
legs of a bridge circuit.
R x is the unknown resistance,
R 1, R 2 and R 3 are
known resistances
Rx = (R2/R1)/R3
7
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 8/28
WeWr Weigh bridge roomidge room
Converts signals produced by load cell, to digital
representation of weight.
The weigh bridge room contains the PLC and Human
Machine Interface (HMI).
HMI is, operator’s window to start, batch operation of filling
and monitor filling operation.
Unsafe conditions of plant, due to LNG spillage, gas leak or fire, automatically causes ESD TTLF, stop filling operation
and isolates skid from the plant
8
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 9/28
CONTROL VALVE9
Make: Flow servecorp.
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 10/28
Earthing relay 10
Make :Scully ( 30 feet coil cable)•It provide intelligent
grounding verification with
self-proving connection to
the ground ball & bolt.
•The ground ball & bolt can
be installed in few minutes
•It prevents loading until a
proper groung has been
established.• Automatically shuts off
loading operation if ground
is broken any time
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 11/28
Mass flow meter11
Coriolis Mass Flow meter uses
The Coriolis effect to measure theamount of mass moving throughthe element.This flow meter is used formeasuring lng in ttlf.
Fluid to be measured, runsthrough U-shaped tube that is vibrates by oscillating driver at itsnatural frequency.
Coriolis meter is comprised of two element a sensor andtransmitter.
It can directly measure the massof a flowing fluid & also measure
the flowing fluid density.
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 12/28
Working priciple12
The arm through which fluid flows away from the axis of rotation must exert a force on the fluid, to increase its
angular momentum, so it bends backwards. The arm
through which fluid is pushed back to the axis of rotation
must exert a force on the fluid to decrease the fluid's
angular momentum again, hence that arm will bend
forward.
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 13/28
Filling operation
Truck should be in proper location on ramp
Ignition should be off, Wheels should be choked & truck should be
grounded.
Lng & Vapour arm should be with positive nitrogen pressure.
Operater calculate wt of truck. Check for residual LNG(heel) in thetruck tank.
Oxygen less should be than 3% of lel.
Once check list established downstream FV 13002 shall be opened.(
purging with nitrogen is to be done).
Operator calculate tare wt of truck in weigh bridge panel. By calculating heel operator calculate lng to be filled in lng truck. He
reset wt in weigh bridge panel & start filling operation.
13
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 14/28
Filling operation
By calculating heel operator calculate lng to be filled in lng
truck. He reset wt in weigh bridge panel & start filling
operation.
Some amount is constantly recirculated through FV 13003
(3600kg/hr).
Intially FV 13001 is opened 13% then it can ramp upto
83% .
When filling reaches to 98 % of filling capacity of truck, it is
again ramp down to 13 %( total lng filled = (total wt) – (t wt
+ heel).
After filling operation , by isolating system(closing movp
13001 & fv 13001). Lng is drain out from loading arm .
14
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 15/28
Safety Features for TTLF
Emergency shutdown system can be activated by
2 UV-IR flame detectors.
7 Spill detectors
7 Gas detectors
Water sprinkler system, 2 DV with option of operating in
auto & manual mode (ttlf control).
Earthing system for Tanker and Skid
15
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 16/28
16
EARTHING SWITCH
Hs 12052
Hs 12051
ESD 2 PSHH13005
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 17/28
FIRE DETECTOR
The IR sensor is sensitive to radiation over the range of 2.5-3.0
micron.
The IR channel will register a detection signal, at the appropriate
level, when the IR sensor is exposed to radiation in the appropriate
frequency range, having an intermittent gleam pattern characteristic
to flickering-fire, and a preset threshold and time duration arereached.
The UV sensor is sensitive to radiation over the range of 0.185-0.260
micron.
The UV channel incorporates a special logic circuit that eliminates
false alarms caused by solar radiation and other non-fire UV sources.
Simultaneous detection of radiation in both the UV and the IR
channels having an intensity, which exceeds detector’s preset Alarm
level, will result in an Alarm
17
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 18/28
GAS DETECTOR
• The detection is based on infrared radiation passingthrough volume of air
• It employs a dual beam , dual wavelength with
separate optical detector.• Different types of gas have unique gas absorption
spectra. They can be easily identify by properselection of wavelength at which absorption is
measured.• By camparing transmission of two wavelenght , the
gas concentration in air can be determined
18
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 19/28
GAS DETECTOR 19
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 20/28
Pressure switch
Pressure switch is a form
of switch that makes electrical
contact when a certain
set pressure has been reached onits input.
This is used to provide on/off
switching from
a pneumatic or hydraulic source. The switch may be designed to
make contact either on pressure
rise or on pressure fall
20
Make : switzerModel :
GK-201-02-a8k-g-zRange : 1 to 16 bar
Set at 5.5 barRising pressure
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 21/28
Spill detector
Total we have 7 spill detector including 3 on skid atttlf
In spill detector pt 100 is placed where there is a
possibility of leak . If due to leak any lng fall on it .
Its resistance change rapidly giving an alarm aboutlng leakage
Make: emerson
Resistance thermometer :pt 100
Length :200mm.
21
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 22/28
Level switch
• In a simple capacitance probe-type sensingelement, when the level rises and materialcovers the probe, the capacitance within thecircuit between the probe and the media or theprobe and the vessel wall , increases.
• This is due to the dielectric constant (k) of thematerial which causes a bridge imbalance. Thesignal is demodulated and amplified, then theoutput is increased.
• if medium is non conductive then it provide alarge change in dielectric constant
• If medium is conductive then insulated probe isused & capacitance is formed by outer surface of
insulation & electrode
22
Make : dexelbrook Model : PGL 2272-dl1z0356-200+aq
Press/ temp :67 bar@38c
Trip: 270 mm
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 23/28
Cause & effect23
CAUSE EFFECTHSS 12051, HSS 12052,
ESD 2, FGS Detection
ESD TTLF
ESD TTLF, PAHH 13005
WAHH 13001
MOVP 13001
(LNG supply valve close)
ESD TTLFMOVP 13002 (vapor return valve
close)
ESD TTLF
HCV 13003 (recirculation valve close)
FV 13001(tanker inlet line control valve
close)
ESD TTLF, PAHH 13005, ZSL 13002, PAL
13003
FV 13001 (inlet line control valve open) ZSH 13002(MOVP 13002 open)
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 24/28
Ttlf plc24
Make : Allen bradley Micrologix controller 1500
Supply: 110 v ac
Single processor , supply & i/o module
14 k words of user configurable for program & data
Supply: Digital i/p :48
Digital o/p : 16
Analogue i/p : 16
Analogue o/p : 16
Communication : RS 232 communication port.
Scan time: 50ms
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 25/28
CONFIGURATATION25
CPU + I/P ANALOGUE
I/P
MODULE 1
EXPANSION ANALOGUE
I/P
MODULE 2
EXPANSION ANALOGUE
I/P
MODULE 3
EXPANSIONDIGITAL
I/P
MODULE 1
EXPANSIONDIGITAL
I/P
MODULE 2
EXPANSIONDIGITAL
I/P
MODULE 3
EXPANSION
RTD
MODULE 1
EXPANSION
ANALOGUE
O/P
MODULE 2
EXPANSION
DIGITAL
MODULE 2
EXPANSION
DIGITAL
MODULE 1
EXPANSION
RTD
MODULE 2
EXPANSION
I/P COUNTER
MODULE
2 SPARE
SLOT
POWER SUPPLY
(FOR ALL CARDS)
1769
CRL 1
+-E
CPU
RS- 232
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 26/28
PCU 300 a pressurized enclosure system26
PEPPERL-FUCHSFA6 PCU 300A EX 014
• A pressurized enclosure system
comprise of of control unit ,pressure
moniter ,solenoid valve & housing.
• Air or inert gas such as nitrogen is
fed into the enclosure housing
producing a non explosive
atmosphere to avoid ignition source
•Control unit with pressure switchmoniter circulation process &
pressure
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 27/28
CABLE BLOCK DIAGRAM27
Analog jb AJB - 13002
Digital jbDJB - 13001
Digital jbDJB - 13001
F& g detectorsignal
FJB 13004
Ttlf plc (Allen bradley)
HS 12052, D.V
CONTROL,WEIGH BRIDGE
HUMAN
MACHINEINTERFACE
HS 12051,2 FSD,3 GSD
ER SWITCH&
SOLENOIDSUPPLY
VAL VELIMIT
SWITCH &
PSHH
I/P,CONVERTER
PT,TT
AJB 13005
FJD 13007
AJB 13006 TT, PT
4 GD OFF
SKID
TT13003,13004,
FT 13001
7/28/2019 ttlf
http://slidepdf.com/reader/full/ttlf 28/28
Thank you
28