tunnel control system of gotthard base tunnel

29
AlpTransit Gotthard Railway Tunnel 08.09.2015, SWISSED15 Peter Müller / MOL PE51 © Siemens Schweiz AG 2015 Agenda: 1. Siemens Switzerland Ltd. 2. Project AlpTransit Gotthard 3. Project LP60 Tunnel Control System 4. Maintenance Management Tunnel Control System of Gotthard Base Tunnel

Upload: others

Post on 24-Nov-2021

21 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Tunnel Control System of Gotthard Base Tunnel

AlpTransit Gotthard Railway Tunnel

08.09.2015, SWISSED15

Peter Müller / MOL PE51© Siemens Schweiz AG 2015

Agenda:1. Siemens Switzerland Ltd.2. Project AlpTransit Gotthard3. Project LP60 Tunnel Control System4. Maintenance Management

Tunnel Control Systemof Gotthard Base Tunnel

Page 2: Tunnel Control System of Gotthard Base Tunnel

September 2015

© Siemens Schweiz AG 2015Seite 2 Peter Müller / MOL PE51

The organizational structure of Siemens Ltd

Electrification, automation and digitalization are Siemens' long-term growth sectors. To fully exploit thesesectors' market potential, we grouped our business into nine Divisions plus Healthcare as an independentlymanaged business.

Pow

erG

ener

atio

nSe

rvic

es

Pow

eran

dG

as

Win

dPo

wer

and

Ren

ewab

les

Ener

gyM

anag

emen

t

Bui

ldin

gTe

chno

logi

es

Mob

ility

Dig

italF

acto

ry

Proc

ess

Indu

strie

san

dD

rives

Hea

lthca

re

Fina

ncia

lSer

vice

s

Page 3: Tunnel Control System of Gotthard Base Tunnel

September 2015

© Siemens Schweiz AG 2015Seite 3 Peter Müller / MOL PE51

Urban Transport Turnkey Projects &Electrification

Mobility Division/MO CC

Organizational structure of the Mobility Division

Jürgen Brandes (CEO)Pierre Bauer (CFO)

Jürgen Wilder (CEO)Veronika Bienert (CFO)

Johannes Emmelheinz (CEO)Marko Feulner (CFO)

Sandra Gott-Karlbauer (CEO)Thomas Karazmann (CFO)

Products, solutions and turnkeysystems for railand road automation andoptimization

Short-distance, regional andlong-distance rolling stock, andproduct and system solutions forpassenger and freight transport

Railbound urban publictransport vehicles, eBuses andpassenger coaches

Complete rail and road solutionsand rail electrification solutions

Services and tools for road andrail infrastructure and rollingstock

Jochen Eickholt(CEO)

Karl Blaim(CFO)

Business Units

Mainline Transport Customer ServicesMobility Management

Ralph Hasselbacher (CEO)Carsten Schladitz (CFO)

Page 4: Tunnel Control System of Gotthard Base Tunnel

September 2015

© Siemens Schweiz AG 2015Seite 5 Peter Müller / MOL PE51

Project AlpTransit GotthardEuropean Railway System

Bild: © ATG

Page 5: Tunnel Control System of Gotthard Base Tunnel

September 2015

© Siemens Schweiz AG 2015Seite 6 Peter Müller / MOL PE51Seite 6

MapAlpTransit Gotthard Railway Tunnel

Bild: swisstopo

Page 6: Tunnel Control System of Gotthard Base Tunnel

September 2015

© Siemens Schweiz AG 2015Seite 7 Peter Müller / MOL PE51

ProfileAlpTransit Gotthard Railway Tunnel

Bild: © ATG

Bild: © ATG

Page 7: Tunnel Control System of Gotthard Base Tunnel

September 2015

© Siemens Schweiz AG 2015Seite 8 Peter Müller / MOL PE51

Tunnel detail viewAlpTransit Gotthard Railway Tunnel

Bild: © ATGBild: © ATG

Page 8: Tunnel Control System of Gotthard Base Tunnel

September 2015

© Siemens Schweiz AG 2015Seite 9 Peter Müller / MOL PE51

OrganizationAlpTransit Gotthard Railway Tunnel

Alptransit Gotthard AG

Siemens Switzerland AGMobility RCM

LP60Tunnel control system

Siemens Switzerland AGMobility PE

LP82Railway control system

SBBInfrastructureOperator

Consortium Transtec Gotthard (TTG)

ALPIQ Alcatel-LucentTHALES

BalfourBeatty

RenaissanceConstruction

Page 9: Tunnel Control System of Gotthard Base Tunnel

September 2015

© Siemens Schweiz AG 2015Seite 10 Peter Müller / MOL PE51

Time scheduleAlpTransit Gotthard Railway Tunnel

On site

Labor

On site

2010 2011 2012 2013 2014 2015 201620092008

startTestinstallation

TestEngineering

TestInstall.

Labor

CompleteSystem

Engineering

Installation Test

Ready for commercial operation

Start

Test

Page 10: Tunnel Control System of Gotthard Base Tunnel

September 2015Seite 11 Peter Müller / MOL PE51

© Siemens Schweiz AG 2015Seite 11

Project LP60 Tunnel Control SystemAlpTransit Gotthard Railway Tunnel

© Siemens Schweiz AG 2014

Page 11: Tunnel Control System of Gotthard Base Tunnel

September 2015

© Siemens Schweiz AG 2015Seite 12 Peter Müller / MOL PE51

Scope of supply LP60 Tunnel Control SystemAlpTransit Gotthard Railway Tunnel

IT - Infrastruktur

SingleSign On Einsatzleit-

System

MaintenanceManagement

Tool

TunnelControl System

Elec

trom

echa

nica

lequ

ipm

ent

Elec

trom

echa

nica

lequ

ipm

ent

Elek

trom

echa

nisc

heA

nlag

en

Eise

nbah

nlei

tsys

tem

Tunnel ControlCystem LP60

WinCC OA

Page 12: Tunnel Control System of Gotthard Base Tunnel

September 2015

© Siemens Schweiz AG 2015Seite 14 Peter Müller / MOL PE51

Integration elektromechanischer Anlagen in die TLTGotthard Basistunnel

© Siemens Schweiz AG 2013

Tunnelleittechnik Eisenbahnleitsystem

Auftraggeber TTG: Auftraggeber ATG RBA:- Expertensystem (BKA, DN, SN, TFK) - Querschlagstüren, Nothaltestellentüren,- Lt 16.7 Hz Bahnstrom - Spurwechseltore, Abschlüsse, Schleusen- Lt 50 Hz Energieversorgung - Querschlagslüftung, Betriebslüftung- TAG/BLT - Hebeeinrichtung Sedrun

- Elektroanlagen NBW, RLT-Anlagen NBWAuftraggeber ATG RB: - Entwässerung inkl. KWKW Sedrun- Bahntechnik-Gebäude Bodio- Bahntechnik-Gebäude Erstfeld

MaintenanceManagement Tool

SAP PM

OPC-UA

OPC-UAXML-Datei

Page 13: Tunnel Control System of Gotthard Base Tunnel

September 2015

© Siemens Schweiz AG 2015Seite 15 Peter Müller / MOL PE51

System architectureAlpTransit Gotthard Railway Tunnel

Betriebsleitzentrale Süd

West

WinCC OA Master

Ost

Oracle RAC 1b

WinCC OA Slave

Ost

WinCC OA Slave

Oracle RAC 2b

West

Ethernet TCP/IP LAN ServerEthernet TCP/IP LAN DB

Redundante KopfrechnerEM – Anlagen

Tunnel OstTunnel West

Betriebsleitzentrale Nord

WinCC OA Master

Oracle RAC 2a

Oracle RAC 1a

KRKRKRKRKRKRKRKR

KRKRKRKRKRKRKRKR

Page 14: Tunnel Control System of Gotthard Base Tunnel

September 2015

© Siemens Schweiz AG 2015Seite 16 Peter Müller / MOL PE51

Display, different levelsAlpTransit Gotthard Railway Tunnel

LP60Tunnel control system

Levels of sub-systems(EMA)

Level 1Overview GBT und CBT

Level 2aOverview GBT

Level 2bSector overview

Level 3Detailview

Level 4aOverview GBT (Web-Browser)

Level 4bSector overview (Web-Browser)

Level 5Detailview (Web-Browser)

Page 15: Tunnel Control System of Gotthard Base Tunnel

September 2015

© Siemens Schweiz AG 2015Seite 17 Peter Müller / MOL PE51

Level 1AlpTransit Gotthard Railway Tunnel

Page 16: Tunnel Control System of Gotthard Base Tunnel

September 2015

© Siemens Schweiz AG 2015Seite 18 Peter Müller / MOL PE51

Level 2aAlpTransit Gotthard Railway Tunnel

Page 17: Tunnel Control System of Gotthard Base Tunnel

September 2015

© Siemens Schweiz AG 2015Seite 20 Peter Müller / MOL PE51

Level 3AlpTransit Gotthard Railway Tunnel

Level 4 & 5:Web-browserInterface

Page 18: Tunnel Control System of Gotthard Base Tunnel

September 2015

© Siemens Schweiz AG 2015Seite 21 Peter Müller / MOL PE51

Level 4 & 5, Web BrowserAlpTransit Gotthard Railway Tunnel

Page 19: Tunnel Control System of Gotthard Base Tunnel

September 2015Seite 22 Peter Müller / MOL PE51

© Siemens Schweiz AG 2015

Control Center Pollegio CEPAlpTransit Gotthard Railway Tunnel

© Siemens Schweiz AG 2014

Page 20: Tunnel Control System of Gotthard Base Tunnel

September 2015

© Siemens Schweiz AG 2015Seite 23 Peter Müller / MOL PE51

Technical OperatorAlpTransit Gotthard Railway Tunnel

LP60

Sub-Systeme

MaintenanceManagement Tool

SAP PM

EmergencyResponse

System

Tunnel ControlSystem

WinCC OA

Error handling / help

info

Railwaycontrol system

Page 21: Tunnel Control System of Gotthard Base Tunnel

September 2015

© Siemens Schweiz AG 2015Seite 24 Peter Müller / MOL PE51

Error handling tool / help / Operator-InstructionsAlpTransit Gotthard Railway Tunnel

Page 22: Tunnel Control System of Gotthard Base Tunnel

September 2015

© Siemens Schweiz AG 2015Seite 25 Peter Müller / MOL PE51

LP60

Emergency Response SystemAlpTransit Gotthard Railway Tunnel

Sub-Systeme

MaintenanceManagement Tool

SAP PM

EmergencyResponse

System

Tunnel ControlSystem

WinCC OA

Error handling / help

Tunnel ReflexRailway

control system

Page 23: Tunnel Control System of Gotthard Base Tunnel

September 2015

© Siemens Schweiz AG 2015Seite 26 Peter Müller / MOL PE51

Emergency Response SystemAlpTransit Gotthard Railway Tunnel

Train:•Train - derailment•Train - crash•Release of dangerous goods•Fire at a train•Stop of train

Infrastructure:• Infrastrucure - fire• Infrastructure - Information from Tunnel Control System

Third party:•Bomb thread•Use of force•Accidence during maintenance•Staff accident•Severe weather, water damage

Page 24: Tunnel Control System of Gotthard Base Tunnel

September 2015

© Siemens Schweiz AG 2015Seite 27 Peter Müller / MOL PE51

Emergency Response SystemAlpTransit Gotthard Railway Tunnel

Page 25: Tunnel Control System of Gotthard Base Tunnel

September 2015

© Siemens Schweiz AG 2015Seite 28 Peter Müller / MOL PE51

LP60

Maintenance Management ToolAlpTransit Gotthard Railway Tunnel

Sub-Systeme

MaintenanceManagement Tool

SAP PM

EmergencyResponse

System

Tunnel ControlSystem

WinCC OA

Error handling / help

Info

Railwaycontrol system

Page 26: Tunnel Control System of Gotthard Base Tunnel

September 2015

© Siemens Schweiz AG 2015Seite 29 Peter Müller / MOL PE51

Maintenance Management ToolAlpTransit Gotthard Railway Tunnel

Failure

Contact failure of door+QSLX.145958.N02=NT01.TA01-A156;AST3

Failure

others

Tunnel control system

Operation instruction

1 2 3..

3 2 1

Operating hours of light+QSLX.145021.N01=EN11.UV01-K32107;K

MaintenanceManagement Tool1 2 3 4 5 6Maintenence orders

1 3

4

2 5

6

Maintenance bundle

Maintenanceshift

31

Message 3324h

> 3000 h

Page 27: Tunnel Control System of Gotthard Base Tunnel

September 2015

© Siemens Schweiz AG 2015Seite 30 Peter Müller / MOL PE51

LinksAlpTransit Gotthard Railway Tunnel

AlpTransit Gotthard AG – ATGwww.alptransit.ch

Transtec Gotthard – TTGwww.transtec-gotthard.ch

Bundesamt für Verkehr – BAVStandberichtewww.bav.admin.ch/alptransit/01386/index.html

Page 28: Tunnel Control System of Gotthard Base Tunnel

September 2015

© Siemens Schweiz AG 2015Seite 31 Peter Müller / MOL PE51

Questions ?

Page 29: Tunnel Control System of Gotthard Base Tunnel

September 2015

© Siemens Schweiz AG 2015Seite 32 Peter Müller / MOL PE51

ThanksPeter MüllerSenior Project Manager, MO MM PE51Hammerweg 1CH-8304 Wallisellen