By VISHAL KUMAR SINGH 1CR12CV057 Guided by: Vibha N. Dalawai TUNNELING BY TUNNEL BORING MACHINE

Upload: vishal-kumar-singh

Post on 14-Jan-2017

420 views

Category:

Engineering


12 download

TRANSCRIPT

Page 1: Tunneling by tunnel boring machine

ByVISHAL KUMAR SINGH

1CR12CV057Guided by:

Vibha N. Dalawai

TUNNELING BY TUNNEL BORING MACHINE

Page 2: Tunneling by tunnel boring machine

CONTENTS Introduction Objective Major construction of TBM Tunnel lining Surveying Geotechnical consideration Different types of TBM Annulus grouts & Mortars References

Page 3: Tunneling by tunnel boring machine

INTRODUCTION First tunneling shield by Sir Marc Isambard Brunel

to excavate under the Thames in 1825. Actual boring machine built-in 1845 by Henri-

Joseph Maus

Page 4: Tunneling by tunnel boring machine

OBJECTIVES To give an understanding of what is a

TBM. To build up an awareness of the wide

variety of perils TBMs are exposed to. Role of civil engineers in this machine

tunneling work. How we utilizes our geotechnical and

survey knowledge.

Page 5: Tunneling by tunnel boring machine

MAJOR COMPONENTS OF TBM

Page 6: Tunneling by tunnel boring machine

TUNNEL LINING 5 segments and 1 key segment, each 1.2

and 1.5 m long and 275 mm thick. The segments were precast with M50

grade concrete at the casting yard

Page 7: Tunneling by tunnel boring machine

SURVEYING After doing general survey i.e.

identifying geographical extent of the construction work, reconnaissance survey, establishing new survey stations from known control stations.

Computation of global coordinates of control stations are performed

Secondary control station established for TBM launching shaft at surface & then transfer that to tunnel control station at underground level

Page 8: Tunneling by tunnel boring machine
Page 9: Tunneling by tunnel boring machine
Page 10: Tunneling by tunnel boring machine
Page 11: Tunneling by tunnel boring machine

GEOTECHNICAL CONSIDERATION

Rock-quality designation (RQD) is a rough measure of the degree of jointing or fracture in a rock mass, measured as a percentage of the drill core in lengths of 10 cm or more. High-quality rock has an RQD of more than 75%, low quality of less than 50%.

Page 12: Tunneling by tunnel boring machine

DIFFERENT TYPES OF TBM 1. SLURRY SHIELD TBM

Page 13: Tunneling by tunnel boring machine

slurry test programmed will generally include the above parameters[ 2]

Page 14: Tunneling by tunnel boring machine

2. Earth pressure balance TBM

Page 15: Tunneling by tunnel boring machine

indicates typical particle size distributions for the use of EPBM[ 3 ]

Page 16: Tunneling by tunnel boring machine

ANNULUS GROUTS & MORTARS To prevent flotation and heaveTo prevent surface subsidence To prevent misalignment of the segment rings To bond the soil and segments into a single

component

Page 17: Tunneling by tunnel boring machine
Page 18: Tunneling by tunnel boring machine

REFERENCES 1).To my training, which I did in tunneling, on the metro site of Delhi, which was under construction under

Shanghai Urban Construction Group (SUCG), joint venture with L&T.

2). Andrew Hung Shing Lee, “ENGINEERING SURVEY SYSTEM FOR TBM (Tunnel Boring

Machine TUNNEL CONSTRUCTION)”, Hong Kong ISBN 978-56-56-65-55

3). Kolymbass, 2005 “TUNNELING & TUNNEL MECHANICS”, 2005, ISBN 456-23-59-20-

12

4). “A GENERAL OVERVIEW ON TUNNEL BORING MACHINES” By Prof. jian ZHAQ, rock

mechanics and tunnelling. UK ISBN 111-419-23-45-71-83

M. Cigla, S. Yagiz & l.Ozdemir,"APPLICATION OF TUNNEL BORING MACHINES IN

UNDERGROUND MINE DEVELOPMENT" ISBN 298-826-67-91-55