Page 1: Turnout 229 Installation 24-02-2016

Turnout 229 Installation

24-02-2016

Page 2: Turnout 229 Installation 24-02-2016

Turnout 229 lifted & placed on sleepers prior to shut

Page 3: Turnout 229 Installation 24-02-2016

Cut of rail on existing mainline and

removing rails with TLB.

Page 4: Turnout 229 Installation 24-02-2016

Removal of sleepers on

mainline

Page 5: Turnout 229 Installation 24-02-2016

Removal of ballast with TLB on

mainline

Page 6: Turnout 229 Installation 24-02-2016

Compacting ballast bed with Mini-Roller

Page 7: Turnout 229 Installation 24-02-2016

Place mini rollers on skid rails under turnout

Page 8: Turnout 229 Installation 24-02-2016

Slide turnout into position

Page 9: Turnout 229 Installation 24-02-2016

Slide turnout into position

Page 10: Turnout 229 Installation 24-02-2016

Slide turnout into position

Page 11: Turnout 229 Installation 24-02-2016

Align turnout with mainline rails

Page 12: Turnout 229 Installation 24-02-2016

Place ballast from stockpile Using TLB;

Clean excess ballast and tamp by hand

Page 13: Turnout 229 Installation 24-02-2016

Welding of SRJ Welds

Page 14: Turnout 229 Installation 24-02-2016

Installation of signal rodding, points machine

and signal pole

Page 15: Turnout 229 Installation 24-02-2016

Welding of ES Welds

Page 16: Turnout 229 Installation 24-02-2016

Tamping Machine

Page 17: Turnout 229 Installation 24-02-2016

1st Train traversing over turnout