twg iii analysis of energy saving electricity in ......grand legi hotel mataram, ntb 26 feb –2...
TRANSCRIPT
-
UNDIP TEAMTECHNICAL WORKING GROUP III :
ANALYSIS OF ENERGY SAVING
ELECTRICITY IN CENTRAL JAVA
Grand Legi Hotel Mataram, NTB 26 Feb – 2 March 2011
-
GENERAL INFORMATION OF CENTRAL JAVA PROVINCE
2
-
According to PLN statistic data costumers in
Central Java increase about 3.5 % every years.
That makes the usage of electrical energy
growing steadily while indonesia is in state of
electrical crisis resulting in power cutting in
random area.
Because of that we need to saving the electrical
energy from household, business, and industry
sectors
3
-
SECTOR FOR EFFICIENCY
HOUSEHOLD
BUSINESS
INDUSTRY
4
-
The most costumers is in household sector
instead of another sectors. Because we
have a lot of customers from this sector,
we can save a lot of energy
HouseHold 5
-
LEVELTotal Costumer
HouseHold Business Industry
Type - 1 (450VA) 3,980,991.00 35,970.00 26.00
Type - 1 (900VA) 1,693,816.00 46,751.00 90.00
Type - 1 (1300VA) 215,524.00 34,785.00 123.00
Type - 1 (2200VA) 85,470.00 38,307.00 151.00
Type - 1 (The Rest) - - 996.00
Type - 2 23,553.00 40,794.00 2,194.00
Type - 3 2,841.00 199.00 900.00
Type - 4 - - 2.00
TOTAL 6,002,195.00 196,806.00 4,482.00
Comparison table between each sectors in Central Java
HouseHold
Reference: Data dan Statistik Tahun 2009 PT. PLN(Persero)
6
-
HouseHold
Business
Industry-
1,000,000.00
2,000,000.00
3,000,000.00
4,000,000.00
5,000,000.00
6,000,000.00
7,000,000.00
Total Costumer
6,002,195.00
196,806.00 4,482.00
HouseHold
Business
Industry
HouseHold 7
-
How to Save Energy in Household Sector?• Increasing the awareness of costumer’s electrical
usage
• Replacing the conventional tools with the energy
saving one
For example, bulb usage is one of energy
saving.
HouseHold 8
-
One way to increase the costumers awareness is time managing
Example : every houses must turning off 2 bulbs in specific time
(ex: 5pm – 10pm). That bulb has 10 watts. Then, every houses
can save about 100 watts.
And every months saving = Rp 9,607,413,426.75 = Rp 9.6
billion with just the awareness from citizen to turn bulb off from
this household sector, or this can save up to 18GWh
HouseHold 9
-
HouseHold
Number of bulb 2
Energy Consumed (W) 10
Time(hours) 5
Price (Rp./kWh) 533.55
Total Costumer 6,002,195
Saving energy (Rp.) 9,607,413,426.75
Saving energy (kWh) 18,006,585
Before Saving Energy After Saving Energy
Total Energy Sold (kWh) 6,424,319,568 6,406,312,983
Percentage saving : 0.28%
10
Saving energy : 9.6 Billion rupiah
-
HouseHold
6,395,000,000
6,400,000,000
6,405,000,000
6,410,000,000
6,415,000,000
6,420,000,000
6,425,000,000
Before Saving Energy After Saving Energy
6,424,319,568
6,406,312,983
Total energy sold 1 year(kWh)
Total energy sold 1 year(kWh)
11
-
Beside awareness, we can save the energy with another
method, that is with replacing the conventional bulb with the
energy-saving bulb
For example, every houses replace 3 conventional bulb with
the energy-saving bulb, then we can analyze for using energy-
saving bulb, we can save such amount of kW
HouseHold 12
-
Conventional Energy saving
Life time (hours) 1000.00 6000 - 10000
Replacement (month) 8 50
Energy consumed (W) 60 14
Price (Rp.) 5,000 32,500
Electric cost Rp./kWh (for 1300 VA) 694.48 694.48
watt hours per month 8,280 1,932
kWh per month 8.28 1.93
Monthly payment 5,750.31 1,341.74
Monthly pay for 3 bulbs 17,250.92 4,025.22
HouseHold 13
-
According to counting and analyzing in that chart, the
usage of energy-saving bulb in 5 months can give back
our money to buy the energy saving bulb.
Even, in next months, every houses make such a profit
after using the energy-saving bulb.
And, the important is, with using this energy-saving bulb,
Central Java can save money up to Rp 26.9 billion just
from household sector.
Percentage : 0.78%
HouseHold 14
-
This business sector is a sector which need a lot of
energy
According to PLN statistic data, the electric cost/kWh in
this sector is higher than other sector
Business 15
-
Business
LEVELPrice (Rp./kWh)
HouseHold Business Industry
Type - 1 (450VA) 417.95 556.26 461.58
Type - 1 (900VA) 624.38 644.14 630.68
Type - 1 (1300VA) 694.48 708.70 747.67
Type - 1 (2200VA) 705.38 768.34 782.45
Type - 1 (The Rest) - - 1,048.29
Type - 2 791.36 1,037.42 832.28
Type - 3 1,186.33 839.33 649.46
Type - 4 - - 529.88
TOTAL 533.55 927.89 648.35
Reference: Data dan Statistik Tahun 2009 PT. PLN(Persero)
16
-
HouseHold
Business
Industry-
200.00
400.00
600.00
800.00
1,000.00
Rp./kWh
533.55
927.89
648.35
HouseHold
Business
Industry
Business 17
-
How to Save Energy in Business Sector?
like household sector, in business sector, there’s two ways to saving
energy
• Increasing the awareness of costumer’s electrical
usage
• Replacing the conventional tools with the energy
saving one
Business 18
-
To increase the costumers awareness is time managing
we can prevent energy wasting when not needed like
lamp, water heater in Hotel, etc
Example of management time in Santika Hotel
Semarang
Business 19
Saving Energy.xls
-
Kind of Hotel
Star Hotel Non Star Hotel
Unit 106 1090
Number of Bulb 10 4
Saving Time(hours) 5 5
Energy Consumed(W) 60 60
Electric Cost (Rp./kWh) 1037.42 708.7
Watt hours per month 9000 9000
kWh per month 9 9
Monthly Saving/bulb 9336.78 6378.3
Monthly Saving/ hotel Total Saving(Rp.)
STAR HOTEL 93,367.8 9,896,986.8
NON STAR HOTEL 25,513.2 27,809,388.0
ALL HOTEL 37,706,374.8
Business
Analysis of counting energy saving with power cutting in hotels in Central Java
20
-
The second method is replacing conventional with
energy saving electrical tools.
For example, saving energy can be done just with
replacing conventional bulb with energy-saving lamp, just
like in household sector.
In hotel business, we can replacing solar-fuel boiler with
heat exchanger
Business 21
-
For simulation, assume that every hotels replace 20
conventional bulbs with energy-saving bulbs.
Business
Conventional Energy saving
Life time (hours) 1000 6000 - 10000
Replacement (month) 8 50
Energy consumed (W) 60 14
Price (Rp.) 15,000 32,500
watt hours per month 8,985 1,932
kWh per month 8.99 1.93
Electric cost Rp./kWh (for 450 VA) 556.26 556.26
Electric cost Rp./kWh (for 900 VA) 644.14 644.14
Electric cost Rp./kWh (for 1300 VA) 708.70 708.70
Electric cost Rp./kWh (for 2200 VA) 768.34 768.34
Electric cost Rp./kWh (for Type - 2) 1,037.42 1,037.42
Electric cost Rp./kWh (for Type - 3) 839.33 839.33
22
-
According to counting and analyzing every level from this
sector, will produce different saving in every level.
Here is a chart for energy saving every level from
replacing conventional bulb with energy-saving bulb
Business
Click
me
LEVEL Energy Saving (Rp.)
B1-450VA 773,129,389
B1-900VA 1,163,617,070
B1-1300VA 3,487,554,951
B1-2200VA 1,049,008,756
B - 2 1,635,261,145
B - 3 6,453,875
TOTAL B 8,115,025,185
23
comparison between conventional and energi save bulb.xlsxcomparison between conventional and energi save bulb.xlsx
-
773,129,389
1,163,617,070
3,487,554,951
1,049,008,756
1,635,261,145
6,453,875
(Rp.)
B1-450VA
B1-900VA
B1-1300VA
B1-2200VA
B - 2
B - 3
Business 24
-
Assume we replacing solar-fuel boiler with heat
exchanger.
With the data as below, we can analyze advantages of
using a heat exchanger than the boiler
Boiler Heat Exchanger
Price (Rp.) 35,000,000 42,000,000
Diesel Oil cost Rp 4,500 -
Diesel Oil cost (for 2500 VA) Rp 1,800/kWh -
watt hours per days 10,000 -
watt hours per month 300,000 -
kWh per month 300.00 -
Monthly payment 540,000.00 -
Business 25
-
From the above data obtained calculation results that by
replacing the heat exchanger obtained BEP (Break Event
Point) in the next 11 months from the time of initial
purchase.
And when calculated by the turn of heat exchanger the
importance of the profit of Rp 66.036.872/month, with the
amount of 106 hotels, include two star hotels to five star.
Business
LEVEL TOTAL HOTELS SAVING ENERGY(Rp)
B1-450VABecause non star hotel (450VA-1300VA) don't use heat
exchanger, we don't count themB1-900VA
B1-1300VA
B1-2200VA 51 31,900,056
B - 2 54 33,348,110
B - 3 1 788,706
JUMLAH B 106 66,036,872
26
-
This sector has the highest active work
than other sectors.
Electrical usage for production must be
active for about 12 hours a day.
This sector has also consume the highest
electrical power than other sectors
Industry 27
-
LEVELAvarage Time per Costumer
HouseHold Business Industry
Type - 1 (450VA) 156 132 227
Type - 1 (900VA) 116 140 130
Type - 1 (1300VA) 133 141 125
Type - 1 (2200VA) 135 133 113
Type - 1 (The Rest) 0 0 77
Type - 2 132 145 154
Type - 3 116 187 319
Type - 4 0 0 334
Industry
Table comparison of active work between each sector in Central Java
Reference: Data dan Statistik Tahun 2009 PT. PLN(Persero)
28
-
Industry
Picture of comparison of active work between each sector in Central Java
0
50
100
150
200
250
300
HouseHold Business Industry
Avarage Time per Costumer 1 year
Avarage Time per Costumer
29
-
LEVELkWh per costumer
HouseHold Business Industry
Type - 1 (450VA) 70 59 102
Type - 1 (900VA) 105 126 117
Type - 1 (1300VA) 173 183 163
Type - 1 (2200VA) 297 292 249
Type - 1 (The Rest) - - 703
Type - 2 541 1,769 11,802
Type - 3 1,348 127,978 339,017
Type - 4 - - 22,740,000
Industry
kWh per costumer comparison between each sectors in Central Java
30
-
Industry
kWh per costumer
HouseHold
Business
Industry
kWh per costumer comparison between each sectors in Central Java
31
-
How to Save Energy in Business Sector?
Just like in household sector and business sector, there’s two ways to saving energy
• Increasing the awareness of costumer’s electrical
usage
• Replacing the conventional tools with the energy
saving one
Industry 32
-
We can save a lot of energy-saving with turning off non-
usage electrical tools. Assume every consumer of
industry sector turning off 6 bulbs in 5 hours.
After counting, this sector can save up to
Rp.156,930,955.20/month, if we convert it into kWh, we
can save up to 242,028 kWh/month.
Industry 33
-
Number of bulb 6
Energy Consumed (W) 60
Time(hours) 5
Price (Rp./kWh) 648.4
Total Costumer 4,482
Saving energy (Rp.)/month 156,930,955.20
Saving energy (kWh)/month 242,028
Before Saving Energy After Saving Energy
Total Energy Sold (kWh) 4,527,128,866 4,524,224,530
4,522,000,000
4,523,000,000
4,524,000,000
4,525,000,000
4,526,000,000
4,527,000,000
4,528,000,000
Before Saving Energy
After Saving Energy
Total energy sold 1 year(kWh)
Total energy sold 1 year(kWh)
Industry 34
-
Replacing the conventional tools with a
energy-saving tools can save a lot of
energy
Or replacing the diesel pump with the
electric pump.
Industry 35
-
In this sector, we also can replacing the conventional with
energy-saving bulbs.
Assume that every industry replacing 10 conventional
with 10 energy-saving bulbs
Industry 36
-
LEVELEnergy saving/month
(kWh)
Type - 1 (450VA) 8.92
Type - 1 (900VA) 12.18
Type - 1 (1300VA) 14.45
Type - 1 (2200VA) 15.12
Type - 1 (> 2200VA) 20.25
Type - 2 16.08
Type - 3 12.55
Type - 4 10.24
TOTAL 99.54
LEVELEnergy Saving/month
(Rp)
I1-450VA 231,861
I1-900VA 1,096,618
I1-1300VA 1,776,744
I1-2200VA 2,282,650
I1- >2200VA 16,015,359
I - 2 35,278,813
I - 3 11,292,856
I - 4 20,474
TOTAL I 56,682,044
Industry 37
-
-
50,000.00
100,000.00
150,000.00
200,000.00
250,000.00
Saving Energy in kWh/Year
Energy saving
Conventional
Industry 38
-
2,934,600,000,000
2,934,800,000,000
2,935,000,000,000
2,935,200,000,000
2,935,400,000,000
2,935,600,000,000
2,935,800,000,000
2,936,000,000,000
TOTAL I
Energy Saving per Year (Rp.)
ENERGY SAVING
BEFORE
Click
me
Industry 39
comparison between conventional and energi save bulb.xlsxcomparison between conventional and energi save bulb.xlsx
-
This method will have result in saving a lot of electrical energy.
Assume we replace 3 diesel oil pump with 3 electric pump.
Pump (with genset) Pump (with electric pump)
Price (Rp.) 3,850,000 5,000,000
Diesel Oil cost Rp 4,500 -
Energy consumed (W) 380 380
Diesel Oil cost (for 1300 VA) Rp 1,800/kWh -
Electric cost (for 1300 VA) - Rp.694.5/kWh
watt hours per days 2,356 2,356
watt hours per month 70,680 70,680
kWh per month 70.68 70.68
Monthly payment 127,224.00 49,087.26
Monthly pay for 3 pump 381,672.00 147,261.78
Industry 40
-
From the data above, we know that with replacing diesel
oil pump with electric pump, we get profit around Rp 1.2
billion/month from the 5537 industries in Central Java.
(after we counting, we get BEP for 6 months).
Industry 41
-
LEVEL
TOTAL
INDUSTRY
SAVING
ENERGY(Rp)
I1-450VA 32 7,022,681
I1-900VA 111 24,309,281
I1-1300VA 152 33,222,683
I1-2200VA 187 40,785,571
I1-sisanya 1230 269,022,705
I - 2 2710 592,606,240
I - 3 1112 243,092,806
I - 4 2 540,206
JUMLAH I 5537 1,210,602,174
Industry 42
Saving in rupiah/month = Rp. 218,638.6
-
2,930,000,000,000
2,932,000,000,000
2,934,000,000,000
2,936,000,000,000
2,938,000,000,000
2,940,000,000,000
JUMLAH I
SAVING ENERGY
BEFORE
Industry 43
-
Electric General Activities ImplementedRealization
KWH/Year
Optimisation of lamps
Spinning 1 – 7
WV 3 Inspect
Reduction lamp at no machine area
Reduction lamp at no machine area
933.47
9.93
Reposition of lamps
Weaving 1A
Weaving 1B + 1 Prept
Weaving 4 Rebeamer + ball
warper
Reposition and reduction of lamps
Reposition and reduction of lamps
Reposition and reduction of lamps
134.31
94.32
108.60
Energy efficient lamps
Workshop Vehicle Dept
Outside lighting
Garden lamp of offices
Warehouse lamp canopy
Warehouse lamp canopy
Change Lp. HPL-N 250W to Lp. TL 1X36 W
LDR to Rotary Timer Relay (10 have- attach )
Change to Lp. HPL-N 125W dg lp SL 27 W
Change to Lp HPL-N 125W dg lp TL 2X40 W
Change to Lp HPL-N 250W dg lp TL 1X40 W
5.47
801.35
617.48
3.64
7.58
Industry 44
-
Electric General Activities ImplementedRealization
KWH/Year
Power Genset + PLN Optimisation of Cos Q and monitoring 957.24
Spinning 1
Optimisation of Dust filter stop 6 mc. @11 KW
for 24 hrs for carding464,238.37
Switching off carding motor during main
Cleaning cycle5,625.92
Stop dust filter blowing 2 mc.@30kw for 24 hrs 422,034.39
Spinning 1,2,3,4,5,6,7Installing timer to control empty tube conveyor
in winding13,245.70
Spinning 2
Optimisation of vaccum
Stop central blower 1 motor
30kw for 24 hrs in winding
211,017.19
Switching off carding motors during main
cleaning cycle6,329.84
Industry 45
-
Electric General Activities ImplementedRealization
KWH/Year
Spinning 3Switching off carding motors during main
cleaning cycle13,128.97
Spinning 4 RY
Switching off carding motors during main
cleaning cycle5,625.92
Optimisation of supply air fan blowing 2 unit @
11 kw154,745.67
Spinning 4 RY, 5 , 6,7 Optimisation of blower TFO 2 unit @ 11 kw 921,441.60
Spinning 6Optimisation dust collector blowing 4motor 30kw
for 24 hrs/day844,070.15
Switching off carding motors during main
cleaning cycle25,009.26
3,090,186.37
In rupiah : 3,090,186.37 *Rp. 530= Rp. 1,637,798,776 = 1.6 Billion Rupiah/yearFor 1 industry
Industry 46
-
Electric General Activities ImplementedRealization
KWH/Year
Reposition of lamps
TFO & Winding SP 4Reposition and reduction of lamps 82,022
Energy efficient lamps
Change Lp. Iwata 250 W to Lp. Garden 125 W
Change Lp. HPL-N 250 W (kanopi) to Lp. TL
2x36 W
13,500
Change Lp. HPL-N 250 W to Lp. SON-H 220 W 108
Power PLNTo reduce KVA max /set cos Q 0,99 during
WBP 0,703 becomes 0.613 =1,060 KVAmax642,952.56
Room of Transfomer Spinning
Spinning 2
Spinning 4 + 6
Change exhaust fan with bird mesh 20,512.80
Change exhaust fan with bird mesh 56,448.00
Industry 47
-
Electric General Activities ImplementedRealization
KWH/Year
Compressor ST 2
SP 1, 2 , 5 & 6 optimisation of
transformer
Optimisation of transformers 17,600
Spinning 1
Modification in blening system to stop motor
Roller equipment during proces of Rayon
(3x0,37 KW during 24 hrs )
8,151.84
Spinning 1,2,4OE,5,6,7Stop Chiller according to process and better
outside condition9,340,500.00
Spinning 2
Stop Multi Mixer 2 mesin @ 8 KW during 24 hrs
Line 354,508.80
Line 2 49,776.00
Spinning 3Optimisation of Central Blower 1 motor 30 KW
Ampere total decrease +/- 10 Amp44,256.17
Industry 48
-
Electric General Activities ImplementedRealization
KWH/Year
Spinning 4 RY,4OE,5Stop Supply Air Fan MC. Wind 1x15 KW for 24
hrs/day1,052,028.00
Spinning 5 , 6 , 7Stop Return duct Blowing of east location 1x 30
KW for 24 hrs/day772,344.00
Spinning 6
Optimisation of air conditioning in Prep (Roving)
1x22KW for 24 hrs/day161,568.00
Stop Waste Dust Collection Blowing of south
location (2 x 11 KW)161,568.00
Stop Cooling Fan R.Trafo (6 x 0.37 KW) 13,586.40
Spinning 7
Optimisation of air conditioning in Drawing 2 x
22KW during 24 hrs/day296,208.00
Stop Supply Air Fan for mc. Winding- (1 x 18.5
KW)124,542.00
Industry 49
-
Electric General Activities ImplementedRealization
KWH/Year
Weaving 1A , 1B , 1 Prep Optimisation of lighting 487,604.20
Weaving 1A , 1 Prep , 2 , 3
Optimisation of air conditioning system ( 133.052
KWH / Month )2,421,881.28
Change new main motor 3 nos for somet
( 1528.2 KWh / Month )15,282.00
Stop Operational Blower 60 during yarn breakage (
@713,1 KWh / Month )42,786.00
Weaving 2Stop Operasional main motor 20 duringyarn
breakage ( 2.280 KWh)27,360.00
Total 15,907,094.45
In rupiah : 15,907,094.45 *Rp. 530= Rp. 8,430,760,059 = 8,43 Billion Rupiah/yearFor 1 industry
Industry 50
-
0 Year First Year Second Year
Energy Consumption kW
h
348.647.205 336.947.485 310.876.940
Saving kW
h
0 (3.090.186,37) (15.907.094,45)
Precentage ( % ) (0.91) (5.1)
In Rupiah (Billion/Year) 1.6 8,43
Industry 51
-
52