TWI Land at Granta Park
Pre-Let Opportunities February 2017
Contents
1.0 Masterplan Phase I & Phase II . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
2.0 Masterplan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
3.0 Summary Schedule of Areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
4.0 Building Massing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
5.0 CGI / Images . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
6.0 Specification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
7.0 Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
8.0 Park Amenities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
9.0 Team & Track Record . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Contents
1.0 Masterplan Phase I & Phase II
Aerial Photograph of Granta Park - September 2011
PHASE I
PHASE II
2 T W I G R A N TA PA R K J A N UA R Y 2017
T W I G R A N TA PA R K J A N UA R Y 2017 3
2.0 Masterplan
3.0 Summary Schedule of Areas
ZoneZone 2 Site Area
PLOT
sqft sqm sqft sqm sqft sqm sqft sqm sqft sqm sqft sqmBuilding Areas
above Ground (GEA)Level 0 24,000 2,230 24,000 2,230 28,000 2,605 28,000 2,605 28,000 2,605 132,000 12,275
Level 1 24,000 2,230 24,000 2,230 28,000 2,605 28,000 2,605 28,000 2,605 132,000 12,275
Level 2 24,000 2,230 24,000 2,230 28,000 2,605 28,000 2,605 0 0 104,000 9,670
Total Areas above Ground (GEA) 71,000 6,690 71,000 6,690 85,000 7,815 85,000 7,815 56,000 5,210
Total Plot Area (GEA in sqft)
Total Plot Area (GEA in sqm)
Car Park Spaces at Grade
Car Parking Car Parking Spaces
Total
Car Parking Efficiency (%) 51 51
368,000
34,220
218
263 749
658
22 31
13,380 20,840
A B
876
25 25 24
1,012
34
23 29 136
F G H
31
226,000142,000
1,221,000 sqft2
TOTALS
NIA / GIA Efficiencies will be targeted at 85%
T W I G R A N TA PA R K 27 M A R C H 2015 5
4.0 Building Massing
6 T W I G R A N TA PA R K J A N UA R Y 2017
5.0 CGI / Images
T W I G R A N TA PA R K J A N UA R Y 2017 7
6.0 Specification
The building will be constructed in accordance with the following base specification. It will be designed and constructed in accordance with all relevant British Standards and current best practice. The design will be based on the recommendations of the BCO Office Guidelines.
• Building Structure Steel frame with concrete floors
• Building Envelope High quality proprietary glazing and cladding system
• Key Dimensions 1.5m planning grid and 2.80m floor to ceiling
• Floors and Ceilings 150mm (nominal) raised floor access and metal ceiling tiles
• Air Conditioning EC/DC 4-pipe variable air volume fan coil on the perimeter providing heating and cooling 2-pipe variable speed fan coil in the internal areas to provide cooling only
• Mechanical Services Internal design conditions 24oC +/-20C (summer), 20oC +/-20C (summer)
• Electrical Services Small power 15w/sqm plus 10w/sqm. Lighting 10w/sqm – LG7 compatible
• Floor Boxes Floor boxes provided at 1:10 per sqm
• Population Density Occupation of 1:10 per sq. m with opportunity for 1:8 sq. m on lower floors (escape 1:6 per sqm)
• Lifts (Typical Building) 2 x 21 person passenger lifts. 1no 2000kg goods lift
• WC and Shower Provision 1:10 with no diversity of 1:8 with 20% diversity.
• Car and Cycle Parking Car parking, ratio of 1 space / 34 sqm, provision of cycle racks, lockers and changing facilities
• Sustainability BREEAM Excellent EPC B
• Tenant Plant Area Designated area within roof top plant room
8 T W I G R A N TA PA R K J A N UA R Y 2017
7.0 Summary
• High quality
• Superb landscape setting
• Proximate to many new amenities on the park
• In the heart of the shifting focus of Granta Park
• Excellent sustainability credentials
• Large, flexible and efficient floor plates
• Adjoining plot expansion opportunities
• Car parking of 1space / 34 sqm
• Bicycle parking
• Quick planning and delivery programme from experienced team
Aerial Photograph of Granta Park - September 2011
PHASE I
PHASE II
T W I G R A N TA PA R K J A N UA R Y 2017 9
8.0 Park Amenities
• Park Cafe
• Fully catered restaurant
• Conference & meeting facilities on site
• Swimming pool
• Climbing wall
• Cycle track
• Creche
• Shuttle bus
10 T W I G R A N TA PA R K J A N UA R Y 2017
9.0 Team & Track Record
The original Granta Park masterplan was prepared in the 1990s by Eric Parry Architects with Glanville Associates responsible for the design of all on site services and highway engineering and Carter Jonas acting as planning consultants.
This original team will provide a full service on behalf of the freeholder including approval of building drawings within the Granta Park Masterplan criteria, submission and settling of all planning applications.
Client:
Granta Park Estates c/o TWI
Granta Park Abington Cambridgeshire CB21 6AL
Ian Laing
Profile
Ian Laing has been involved in property development since the early 1970’s. He has been responsible for a large number of commercial developments.
These include the transformation of Milton Park near Oxford from an ordnance depot to one of Europe’s leading mixed use business parks and the development of Granta Park from its inception in the mid 1990’s to the recent TWI extension project.
Architect:
Eric Parry Architects
Discovery House 28-42 Banner Street London EC1Y 8QE
Eric Parry
Profile
Eric Parry Architects was established in 1983. Eric Parry’s ability to work across many building types is shown in the long standing history of working in all fields of architecture spanning from masterplan design to many office buildings in the City of London as well as educational buildings.
Eric Parry Architects’ masterplan involvement include office building contributions for Stockley Park, a large business park close to Heathrow developed by Stanhope Properties, establishing Phase 1 of the Granta Park Masterplan for The Welding Insitute and the recently completed extension of the existing Welding Institute facilities on site.
Civil and Transport Engineer:
Glanville Consultants Limited
3 Grovelands Business Centre Boundary Way Hemel Hempstead HP2 7TE
Nigel Porter
Profile
Nigel Porter is a structural engineer and project manager. He has been involved in commercial and laboratory developments for over 30 years.
These have included all the infrastructure works at Granta Park and most of the buildings including the Flowers Building and the current TWI extension.
Property Consultants:
Bidwells
Bidwell House Trumpington Road Cambridge CB2 9LD
Dick Wise
Profile
Cambridge Number 1 agents with a track record in delivering significant pre lets including, Microsoft, NAPP Pharmaceuticals, Astra Zeneca ( land sale ) and the two pending including ARM and Illumina.
T W I G R A N TA PA R K J A N UA R Y 2017 11