uknf: management. organisation sb:sb: –now in place; –inaugural chair, r.gamet (liverpool)...

3
UKNF: UKNF: Management Management

Upload: karen-carter

Post on 17-Dec-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: UKNF: Management. Organisation SB:SB: –Now in place; –Inaugural chair, R.Gamet (Liverpool) –First meeting in April, elected P.Harrison (Warwick) as Chair

UKNF:UKNF:

ManagementManagement

Page 2: UKNF: Management. Organisation SB:SB: –Now in place; –Inaugural chair, R.Gamet (Liverpool) –First meeting in April, elected P.Harrison (Warwick) as Chair

OrganisatiOrganisationon• SB:SB:

– Now in place;Now in place;– Inaugural chair, R.Gamet Inaugural chair, R.Gamet

(Liverpool)(Liverpool)– First meeting in April, elected First meeting in April, elected

P.Harrison (Warwick) as ChairP.Harrison (Warwick) as Chair• EB:EB:

– Meeting monthly:Meeting monthly:– WPMs and SB chairWPMs and SB chair– Strategy and management of Strategy and management of

resources and priorities, resources and priorities, – Reports to SBReports to SB

• FC:FC:– Now in placeNow in place

• Improvements in presentation Improvements in presentation of information still required, of information still required, but data collection workingbut data collection working

• PO:PO:– Role is collecting milestone Role is collecting milestone

data preparation of EV etc.data preparation of EV etc.– TO now defined:TO now defined:

• Ray Gamet (Liverpool)Ray Gamet (Liverpool)– Ideal! Ideal! – Highly organised respected Highly organised respected

senior member of staffsenior member of staff

• Anticipate continued Anticipate continued improvement as teams ‘bed in’improvement as teams ‘bed in’

UKNF Executive Board

Meets monthly

Chair: Spokesman

Representation:WPMsOthers by invitation

UKNF Stakeholders BoardMeets at plenary meetings

i.e. 2–3 times a year

Chair: Chosen from SB members

Representation:Group leadersWork-package managersLab./BU/Dept. representatives

Finance CommitteeMeets monthlyOAPM, MICE-UK PM, FO

Project OfficeMeets as requiredOAPM, MICE-UK PM, TO

UKNF/MICE-UK organisation 2007

UK Neutrino Factory programme

UKNF specific UKNF specific UKNF generic UKNF generic

WP1: Conceptual design

WP1: Conceptual design

MICE-UK MICE-UK

WP2: Site survey and geology

WP2: Site survey and geology

WP3: Intl Design Study

WP3: Intl Design Study

WP1: MICE Hall, etc.

WP1: MICE Hall, etc.

WP2: Focus-coil module

WP2: Focus-coil module

WP3: Operations and analysis

WP3: Operations and analysis

WP1: Front-end test stand

WP1: Front-end test stand

WP2: Target studies

WP2: Target studies

WP3: Cavity development

WP3: Cavity development

OAPM: Over-arching project managerMICE-UK PM: MICE-UK project managerTO: Technical OfficerFO: Finance Officer

Page 3: UKNF: Management. Organisation SB:SB: –Now in place; –Inaugural chair, R.Gamet (Liverpool) –First meeting in April, elected P.Harrison (Warwick) as Chair

Bringing it all together:Bringing it all together:• UKNF programme, of which MICE Phase II is UKNF programme, of which MICE Phase II is

the flagship, is working wellthe flagship, is working well• International Design Study for the Neutrino International Design Study for the Neutrino

Factory (the IDS-NF) vision drives the delivery Factory (the IDS-NF) vision drives the delivery of the whole:of the whole:– IDR 2010: defines the goals for (EuroNu) and:IDR 2010: defines the goals for (EuroNu) and:

• UKNF-Specific WP1UKNF-Specific WP1

– RDR 2012: defines the goals for (EuroNu later years) RDR 2012: defines the goals for (EuroNu later years) and:and:• MICEMICE• UKNF-Generic WP1, 2, 3UKNF-Generic WP1, 2, 3

• IDS-NF:IDS-NF:– Now working to define responsibilitiesNow working to define responsibilities

• Goal draft document by next IDS-NF plenary March 2009Goal draft document by next IDS-NF plenary March 2009

– STFC should (and has made initial steps to) take the STFC should (and has made initial steps to) take the lead in assembling a consortium (STFC, DOE, CERN, lead in assembling a consortium (STFC, DOE, CERN, …) to give IDS-NF the mandate to deliver RDR by …) to give IDS-NF the mandate to deliver RDR by 20122012