Understanding About Checklist Noel MadesFebruary 4, 2014Checklists
There was one search on this site; it appeared to be like this “Definition of Checklist and How to
build.” Let us give a response for that search by making a post for that alone, it may have been a kind
of request.
I am going to give a definition and ways on how to build a checklist and I am going to show also the
sample checklist. But first let me give a definition of Checklist.
Checklist Definition
Checklist is a list of items to be noted or checked in a completed part of activity. It is always attached
with the Inspection Request (IR) to be signed-off by concern parties once inspection is accepted.
A Checklist shall be made for each activity on site. It is the basis of confirmation that a part of
activity has been done as per method or procedure of the work.
Checklist shall be done after a construction of method statement and Inspection and Test Plan.
Here is a sample of a Checklist for Block Works activity.
![Page 2: Understanding About Checklist.pdf](https://reader031.vdocument.in/reader031/viewer/2022020519/577cc5bf1a28aba7119d1cff/html5/thumbnails/2.jpg)
Checklist for Block Works
ITEM Ativities/Items to be
Inspected
Conforms
(YES/NO) Contractor
Engineer/
Consultant
Client/
Employer Remarks
a). Preparatory Inspection
1 MS/ITP/Shop Drawing
Approved
2 Materials Approved by
Client or Engineer
b. Final Inspection
1 Check Setting out and
Surface Preparation
2 Blocks are dampened
with water before
installation
3 Mortar Mix as per
approved MS
4 Number of course as
specified and approved
5 Blockwork joints were
properly filled with
mortar and rake to form
key for plaster
6 Wall ties are fixed at
junctions of concrete
walls and columns and
all requiered
7 Horizontal stack
provided as per method
![Page 3: Understanding About Checklist.pdf](https://reader031.vdocument.in/reader031/viewer/2022020519/577cc5bf1a28aba7119d1cff/html5/thumbnails/3.jpg)
ITEM Ativities/Items to be
Inspected
Conforms
(YES/NO) Contractor
Engineer/
Consultant
Client/
Employer Remarks
statement
8 All required MEP
embedments and
openings are in placed
9 Alignment and
verticality checked
10 Compressible filler and
sealant provided
11 Curing is made
Comments/ Discrepancies (If any:)
That’s how to build a checklist. If you have suggestions please feel free to comment and leave your
reply.
To those who want to request for a soft copy of the complete format (excel format) of this checklist
please comment or leave your request below and I’m going to send to you via email.