university of seoulwpvcemweb01.itap.purdue.edu/glf/docu/university of seoul.pdf · on going...

23
1 University of University of University of University of Seoul Seoul Seoul Seoul (South Korea) (South Korea) (South Korea) (South Korea) CEM CEM CEM CEM Program Program Program Program Professor Chang Professor Chang Professor Chang Professor Chang-Taek Taek Taek Taek Hyun, Ph.D., P.E. Hyun, Ph.D., P.E. Hyun, Ph.D., P.E. Hyun, Ph.D., P.E. Vice President, KICEM(Korea Institute of CEM) Vice President, KICEM(Korea Institute of CEM) Vice President, KICEM(Korea Institute of CEM) Vice President, KICEM(Korea Institute of CEM) First Global Leadership Forum for Construction Engineering and Management Programs, 2011. 03. 20~22 Department History 1 Research 2 Teaching 3 Academic Management 4 Issues and Concerns 5 CONTENTS CONTENTS KICEM 7 Collaboration Opportunities 6

Upload: dinhliem

Post on 23-Jan-2019

224 views

Category:

Documents


0 download

TRANSCRIPT

1

University of University of University of University of SeoulSeoulSeoulSeoul(South Korea)(South Korea)(South Korea)(South Korea)

CEM CEM CEM CEM ProgramProgramProgramProgram

Professor ChangProfessor ChangProfessor ChangProfessor Chang----TaekTaekTaekTaek Hyun, Ph.D., P.E.Hyun, Ph.D., P.E.Hyun, Ph.D., P.E.Hyun, Ph.D., P.E.

Vice President, KICEM(Korea Institute of CEM) Vice President, KICEM(Korea Institute of CEM) Vice President, KICEM(Korea Institute of CEM) Vice President, KICEM(Korea Institute of CEM)

First Global Leadership Forum for Construction Engineering and Management Programs, 2011. 03. 20~22

Department History1

Research2

Teaching3

Academic Management4

Issues and Concerns5

CONTENTSCONTENTS

KICEM7

Collaboration Opportunities6

2

1. Department History

1975197519751975Inauguration ofArchitecturalEngineeringDepartment

1982198219821982

Inauguration of theMasters program in theGraduate School

1985198519851985Inauguration of thePh.D program in theGraduate School

1996199619961996

The Programs in Architecture andArchitectural Engineering wereReestablished as 4-year programsWithin the newly formed Faculty ofArchitecture, Urban Planning,Landscape Architecture and College ofUrban Sciences

1999199919991999Post-professionalGraduate programRe-established asGraduate School ofUrban Science

2000200020002000Department of Architecture and Department of ArchitecturalEngineering established

2002200220022002

Inauguration of the5-year Program inArchitecture

2003200320032003Department of Architecture and Department of ArchitecturalEngineering established asIndependent programs in theGraduate School

Start to prepareABEEK(Acceditation Board forEngineering Educaiton of korea)

2005200520052005

Reorganization into School ofArchitecture and ArchitecturalEngineering

1. Department History

2009200920092009Receive theAccreditation ofABEEK

4

Department : From 1975~(36years)

3

1. Department History

� Prepare opportunity to study overall construction process, form feasibility Study to maintenance and demolition

� Provide global leadership in the Architectural Engineering and urbanism of the Asian Arena

� Nurture fundamental engineer based on innovative program, various practical experience, and extramural activities

5

� Purpose of Department

1. Department History

6

� Purpose of CEM

4

1. Department History� Faculty

ProfessorProfessorProfessorProfessor

Dr. Myung-Jun KimNoise & Vibration Control

in Buildings

Dr. Myong-O YoonArchitectural Materials & Fire Protection Engineering

Associate Professor

Dr. Kyo-Jin kooConstruction Engineering

and Management

Dr. Jung-Ho HuhBuilding Energy and Environment,HAVC System Design and Control

Job openingCE & M

7

Dr. Ki-Hyuk KwonEvaluation and Analysis

of Structures

Dr. Sung-Mo ChoiStructures Engineering and Steel Structure

Dr. Kang-Su KimStructures Engineering and Concrete Structure

Dr. Chang-TaekHyunConstruction Engineering

and Management

1. Department History� Faculty

Dr. Yoo-Sang YoonMega Project

Research Professor

Dr. Hyun-SeokMoonBK21

Staff

Jung-Min LeeSun-Young Lee

8

* BK21 : ‘Brain Korea 21* BK21 : ‘Brain Korea 21* BK21 : ‘Brain Korea 21* BK21 : ‘Brain Korea 21stststst century’century’century’century’Program funded by GovernmentProgram funded by GovernmentProgram funded by GovernmentProgram funded by Government

Assistant Professor

Dr. Hyung-JoonKimStructural Engineering

and Building Vibration Control

5

2. Research

2. Research� Research Areas (CE & M)

10

Dr. Chang-Taek Hyun

•Construction Eng. & Mng. •Program Management •Sustainability & Green Building •Design VE & Constructability •Contract and Claims •Project Delivery System

Dr. Kyo-Jin Koo

•Project Financing & Project development •Feasibility Study•Time Management •Information Technology

New Member (Job Opening)

•CE & M (Maintenance, LCC, LCA, etc.)

Dr. Myong-O Yoon

•Architectural Materials•Fire Protection Engineering

6

2. Research� Research Areas (Structural Eng. & Environmental Eng.)

11

Dr. Jung-Ho Huh

•Building Energy and Environment

•HVAC System Design and Control

Dr. Ki-Huik Kwon

•Evaluation and Analysis of Structures

Dr. Myung-Jun Kim

•Noise & Vibration Control in Buildings

•Architectural Acoustics Dr. Kang-Su Kim

•Structural Engineering and Concrete Structures

Dr. Hyung-Joon Kim

•Structural Engineering and Building Vibration Control

Dr. Sung-Mo Choi

•Structural Engineering and Steel Structures

2. Research� Industry Collaboration

University of SeoulUniversity of SeoulUniversity of SeoulUniversity of SeoulCEM ProgramCEM ProgramCEM ProgramCEM Program

A / EA / EA / EA / E

Problems / Raw data

Solutions / Information

OwnerOwnerOwnerOwner

CMrCMrCMrCMr////PMrPMrPMrPMr

Contractor/Contractor/Contractor/Contractor/BuilderBuilderBuilderBuilder

Problems

Raw Data

….

Solutions

Information

….

…………

Public & Private

…………

…………

12

7

0101 연구개발 목표 및 수행과정

0202 2차년도 연구개발 내용

0303 3차년도 연구계획

0404 평가항목별 연구결과

2. Research�On going Research 01

Ministry of Land, Transportation & Maritime AffairsMinistry of Land, Transportation & Maritime AffairsMinistry of Land, Transportation & Maritime AffairsMinistry of Land, Transportation & Maritime Affairs

HighHighHighHigh----Tech Urban Development ProgramTech Urban Development ProgramTech Urban Development ProgramTech Urban Development Program

http://www.mega-cm.co.kr/

14

�On going Research 01 : 5W2H

2. Research

1. W1. W1. W1. Who?ho?ho?ho?Participation of the Highest Level CEM Specialist.

2. W2. W2. W2. When?hen?hen?hen?DEC 2007 ~ Apr 2014(6 years and 3months)

3. W3. W3. W3. Where?here?here?here?Mega Projects

orMultiple Projects

4. W4. W4. W4. What?hat?hat?hat?the Development of Intelligent Program Management Information System

5. H5. H5. H5. How?ow?ow?ow?a Practical and Theoretical Approach

6. W6. W6. W6. Why?hy?hy?hy?1) 10% reductionin capital and maintenance cost2) 20% reduction in the program duration

7. H7. H7. H7. How much?ow much?ow much?ow much?$ 10,200,000 (₩ 11 Billion)

※1 $ = 1,100 ₩

-Leader : Univ. of Seoul-Total : 34 org.

8

2. Research�On going Research 01 : The Trend of Mega-Projects

15

Decaying

The

downtown

Expansion of Cities

Change

in Industrial

structure

MegaMegaMegaMega----ProjectsProjectsProjectsProjects

for Urban Renaissancefor Urban Renaissancefor Urban Renaissancefor Urban Renaissance

2. Research�On going Research 01 : i-PgMIS Concept

ProgramDurationMgt. System

PerformanceMgt. System

Contract Mgt. System

Situation

Portal information

Schedule & Progress Mgt.

Cost & Change Mgt.

Performance & Maintenance Mgt.

Conflict Mgt. &IETM

Visual basedProgram Definition

Platform levelIntegration

Procedure basedManual

Web control Center

Budget & CostSituation

Schedule & Performance Situation

Program status

Notice

Legislation check

News

Cost Mgt.System

Contract & Execution Mgt.

Smart PhoneSystem

Documentation Mgt. & Electronic Approval

MLTMMLTMMLTMMLTM

Local Local Local Local GovernmentGovernmentGovernmentGovernment

UR ProgramUR ProgramUR ProgramUR Program

※MLTM : Ministry of Land, Transportation & Maritime Affairs

Process Optimization System

16

9

사업비관리 시스템

Tech-4 : ISPPM & BIMOM System

2. Research�On going Research 01 : i-PgMIS Composition

17

① Core technique module

② Improvementprocedure

③ Core technique operation

④ Top-menu click

Tech-3 : Process Optimization System

⑤ Link with related system

Tech-2 : Program Duration Mgt. System

⑤ Link with related system

Intelligent Program Management Information System

사업비관리 시스템

Tech-1 : Cost Mgt. System

2. Research

ProgramProgramProgramProgramDurationDurationDurationDurationMgt. SystemMgt. SystemMgt. SystemMgt. System

PerformancePerformancePerformancePerformanceMgt. SystemMgt. SystemMgt. SystemMgt. System

Contract Contract Contract Contract Mgt. SystemMgt. SystemMgt. SystemMgt. System

SituationSituationSituationSituation

Portal informationPortal informationPortal informationPortal information

Cost & Cost & Cost & Cost & ChangeChangeChangeChangeMgt.Mgt.Mgt.Mgt.

Schedule & Schedule & Schedule & Schedule & Progress Progress Progress Progress Mgt.Mgt.Mgt.Mgt.

Performance & Performance & Performance & Performance & Maintenance Maintenance Maintenance Maintenance Mgt.Mgt.Mgt.Mgt.

Conflict MgtConflict MgtConflict MgtConflict Mgt. &. &. &. &IETMIETMIETMIETM

Visual basedVisual basedVisual basedVisual basedProgram DefinitionProgram DefinitionProgram DefinitionProgram Definition

Platform levelPlatform levelPlatform levelPlatform levelIntegrationIntegrationIntegrationIntegration

Procedure basedProcedure basedProcedure basedProcedure basedManualManualManualManual

Web control CenterWeb control CenterWeb control CenterWeb control Center

Budget & CostBudget & CostBudget & CostBudget & CostSituationSituationSituationSituationSchedule & Performance Schedule & Performance Schedule & Performance Schedule & Performance SituationSituationSituationSituation

Legislation checkLegislation checkLegislation checkLegislation check

NewsNewsNewsNews

Cost Mgt.Cost Mgt.Cost Mgt.Cost Mgt.SystemSystemSystemSystem

Contract & Contract & Contract & Contract & Execution Execution Execution Execution Mgt.Mgt.Mgt.Mgt. Smart PhoneSmart PhoneSmart PhoneSmart Phone

SystemSystemSystemSystem

Documentation Mgt. Documentation Mgt. Documentation Mgt. Documentation Mgt. & Electronic Approval& Electronic Approval& Electronic Approval& Electronic Approval

MLTMMLTMMLTMMLTM

Local Local Local Local GovernmentGovernmentGovernmentGovernment

UR ProgramUR ProgramUR ProgramUR Program

※※※※ MLTM : Ministry of Land, TransportationMLTM : Ministry of Land, TransportationMLTM : Ministry of Land, TransportationMLTM : Ministry of Land, Transportation& Maritime Affairs& Maritime Affairs& Maritime Affairs& Maritime Affairs

Process Process Process Process Optimization Optimization Optimization Optimization SystemSystemSystemSystem

18

�On going Research 02

Ministry of Land, Transportation & Maritime AffairsMinistry of Land, Transportation & Maritime AffairsMinistry of Land, Transportation & Maritime AffairsMinistry of Land, Transportation & Maritime Affairs

the Research Policy and Infrastructure Development Programthe Research Policy and Infrastructure Development Programthe Research Policy and Infrastructure Development Programthe Research Policy and Infrastructure Development Program

http://www.icce.re.kr:8080/work_index.jsp

10

19

�On going Research 02 : 5W2H

2. Research

1. W1. W1. W1. Who?ho?ho?ho?Participation of the Highest Level Construction Cost Managers

2. W2. W2. W2. When?hen?hen?hen?SEP 2006 ~ MAY 2011(4 years and 8months)

3. W3. W3. W3. Where?here?here?here?1) Cost Budgeting in Multifamily Housing Projects

2) Public Office Building Projects

4. W4. W4. W4. What?hat?hat?hat?the Development of Fair Construction Cost Estimating System

5. H5. H5. H5. How?ow?ow?ow?a Practical and Theoretical Approach

6. W6. W6. W6. Why?hy?hy?hy?to Reduce Expected Accuracy Range(%) :7. H7. H7. H7. How much?ow much?ow much?ow much?

$ 2,000,000 (₩ 2 Billion) ※1 $ = 1,100 ₩

-Leader : Univ. of Seoul-Total : 8 org.

As Is..-30 ~ +50

To Be..-15 ~ +15

2. Research�On going Research 02 : The Need to Estimate Fair Cost

0

10

20

30

40

50

60

70

80LABOR

OUTPUT(M3)

DifferencesDifferences

OUTPUT M3 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 1000

EstimatedValue

0.49 Man 2.45 4.9 7.35 9.8 12.25 14.7 17.15 19.6 22.05 24.5 26.95 29.4 31.85 34.3 36.75 39.2 41.65 44.1 46.55 49

0.24 Man 1.2 2.4 3.6 4.8 6 7.2 8.4 9.6 10.8 12 13.2 14.4 15.6 16.8 18 19.2 20.4 21.6 22.8 24

Total 3.65 7.3 10.95 14.6 18.25 21.9 25.55 29.2 32.85 36.5 40.15 43.8 47.45 51.1 54.75 58.4 62.05 65.7 69.35 73

Observed Value Man 7 7 7 7 7 14 14 14 14 14 21 21 21 21 21 28 28 28 28 28

estimated value

observed value

20

( ex : concrete pouring activity )

11

2. Research�On going Research 02 : Definition of “Fair Construction Cost”

• Total cost : Based on the design phase, include following costs① Direct cost : A cost directly attributable to the constructing product, such as material cost, direct labor cost, and estimated expenses

② Legal Indirect cost : indirect construction cost, administrative cost, insurance fee, surtax, etc③ Acceptable profit④ Incidental expenses : design fee, superintendent fee, CM fee, permission, etc

• Fair Construction Cost : ①, ②, ③ should be included※Within Accuracy (planning ±25% / Design Development ±15% /Construction Document ±10% / Bidding ±5%)

ANSI(Z94.0) &ANSI(Z94.0) &ANSI(Z94.0) &ANSI(Z94.0) &AACE(1997)AACE(1997)AACE(1997)AACE(1997)

Order of Magnitude estimate

Budget estimate Definitive estimate

+50~-30% +30~-15% +15~-5%

AhujaAhujaAhujaAhuja(1988)(1988)(1988)(1988)Concept Preliminary Detailed Tender

±25% ±15% ±10% ±5%

Means(2001)Means(2001)Means(2001)Means(2001)contingencycontingencycontingencycontingency

Conceptual Schematic Detailed Definitive

20% 15% 10% 5%

21

2. Research

Total CostTotal CostTotal CostTotal Cost

Predict Predict Predict Predict Direct/Indirect CostDirect/Indirect CostDirect/Indirect CostDirect/Indirect Cost

Project InformationProject InformationProject InformationProject Information

---- CaseCaseCaseCase----based reasoning(CBR) is a highly effective technique in the artificial intelligbased reasoning(CBR) is a highly effective technique in the artificial intelligbased reasoning(CBR) is a highly effective technique in the artificial intelligbased reasoning(CBR) is a highly effective technique in the artificial intelligence(AI) domain by solving or providing suggestions for the current problems by ence(AI) domain by solving or providing suggestions for the current problems by ence(AI) domain by solving or providing suggestions for the current problems by ence(AI) domain by solving or providing suggestions for the current problems by storing and retrieving results of previous cases.storing and retrieving results of previous cases.storing and retrieving results of previous cases.storing and retrieving results of previous cases.

---- CaseCaseCaseCase----based reasoning(CBR) is a highly effective technique in the artificial intelligbased reasoning(CBR) is a highly effective technique in the artificial intelligbased reasoning(CBR) is a highly effective technique in the artificial intelligbased reasoning(CBR) is a highly effective technique in the artificial intelligence(AI) domain by solving or providing suggestions for the current problems by ence(AI) domain by solving or providing suggestions for the current problems by ence(AI) domain by solving or providing suggestions for the current problems by ence(AI) domain by solving or providing suggestions for the current problems by storing and retrieving results of previous cases.storing and retrieving results of previous cases.storing and retrieving results of previous cases.storing and retrieving results of previous cases.

Case Based ReasoningCase Based ReasoningCase Based ReasoningCase Based Reasoning

Genetic AlgorithmGenetic AlgorithmGenetic AlgorithmGenetic Algorithm

Regression AnalysisRegression AnalysisRegression AnalysisRegression Analysis

InputInputInputInput SYSTEMSYSTEMSYSTEMSYSTEM OutputOutputOutputOutput

CostCostCostCost DBDBDBDB

22

�On going Research 02 : Framework for Cost prediction

12

3. Teaching

3. Teaching� Graduate Programs

24

Laboratory of LCCA and FM & IM

Laboratory of Reinforced Concrete Structures etc.

Laboratory of Structure safety estimation

Laboratory of Steel & Composite Structure

Laboratory of Building Vibration Control

Laboratory of Construction Engineering and Management

Construction Management & Information Laboratory

Building Energy Environment Laboratory

Laboratory of Architectural Acoustics

13

3. Teaching� Curriculum : Graduate (CE & M)

25

SubjectSubjectSubjectSubject

1Construction Contraction and legal

Aspects12

Advanced Construction Scheduling and Control

2 Advanced Construction Productivity 13 Construction law & Policy

3 Construction Resource management 14 Construction Development Project

4 Construction Technology Seminar 15 Design & Construction Integration

5 Construction management Seminar 16 Construction Procurement System

6 Building Maintenance 17 Advanced Construction Economics

7 Construction Safety Management 18Value Engineering and Life Cycle Cost

Analysis

8 Studies in Environment Design 19 Construction Information Management

9 Advanced Construction Quality

Management20 Construction Risk Management

10 Advanced Construction Cost Management 21 Infrastructural Asset Management

11 Construction Decision Making

4. Academic Management

14

4. Academic Management�Support from the university / college

� Asian Coalition for Building Science and Construction Engineering(ACBC)

Osaka University, The Hong Kong Polytechnic University

� Brain Korea 21 (BK21) : “Development of Technology for Efficient Construction and Hazard Protection in High-rise Buildings”

� Engineering Accreditation(ABEEK)

� Student Exchange Program

� Architectural Field Trips

27

� and so on ….

4. Academic Management�System Support : WISE

Campus News

Online Submission Academic Planner

Private InformationPrivate

Information

Student Progress Reports

Time tableExamination Management

Library

WISE : Academic Manager Support System

Faculty Students Staff

28

15

4. Academic Management�Structure

Architecture

Aesthetics

(Design)

Architecture

Aesthetics

(Design)

Architectural Engineering Function

(Facilities)

Architectural Engineering Function

(Facilities)

Technology

(Material, Structure, Construction,

management, environment)

Technology

(Material, Structure, Construction,

management, environment)

Support from

the University

Support from

the College

29

5. Issues and Concerns

16

5. Issues and Concerns

31

� Program Management

� Delivery Systems incl. CM at Risk

� Sustainability & Green

� Global Collaboration

6. Collaboration Opportunities

17

6. Collaboration Opportunities�Support from the college : ACBC, MOU

33

6. Collaboration Opportunities�Support from the university

34

18

7. KICEM (Korea Institute ConstructionEngineering Management)

36

7. KICEM (Korea Institute Construction Engineering Management)

3.

2.

4.

5.

6.

1. Founded in 1999.Founded in 1999.

More than 3,000 professionals from a variety of construction business and research fields have joined KICEM.More than 3,000 professionals from a variety of construction business and research fields have joined KICEM.

Their collaborative efforts made significant contributions to the construction profession in Korea.Their collaborative efforts made significant contributions to the construction profession in Korea.

The leading professional membership society of construction engineering and management in Korea.The leading professional membership society of construction engineering and management in Korea.

KICEM has held an annual conference as well as various seminars and workshops.KICEM has held an annual conference as well as various seminars and workshops.

The Korean Journal of Construction Engineering and ManagementAnd technical reports published by KICEM are also important sources.The Korean Journal of Construction Engineering and ManagementAnd technical reports published by KICEM are also important sources.

7. KICEM has been providing several continuing education and certificationGranting programs for construction engineers.KICEM has been providing several continuing education and certificationGranting programs for construction engineers.

�About KICEM

19

37

7. KICEM (Korea Institute Construction Engineering Management)�Mission Statement and Goals

“KICEM promotes professional leadershipin construction engineering and management, in representing the construction engineering profession, and in enhancing the capabilities of those who are involved in the application, education training, research or development of construction engineering and management.”

cooperative cooperative cooperative cooperative international relationships international relationships international relationships international relationships

38

7. KICEM (Korea Institute Construction Engineering Management)�Membership

20

39

7. KICEM (Korea Institute Construction Engineering Management)�KICEM Activities

� KICEM has an annual conference, which is the only one exclusively focused on construction engineering and management area in Korea. Categories of interests in the conference are : Recent CM Projects, Management & Business in Construction, Computer & Information Technology in Construction, and Advanced Construction Management Technology.

� KICEM publishes the Korean Journal of Construction Engineering andManagement bimonthly, which is the recognized academic journal by the Korean Research Foundation.

� KICEM provides education and training programs for individuals in the practice or for specific organizations, such as professional institutes and construction or engineering companies. KICEM has a great pool of instructors, including university professors and industrial experts, involved in KICEM.

40

7. KICEM (Korea Institute Construction Engineering Management)�Research and Development

“KICEM has performed many construction engineering and management related research projects and consulting works since its outset. University professors, researchers and experts from the industry have been involved in those projects.”

� Priority Analysis for Improvement of Construction Information System

�On-line Construction Project Control System through Process and Data Modeling

�Information Management Process Analysis for Construction Acquisition and Life-cycle Support(CALS)

�Intelligent Construction Work Information Gathering and Management System

�Intelligent Management System for Construction Daily Work Plans and Reports

�General Contractor’s Strategic Planning for Application of Constrcution Management Technology

�Work Process Modeling in Pre-construction Phase

�Improvement of Time Management System in office Building Construction

21

41

7. KICEM (Korea Institute Construction Engineering Management)�Research and Development

�Measurement and Improvement of Efficiency in Construction Site Office

�Performance Measurement of Construction Management Delivery System

�Application of Construction Management System in Large BOT Capital Projects

�Application of Innovative Construction Schedule Management System to Construction Site

�Development of Knowledge Management System for Earth Work in Building Construction

�Modeling for Construction Progress Measurement

�Decision Process Model for Construction Finish Work

�Facility Management System for Public Arts Center

�Effective Construction Equipment Application for Productivity Improvement

� JCEPM

0101 연구개발 목표 및 수행과정

0202 2차년도 연구개발 내용

0303 3차년도 연구계획

0404 평가항목별 연구결과

7. KICEM

http://www.jcepm.org/

22

� JCEPM-SCOPE

7. KICEM

� Computer-Aided Design and Engineering

� Process Simulation Models� Information Technology� Green Construction� Sustainability� Building Information Modeling

� Life Cycle Assessment and Life Cycle Environmental Analysis

� Carbon Accounting� Cost Estimating in Green Construction

� Construction Engineering Economics

� Construction Engineering� Construction Practices� Construction Management� Computer Application in Construction

� Construction Technology� Infrastructure Asset Management

� Facility Management�Maintenance and Operation in Construction

The topics include :The topics include :The topics include :The topics include :

� JCEPM-CALL FOR PAPERS

7. KICEM

All the Contents should be written in English and not be over 10,000 words.Papers are needed to be prepared in full-size format on A4 size paper.

More information about paper template can be found at www.jcepm.org

Those who are interested in our journal are welcome to submit paper a technical paper by ane-mail to [email protected]

The submission due date for the first publication is 2011/02/28. The journal will be published quarterly so papers can be submitted continuously even after above date.

23

Q & AQ & AE-mail : [email protected] : [email protected]

http://cemuos.uos.ac.kr/korean/portal.phphttp://cemuos.uos.ac.kr/korean/portal.php

Volunteering Exercising

Site trip Membership

Workshop Bazaar