up gradation item rate card 5
TRANSCRIPT
-
8/7/2019 Up Gradation Item Rate Card 5
1/4
S.No Electrical Item rates applicable for Upgradation activity Unit
1 Supply & Installation of 6 SqMM Cu Cable RMT
2 RMT
3 Supply & insttn of 4C X 16Sq MM Copper Mtr
4 Supply & insttn of 4C X 10Sq MM Copper Mtr
5 Siupply & insttn of 4 C X 25Sq MM Al Mtr
6 Supply & Installation 4C X 35 Sq MM AL Ar RMT
7 Supply & insttn of 1CX 35 SQmm Copper cable 18 Supply & insttn of 1CX6 SQmm Copper cable 1
9 Supply of 1CX16 SQmm Copper cable 1
10 Supply & insttn of 2CX 35 SQMM AL Ar cable 1
11 Supply & insttn of 2C X 1.5Sq MM Copper 1
12 Supply & insttn of 2C X 2.5Sq MM Copper 1
13 Supply & Installation of 50 SqMM Cu Cable RMT
14 Supply & Installation of 50 SqMM Cu Cable RMT
15 Rigid flexible pipe 25 mm RMT
16 Rigid flexible pipe 45 mm RMT
17 Supply & Installation of 50MM GI Pipe RMT
18 Electrical Cable Installation (per Site) Including Transportation(Less than 10 m) LS
19 Electrical Cable Installation (per Site) Including Transportation(more than 10 m) LS
20 Additional MCB 6A/16A/32A/63AMP 1
21 Copper earthing complete with Pit 1
22 Supply and installation of 63 A TPN with Box 1
23 Supply and installation of 63 A TPN w/o Box 1
S.No Upto 25KVA DG
1 De-Installation of Old DG LS
2 Installation of New DG LS
3 De-Installation of Old DG (RTT Site) LS
4 Installation of New DG (RTT Site) LS
For 30 KVA DG
1 De-Installation of Old DG LS
2 Installation of New DG LS
3 De-Installation of Old DG (RTT Site) LS4 Installation of New DG (RTT Site) LS
5 De-Installation of Old SMPS LS
6 Installation of New SMPS LS
7 De-installation of old Battery Bank (300AH) LS
8 De-installation of old Battery Bank (600 AH) LS
9 Installation of New Battery Bank (300AH) LS
10 Installation of New Battery Bank (600AH) LS
11 De-installation of Servo LS
12 Installation of Servo LS
13 Site Survey optional 1
S.No PIU
1 Dismentling of 15 KVA PIU 1
2 Dismentling of 30 KVA PIU 1
3 Installation of upgraded 25 KVA PIU 1
4 Installation of 30 KVA PIU 1
S.No ACDB & DCDB
1 Supply & Insttn of ACDB 3 Phase 1
2 Supply & Insttn ACDB 1 Phase 1
3 Supply & Insttn of DCDB 1
S.No Misc
1 Installation of Battery Chiller 1
2 Installation of Outdoor Power Plant 1
3 Tx Rack Installation 1
4 De- Installation of AC 1
supply & Insttn of 10 Pair 1.5MM Control cable
-
8/7/2019 Up Gradation Item Rate Card 5
2/4
5 Installation of AC 1
6 Supply and Installation of EGB/IGB 1
7
8 Installation of Alarm Box (With one operator cable) 1
9 Installation of Alarm Box (Normal)
10 Supply & Installation of TPN with Box 1
In case Vendor has to do the supplyS.No Material description
1 26002 2800
3 Dual Pole Mount 5500
4
5 1950
6 Transportation (In case of Mount & Cable tray supply) 1000/-
7 Project Management Charges (PMC)
PMC
APPLICABLE FOR BB/PP/AC ONLY
IT HAS TO BE PAID ONLY ONCE AGAINST ONE SITE
SCOPE INCLUDES SIGNOFF FROM CLUSTER MANAGER FOR SRN
Item Description UnitEB Liaisoning EB for UP East and UP West (If Applicable) Per Site
Municipal (If Applicable)Per Site
DG Safety DG Saftey (If Applicable) Per Site
DG PCB DG PCB (If Applicable) Per Site
Cable Tray grouting
Supply(EA)
MW MountGSM Mount
Cable Tray 480/ per meter
Hatch Hole plate with Rubber
MunicipalLiaisoning
-
8/7/2019 Up Gradation Item Rate Card 5
3/4
Rate
55
120
440
310
200
260
22032
110
130
15
24
350
350
50
60
360
1000
2000
300
1500
1200
2000
5000
5000
5000
2500
7000
20007000
1000
2000
2000
2000
2000
2000
2000
2500
3000
1000
10001000
1000
9500
4500
5000
1000
1000
500
600
-
8/7/2019 Up Gradation Item Rate Card 5
4/4
1000
2000
400
500
500
1000
Installation(EA)
10001000
1500
100/ per meter
500
Per site
0 3000
Qty Rates1 15000
1 8000
1 6000
1 6000