UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION

PROGRESS

Business Operations and Facilities CommitteeJanuary 16, 2017

Page 2: UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS

Building

Area A – South Classroom wing closest to Doe Run Road

Area B – Administration Suite, Main vestibule

Area C - Gymnasium, Cafeteria, Kitchen

Area D – North Classroom Wing

Page 3: UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS

Exterior views of the building – South Elevation

Page 4: UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS

Exterior views of the building

East Elevation Southwest Elevation

Page 5: UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS

Exterior views of the building

Area B - Roof Area B – South Elevation

Page 6: UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS

Area A - South Classroom wing closest to Doe Run Road

1st Floor Locker framing, Classroom Area A

Typical Classroom, Classroom Area A

Page 7: UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS

Area A - South Classroom wing closest to Doe Run Road

2nd Floor Corridor, Area A, Notice framing for windows

and lockers

2nd Floor Classroom, Classroom Area A

Page 8: UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS

Area A – Large Group Instruction area

Looking into the LGI area in Classroom Area A

Standing inside LGI in Area A

Page 9: UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS

Gymnasium

2nd Floor looking down across Gymnasium

2nd Floor looking across Gym, Stage opening on the right

Page 10: UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS

Cafeteria / Stage

2nd Floor looking down into Café, Kitchen & Serving area.

2nd Floor looking across Café, through stage, and into Gym

Page 11: UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS

Media Center

Media Center - main entrance, Reading area on right

Media Center – Circulation desk on left

Page 12: UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS

Great Views from 2nd Floor!