Ministry of Infrastructure and Port Development Sarawak (MIPD)
09
10
11
12
MIPD’s Role In Infrastructure Development
MIPD Legal Framework
Organization Structure
Ministers, Assistant Ministers and Permanent Secretary Served withMIPD
08
Introduction of MIPD At A Glance
Vision, Mission and Core Functions
History of MIPD
Organization Structure
Agencies Under MIPD Purview
Infrastructure and Connectivity Development
Way Forward 2030
Conclusion
01
02
03
04
05
06
07
CONTENTS
Ministry of Infrastructure and Port Development Sarawak (MIPD)
❑ While Sarawak is developing our digital
economy, infrastructure is and shall
remain as an integral part that supports
physical movement of human and goods
in support of digital economy
❑ Road infrastructure is crucial in any
country’s development plan. The
connectivity it provides serves as a
catalyst for economic activities
❑ The motto of our Ministry which is “Links
and Develops”, has accurately portrayed
the essence of what the Ministry does and
the objectives that we hope to achieve
INTRODUCTION
1
MISSION
Deliver Efficient Infrastructure
and Port for Sarawak through
Project and Program Delivery
Excellence
VISIONA High Performance Ministry In Transforming
Infrastructure and Port Development in Sarawak
CORE FUNCTIONS
2
Ministry of Infrastructure and Port Development Sarawak (MIPD)
IV
Management
of Trust Funds
III
Federal
Watching
Brief
II
Planning and
Development
I
Policy
Formulation
MIPD is not an island by itself, but
working together with:
1. Ministry of Utility (MOU) Sarawak on pipe laying and relocation of utilities along roads;
2. Ministry of Transport (MOT) Sarawak on transport matters;
3. Ministry of Urban Development and Natural Resources (MUDeNR) on land matters on road, siting of buildings and so on; and
4. And other Agencies on related matters.
COLLABORATIONPURVIEW WATCHING BRIEF
1. State public works and buildings;
2. Control and maintenance of State roads and bridges;
3. Road safety;
4. Federal public works undertaken in Sarawak;
5. Ferry services;
6. Buoys and Lights;
7. Development andmanagement of Sarawakports; and
8. Management of dockyard and marine engineering services.
9. Management of State Trust Funds:
a. Infrastructure Development Trust Funds; and
b. Riverine Traffic Fees.
All related Federal Agencies
and subjects including:
1. Airport and airfields; and
2. Liaising with Federal Ministries and Agencies on matters relating to infrastructure and port development.
MIPD AT A GLANCE
3
Ministry of Infrastructure and Port Development Sarawak (MIPD)
Ministry of Infrastructure and Port Development Sarawak (MIPD)
MIPD’S ROLE IN INFRASTRUCTURE DEVELOPMENT
PolicyPolicy formulation on Infrastructure and Port development.
EnablerProvide extensive connectivity which is imperative because
accessibility is an essential developmental factor in all aspects of economic activities such as tourism, marketing, logistics,
agriculture, etc.
PlanningProviding reliable infrastructure which is critical as the demand for
such services will surge over the years with the increase in population.
4
Ministry of Infrastructure and Port Development Sarawak (MIPD)
MIPD LEGAL FRAMEWORKS
State Road Ordinance
1994
Brooke Dockyard & Engineering Works
Corporation Ordinance (cap.
100)
Ports Authorities Ordinance
1961
Merchant Shipping
Ordinance 1960
5
YB TAN SRI DATUK AMAR DR. JAMES JEMUT MASING
DEPUTY CHIEF MINISTER AND MINISTER FOR INFRASTRUCTURE AND PORT DEVELOPMENT SARAWAK
YBHG. DATU HAJI SAFRI BIN HAJI ZAINUDINPERMANENT SECRETARY
BROOKE DOCKYARD & ENGINEERING WORKS
CORPORATION (BDEWC)
KUCHING PORT AUHTORITY
(KPA)
MIRI PORT AUTHORITY
(MPA)
RAJANG PORT AUTHORITY
(RPA)
JABATAN KERJA RAYA(JKR)
BUOYS
AND LIGHTS BOARD
MINISTRY OF INFRASTRUCTURE AND PORT DEVELOPMENT SARAWAK
TANJUNG MANIS PORT AUTHORITY
(TMPA)
SAMALAJU
PORT AUTHORITY
(LPS)
SUPPORTING AGENCIES
PROJECT PORTS FINANCESERVICE
MANAGEMENT AND ASSET DIVISION
AGENCIES/STATUTORY BODIES
YB DATUK HAJI JULAIHI BIN HAJI NARAWIASSISTANT MINISTER FOR INFRASTRUCTURE AND PORT DEVELOPMENT SARAWAK
CORPORATE COMMUNICATION
AND ICT
INFRASTRUCTURE
Organization Structure 6
A BRIEF HISTORY
OF MIPD
03
02
01
13TH MAY 2016Renamed Ministryof InfrastructureDevelopment andTransportation(MIDT)
12TH APRIL 1984Name changed toMinistry of Worksand SpecialFunctions
18TH JULY 1985Renamed the Ministry ofInfrastructureDevelopment
1ST AUGUST 1963Ministry was established as Ministry of Communication and Works
16TH SEPTEMBER 1996Became Ministry ofInfrastructureDevelopment andCommunications(MIDCOM)
22ND AUGUST 2019Renamed Ministryof Infrastructureand PortDevelopment(MIPD)
04
05
06
Sarawak Independence22th July 1963
Formation of Malaysia
16th September 1963
7
07.07.1977-10.10.1980
MINISTERS WHO SERVED IN MIPD
01.08.1963-22.08.1966
YB Encik Abdul Taib Mahmud
YB Dato Sri Teo Kui Seng
YB Datuk Amar Stephen Yong
YB Tan Sri Datuk Amar Sim Kheng
Hong
YB Datuk Dunstan
Endawi anakEnchana
Ministry of Infrastructure and Port Development Sarawak (MIPD)
23.08.1966-27.07.1970 28.07.1970-17.09.1974 18.09.1974-06.07.1977
11.10.1980-22.03.1981 23.03.1981-11.09.1996 12.09.1996-30.06.2004 01.07.2004-30.09.2009 01.10.2009-12.05.2016 13.05.2016-Present
YB Dato Daniel Tajem anak
Miri
YB Datuk Dr. Wong Soon Kai
YB Dato Sri Wong Soon
Koh
YB Datuk Patinggi Tan Sri
Alfred Jabu anak Numpang
YB Dato Sri Michael Manyin
anak Jawong
YB Tan Sri Datuk Amar
Dr. James Jemut anak
Masing
8
Assistant Ministers Who Served in MIPD
1.11.1976-25.3.1981
YB Encik Abdul Taib Mahmud
YB Dato Robert Jacob Ridu
YB Datuk David Teng Lung Chi
Dr. Patau Rubis YB Datuk William Mawan Ikom
Ministry of Infrastructure and Port Development Sarawak (MIPD)
26.3.1981-30.9.1981 2.10.1985-19.4.1987 20.4.1987-8.10.1992
1.7.2004-30.9.2009 1.7.2004-18.5.2016 1.10.2009-18.5.2016 19.5.2016-6.5.2017 19.5.2016-6.5.2017 7.5.2016-22.8.2019
Tuan Haji Bolhassan Haji DI
YB Datuk Lee Kim Shin
YB Datuk Haji Ir. Daud Abdul
Rahman
YB Datuk Haji Talib bin Zulpilip
YB Liwan Lagang
YB Datuk Haji Julaihi bin Haji
Narawi
9
7.5.2016-Present
YB Datuk Dr. JeripSusil
YB Datuk Wahab Haji Dollah
YB Datuk Dr. Judson Sakai Tagal
9.10.1992-30.11.1997 2.12.1997-31.10.2001 30.11.2001-30.6.2004
PERMANENT SECRETARY PERIOD:
(1) Encik D.L. Bruen 08.08.63 - 27.09.64
(2) Encik R.A.Young 28.09.64 - 31.03.65
(3) Encik D.L. Bruen 01.04.65 - 02.07.65
(4) Encik D.C. Walker 03.07.65 - 31.12.65
(5) Encik D.L. Bruen 01.01.66 - 22.09.66
(6) Encik R.J. Pole Evans 23.09.66 - 14.08.67
(7) Encik Lo Yii Fong (Acting) 15.08.67 - 17.08.67
(8) Encik Hwang Cheng Hua (Acting) 18.11.68 - 10.08.69
(9) Encik Liang Kim Bang 11.08.68 - 07.02.71
(10) Encik Arni Haji Lampan 08.02.71 - 29.08.72
(11) Encik William Tang Tieng Kee 30.08.72 - 09.10.78
(12) Encik Safri Awang Zaidell 10.10.78 - 04.06.81
(13) Tuan Haji Saad Haji Hassan 05.06.81 - 14.06.84
(14) Tuan Haji Bujang Mohidin Haji Jol 15.06.84 - 04.03.87
(15) Tuan Haji Mohd Tazuddin Haji Junaidi 05.03.87 - 30.04.90
(16) Tuan Haji Abdul Aziz bin Haji Hussein 02.05.90 - 30.09.93
(17) Tuan Haji Talip Zulphilip 01.10.93 - 31.12.94
(18) Tuan Haji Hamzah bin Haji Drahman 01.01.95 - 30.03.96
(19) Tuan Haji Suud bin Haji Suhaili 01.04.96 - 02.08.99
(20) Tuan Haji Salleh bin Haji Sulaiman 03.08.99 - 07.11.01
(21) Encik Nicholas Patrick 08.11.01 - 18.01.04
(22) Encik Kong Ping Kung 19.01.04 - 25.02.06
(23) Datu Haji Wan Kassim Tuanku Zubir 26.02.06 - 04.10.09
Permanent SecretariesServed in MIPD(1963-Current)
(24) Datu Haji Safri bin Haji Zainudin
05.10.09 - Present
10
Ministry of Infrastructure and Port Development Sarawak (MIPD)
Present MIPD Structure
YB DATUK HAJI JULAIHI BIN HAJI NARAWI
ASSISTANT MINISTER FOR INFRASTRUCTURE AND PORT DEVELOPMENT SARAWAK
YB TAN SRI DATUK AMAR DR. JAMES JEMUT MASING
DEPUTY CHIEF MINISTER AND MINISTER FOR INFRASTRUCTURE AND PORT DEVELOPMENT SARAWAK
YBHG. DATU HAJI SAFRI BIN HAJI ZAINUDIN
PERMANENT SECRETARY
11
SNAPSHOT OF AGENCIES UNDER MIPD PURVIEW
Ministry of Infrastructure and Port Development Sarawak (MIPD)
PUBLIC WORKS DEPARTMENT (PWD) /
JABATAN KERJA RAYA (JKR)
JKR was established in 1882 during the Rajah Brooke era.
Since its establishment, JKR hasbeen entrusted with the rolesand responsibilities in roadconstruction (MRCUs), bridges,wharves, jetties, river walls,airfields, water supply andbuildings.
From 1980s, the roles of JKR haveprogressively changed from being a“Builder” to a “Manager”.
However, in 2015 JKR is no longertasked to look after water supply inrural areas. This is undertaken by anew water authority, JabatanBekalan Air Luar Bandar (JBALB).This authority is under the purviewof the Ministry of Utilities (MOU)Sarawak.
12
Ministry of Infrastructure and Port Development Sarawak (MIPD)
BUOYS AND LIGHTS BOARD
The Buoys and Lights Boardwas established on 12th
January 1961 under regulation4 of the Merchant Shipping(Buoys and Lights) Regulation1961.
Main functions:a. Care of all lighthouses in
Sarawak;b. Aids to Navigation, e.g.,
lighthouses, buoys, beacons,navigation radio services andso on; and
c. Hydrographic surveys.The Chairman is the PermanentSecretary, MIPD. Theimplementing agency is theMarine Department.
13
BROOKE DOCKYARD AND ENGINEERING
WORKS CORPORATION (BDEWC)
BDEWC was set up in 1912 aspart of the government’sworkshop for repairs ofgovernment vessels andmachinery as well as privatevessels.
In 1996, BDEWC re-aligned itscore business to oil and gasfabrications.
BDEW is now the No. 1 player inthe oil and gas modulesfabrication in East Malaysia.
Ministry of Infrastructure and Port Development Sarawak (MIPD)
BDEW became a statutory bodyon 1st August 1977.
14
KUCHING PORT AUTHORITIES (KPA)
KPA was established on 1st May 1961 under the Port Authorities
Ordinance,1961.
KPA operates two terminals, namely: Pending Terminals (capacity of
2.9 million tons) and Senari Terminal (capacity of 7.0 million tons).
Total capacity of throughput is at 9.9 million tonnes.
KPA has 2 “Approved Port Operators”:
-(1) IOT - Senari Synergy Sdn Bhd (ASSAR); and
-(2) Tebedu Inland Port.
PENDING TERMINAL
SENARI TERMINAL
INDEPENDENT OIL TERMINAL
15
RAJANG PORT AUTHORITY (RPA)
RPA was established under the Port Authorities Ordinance,
1961 on 1st November 1970 and commenced operations on
17th May 1971. It handles cargo bound for the Central
Region of Sarawak and its hinterland.
RPA has a design capacity of 3.3 million tonnes throughput.
16
MIRI PORT AUTHORITY (MPA)
MPA was established under the provision of the Port Authorities
Ordinance, 1961 on 1st February 1981 and commenced
operations on 1st March, 1983.
MPA was relocated from the old port site in Miri Town to
Kuala Baram in July 1998.
MPA was designed with 3.5 million tons of annual cargo
throughput.
17
TANJUNG MANIS PORT AUTHORITY (TMPA)
TMPA was established under the provision of the Port Authorities
Ordinance, 1961 on 19th April 2012 and commenced operations on
2nd January 2014.
TMPA was designed with 3.3 million tons of annual cargo throughput
capacity.
The establishment of TMPA was designed specially to regulate port
activities in Tanjung Manis through its approved port operator, Tanjung
Manis Integrated Port Sdn. Bhd. (TMP).
TMPA is to serve as a planning and coordinating agency for the
development of infrastructure and port facilities in accordance with the
State’s development plan in Tanjung Manis.
18
SAMALAJU PORT AUTHORITY (LPS)
LPS was established under the provision of the Port Authorities
Ordinance, 1961 on 7th October 2010 and commenced operations
on 22nd April 2014. The interim port facility was completed on
31st May 2014. The port is now completed in May 2017.
LPS was designed with 14 million tons of annual cargo
throughput.
19
INFRASTRUCTURE AND CONNECTIVITY DEVELOPMENT
❖Coastal Road Network Connectivity Programme
❖Second Trunk Road
❖Projek Rakyat
ROAD 20
PROPOSED CONSTRUCTION OF THE COASTAL ROAD NETWORK AND THE SECOND TRUNK ROADS
21
COASTAL ROAD NETWORK CONNECTIVITY PROGRAMME
Batang Saribas Bridge
Sungai Krian Bridge
Jalan Pasi – Jalan Sibu Tg. Manis including Btg. Rajang
Bridge
Batang Paloh Bridge Muara Lassa Bridge
Bintulu – Jepak Bridge Crossing Kuala Kemena
Batang Rambungan
Batang Samarahan Bridge Batang Sadong Bridge
Batang Lupar Bridge
Batang Igan Bridge
Proposed Second Kuching / Samarahan Trunk Road
including Sejingkat Bridge
MUKAH
SARIKEI
Sebuyau
SAMARAHAN
BINTULU
Daro
TanjungManis
Pusa
Lundu
KUCHING
Proposed Kpg. Buntal –Kpg. Bako Road
Legend
Under Construction
Pre-contract Stage
Design Stage
Ready for Tender
22
Ministry of Infrastructure and Port Development Sarawak (MIPD)
SECOND TRUNK ROAD PROGRAMME
KUCHING
SIBU
SAMARAHAN
SARIKEI
B1
A4
A5
ROBAN
SARATOK
SEBUYAU
BETONG
LINGGA
KABONG
PKG PACKAGE NAME
A1Road from Btg. Samarahan Bridge to Btg. Sadong Bridge
A2Road from Btg. Sadong Bridge to Btg. LuparBridge at Sebuyau
A3Road from Btg. Lupar Bridge at Triso to Btg. Saribas Bridge at Kuala Saribas
A4 Btg. Saribas Bridge (at Kuala Saribas)
A5Road from Btg. Saribas Bridge (at Kuala Saribas) to Roban Interchange (Pan Borneo Highway)
B1 Road from Sebuyau to Lingga
B1A Sg. Lingga Bridge
B2Road from Lingga to Btg. Lupar Bridge No.2 (at Sri Aman) including Spur Road thru Jln. Kejatau at Sri Aman
B3 Btg. Lupar Bridge No.2
B4Road from Btg. Lupar Bridge No.2 / Sri Aman – Betong Interchange
C1Upgrading of Jln. Kelupu / Jln. Tg. Genting –Simpang Jln. Tulai
C2Upgrading of Road from Simpang Jln. Tulai –Lanang Bridge (Sibu)
A3
A2
A1
ASAJAYA
B1A
B2B3
SRI AMAN
B4
C1
C2
Legend
Under Construction
Pan Borneo Highway
Second Trunk Road
Coastal Road Network
Tender Evaluation Stage
23
Ministry of Infrastructure and Port Development Sarawak (MIPD)
Overview of Projek Rakyat in Sarawak
Category No. of ProjectsProject Cost (RM Million)
Road 71 2,766
Bridge 25 2,247
Building 19 324
Airfield 2 301
Total 117 5,638
Ministry of Infrastructure and Port Development Sarawak (MIPD) and Public Works Department (PWD)
PROJEK RAKYAT
24
Ministry of Infrastructure and Port Development Sarawak (MIPD)
WAY FORWARD 2030 25
Ministry of Infrastructure and Port Development Sarawak (MIPD)
JKR Dashboard (web-based dashboard ) yang
dibangunkan oleh Jabatan Kerja Raya Sarawak
bertujuan bagi memudahkan kerja penyeliaan,
pemantauan dan pelaporan projek yang
dilaksanakan.
WAY FORWARD 2030 26
Ministry of Infrastructure and Port Development Sarawak (MIPD)
Engineering Study Portal ( ESP ) yang dibangunkanoleh Jabatan Kerja Raya Sarawak bertujuan bagi
memudahkan kerja-kerja awal projek yang
dicadangkan termasuk penyedian skop kerja,
anggaran kos projek dan rekabentuk awal.
WAY FORWARD 2030 27
Ministry of Infrastructure and Port Development Sarawak (MIPD)
JKR State Pre-Approved Plan yang dibangunkan olehJabatan Kerja Raya Sarawak bertujuan bagi
memudahkan dan mempercepatkan kerja rekabentuk
di fasa pra-kontrak projek bangunan di mana pelan-
pelan rekabentuk bangunan yang sudah siap dengan
beberapa pilihan jenis sedia untuk digunakan.
STATE PRE-APPROVED PLAN
28
Ministry of Infrastructure and Port Development Sarawak (MIPD)
Pelabuhan laut dalam di gerbang perdagangan Laut China
Selatan, hab minyak dan gas, hab pengangkutan kontena
dan terminal serbaguna untuk menampung cruise terminal
dan zon bebas.
Cadangan Pembinaan dan Penyiapan Terminal Tanjung
Po, Kuching
Meningkatkan jaringan pengangkutan bandar, mobiliti
masyarakat, melalui sistem pengurusan lalu lintas yang
bersepadu dalam meningkatkan pergerakan di
persimpangan bagi memperbaiki jaringan pengangkutan
jalan raya di bandar.
Rangkaian Pengangkutan Bandar
29
Ministry of Infrastructure and Port Development Sarawak (MIPD)
Jalan alternatif atau jalan pintas yang dicadangkan dari Lawas dan
Limbang ke Miri yang tidak melalui Negara Brunei Darussalam
adalah merupakan jalan tambahan kepada Lebuhraya Pan Borneo.
Jalan alternatif ini akan membuka lebih banyak kawasan untuk
kegiatan ekonomi, terutamanya untuk pembangunan pertanian dan
pelancongan.
Jalan Raya Perhubungan Miri - Limbang - Lawas
Memperbaiki dan membina jalan di sepanjang kawasan
keselamatan sempadan akan membantu menghubungkan
masyarakat luar bandar, meningkatkan dan mempromosi
industri pelancongan serta membuka beberapa industri
pertanian sederhana kecil.
Border Security Road
30
Ministry of Infrastructure and Port Development Sarawak (MIPD)
Mendalamkan 8m di bawah saluran akses drauf datum carta (semasa 0.7m - 3.0m
drauf) untuk membolehkan kapal sehingga 10,000 DWT masuk berdasarkan justifikasi
berikut:
- Secara teknikal, daya maju komersial serta dapat memastikan keselamatan pelayaran.
- Meningkatkan semula operasi limbungan di Kawasan Perindustrian Kuala Baram
(KBIE).
- Menyokong pertumbuhan dan keperluan industri minyak sawit, minyak dan gas,
pertanian dan perlombongan di wilayah Utara.
Cadangan Kerja Pengerukan Kapital di Kuala Baram, Miri
Inisiatif ini akan menyediakan hubungan antara kawasan luar bandar/penempatan
dengan bandar yang akan membantu mengembangkan kawasan luar
bandar/penempatan dengan bandar, ini akan membangunkan dan mengurangkan
jurang di antara kawasan tersebut.
Seterusnya, kemudahan jalan dan jambatan ini akan memudahkan pembukaan industri
komersial, pertanian dan pelancongan di kawasan luar bandar/kawasan penempatan.
Perhubungan Luar Bandar
CONCLUSION
❑ To be a developed State by 2030, infrastructural network has to be built
between towns and villages, which will then allow development of various
industries
❑ The vision of Sarawak becoming a developed and high-income State by
2030 can only be realised when it has a Ministry that “Links and Develops”
MIPD “Links and Develops”
31
Ministry of Infrastructure and Port Development Sarawak (MIPD)
Ministry of Infrastructure and Port Development Sarawak (MIPD)
4th Floor, Bangunan Baitul Makmur, Medan Raya, Petra Jaya, 93050 Kuching, Sarawak
082-311815
082-311692
Address
Contact Information