upgrade technical proposal status
DESCRIPTION
Upgrade Technical Proposal Status . J. Butler August 5 , 2010. O utline. Latest of the schedule Review Steps Status of chapter and appendices Internal Chapter review Ex Officio Members Requested chapter readers Schedule goals. The 10 year technical Plan. The 20 year physics plan. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Upgrade Technical Proposal Status](https://reader036.vdocument.in/reader036/viewer/2022081502/56815ec4550346895dcd4c49/html5/thumbnails/1.jpg)
1
Upgrade Technical Proposal Status
J. ButlerAugust 5, 2010
![Page 2: Upgrade Technical Proposal Status](https://reader036.vdocument.in/reader036/viewer/2022081502/56815ec4550346895dcd4c49/html5/thumbnails/2.jpg)
2
Outline
• Latest of the schedule• Review– Steps– Status of chapter and appendices– Internal Chapter review• Ex Officio Members• Requested chapter readers
– Schedule goals
![Page 3: Upgrade Technical Proposal Status](https://reader036.vdocument.in/reader036/viewer/2022081502/56815ec4550346895dcd4c49/html5/thumbnails/3.jpg)
3
The 10 year technical Plan
![Page 4: Upgrade Technical Proposal Status](https://reader036.vdocument.in/reader036/viewer/2022081502/56815ec4550346895dcd4c49/html5/thumbnails/4.jpg)
The 20 year physics plan
4
2 year cycle: 6-8 month shutdown once every 2 years
![Page 5: Upgrade Technical Proposal Status](https://reader036.vdocument.in/reader036/viewer/2022081502/56815ec4550346895dcd4c49/html5/thumbnails/5.jpg)
Preliminary Luminosity Predictions
5
So here we go
Very preliminary with
large
error b
ars
![Page 6: Upgrade Technical Proposal Status](https://reader036.vdocument.in/reader036/viewer/2022081502/56815ec4550346895dcd4c49/html5/thumbnails/6.jpg)
Preliminary Luminosity Predictions
6
So here we go
![Page 7: Upgrade Technical Proposal Status](https://reader036.vdocument.in/reader036/viewer/2022081502/56815ec4550346895dcd4c49/html5/thumbnails/7.jpg)
7
Preliminary Long Term Predictions
![Page 8: Upgrade Technical Proposal Status](https://reader036.vdocument.in/reader036/viewer/2022081502/56815ec4550346895dcd4c49/html5/thumbnails/8.jpg)
8
Preliminary Long Term Predictions
![Page 9: Upgrade Technical Proposal Status](https://reader036.vdocument.in/reader036/viewer/2022081502/56815ec4550346895dcd4c49/html5/thumbnails/9.jpg)
9
STEPS OF REVIEW
• Initial draft – status on next slide• Review in subsystem communities and
acceptance• Reading for overall consistency of document• Designated Readers from CMS for some or all
of the document• Broad release in CMS• Acceptance by CMS
![Page 10: Upgrade Technical Proposal Status](https://reader036.vdocument.in/reader036/viewer/2022081502/56815ec4550346895dcd4c49/html5/thumbnails/10.jpg)
10
Status of Chapters and Appendices• Subsystem chapters – all submitted and much back-and-forth with subsystem authors.
– Muon - ready for internal review in community POSTED– Hcal HB/HE - almost ready for internal review– Hcal forward – almost ready for internal review POST TODAY OR TOMORRW– Pixels – almost ready for internal review POST TOMORROW OR SATURDAY– Trigger/DAQ – ready for internal review of community TRIGGER POSTED, DAQ HAS SOME MISSING FIGURES
(SHOULD RESOLVE TODAY)– BRM/lumi – in final stages. Is being presented to full community and Technical Coordination as they go– Infrastructure – initial draft available, STATUS?
• Appendices– High Performance Spectrometer (a version on FP420) – almost ready for internal review WILL READ AND POST
TOMORROW– MPGD – (Micro Pattern Gas Detector (a GEM) eta coverage of 1.6-2.1 for muon redundant coverage. Alternative to
RPCs)– Phase 2 – very little work done– ECAL – new section, just added– IFP ????
• Other chapters– Introduction – material exists. Needs input from July 26 schedule which we now have – will work on this weekend
with a draft by Monday for initial circulation in this group– Physics case – much work to be done (more below)– Cost and Schedule and Organization – basic input exists - priority for next week and following week
![Page 11: Upgrade Technical Proposal Status](https://reader036.vdocument.in/reader036/viewer/2022081502/56815ec4550346895dcd4c49/html5/thumbnails/11.jpg)
11
Internal Chapter Reviewers
• Ex Officio – Spokesperson and deputies– Affected Project Managers, Run Coordinators,
Technical Coordinators – Physics Coordinators and Deputy– ?
![Page 12: Upgrade Technical Proposal Status](https://reader036.vdocument.in/reader036/viewer/2022081502/56815ec4550346895dcd4c49/html5/thumbnails/12.jpg)
12
Internal Chapter Reviewers• Additional Reviewers (non confirmed, more nominees requested, discuss today!)
– HCAL• Jim Virdee• Harvey Newman• Michel Della Negra• Brad Cox• Kirsten Borras
– Muons• Peter Sharp• Jim Virdee• Thomas Mueller• Dan Green• Daniela Bortoletto• ?
– Pixels• Peter Sharp• Jeff Spalding• Ranier Wallney• Gail Hansen• Frank Hartmann• Joe Incandela• Gigi Rolandi• Kevin Burkett
![Page 13: Upgrade Technical Proposal Status](https://reader036.vdocument.in/reader036/viewer/2022081502/56815ec4550346895dcd4c49/html5/thumbnails/13.jpg)
13
Internal Chapter Reviewers• Additional Reviewers (non confirmed, more nominees requested)
– Trigger/DAQ• Vivian Odell• Harry Cheung• Geoff Hall• Marvin Johnson (?)• ?
– BRM• Nicola Bacchetta• Roland Horisberger• Gino Bolla• Peter Sharp• Karl Gill• Pushpa Bhat
![Page 14: Upgrade Technical Proposal Status](https://reader036.vdocument.in/reader036/viewer/2022081502/56815ec4550346895dcd4c49/html5/thumbnails/14.jpg)
14
Schedule for Document
• From Guido (this morning): – I am assuming that we will be ready to distribute a
draft0 around August 16-18, followed by a draft 1 after a couple of weeks.
• September 6: Final Draft