MIXED USE INFILL PROPOSAL @ TAMAN SARI, KUALA LUMPUR
BAEE 4136_ PLANNING & URBAN DESIGN IASSIGNMENT 3 1
TABLE OF CONTENT
1.0 Introduction.. 2
2.0 Background Study of Proposed Site. 3
2.1 Location 3
2.2 Building surrounding... 3
2.3 Land ownership.. 4
2.4 Potential Development. 4
3.0 Proposed Development. 4
3.1 Aim and Objective... 4
3.2 Concept Development and Marketing Strategy. 5
3.3 Development Data.. 6
4.0 Planning and Design Concept 8
4.1 Current Urban Design Problem 8
4.2 Planning Concept 8
4.3 Planning Element 8
4.4 Design Principle. 94.5 Design Consideration 10
5.0 Conclusion 22
-
7/25/2019 urban report final.pdf
2/22
MIXED USE INFILL PROPOSAL @ TAMAN SARI, KUALA LUMPUR
BAEE 4136_ PLANNING & URBAN DESIGN IASSIGNMENT 3 2
1.0 INTRODUCTION
Titiwangsa is one of the main district area in Kuala Lumpur located at South Sentul. It is divided into
two sections namely West Sentul and East Sentul. The Malayan Railway train depot was located here.
Many Hindu temples and churches can be seen in this town because many Indian workers have been
working in the train depot since the Federated Malay States was founded by the British in 1896. Jalan
Sentul and Jalan Ipoh are the two major roads servicing this area.
With the increase of the population lead to the rapid development as can be seen in the vicinity of
Sentul, especially the development in housing sector and commercial sector. These development
process has indirectly influenced the locals living style with the efficient and effective amenities and
facilities provided, living in harmonious environment and the needs of quality of life.
With the emergence of potential mentioned above, the large-scale mixed-use development
(development mix) strategy is considered to be planned and carried out in this area. The purpose of
this development is to create a place with careful planning, rigorous and has a lasting vision. These
mix development are propose with complete facilities including education, commercial, residential,
entertainment, public transport and the landscaping design to increase the quality of life. This
development also will become an example for Sentul District residents to improve their living
standards and stimulate the quality development in the future.
-
7/25/2019 urban report final.pdf
3/22
-
7/25/2019 urban report final.pdf
4/22
MIXED USE INFILL PROPOSAL @ TAMAN SARI, KUALA LUMPUR
BAEE 4136_ PLANNING & URBAN DESIGN IASSIGNMENT 3 4
2.3 Land Ownership
The proposed site is located on Lot 304807, beside Titiwangsa District with an area of approximately
3.6 hectares (9.0 acres) under the Government. In 2005, Government-appointed developer ASIE Sdn
Bhd began demolishing some blocks at the end of 2005 until early 2006 after most of the residents
from the 11 Pekeliling flat blocks have moved out, mostly to the Taman Sri Rampai f lats in Setapak.
The existing site consists 6 blocks of abundant Pekeliling flat also known as Tunku Abdul Rahman
Flats (17-storey flats built in 1967), Bulatan Pahang mosque, Institute Perubatan Respiratory Hospital
KL, which will be demolishes into mix-development.
2.4 Potential Development
From the analysis results that have been made, the proposed site has high potential to developed with
the support of the following factors :
- There are no restrictions or barriers in terms of "site status" and the next location.
- The main street (Jalan Pahang and Tun Razak) is an "advantage" for the mix- development.
- The site's condition with flat land and available with electricity and water supply sources help
minimize development costs, particularly infrastructure costs.
- Land area is suitable and adequate for the purpose of an entertainment concept.- Strategies location beside the transportation hub (monorail and LRT)
- Have access in and out and the "service road" legitimate, organized, safe and not cause any
problems or inconvenience to the user / client.
- Selection of this proposed site for the mix-development is a smart investment and with a high "value
added" in the long-term investment context.
-
7/25/2019 urban report final.pdf
5/22
-
7/25/2019 urban report final.pdf
6/22
MIXED USE INFILL PROPOSAL @ TAMAN SARI, KUALA LUMPUR
BAEE 4136_ PLANNING & URBAN DESIGN IASSIGNMENT 3 6
3.3 Development Data
Site Planning Requirement and Data
According to local authority DBKL, some planning required must considered as below:
- It required 20 feet setback all over the site.
- Parking spaces for cars and motorcycles only. Heavy vehicles and depot use are NOT allowed.
- Plot ration of 1:8
- Soft Landscape: Min. 10%
Design of Planning Proposal
Site area = 109193 sq.m
Plot ratio calculation
Plot ratio = total f loor area (not included parking area within building) / site area
= 109193 X 8
= 873544 sq.m
Plinth ratio calculation
Plinth ratio = (Foot print of building (ground floor) Area of site) x 100%
= (43882sq.msq.m 109193sq.m) x 100%
= 40.18%
Open area = 59.82%
Requirement of project brief is minimum 40% of green area and GBI 60% of green area. The proposed
development has 65.20% of green area, hence, it fulfills the project briefs and Green Building Index
requirement.
-
7/25/2019 urban report final.pdf
7/22
MIXED USE INFILL PROPOSAL @ TAMAN SARI, KUALA LUMPUR
BAEE 4136_ PLANNING & URBAN DESIGN IASSIGNMENT 3 0
-
7/25/2019 urban report final.pdf
8/22
MIXED USE INFILL PROPOSAL @ TAMAN SARI, KUALA LUMPUR
BAEE 4136_ PLANNING & URBAN DESIGN IASSIGNMENT 3
4.0 PLANNING AND DESIGN CONCEPT
4.1 Problem with Current Urban Design
4.2 Planning Concept
The proposed development scheme is based on the 'concept of resort living' with a view to providing a
comfortable place, harmonious and friendly environment for its users surrounding.
In terms of organization of space, it is based on the concept of providing a center that is conducive toinhabit, doing business, relax, play and learn. Restructuring space is in accordance with the desired
zones and taking into account aspects such as accessibility of practical planning, the type of use,
privacy, separation and amalgamation, the frequency of use, relationship between the zones and so
on.
The main access to the site of this proposal is through the 20-foot wide service road with a gate that
marks the main access to the proposed site.
In view of the Pekeliling proposed site is relatively flat, the level of rates is an environment-friendly
nature of the ground work required is minimal and only involve the coordination level only.
4.3 Planning Element
Key planning elements for this mix-development proposed are:
A- Commercial and entertainment zone
B- Residential zone
C- Office and SOHO zone
D- Recreational zone
Zones of the proposed commercial and entertainment centers included and complex, a shopping
complex. These complexes can provide more and enrich the sale of products to the people in
Pekeliling and around Klang Valley generally. In addition to shopping centers, as a shopping
destination and a shopping complex also provides entertainment to its users. Entertainment facilities
include a cinema, internet caf, caf food, center of paddle boats and so on. Complexes that operate
to generate employment, economic development and improve the standard of living of Pekeliling area.
Residency is a residential zone for any who interested to live there and ranges from medium to highends. This residential zone is connected to the commercial and entertainment zone in which it is
separated by a zone of sports and access road to provide privacy to the residents.
Recreation and sports zone located between residential zones and commercial zones and it has a
watershed that separates these two places. Recreation and sports zone consists of the new manmade
lakes and green spaces and well equipped with exercise tools.
-
7/25/2019 urban report final.pdf
9/22
-
7/25/2019 urban report final.pdf
10/22
MIXED USE INFILL PROPOSAL @ TAMAN SARI, KUALA LUMPUR
BAEE 4136_ PLANNING & URBAN DESIGN IASSIGNMENT 3 1=
4.5 Design Consideration
Group Form
The group form cause the result of incremental accumulation of elements in space along an armature
and is particularly typical of the spatial organisation of the development time line (history influences).
This cause the early "built form" linkage is neither implied nor imposed but is naturally evolved as an
integral part of the organic, generative structure. The group form is characterized by a consistency of
topography response, materials, a wise which deference to human scale and by sequences of spaces
defined by building typology such as edge, tangible, intangible and the image itself "impact from
cultural, design pattern, materials and colour of the group form". That means it create a difference
function and activities of the place.
Figure : Shown "group form" imposed naturally.
The Harmony within Complexity
The relationship between each modular pieces interacting with the other. As a whole, the unity seems
to have provided within its own complexity, a rather simple harmony between the pieces that interacts.
This harmony then analyzed as fragments in space. Secluding the rest and just focusing on certain
provocative moments which was found is beautiful and architecturally speaking. The pieces in its
different configurations of angles, thicknesses and dimension evokes a dialog within the space it
creates.
Figure : Shown the harmony within the complexity in urban scale.
-
7/25/2019 urban report final.pdf
11/22
-
7/25/2019 urban report final.pdf
12/22
-
7/25/2019 urban report final.pdf
13/22
MIXED USE INFILL PROPOSAL @ TAMAN SARI, KUALA LUMPUR
BAEE 4136_ PLANNING & URBAN DESIGN IASSIGNMENT 3 13
Zoning
The basic zoning for the development has taking the failure of the uran design as it precedent. For
example the idea of individual block has resulted many problems such as poor connectivity between
one building to another. Thus the new proposed development has consider larger scale of block and
being divided into few zones based on the category stated before. It somehow encourage the limitless
activities to happen around the area with complete segregation beween automobiles and pedestrian.
Site Zoning and Environmental Consideration
The environmental factors have been put up as the main consideration for the zoning. Since Malaysia
climate is hot and humid for the whole year, the design is striving in providing a very comfortable
leisure setting regardless the weather. The zoning of the development also trying to respect the
existing surrounding development such as residential and so on. For example, the residential zones is
located adjacent to the existing residential area so that it would not breaking the existing
neighbourhood at that area, but trying to be more friendly. For the leisure zones, it has been plan to
utilize the existing riverside as a part of its features. The future development also shows that the river
will be revitalized so it is a big opportunity for this development to take the advantage of the future
development. The entertainment zones, which took place more than 1/3 of the development is placed
along Jalan Tun Razak. The intention is to gain more attention from the public as the building is
function mostly for entertainment and commercial. It is sort of self advertising to the road and the
people pass by. The issues of noise and other is not a problem here because the spaces involved in
the entertainment zones doesnt required a quite situation.
-
7/25/2019 urban report final.pdf
14/22
MIXED USE INFILL PROPOSAL @ TAMAN SARI, KUALA LUMPUR
BAEE 4136_ PLANNING & URBAN DESIGN IASSIGNMENT 3 14
Site Syntax
As the overall development is design is such a way it is taking the form of the mega structure, the site
syntax that by planning has been created based on its activities. To allow certain transparency to the
outside, the building elements is design in such allowing certain degree of visiblity from certain
numbers of angle from outside. The main reason it allows as such is to tells the people from outside
about the activities that happening, inside the development. The issues of safety and security might be
bring up, but the was carefully plan so that is is just allowing visual connection from myriads of area.
The main entrance (physical entance) to the site is still remain limited so that it will be more easy to be
controlled.
-
7/25/2019 urban report final.pdf
15/22
MIXED USE INFILL PROPOSAL @ TAMAN SARI, KUALA LUMPUR
BAEE 4136_ PLANNING & URBAN DESIGN IASSIGNMENT 3 15
Land use and Building Heights
-
7/25/2019 urban report final.pdf
16/22
MIXED USE INFILL PROPOSAL @ TAMAN SARI, KUALA LUMPUR
BAEE 4136_ PLANNING & URBAN DESIGN IASSIGNMENT 3 16
Design Features ( Ground Floor)
-
7/25/2019 urban report final.pdf
17/22
MIXED USE INFILL PROPOSAL @ TAMAN SARI, KUALA LUMPUR
BAEE 4136_ PLANNING & URBAN DESIGN IASSIGNMENT 3 10
Design Features (Roof Area)
-
7/25/2019 urban report final.pdf
18/22
Walkability
The development also con
walking. The radius in red
building such as hotels an
sidered the possibility of reaching the surro
indicates the distance from the heart of the
other amenities. Although it is a mega bloc
unding facilities by the mean of
evelopment to the surrounding
development, it is not only
conc
to the
MIXED USE INFI
BAEE 4136_ PLANNING
ntrated within its own area, but trying to inte
adjacent development.
LL PROPOSAL @ TAMAN SARI, KUALA LU
URBAN DESIGN IASSIGNMENT 3 1
grate with the surrounding. Contextually it is
PUR
respond
-
7/25/2019 urban report final.pdf
19/22
MIXED USE INFILL PROPOSAL @ TAMAN SARI, KUALA LUMPUR
BAEE 4136_ PLANNING & URBAN DESIGN IASSIGNMENT 3 1