user facilities building 507

12
User facilities Building 507 3rd HIE ISOLDE Physics Coordination Group meeting CERN, 3 September 2012 HIE-ISOLDE Erwin Siesling

Upload: chaim

Post on 07-Feb-2016

44 views

Category:

Documents


0 download

DESCRIPTION

HIE-ISOLDE. User facilities Building 507. 3rd HIE ISOLDE Physics Coordination Group meeting CERN, 3 September 2012. Erwin Siesling. User Facilities. Increasing the surface of the Solid State Lab in building B.115 by 120m2: - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: User facilities Building 507

User facilities

Building 507

3rd HIE ISOLDE Physics Coordination Group meeting

CERN, 3 September 2012

HIE-ISOLDE

Erwin Siesling

Page 2: User facilities Building 507

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 2

1. Increasing the surface of the Solid State Lab in building B.115 by 120m2:

For RP safety reasons all solid state activities will be moved from B.275 to B.115This will suppress the existing workshop in B.115 and courtyard between B.115 and B.601

 

2. Replace the existing building 507 by a new building / modular cabins:Ground floor (only accessible from within the surveyed area):

- Labs and workshopFirst floor (accessible from outside the surveyed area):

- Data Acquisition rooms- Meeting room/Visitors Center- (Kitchen?)

Design study:Eliseo Perez-Duenas GS/SE

User Facilities

Page 3: User facilities Building 507

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 3

Cost studies new B 507

Use of modular cabins instead of a full concrete building

Phase 1: estimate 120kChf 160kChf- dismounting the present building 30kChf- construction permit- adapting the concrete foundation 130kChf

Phase 2: estimate 500kChf 520kChf- (non-standard) modular cabins, interconnected and on 2 floors - total surface 420 m2 435 m2

- not taken in account electrical installations, CV, Labo’s, etc.

Advantages: - lower costs- fast construction- flexible work floor

Page 4: User facilities Building 507

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 4

Present situation (ground floor Jura side):

Control room

User Facilities

Page 5: User facilities Building 507

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 5

Solid State Lab 115

1. Increasing the surface of the Solid State Lab in B.115:

Control room

Page 6: User facilities Building 507

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 6

Replace building 507

2. Replacing the existing building 507 by a new building - Ground floor (only accessible from within the surveyed area):

Page 7: User facilities Building 507

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 7

2. Replacing the existing building 507 by a new building - First floor (accessible from outside the surveyed area):

Replace building 507

Page 8: User facilities Building 507

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 8

New building 508

Page 9: User facilities Building 507

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 9

Situation

Page 10: User facilities Building 507

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 10

Cabins on 2 floors

Page 11: User facilities Building 507

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 11

First draft

Page 12: User facilities Building 507

Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 12

Corrected – for discussion

Controlled access

Free access Controlled area