user requirements of ongoing dup, due, and gse projects c. zehner/s. pinnock eo applications and...

21
User Requirements of ongoing DUP, DUE, and GSE Projects C. Zehner/S. Pinnock EO Applications and Services Development Division

Post on 19-Dec-2015

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: User Requirements of ongoing DUP, DUE, and GSE Projects C. Zehner/S. Pinnock EO Applications and Services Development Division

User Requirements of ongoing

DUP, DUE, and GSE Projects

C. Zehner/S. PinnockEO Applications and Services Development Division

Page 2: User Requirements of ongoing DUP, DUE, and GSE Projects C. Zehner/S. Pinnock EO Applications and Services Development Division

Presentation Overview

Ongoing ESA EO Missions

User Requirements of DUP/DUE Projects (on Atmosphere)

GMES Service Element Perspectives on Atmosphere

Page 3: User Requirements of ongoing DUP, DUE, and GSE Projects C. Zehner/S. Pinnock EO Applications and Services Development Division

ERS 1 ERS 2

OceansSea IceCryosphereLand SurfaceClimatology

Global Ozone

1991 1995

ENVISAT

Ocean ColourAtmosphericConstituents

Earth Explorer

Earth Watch?

2002

The Evolution of ESA EO Missions

Page 4: User Requirements of ongoing DUP, DUE, and GSE Projects C. Zehner/S. Pinnock EO Applications and Services Development Division

Data User Programme/Element

Projects

Applications & Service

Development

Scientific Research

AO/Cat I Projects

GMES Service Element

ESA EO Exploitation

10 Projects ongoing

2 new Projects starting now Su

stai

nab

le E

O S

ervi

ces

Page 5: User Requirements of ongoing DUP, DUE, and GSE Projects C. Zehner/S. Pinnock EO Applications and Services Development Division

Working with Users within DUP (B,CH,NL,I)

2 small projects running in parallel (1 year duration, 100 K€, 2001):

POLPO Demonstration Project : Pollution Hot Spot Monitoring from GOME Applied to the Po-basin

Project Aim: to demonstrate the feasibility to combine ground based measurements with satellite measurements for regional air pollution monitoring (Po-valley emissions, trans-boundary transport)

TEMIS Project Definition: Tropospheric Emission Monitoring Internet Service

Project Aim: find users, collect user requirements, identify few core users, define a service for these users based on existing EO missions

Page 6: User Requirements of ongoing DUP, DUE, and GSE Projects C. Zehner/S. Pinnock EO Applications and Services Development Division

Summer means (June, July, August 2000 and 2001) of tropospheric NO2 columns from GOME – POLPO Output Example

Page 7: User Requirements of ongoing DUP, DUE, and GSE Projects C. Zehner/S. Pinnock EO Applications and Services Development Division

Follow on of the 2 small activities:

TEMIS Project: Tropospheric Emission Monitoring Internet Service - http://www.temis.nl/ (1M€, mid 2002-end 2004)

Companies involved: consortium of 6 companies (Belgium, Italy, Switzerland, and The Netherlands) lead by KNMI

Project Aim: to support air pollution monitoring, UV radiation monitoring Kyoto Protocol monitoring, and aviation control 

Instruments: GOME, SCIAMACHY, ATSR

Page 8: User Requirements of ongoing DUP, DUE, and GSE Projects C. Zehner/S. Pinnock EO Applications and Services Development Division

RIVM X   X     X X X X X

ECMWF X                  

L’Oreal X X X       X X   X

VAAC/MéteoFr.

              X X  

ARPA X X X X X       X X

ITC     X     X X X X X

O3 UV NO2 CH2O BrO CH4 CO SO2 aerosol H2O

Core Users and their Requirements

Page 9: User Requirements of ongoing DUP, DUE, and GSE Projects C. Zehner/S. Pinnock EO Applications and Services Development Division

Output of TEMIS (on the Web – available to the public – www.temis.nl)

NRT Total Ozone (using now SCIAMACHY data)

UV information

Tropospheric trace gas information (NO2, SO2, BrO, Aerosol – Level 2 data and synoptic maps by using assimilation techniques) in order to support air pollution monitoring

Page 10: User Requirements of ongoing DUP, DUE, and GSE Projects C. Zehner/S. Pinnock EO Applications and Services Development Division

Tropospheric ozone in 2002

Page 11: User Requirements of ongoing DUP, DUE, and GSE Projects C. Zehner/S. Pinnock EO Applications and Services Development Division

Daily UV dose for Europe

Page 12: User Requirements of ongoing DUP, DUE, and GSE Projects C. Zehner/S. Pinnock EO Applications and Services Development Division

User Needs for improved Satellite Measurements on Air Pollution Monitoring

Spatial resolution: few km

Temporal resolution: at least once a day – preferred hourly

Better accuracy of retrieved species in the troposphere (e.g. GOME NO2: 30-70%)

Insure data homogeneity and continuation over a long time period

Page 13: User Requirements of ongoing DUP, DUE, and GSE Projects C. Zehner/S. Pinnock EO Applications and Services Development Division

GOME Follow-on Missions

Page 14: User Requirements of ongoing DUP, DUE, and GSE Projects C. Zehner/S. Pinnock EO Applications and Services Development Division

Chemical Weather User Requirements Workshop – Nov. 2003

Who are the Users?:

• Atmospheric modelling community (ECMWF, MeteoFrance, UKMO, MPI, etc)

• Trans-boundary pollution monitoring (EMEP)• Regional air quality monitoring agencies (Athens, Lombardia, Flanders,

Rhine Valley, etc)

What are there requirements?:

Trace Gas: SO2, NOx, O3, VOC, CH4, CO, CO2, N2O, NH3, H2CO, HOx

Aerosol: PM10, PM2.5, and possibly smaller particles in the near future.Speciation (anthropogenic, dust, soot, marine, etc.)

Time period: Long term data setNear-real time monitoring and forecast

Horizontal Res: few kmVertical Res: varies from few meters to integrated tropospheric column

amounts

Page 15: User Requirements of ongoing DUP, DUE, and GSE Projects C. Zehner/S. Pinnock EO Applications and Services Development Division

Applications• Climate change and atmospheric chemistry• PM emission sources and dynamics• Background for regional air quality monitoring• Atmospheric correction of optical satellite data

Products/Activities• High Resolution (1km) global aerosol data set (target time span: 1995 - 2005)

Land and Ocean (Optical depth, Ångstrøm coeff)Size distribution: PM10, PM2.5 , PM1.

• Models assimilation and intercomparison exercise• Products tailored for different types of user - e.g. multi-resolution, AOD vs [PM2.5], etc.

Input: ATSR, MERIS, MSG

Invitation to tender: To be issued in mid Feb 2004 (max. 1 M€)

GlobAER - Global Aerosol from Earth Observation

Page 16: User Requirements of ongoing DUP, DUE, and GSE Projects C. Zehner/S. Pinnock EO Applications and Services Development Division

2004 2005200320022001

Industry & Market path

New Providers

User path

New Users

GMES ServicesEarthwatch

MissionsResearch pathNew

Methods

Page 17: User Requirements of ongoing DUP, DUE, and GSE Projects C. Zehner/S. Pinnock EO Applications and Services Development Division

Policy Needs for Atmospheric Monitoring

Montreal-Protocol: seems to be solved for many Politicians (e.g. closing of ground-based monitoring stations)

Convention on Long-Range Trans-boundary Air Pollution: high political attention (e.g. impact of PM on

Health)

Kyoto-Protocol, United Nations Framework Convention on Climate Change: high political attention (e.g. CO2 trading)

Page 18: User Requirements of ongoing DUP, DUE, and GSE Projects C. Zehner/S. Pinnock EO Applications and Services Development Division

Users and their Needs

ECMWF, Meteo-France, WMO: Ozone Information

NILU, DG Environment, ADEME, VITO, ARPA, EPA, INERIS, DEFRA: CLRTAP Monitoring

ARPA, Nordrhein-Westfahlen, WHO, ATMO Auvergne, Airmaraix, Air Pays de la Loire, UBA-Austria,UBA-Berlin: AQ Forecast

SYKE, RIVM: UV-B Monitoring

BVDD: UV-B Forecast

Page 19: User Requirements of ongoing DUP, DUE, and GSE Projects C. Zehner/S. Pinnock EO Applications and Services Development Division

Target Instruments/Key Methods

ESA: GOME, ATSR-2, SCIAMACHY, GOMOS, MIPAS, AATSR, MERIS

EUMETSAT: GOME2, IASI

NASA: TOMS, MODIS, MOPITT, OMI, (TES)

NASDA/CNES: POLDER

Ground-based Measurements

Key Technology to produce secondary products: Assimilation Techniques (Combination of measurements and models) – MOZART, EURAD, TM3, CHIMERE, LOTOS ATSR 2000 etc.

Page 20: User Requirements of ongoing DUP, DUE, and GSE Projects C. Zehner/S. Pinnock EO Applications and Services Development Division

Precursor Services

Ozone: ESA TEMIS, EC FP5 GOA/ASSET, FP4 SODA

Greenhouse Gases: GMES-GATO, EC FP5 EVERGREEN

CLRTAP: EC FP5 GMES-CREATE/DAEDALUS

AQ Forecast: ESA AO projects PAGODA1/2, SENECA, EVIVA - National Funding (AFO 2000): INVERT, SACADA, SATEC4D Assimilation, MAPP-MERIS LCC processor

UV-B Monitoring: EUMETSAT O3SAF, EU FP5: CANDIDOZ, RETRO, QUOBI, EDUCE, FMI National Funding on OMI, etc.

UV-B Forecast: ESA TEMIS, EC STREAMER

Page 21: User Requirements of ongoing DUP, DUE, and GSE Projects C. Zehner/S. Pinnock EO Applications and Services Development Division

Planned PROMOTE Project Start: Feb. 2004

about 30 Institutions involved

Duration: 20 months

Scale: 1.5 M€

Scope: Demonstration Project for GMES (to define future GMES services – planning up to 2014)

Strategy: Integration of ground-based and satellite data

Ozone and UV – full operational Service - 300 K€ each

Air Pollution - demonstration Service – 800 K€

Greenhouse Gases - Service definition