Using GPS Enabled Tablets To Collect Performance & Acceptance DataJohn MorrisonDelcan - a Parsons CompanyEsri AEC - July 13, 2014
![Page 2: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/2.jpg)
• The transportation construction industry is moving to a more broad use of GPS enabled tools during project delivery
• GPS tools used by inspection teams help “connect the dots” for owners, in turn, building confidence
• Parsons (Delcan) are an industry leader in deploying GPS enabled data collectors
Take Away Points
![Page 3: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/3.jpg)
Reasons for Collecting Field Data
• Land Survey• Asset Audits• Compliance Documentation• Existing Condition Assessment• Construction Inspection• Performance Measures• Job Site Assessment• Environmental Conditions• Manpower and Equipment• …Etc.
![Page 4: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/4.jpg)
• Paper inspection reports• Field staff returns report into office• Office staff process the
information• Report is scanned into a
document repository• Hard copy is stored in a box
Traditional Methods
![Page 5: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/5.jpg)
Traditionally Measuring Progress of Work
![Page 6: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/6.jpg)
• Hand written• Scanned image (loses quality)• Very hard to retrieve actual data• Signatures and data often illegible• No information on whether or not
requirements have been verified
A Typical Inspection Report…
![Page 7: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/7.jpg)
• Hand written• Scanned image (loses quality)• Very hard to retrieve actual data• Uncertainties:
- What alignment were they on?- Did they record the right number?- Is the calculation correct?
A Typical Material Testing Report…
![Page 8: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/8.jpg)
• Field markers containing location information
• Location is approximated from a survey stake
• Survey stakes are often damaged, illegible or moved.
Typical Geospatial Location of Work
![Page 9: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/9.jpg)
More projects (complex or simple) have more advanced contractors starting to use automatic machine control driven by 3D models but owner oversight efforts are still based upon a 30 year old technology with paper plan sheets and hand written forms.
Projects Big and Small
3D Laser Scanner
Plan Sets & Paper Forms
![Page 10: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/10.jpg)
Innovative and advanced owners are moving to GPS enabled data collectors to get better and more consistent geospatial location of points of inspection and testing.
Innovative Users
DOT and Contractor Representatives
![Page 11: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/11.jpg)
So Many Options…
• Numerous applications available for multiple uses:- Asset tracking- Construction management- Photo applications- Environmental evaluation- Etc.
• Multiple platforms available- iOS- Android- Windows- Windows Mobile- Etc.
![Page 12: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/12.jpg)
• Model Motion F5v• Windows 7 Professional• 10”L x 10”W x 0.95”D• 1.2 GHz Intel Processor• 10.4” (1024 x 768) Gorilla glass
screen• Hot swappable Li-Ion battery• Wi-Fi• Qualcomm Gobi 2000 Card• MIL810G, IP54 rated
GPS Enabled Tablet
![Page 13: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/13.jpg)
• 10-15 meters stand alone• 7.5 meters• 20 minute cold fix• 3 minutes warm fix• 1 minute subsequent
Tablet GPS Capabilities
![Page 14: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/14.jpg)
GPS Tablet – Other Capabilities
• Bar code scanning- Indexing of material tests and samples- Bar code stays adhered to cylinder
during cure for later scanning
• Geotagged Images- Record photos with verification
metadata
![Page 15: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/15.jpg)
Field Verification Data Collection
Inspections
Material tests
Location accuracyBetter tools, better training…
RESULT: Better data, increased efficiency
![Page 16: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/16.jpg)
• Able to capture records and associate many attributes in the form of metadata
• GPS coordinate will always be true to the project while project Station and Offset my change
• GPS tracking provides the field inspector an interface to determine which asset/alignment they are performing their work at
• Minimize the number of “hands” that would traditionally be involved with an inspection record
• Mobile workstation- Complete functionality in the office or in the field
GPS Tablet Advatages
![Page 17: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/17.jpg)
• Automated synchronization with current RFC plan sets
- Updated digitally and synched automatically
- No paper plans in the field
• Most have a scribe feature available
• Full version of Windows- Suitable workstation- Recognizable interface- Runs popular software
applications
Other Benefits of Tablets
![Page 18: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/18.jpg)
• Software implementation- Feature loaded- Able to install across multiple platforms and multiple
devices- Scalable for any type of project
• Training Program- User specific for managers and administrators- General “bulk” training for multiple users with the
similar tasks
How Can Tablets Collect Performance & Acceptance Data On Projects?
![Page 19: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/19.jpg)
The project includes the reconstruction of one of the most highly traveled sections of Ohio’s Interstate system within the heart of Columbus.
Complex Example –Columbus Crossroads
![Page 20: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/20.jpg)
Complex Example – Columbus Crossroads• 22 MSE Walls• 4 CIP Walls• 1,200 ft. T-wall• 18 Ramps• Micro-Tunnel
![Page 21: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/21.jpg)
Complex Example – Columbus Crossroads
• 22 Bridges- (2 reconstruction)
• Mainline Roadway- I-71 NB, I-71 SB & I-670 EB
• City Street• All within a 1 sq. mile footprint
![Page 22: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/22.jpg)
Software Implementation
ACCEPTANCEAACCEPTANCECCEPTANCE
PERFORMANCE
MONITORING
PPERFORMANCEERFORMANCE
MMONITORINGONITORING
REQUIREMENTSRREQUIREMENTSEQUIREMENTS
QMOSTQQ
MOSTMOST
VERIFICATION
AUDITING
VVERIFICATIONERIFICATION
AAUDITINGUDITING
AACCEEPTAAANNNCEEAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAC EACCEEPTAAANNNCEECCEEPTAAANNCEECCCEPTTANNCCCCCCEAAAAAAACCCCEPTTANNNCCCCCECCCEPTTANNNCCCCCEAAAAAACCCEEPPTTAAAANNNNNNCCCCCEECCCEEPPTTAAANNNNNNCCCCCEECCCEEPPTTAAAANNNNNNCCCCEECCCEEPPTTAANNNNNNCCCCEE
PPPPEERRFFFOOORRRMMMAAAANNCEEEEE
MMMMOOONNNITTTTOOORRRRIINNNNNNGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGG
PPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPE EEERRFFFOORRRMMMAAAANNCEEEEEEERRFORRMMMAANCEEEEERFFOOORRRMMMAAANCCCCCCCEEEERFFOOORRRMMMAAANCCCCCCCEEEERFFOOORRRMMANCCCCCCEEEERRFFFFOOORRRMMMAAAANNCCCCCCEEEEEEEEEERRFFFOOORRRMMMAAAANCCCEEEEEEERRFFFOOORRRMMMAAAANCCCEEEEEEERRFFFOOORRRMMMAAAANCCCEEEE
MMMMMMMMMMMMMMMMMMMMMMMMMMMO GGGOOONNNITTTTOOORRRRIINNNNNGGGGGGGGGGGGGGGGGGGGOONNNITORRRINNNNNGGGGOOOONNNITTOOORRIINNNGGGGGGGOOOONNNITTTOORRIINNNGGGGGGOOONNNITTORRIINNNGGGGOOOONNNITTTTOOORRRRRIINNNNNNNNNNNGGGGGGGGGGGGGOOOONNNITTTTOOORRRIINNNNNNNNNGGGGGGGGGGGGGOOOONNNITTTTOOORRRIINNNNNNGGGGGGGGGGGGOOOONNNITTTOOORRRIINNNNNNGGGGGGGGGGGG
RRRRREQUUIRREMMEEENNTSSSSSSRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRR SSEQUUIRRREMMEEENNTSSSSSSQ SSSEEEQQQUUUIRREEMMMMMENTTSSSSSRRRRRREEEQQUUIRREEMMMMMENTTSSSSSEEEQUUIRREMMMMMENTTSSSSEEEQQQUUUUUIIIRRRREEEMMMMMMEEEEEENNNTTSSSSSEEQQQUUUUUIIIRRRREEMMMMMMEEEEEENNTTSSSSSEEEQQQUUUUUIIIRRRREEMMMMMMEEEEEENTTSSSSSEEQQQUUUUUIIIRRRREEMMMMMMEEEEEENTTSSSSS
MMOSSTTTTTTMM TMMOSSTTTTTTTMMOSSTTTMMOOSSSTMMOOSSSTMMOOSSTMMOOOSSSSTTTTTTTMMOOSSSSTTTTMMOOSSSSTTTTMMOOSSSSTTTT
VVVVEEERRIFFFIICAATTTIOOOOON
AAAAAAAUUUDITTINGG
VVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVE NEEERRIFFIIICAATTTIOOOONEEERRIFFIIICAATIOOONEEEEEERIFFICCAATIOOOONNVVVVVVVVVVEEEEERIFFFIICCAAAATIIOOOONNEEEEERIFFFIICCAATIIOOONNEEERRRIIIFFFIICCCCAAAATTTIIIOOOOOOONNEEERRRIIIFFFIICCAAATTIIIOOOOOOONNEEERRRIIIFFFICCCAAATTTIIIOOOOOOONNEEERRRIIIFFFICCAAATTIIIOOOOOOONN
AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAUU GUUUDITTINGGUUUDITINGUUUUDDDIITINGGAAAAAAUUUUDDDDIIIITINGGUUUUDDDDIIITINGGUUUUUUDDDDDDIIITTIINNGGUUUUUUDDDDDDIIITIINNGGUUUUUUDDDDDDIIITIINNGGUUUUUUDDDDDDIIITIINNGG
ACCEPTANCEAACCEPTANCECCEPTANCE
PERFORMANCE
MONITORING
PPERFORMANCEERFORMANCE
MMONITORINGONITORING
REQUIREMENTSRREQUIREMENTSEQUIREMENTS
QMOSTQQ
MOSTMOST
VERIFICATION
AUDITING
VVERIFICATIONERIFICATION
AAUDITINGUDITING
• Quality Management Oversight Services for Transportation (QMost)
- Requirements- Verification Auditing- Performance Monitoring- Acceptance
![Page 23: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/23.jpg)
QMost System
STEP 1
• Requirements• Define and organize requirements against a
work breakdown structure.
STEP 2
• Verification• Plan, prioritize and conduct assessments on
the program’s processes, products and management.
STEP 3
• Performance Monitoring• Prepare reports of conformances and non-
conformances and perform trend analysis. Identify systemic issues.
Step 4
• Acceptance• Define and document conditions of
acceptance and link quality records to final acceptance status.
ACCEPTANCEAACCEPTANCECCEPTANCE
PERFORMANCE
MONITORING
PPERFORMANCEERFORMANCE
MMONITORINGONITORING
REQUIREMENTSRREQUIREMENTSEQUIREMENTS
QMOSTQQ
MOSTMOST
VERIFICATION
AUDITING
VVERIFICATIONERIFICATION
AAUDITINGUDITING
AACCEEPTAAANNNCEEAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAC EACCEEPTAAANNNCEECCEEPTAAANNCEECCCEPTTANCCCCNCEAAAAAAAACCCCEPTTANCCCNCNCECCCCEPTTANCCCNCNCEAAAAAACCCEPEPTAAAANNNCNCNCNCCEECCCEPEPTAAANNNCNCNCNCEECCCEPEPTAAAANNNCNCNCNCEECCCEPEPTAAANNNCNCNCNCEE
PPPP RERE FFOOOF RRRMMMAANNCEEE
MMMMOONNNO ITTTOOORRRRIINNNNNGGGGGGGGGGGGGGGGGGGGGGGGGGG
PPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPE ERERE FFOORRRMMMAANNCEEERERE FORRRMMMAANCEEEREE FFFOOORRRMMMAANCCCCCECECEEREE FFFOOORRRMMMAANCCCCCCCEEREE FFFOOORRRMMANCCCCCEERERE FFFOOOF RRRMMMAANANCECECECECECEEERERE FFFOOOF RRRMMMAANA CECECEEERERE FFFOOOF RRRMMMAANA CECECEEERERE FFFOOOF RRRMMMAANA CECECEE
MMMMMMMMMMMMMMMMMMMMMMMMMMMMO GOONNNO ITTTOOORRRRIINNNNNGGGGGGGGGGGGGGGGGOONNNITOORRRINNNNNGGGGGGOONNNO ITTTOOORRRRIINNGGGGGGOOONNO ITTTTOOORRRIINNNGGGGGOONNO ITTTORRRIINNNGGGGOOONNNO ITTTTOOORRRRRIINNNNNNNNNGGGGGGGGGGGGGGOOONNNO ITTTTOOORRRRIINNNNNNNNGGGGGGGGGGGGGGOONNNO ITTTTOOORRRRIINNNNNNGGGGGGGGGGGGGOONNNO ITTTOOORRRRIINNNNNNGGGGGGGGGGGGG
RRRR QUU SSSSSSRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRR SSEQ IUU REERR EEMEM NTNNN SSSSSSQ SSSEQQQEE UIUU RREEMMMEMM NTTSSSSSRRRRRREQEE UUIRREEMMMMENTTSSSSSEQEE UUIRREEMMMMENTTSSSSEQEQEQUIUIIUU REREERR MEMEMEMEMEEM NTTNN SSSSSEQEQEQUIUIIUU RERERR MEMEMEMEMEEM NTTNN SSSSSEQEQEQUIUIIUU RERERR MEMEMEMEMEEM NTTSSSSSEQEQEQUIUIIUU RERERR MEMEMEMEMEEM NTTSSSSS
QQQQQQQQQQQMMOSTTTTSTTTQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQ
MM TMMOSTTTTSTTTTMMOSTTTSMMOOSSSTMMOOSSSTMMOOSSTMMOOSTSTSTTSTTTTMMOOSTSTSTTSMMOOSTSTSTTSMMOOSTSTSTTS
VVVVEREERIFFFICI AATTTIOOOOON
AAAAAAAUUDITTINGG
VVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVE NEREERIFFIICI AATTTIOOOONEREERIFFIICI AATIOOONEEEERIFFFICCAATIOOOONNNVVVVVVVVEEEERE IFF CICAATAA IOIOOONNEEEERE IFF CICAATIOIOONNERERERIFIFIFFICICICCAAATATTTIOIOIOOOOONNERERERIFIFIFFICIICAATATIOIOIOOOOONNERERERIFIFIFICCCAATATTIOIOIOOOOONNERERERIFIFIFICCAATATIOIOIOOOOONN
AAAAAAAAAAAAAAAAAAAAAAAAAAAAUU GUUUDITTINGGUUUDITINGUDUDUDUDIITTITINGGAAAAAAUDUDUDUDIITINGGUDUDUUDIITINGGUDUDUDUDUDUDIITITININGGUDUDUDUDUDUDIITI ININGGUDUDUDUDUDUDIITI ININGGUDUDUDUDUDUDIITI ININGG
ACCEPTANCEAACCEPTANCECCEPTANCE
PERFORMANCE
MONITORING
PPERFORMANCEERFORMANCE
MMONITORINGONITORING
REQUIREMENTSRREQUIREMENTSEQUIREMENTS
QMOSTQQ
MOSTMOST
VERIFICATION
AUDITING
VVERIFICATIONERIFICATION
AAUDITINGUDITING
![Page 24: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/24.jpg)
Requirements Management Interface
• Thousands of requirements are extracted from standard specifications and procedure manuals
• Risk Priority Numbering (RPN) are assigned to each requirement
![Page 25: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/25.jpg)
Requirements Management Interface
• Requirements are loaded into a database application where they are organized and easily accessible.
• These requirements are loaded into a verification based on the contractors CPM or daily work schedule
Requirements
Specs, Proceduresand Manuals RPN
![Page 26: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/26.jpg)
Verification
• The inspector accesses the verification through the GPS tablet while in the field
• This allows a single inspector to move efficiently between different inspection areas
![Page 27: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/27.jpg)
Verification Interface
• The inspector sees the requirements that need to be verified as well as their color coded risk priority
• After record information has been entered, the GPS coordinate is captured by the application
![Page 28: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/28.jpg)
Sampling & Testing Interface
• Digital forms that collect and organize field data for- Concrete air, slump and compressive strength- Soils field compaction, proctor, density and gradations- Asphalt lab and field compaction
• All records indexed and GPS tagged
![Page 29: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/29.jpg)
What Can Be Done With All This Data?
• Raw exported data in tabular form
![Page 30: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/30.jpg)
Report on the Data• Queried data automatically formatted
to a report based on user parametersM
aterials Testing&
Sampling D
ata
Construction D
ata
Design D
ata
![Page 31: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/31.jpg)
Analyzing the Data
• Summary reporting doesn’t always tell the full story• GPS tagged data can be:
- Imported into numerous platforms such as ArcGIS, CAD, etc. to create visual exhibits
- Analyzed further through MS Excel, MS Access, CAD and GIS
![Page 32: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/32.jpg)
Track Inspection Efforts
![Page 33: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/33.jpg)
Conformance Rates
![Page 34: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/34.jpg)
98.9%
100.0%
98.3%
100.0%
97.7%
95.8%
100.0%
100.0%
86.0%
100.0%
84.4%
70% 80% 90% 100%
WallsUtilities
Scope-GeneralRoadway
MOTGeotech
EnvironmentalEarthwork
DrainageDemo
Bridges
Project Construction Performance Rate by Major Work Type
![Page 35: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/35.jpg)
139
533
369
228 1 RD
8 RD
17 RD
5 RD
1NC
1 NC
Adj.99.3% 98.3% 95.6% 97.4%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0
100
200
300
400
500
600
Sep-11 Oct-11 Nov-11 Dec-11 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11
Performance R
ateReq
uire
men
ts V
erifi
edMonthly Construction Performance Activity
Conforming Observations RD's Issued
97.5%Average
![Page 36: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/36.jpg)
Performance Measurement
• Performance Data- Graphical summaries of trends- Standard and customized
queries and reports- Tracking of detected issues until
corrected and verified
![Page 37: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/37.jpg)
Stakeholder Confidence
GPS tagging of all data points are used to graphically represent verification efforts showing how the work was verified. This would build confidence in the stakeholders that the work was done right.
![Page 38: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/38.jpg)
GIS Data Points From Construction Data
GPS data points can be exhibited at any frequency• Examples of monthly &
quarterly plots
![Page 39: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/39.jpg)
Field Verification Data Collection
• Inspection and Testing Density Plots
![Page 40: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/40.jpg)
GIS Data Points From Construction Data
Maintenance of Traffic GPS data can be tracked through various platforms including GIS and CAD
![Page 41: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/41.jpg)
Exhibit As-Built DataTolerances can be examined visually through exhibits
![Page 42: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/42.jpg)
Acceptance Dashboard
Final Acceptance Dashboard
• Linked verification records to FA status
• Outstanding Non-Conformances
• Contractor/Owner Punchlist
• WBS Work Elements• Contract-Defined
Deliverables Acceptance
Punch list
AcceptanceConditions
![Page 43: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/43.jpg)
Final Acceptance
Module is able to handle:• Final Verification • Engineer’s Inspection
and Punch List • Final Inspection • Final Inspector’s Punch
List (if warranted) • Final Documentation • Final Certification
![Page 44: Using GPS Enabled Tablets To Collect Performance & Acceptance … · E ERFORRMMAAN NCCE OONNIITTORRINGGG EEEQQQUUUIIIRRREMMMENNTSSS MMOOSSTT ERIFICATION UDITING ERIFFIICCATTIOONN](https://reader031.vdocument.in/reader031/viewer/2022011918/600b8e3b81fc0a4fa74536a3/html5/thumbnails/44.jpg)
In Summary
• GPS tablets can aid in the efficiency of construction inspection while reducing staff
• Tablet can significantly reduce the volume of paper forms and reports
• Ability to handle complex project phasing through GPS coordinates
• Automated RFC plan distribution through a secure wireless network
• Inspection data can be uploaded daily reducing turn times• Performance data can be used to analyze and forecast
pointing out positive and negative trends • Acceptance data can be used to track specific conditions
through closeout for the handing over of a quality project