Using Project Portfolio Tool ‘PMFolio’
by
AlNik Solutions, LLC
Copyright 2011 ©
Agenda ‘Using PMFolio’
• Introduction• Selecting Projects for Reports• Reports• Selecting Projects for PMFolio• Custom Fields• Preview/Printing/Exporting
Introduction
Sr. Management Revenue Analysis and Portfolio tool for analyzing all projects within the organizations common server database and provides summary reports showing the status and health of all of the projects, or projects of interest. PMFolio is a complementary module to PMPlan.
Custom Reports
Standard Reports
anDbManager(Database Administration)
PMPlan Enterprise Tool Suite
PMPlanDB(Project Management) Basis-Of-Estimate
Labor LoadingOther Direct CostsBudgets
Company Accounting Data
Company Rate Data
Company Roster Data
Work Breakdown Structure
ObjectivesDeliverablesScheduling
Importing ActualEstimate-To-CompleteEarned Value Methodology
Jobs Categories Jobs Rates Burden Rates RosterActual
Standard Reports
Custom Reports
LMPlanDB (Line Management)
Planned Monthly Loading Data
Assigned Monthly Loading Data
Standard Reports
Custom Reports
PMFolio (Portfolio Reports)
Balance RemainingWorkforce RequirementsDeliverablesMilestonesRevenuesCash Flow
PMFolio opens with Project Listing
These checks controls which projects will be used in reports.
This is the latest accounting closing date.
This indicates that the project has been updated in PMPlan since last import.
This indicates that status of that project is not current.
Project Listing (continued)
Clicking on a header will sort on that column. Clicking a second time will reverse the order.
Project Listing (Continued)
Clicking on the funnel icon will allow the data to be filtered.
PMFolio Reports
Except for the Summary Balance Remaining report, the projects selected in the project listing will be used in each of these reports.
Report - Summary Balance Remaining
The Row Background is Green when the BAC/EAC > 1.1
OrVariance > +$50,000
The Row Background is Red when the BAC/EAC < 0.95
Or Variance < -$20,000
Clicking here will display details of selected project at the control account level (see next slide.
Balance Remaining Details of a Project
End of the Incurred To Date (ITC)
Report – Summary Workforce Requirements
Red when < 40% Goal Orange when
40% to 59 % Goal
Yellow when 60% to 79 % Goal
Light-Green when 80% to 99 % Goal
Dark-Green when Over Goal
Blue when Over Head Count
Clicking here will display bar chart for that category (see next slide)
Forecast for Specific Category
Backlog (Active Projects)
Proposals
Report - Detail Workforce RequirementsDefault is to group by Account/Title, then Category
Detail Workforce Requirements (Continued)Dragging the Column Header will change the grouping.
Result
Detail Workforce Requirements (Continued)
Clicking these buttons control monthly or yearly views
Report - Deliverables
Red background indicates overdue
Green background indicates due in more than 3 months
Yellow background indicates due in the next three months
Report - ActivitiesDefault order is expected finish date
Can filter activities based specific Resource Category.
Report - Milestones
Red background indicates overdue
Green background indicates due in more than 3 months
Yellow background indicates due in the next three months
Report – Total Revenue
Report – Revenues by ProjectOrder of these columns determines the grouping
Revenues of Projects (Continued)
Dragging Manager Column to far left changed the groupings
Report – Total Cash Flow
Report – Cash Flow Status by Project
Clicking this will show details of that project (see next slide)
Report – Cash Flow for Specific Project
Current Status
Tools for Administrators
Refreshes the Project Listing
Controls which projects from PMPlan are imported into PMFolio
Allows editing of custom fields used for filtering project list
Allows editing of Project Kinds Listing
If a check mark is displayed the application will import all the selected projects nightly at 1 AM.
Custom Fields for Filtering and Sorting
This indicates that this field will not be used.
Click this to clear field
A lookup list should be used to control what is entered in field cell.
Can have up to ten fields
If a value is removed, it will be necessary to edit values in the ‘Import Projects Table’
Project Kinds Listing
The ID determines the order, but you must not change an ID value. If you want to insert a title, replace the titles of all items greater than the ‘insertion’ point.
To delete an item, click in the row header left of the 5, then press Delete. After that re-titled as desired.
To insert an item, click in the ID cell next to the *, enter 6. After that re-titled as desired.
Projects to ImportThis indicates that this PMPlan project should be imported
The green cells for sorting and filtering
Grey background is not selected.
Projects to Import (Continued)
When you select a white cell a drop down list usually will be displayed.
If a project is checked, make sure each of the white cells are set as desired.
This should be 100 for active project, and less for Proposal based on expected chance of getting the work.
Manually Importing Projects
This will import all of the select projects
This will import all projects that have been updated in PMPlan, since last import.
Previewing/Printing/Exporting
Can export to all these formats
Add Water Mark to foreground or background
Can control Page Setup
Can edit Header and Footer
Can attach report to E-Mail
Using PMFolio
Thank you, any questions?