utility scale pv yield optimization conference & expo 2010

8
Event Sponsors: Official Partners: TOP PV EXPERTS WORLDWIDE: Utility Scale PV Yield Optimization Conference & Expo November 30 - December 1 2010, San José, US Researched & Organized by THE MOST CRUCIAL & RELEVANT UTILITY SCALE PV EVENT IN THE UNITED STATES 6 REASONS WHY YOU MUST ATTEND THIS SUMMIT Enjoyed the atmosphere and easy networking opportunities, Thank You! Hilti Corporation Open now to view the program, speaker line-up & much more! SAVE UP TO $400 if you register early Drive Down your LCOE and Boost your MW Output through Improved Balance of Systems Engineering • MASTERING LCOE - understand today’s most accurate LCOE calculation methods that can help you deliver on PPA expectations and win more projects • OPTIMAL PLANT LAYOUT - PV project construction experts reveal the design lessons learned from existing plants in the US & Europe that will help you maximize your plant’s performance • SMART COMPONENT SELECTION - hear manufacturers examine the reliability, durability and efficiency of their products so that you can evaluate your ROI and improve your LCOE • BoS WIRING WINS - find out how to stay within 2% of wiring loss, calculate the copper consumption that benefits your plant and secure durable wiring that will enhance your plant’s output • ROOF AND GROUND MOUNTING STRATEGIES - gain technical insight into this critical design factor - discover the right plan and budget that will help your plants O&M and guarantee protection in harsh weather conditions • MINIMIZE & FORECAST DOWNTIME - discover the various monitoring solutions and key data so you can arm yourself with information to forecast and avoid costly time offline 1. The only engineering focused PV event, take the opportunity to discuss real plant performance issues in detail 2. 25+ Expert speakers 3. 150+ top attendees from EPCs, developers and technology providers 4. The most relevant international PV experience in one room 5. PV Balance of System focused break out sessions & exhibition area 6. Online eNetworker which will allow you to contact fellow attendees pre and post event!

Upload: new-solar-today

Post on 14-Jun-2015

227 views

Category:

Documents


2 download

DESCRIPTION

How to drive down your LCOE and boost MW output through improved balance of systems engineering

TRANSCRIPT

Page 1: Utility Scale PV Yield Optimization Conference & Expo 2010

Event Sponsors: Official Partners:

TOP PV EXPERTS WORLDWIDE:

Utility Scale PV Yield Optimization Conference & ExpoNovember 30 - December 1 2010, San José, US

Researched & Organized by

THE MOST CRUCIAL & RELEVANT UTILITy SCALE PV EVENT IN THE UNITED STATES

6 reasons why you must attend this summit

“ Enjoyed the atmosphere

and easy networking opportunities, Thank You!

”Hilti Corporation

Open now to view the program, speaker line-up & much more!

save up to $400 if you register

early

Drive Down your LCOE and Boost your MW Output through Improved Balance of Systems Engineering• MasteRING LCoe - understand today’s most accurate LCOE calculation methods that

can help you deliver on PPA expectations and win more projects

• optIMaL pLaNt LaYout - PV project construction experts reveal the design lessons learned from existing plants in the US & Europe that will help you maximize your plant’s performance

• sMaRt CoMpoNeNt seLeCtIoN - hear manufacturers examine the reliability, durability and efficiency of their products so that you can evaluate your ROI and improve your LCOE

• Bos WIRING WINs - find out how to stay within 2% of wiring loss, calculate the copper consumption that benefits your plant and secure durable wiring that will enhance your plant’s output

• RooF aND GRouND MouNtING stRateGIes - gain technical insight into this critical design factor - discover the right plan and budget that will help your plants O&M and guarantee protection in harsh weather conditions

• MINIMIZe & FoReCast DoWNtIMe - discover the various monitoring solutions and key data so you can arm yourself with information to forecast and avoid costly time offline

1. The only engineering focused PV event, take the opportunity to discuss real plant performance issues in detail

2. 25+ Expert speakers

3. 150+ top attendees from EPCs, developers and technology providers

4. The most relevant international PV experience in one room

5. PV Balance of System focused break out sessions & exhibition area

6. Online eNetworker which will allow you to contact fellow attendees pre and post event!

Page 2: Utility Scale PV Yield Optimization Conference & Expo 2010

WELCOME TO THE ONLy PV BALANCE Of SySTEMS ENgINEERINg fOCUSED EVENT IN THE US

Master Balance of System Engineering – and Win the Battle for PV Market Share

The Competitive Edge in Utility Scale PV With 6,600MW of utility scale PV under development solar is fast becoming a major supplier of US grid energy. This market is heating up - that means it’s vital that you harvest every kilowatt-hour possible from your plant. To do that you need exceptional engineering.

yet few companies are focusing on Balance of Systems (BoS) - components that account for over 50% of total system costs. If you act now and improve your plants BoS you will sharpen your competitive edge and improve your Levelized Cost of Energy (LCOE) in one smart move.

This is why CSP today has created The Utility Scale PV Yield Optimization Conference & Expo 2010 - an event packed with practical PV engineering advice that will help you win big in utility scale PV.

You Need To Get Your BoS Right - NowPlant production is critical in assessing solar project viability and the bigger the contract, the bigger the stakes. That’s why BoS is critical now that PV is ramping up to utility scale. you know how vital it is to secure capital - to do this you need attainable predicted production levels that guarantee enticing returns for your investors. In a market where every cent counts LCOE errors & poor engineering will kill your bottom line.

Proving Bankability Investor and PPA provider confidence is essential to project development. By getting BoS engineering right you give yourself the best chance of avoiding the electrical losses and efficiency shortfalls that lead to losing financial support. your plant will also demonstrate a consistent ability to meet your promised level of energy - a plus for you and PV as an industry in the on-going battle with other renewable energy solutions.

The BoS Difference Improving BoS means you need to evaluate your system by looking at plant design, component selection and integration and predicting how every change will affect costs and overall output. It avoids the buy and try approach to engineering. Simply, when you focus on BoS - your plant’s life expectancy goes up.

for example, smart BoS dictates that you never buy a cheap module to cut short term costs -

REGISTRaTION IS qUICk aND EaSY www.csptoday.com/pvbalanceofsystems

EMaIL [email protected] OR CaLL NOW TO BOOk YOUR SEaT 1 800 814 3459 See you in San José in November!

Don’t miss this event! Call now to secure your seat – early bookers get the best prices!

www.csptoday.com/pvbalanceofsystems

because by factoring in overall plant efficiency the numbers show that the cost cut is not worth it. Thousands of engineering decisions like this go into the development and operation of a successful PV plant - considering BoS at every step carves out the efficiency gains that dictate profit margins.

The Best in PV Engineering Experience Whether it is poor component selection, flawed plant layout, costly wire design or badly executed O&M - inadequate Balance of System Engineering costs you time, money and output - this results in lost market share, terminated PPAs, and ugly balance sheets. Don’t let it happen to you! Attend The Utility Scale PV yield Optimization Conference & Expo 2010 and put yourself on the path to long term success.

With only 92MW of utility scale PV running in the US there has been little time to develop best practices - but developers, EPC’s, utilities and installers can take a shortcut and look to lessons learned from Europe that will save time and money.

This is why the Utility Scale PV Yield Optimization Conference & Expo 2010 features experts from across the global PV industry who will share their BoS engineering experiences, best practice tips and strategies. In developing this agenda we have conducted hundreds of hours of research to pinpoint the discussion topics that will help you formulate a Balance of Systems approach to tweak your plant into a streamlined solar powerhouse. Here is a small taste of what you will learn at the show:

> Tips & strategies on how to meet PPA performance projections

> Case studies on how European plants achieved optimal performance

> System design considerations that reduce labour, wiring materials and overall costs

> Component manufactures speak on product reliability, warranty and O&M support for your plant

> How intelligent systems can give you essential performance data and forecast power output failures

This conference drills down into component selection & integration, optimal design, & O+M to an advanced technical level of detail – covering every major component and technology including:

> Inverter reliability & durability

> Mounting systems

> Corner junction boxes

> Wiring design

> String level monitoring & inverter monitoring

> fixed tilt,1-axis & 2-axis trackers

> grounding lugs, roof membranes and many more

Plus, we look at warranties and host an instrumental BoS discussion with major stakeholders, equipment manufacturers, design groups, and utilities on developing standards to maximize efficiency gains.

Your Technical Concerns answeredShould you take a hit on initial costs and shoot for for long-term efficiency, or keep initial costs low? Are fixed tilt or 1-axis and 2-axis trackers the best option? How do you reconcile projected vs actual performance? All these questions and more are tackled at the Utility Scale PV Yield Optimization Conference & Expo giving you the case study examples and the technical facts and figures you need to make smart BOS choices.

Get Balanced, Efficient and Profitable – Get Your Ticket Now!The 2 days you spend at this event will be 2 of your best days in PV this year. Every session is focused on information that will maximize your plant’s yield (look over the page for the full agenda!). And with the ability to meet, arrange meetings and follow up with all the attendees through our networking website you are guaranteed to make connections with some of PV’s finest minds!

Get your ticket now to the only event that will help you master balance of systems engineering and push your plant performance to the peak of its potential Make the smart choice and book now to get the very lowest price ticket available!

Page 3: Utility Scale PV Yield Optimization Conference & Expo 2010

David fernandezSenior Vice President Fottowatio Renewble Ventures

Christopher DymondSolar Technical Developer EnXco

Manfred BaechierChief Technical Officer Phoneix Solar

Daniel BreigPE Director Southern California Edison

Matt CampbellDirector of Utility Products SunPower

forrest CollinsSenior Systems Engineer Juwi Solar North america

Tim ZgonenaPrincipal Engineer Underwriter Labs

gerald HunterMechanical Engineer Salt River Project

gary LawsonSupervisor Power Contracts, Energy Trading & Contracts Department SMUD Energy and Trading

Ward Bower Distinguished Member of the Technical Staff Sandia National Labs

Arturo AlvarezProject Engineer albiasa Solar

Luis RecueroGeneralia Group

Mark EarlyChief Electrical Engineer NFPa

Michael fifeDirector of Quality and Reliability PV Powered

Steve HummelVice President of Engineering PV Powered

Representative TBCSatcon

Representative TBCTigo Energy

Lionel BonyDirector, Office of the Chief Scientist RMI

Cara LibbyProject Manager, Renewable Energy EPRI

Rob WillsIntergrid

Stephen Smithfounder Solvida Energy

Paula MintsDirector, Energy Practice Energy Navigant Consulting

Top International PV Speakers TOP NETWORKINg TOP INfORMATIONThe Utility Scale PV Yield Optimization Conference & Expo offers you the unique opportunity to get crucial technical information and invaluable face time with the people that matter. By signing up for the conference today you will benefit from:

Online access To all DelegatesMessage clients and new contacts, arrange meetings and follow up after the event (great if you lose that crucial business card!)

25+ Expert Speakers Expert speakers from Developers, EPCs and Technology Providers, ready to pass on a wealth of experience at this one-of-a-kind event

all New BoS Business GroupsBreak out sessions discussing how do you implement engineering knowledge from the conference back to the office. So you can meet business objectives on current and future projects

PV Balance of Systems Solutions ExpoTHE place to find solutions to your Balance of System challenges and get the latest on EPC strategies and technical solutions

Exclusive Networking Drinks Partya great chance to network with your industry peers in a relaxed environment

World Class Speaker Line Up

1

2

3

4

5

We´ve got significant interest in addition to this excellent line up of top speakers and we are adding speakers to the program every day!

FOR FURTHER INFORMaTION CHECk www.csptoday.com/pvbalanceofsystems

Reserve Your place today - 1 800 814 3459

New for This Event!Interactive Working Group Discussion

Juggling Utility PV Business Processes & BoS

BoS costs includes; initiation and origination; financing and contracting; system design and procurement; permitting, testing and inspecting; site preparation, installation and testing; operation, monitoring and maintenance.

But meeting these business process objectives is made cumbersome and costly by the challenges of information, customization, inexperience, unfamiliarity, and lack of accountability and oversight.

This session will explore ways to overcome these challenges and decrease projects business processes costs.

Page 4: Utility Scale PV Yield Optimization Conference & Expo 2010

UTILITy SCALE PV LANDSCAPE

PV Plant Performance Lessons from the USa & Europe

> Identify the location specific factors that can affect efficiency by hearing an evaluation of performance in the US and Europe - enabling you to better predict plant feasibility

> find out whether the largest PV installations met the expected $kw installed and generation expectations so you know how to emulate their success

> Leading developers share the insights and best practice tips they have accumulated building PV plants in the European market

David fernandez, Senior Vice President, Fotowatio Renewable venturesChristopher Dymond, Solar Technical Developer, enXcoArturo Alvarez, Project Engineer, albiasa solar

The Tech Specs Utilities Want That Will Win PPas

> find out the level of performance output you need to guarantee partnerships and lock in long term provider relationships

> Utility companies plant preferences - discover whether you should focus your plant design on being economical, efficient or customized

> Utilities speak on interconnection & grid transmissions lines going up to 750 kV and what can be done to limit electrical efficiency losses

> Hear an examination of what utilities expect from the future of PV concerning intermittency and energy storage issues

gerald Hunter, Mechanical Engineer, salt River project gary Lawson, Supervisor Power Contracts, Energy Trading & Contracts Department, sMuD energy and trading

Southern California Edison’s PV Perspective

> gain a utility user design and O+M perspective as SCE share lessons learned and what improvements were made on BoS components to enhance efficiency and durability of their PV projects

> Examination of cost and grid parity, - looking at the attributes of electric utility service, the cost elements of electric service and comparison of PV cost to other generation types

Daniel Breig, PE Director, southern California edison

Reserve your place today - www.csptoday.com/pvbalanceofsystems

get unique insight from leading PV companies

The SEGIS Program – Increasing Grid Connectivity

> Learn how the SEgIS program aims to increase PV penetration into the utility grid and max out the economic value of solar energy - potentially giving your profit margins a healthy boost

> Results from recent Balance of Systems research and development are in - hear how today’s advances in the lab will lead to commercial solutions that improve your plant’s performance

Ward Bower, Distinguished Member of the Technical Staff, sandia National Labs

INVERTERS – HOW TO TREAT PV’S ACHILLES HEEL

Inverter Types, Sizes and Communication

> Uncover the types of intelligent communication now available and see whether your project is the right size for these solutions to be economical

> Examine the perceived risks of implementing small inverters vs large inverters and the economy of scale required to support large inverters - potentially saving you significant O&M costs

> gain insight into the accustomed monitoring and controlling assets that complement utility SCADA systems

Steve Hummel, Vice President of Engineering, pv poweredRepresentative TBC, satcon

Inverter Reliability & Durability Witness a debate on the burning issue of inverter reliability by inverter manufacturers and EPCs covering questions such as:

> How are inverters improving the performance ratio to harvested electricity & what service agreements are available to secure every possible kwh of energy

> Inverter failure - how does degradation affect efficiency over time and what is the full extent of this on overall BoS and plant downtime?

> What is the long term effect of air cooled inverters on printed circuit boards mounted unenclosed inside the cabinet as they become exposed to extreme temperatures and humidity over time?

Michael fife, Director of Quality and Reliability, pv poweredRepresentative TBC, satcon

PLANT ENgINEERINg & DESIgN

EPC & Installer Case Studies: Optimizing BOS Plant Layout

> Installation strategies revealed - discover how to look at the full life cycle of your plant and take labor, wiring and O&M costs into account when planning for a profitable future

> Benefit from top technical tips such as how you can pack in the highest amount of modules possible and avoid the efficiency losses caused by shading

> EPC’s are improving your plant’s reliability - hear how they are guaranteeing a minimum quantity of energy is delivered against the amount of irradiation available

Manfred Baechler, Chief Technical Officer, phoenix solarLuis Recuero, Generalia Groupforrest Collins, Senior Systems Engineer, Juwi solar North america

COMPONENT EffICIENCy, RELIABILITy & ROI

Plug & Play Designs & Pre-assembly Solutions

> fuses, lightning arrestors, surge suppressors, meters and monitors - gain insight into the pre-assembly integrated systems that can save you time and money

> Balancing material costs and labor costs - analyze the approaches available and assess which model makes most sense for your budget and time line

> Beating back environmental factors - learn about the preventive measures you can take that mitigate the risks of wind loading and earthquakes - cutting your down time and saving O&M costs

> Strong roots make profitable plants - take a detailed look at how the strength and weight of your foundation and frame structures affects long term plant performance

Critical Roof Mount & Ground Mount Concerns

> Understand the fundamental structural design concerns that matter: age of roof, membrane of the roof, ease to replace on the roof and leaking & foundations

> find out how you can protect your roof using sealants and supporting equipment that satisfy building codes and safety regulations

> get to grips with the right ways to ground your module, attach clips/grounding lugs and how to protect the grounding lugs

> What should your geotechnical study cover? And how will the capacity of the soil affect your foundation choices?

Page 5: Utility Scale PV Yield Optimization Conference & Expo 2010

More information, more dialogue, more debate

Check out the latest updates on www.csptoday.com/pvbalanceofsystems

Wiring Design, Durability & Efficiency

> How to master cost effective wiring, learn what you need to do to keep your wiring losses under the 2% benchmark

> Avoiding burnout - find out how to secure a durable wiring system that can cope with the unexpected DC or AC flash accidents that can destroy equipment and lead to costly site shutdowns

> Equip yourself with expert cost saving tips on wiring systems, copper consumption, where to place breakers and fuses and more

> Evaluate the role of corner junction boxes and how they can limit the wire needed to connect modules - plan ahead and you’ll save on labor and materials!

Mark Early, Chief Electrical Engineer, NFpaRobert Wills, Intergrid

The Costs & Benefits of Tracker Technology

> With decreasing module prices what is now the most cost effective strategy – deploying more modules or using tracking to increase efficiency?

> After twenty years does the cent/per watt cost make sense? gain an in depth look at whether tracks really generate the levels of power expected

> find out how to tweak your system so that the tracker alignment and programmable logic controller are accurate - reducing stress and making your tracker last longer

CaSE STUDY: an assessment of Comparative Technology

> Benefit from a performance trend evaluation between different tracking options that will illustrate the differences and advantages specific to fixed tilt, 1 axis tracking and 2 axis tracking and efficiency gains for your plant

Stephen Smith, founder, solvida energy

WORKINg gROUP DISCUSSIONS JUggLINg UTILITy PV BUSINESS PROCESSES & BOS > Meeting business process objectives and making BoS decisions is made cumbersome and costly by the challenges of information, customization, inexperience, unfamiliarity, and lack of accountability and oversight.

> This session will explore ways to overcome these challenges and decrease projects business processes costs.

Brief summary can be found on page 3Lionel Bony, Director, Office of the Chief Scientist, Rocky Mountain Institute

ADVANCED PERfORMANCE & OPERATIONS & MAINTENANCE LCOE Sensitivity assessed

> What are the potential cost and LCOE sensitivities when PV systems lack reliability? Examine the risks so you are better able to handle these costly situations

> Discover the most accurate way to calculate LCOE – what values should be used low, high or most probable?

Matt Campbell, Director of Utility Products, sunpower

PV O&M Uncovered > find out the results of EPRI’s O&M study including cost estimates and the main causes of PV system failure and relative frequencies so you are prepared for real life scenarios

> Evaluating the pros and cons of in-house vs. outsourced O&M so you can tailor a strategy that helps your plant generate power over a longer time within budget

Cara Libby, Project Manager Renewable Energy, epRI

Performance Monitoring 101 > Hear practical tips to prevent communication failure so you don’t lose prediction data and ensure you get paid for the every kw your plant produces

> String level monitoring – discover the effective, budget friendly methods that will slash your labor costs

> Take a look at multiple site monitoring solutions - a valuable tool in quickly and easily comparing and analyzing data across your plants

> Understand the available systems that include inverter communication and per module monitoring that can cut down time spent troubleshooting PV arrays

Representative TBC, tigo energy

Testing Reliability & Predicting Downtime

> gain the ability to accurately predict production reliability at the pre-construction phase and evaluate the feasibility of your plant’s design by comparing design alternatives, identify potential failure areas, trade-off system design factors and track reliability improvement

> Discover the post construction reliability tools that will provide you with warranty data analysis and degradation data analysis that will preempt decreased efficiency or system failure

Warranty & Insurance – Who Is Responsible for an Underperforming Plant?

> Make sure you are safeguarding your PV project - understand the securities you can put into place to protect against the possibility of plant performance dipping below PPA terms

> Examine equipment warranty worst case scenarios and discover who is liable and what you can do to prepare for the unexpected

ADVANCES IN BALANCE Of SySTEMS ENgINEERINg

Manufacturing Standards: Enhancing Component Performance

> The BoS components that will boost your plant’s performance - get a comprehensive look at the UL listed products and hear how and when the list will be expanded

> European manufactures share their insight into how best to use standard EU equipment with American UL standards - so you can get equipped using proven methods

> Safety strategies to secure plant operation - find out how to balance a high degree of safety without overreaching your budget

Tim Zgonenam, Principal Engineer, underwriter Labs

Shaping the Future of US Standards

> Be part of an instrumental BoS discussion with key stakeholders, major equipment manufacturers, design groups and utilities as they look at; UL vs, CE/IEC standards & norms, string level voltage – 1000v (European) vs. 600v (USA) & inverter sizing and types of inverters

> find out where the National Electric Code comes into play with US projects & how will this impact component design, usage and plant performance

Tim Zgonenam, Principal Engineer, underwriter LabsArturo Alvarez, Project Engineer, albiasa solarChristopher Dymond, Solar Technical Developer, enXcoPaula Mints, Director Energy Practice, Navigant Consulting

BoS Innovations > find out about the latest technology innovations being developed and hitting the market that will significantly boost your output, reduce installation costs or even provide power harvesting and management solutions for utility scale plants

Page 6: Utility Scale PV Yield Optimization Conference & Expo 2010

The ONLy event in the United States focusing on PV Balance of System Engineering

Past AttendeesCSP Today´s Summits in USA, Europe and MENA have surpassed expectations and attracted thousands of industry professionals. See below for a snapshot of companies that attended our previous events:

for more information on who you will meet at the Utility Scale PV yield Optimization Conference & Expo please visit www.csptoday.com/pvbalanceofsystems . We will keep an updated list of the companies that are already registered to attend.

Sponsorship/ Exhibiting opportunities

Our CSP Today events have proven extremely successful and every year we outgrow previous venues. We have learned that it´s not all about size, but selection is even more important! That is why as a potential sponsor or exhibitor you will need to pass a relevance test.

This ensures that our delegates get the most value from the event and that our limited sponsors and exhibitors really get the attention and the business they seek. Every sponsor and exhibit campaign will be customized to meet your specific objectives so call Jim Cohen today on 1 800 814 3459 to discuss your best options.

Sponsoring, exhibiting or advertising with us is one of the best and most cost effective ways to prospect, generate interest, move companies through your pipeline and ultimately make deals. It gives you a unique and valuable opportunity to build relationships and imprint your company name on the summit attendees and all of the 40,000+ industry contacts we’ll be promoting to for the next 15 weeks.

If your company is looking to be one of the leaders in the PV Balance of Systems space then call today for more information on exactly how we can help you.

fOR MORE INfORMATION CONTACT:Jim CohenHead of Business Development - United States

T: 1 800 814 3459 f: 1 800 814 3460 E: [email protected] W: www.csptoday.com/pvbalanceofsystems

ABB RoboticsAbengoa SolarAcciona Solar PowerACS CobraAir Liquide ElectronicsAir ProductsAlbiasa CorporationALSTOM Power SystemsApplied MaterialsBoeingBosch RexrothBP Alternative EnergyBuilders, Inc.BuschCaerus SystemsChevron Energy SolutionsCIS SolarClairvoyant EnergyDepartment of Energy Dow CorningDPR ConstructionDuPont CompanyEM2 AssociateseiQ Energy

Enphase EnXcoEaton CoroprationErnst & youngErsolflorida Power & Lightfottowatio Renewable Ventures fTL Solarfuji Electric Device Technology Americagerman Aerospace Centergooglegranite Construction Company Harbison-Mahony-HigginsHeliovolt Corporationi2S LineScan ImagingIberdrolaIngeateam Linde ElectronicsLPKf SolarQuipment gmbHLux ResearchMilco Constructors

Mitsubishi InternationalMoser Baer PhotoVoltaicNRELPacific gas and Electric CompanyPatriot Solar groupPg&EPhoenix Solar Pike Energy Solutions Rosendin Electric Sandia National LabsSatconSharp SolarSiemensSMASouthern California EdisonSunEdisonSunPowerSunTechTigoUnirackWorld BankWorleyParsons

Reserve Your place today - www.csptoday.com/pvbalanceofsystems

“ We believe that the next frontier in the PV

industry is going to be optimization of the existing technologies. This agenda is looking at the right pieces of the equation.

”PV Powered

Page 7: Utility Scale PV Yield Optimization Conference & Expo 2010

PaSS PRICES – SEE HOW MUCH YOU SaVE BY BOOkING EaRLY

Cancellation Policy Places are transferable without any charge. Cancellations before October 25, incur an administrative charge of 25%. If you cancel your registration on or after October 25, 2010 we will be obliged to charge you the full fee. All credit card registrations are subject to a 5% administration fee. Please note - you must notify CSP Today in writing of a cancellation (to [email protected]), or we will be obliged to charge you the full fee. All prices displayed are exclusive of VAT

or other applicable national taxes unless otherwise stated. Taxes will be charged where applicable at the prevailing rate on the invoice date and the relevant details will appear on the invoice. The organizers reserve the right to make changes to the agenda without notice. FC Business Intelligence takes every care to ensure that prices quoted are correct at time of publishing, however registrations will only be accepted if there is no material error in the price advertised on the website.

PV Yield Optimization Conference & Expo

Pass Type SUPER EARLy BIRDexpires sept 17th

EARLy BIRDexpires oct 15th

LAST CHANCEexpires nov 12th

fULL PRICE

Platinum Pass•Access to the full conference, exhibition & networking

area during the November 30 – December 1 conference.•Access to the pdf presentations 2 weeks after the event

& access to the full audio recording of the event and the slides 2 months post event for a year.

$1195 $1295 $1495 $1595

Gold Pass•Access to the full conference, exhibition & networking

area during the November 30 – December 1 conference.

•Access to the pdf presentations 2 weeks after the event

$995 $1095 $1295 $1395

academic Pass•Access to the full conference, exhibition & networking

area during the November 30 – December 1 conference.

•Access to the pdf presentations 2 weeks after the event

$745 $795 $845 $895

Post-Conference Materials •Interactive conference proceedings with audio

recording + presentations from the event (available from 2 months after the event via link & password)

$300

$50 discount

use this discount code to claim an extra $50 off

3 easY WaYs to ReGIsteR RIGHt NoW!ONLINE EMAILPHONE

secure & simple registration online at www.csptoday.com/pvbalanceofsystems

[email protected] Just give us your details and pass type – we’ll do the rest!

Call the Csp today team on 1 800 814 3459

i enclose a check/draft for: (Payable to FC Business intelligence Ltd)

Please invoice my company:

Purchase order number:

Please charge my credit card: amex Visa mastercard

mr/mrs/ms/dr: First name: Last name:

Company: Position/title:

telephone: Fax:

email: address:

Zipcode: Country:

Credit card number:

expiry date: security number:

name on card:

signature:

Date Nov 30 - Dec 1, 2010

VenueCrowne Plaza Hotel, San José, California

Thoughtfully positioned across the street from McEnery Convention Center and just three miles from San José International Airport and Santa Clara Fairgrounds

Exclusive discounted rate for attendees $159 + local tax

Page 8: Utility Scale PV Yield Optimization Conference & Expo 2010

Event Sponsors: Official Partners: Media Partners:

TOP PV EXPERTS WORLDWIDE:

Utility Scale PV Yield Optimization Conference & ExpoNovember 30 - December 1 2010, San José, US

Researched & Organized by

THE MOST CRUCIAL & RELEVANT UTILITy SCALE PV EVENT IN THE UNITED STATES

6 reasons why you must attend this summit

Open now to view the program, speaker line-up & much more!

save up to $400 if you register

early

Drive Down your LCOE and Boost your MW Output through Improved Balance of Systems Engineering• MasteRING LCoe - understand today’s most accurate LCOE calculation methods that

can help you deliver on PPA expectations and win more projects

• optIMaL pLaNt LaYout - PV project construction experts reveal the design lessons learned from existing plants in the US & Europe that will help you maximize your plant’s performance

• sMaRt CoMpoNeNt seLeCtIoN - hear manufacturers examine the reliability, durability and efficiency of their products so that you can evaluate your ROI and improve your LCOE

• Bos WIRING WINs - find out how to stay within 2% of wiring loss, calculate the copper consumption that benefits your plant and secure durable wiring that will enhance your plant’s output

• RooF aND GRouND MouNtING stRateGIes - gain technical insight into this critical design factor - discover the right plan and budget that will help your plants O&M and guarantee protection in harsh weather conditions

• MINIMIZe & FoReCast DoWNtIMe - discover the various monitoring solutions and key data so you can arm yourself with information to forecast and avoid costly time offline

1. The only engineering focused PV event, take the opportunity to discuss real plant performance issues in detail

2. 25+ Expert speakers

3. 150+ top attendees from EPCs, developers and technology providers

4. The most relevant international PV experience in one room

5. PV Balance of System focused break out sessions & exhibition area

6. Online eNetworker which will allow you to contact fellow attendees pre and post event!