ONGC
ANDBUSINESS PARTNERS
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 3/44
The Change Process
• Sweeping changes initiated inContracting Policy and Proceduressince August 2001 to
Speed up the Process.Improve transparency & equity.Change from confrontation tocollaboration.
• First Vendor Meet held on 5 th April 2002.
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 4/44
The Change Process
Specifications & BECsTendering PolicyTendering Process
Contract ManagementInternal ProcessesLegal Terms & ConditionsDispute Resolution
Others
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 5/44
Specifications and BEC•
Removal of ambiguity in framingspecifications• Specifications should be focused on
Compliance with National andInternational codes.Exact operational requirements.
Sourcing Best-in-Class Technology incritical areas.• Indentor/ user has exclusive authority on
specifications.
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 6/44
Specifications and BEC•
In Turnkey Contracts, specifications to bebased on CRINE.• Vendor inputs welcomed in framing the
specifications & BECs.• BEC followed in the last contract to be
adopted unless specific changes are
justified. Such changes to be approvedby immediate superior to CPA.
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 7/44
Specifications and BECBEC Standardization
BEC for purchase of goods standardized andissued in April, 2003.Standardized BEC for Service Contracts to beissued in June, 2003.Standardized BEC for Turnkey Contracts to beissued in August, 2003.
•
Standardized BEC to be uniformly incorporatedin all tenders by all Work centers.
• Changes in standardized BEC can not be
approved by any authority other than EPC.
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 8/44
Specifications and BEC
• Vendors suggestions on BEC may beconsidered in Pre-bid conference.
•
No change in BEC allowed after bidopening.
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 9/44
Tender Policy
• Reduction in number of Tenders at Asset/Basin/ Service/ Corporate level by
clubbing all requirements.
• Thrust on long term contracts.
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 10/44
Tender Policy • For procurement of certain high value items of
regular consumption like Casing Pipes, LinePipes, Production Tubing etc., procurement hasbeen centralized and ONGC has entered into
Long Term Contracts leading to reduction innumber of tenders. Also, long term contractsbeing entered for C/H of drilling rigs/ Vessels.
•
For procurement of spares, ONGC intending toenter into long-term Rate Contracts with OEMs.
• Post contract commitment for supply of spares
during the life cycle of equipment .
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 11/44
Tender Policy•
ONGC to have a policy for entering intoAMCs with OEMs.• Under CRINE concept, if improvements in
design etc. are effected by thecontractors after award of contract, 20%of incremental benefit could be offeredto the contractor.
• Bonus linked to IRR to be paid in case ofProject completion ahead of schedule(Min. one month)
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 12/44
Tender Policy• Provision for facilities to ONGC
executives deleted from TurnkeyContracts.
• Commitment on Training made anenabling clause. Cost of Trainingexcluded from evaluation.
• For critical equipment, Inhouse expertcommittee(MDT) to evaluate technicalbids.
• Revised guidelines sought from CVC forspecific type of tenders like Rig hiring etc
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 13/44
Tender Policy
• No opportunity for clarifications will begiven after opening of bids.
• Clarifications required by bidders , if any,should be only through Pre bid
conference.
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 14/44
Tender Policy
• Concept of Pre-bid Conferenceintroduced to resolve doubts of bidderson the various BEC and tender clauses as
well as on tender specifications.• Pre-bid conference being chaired by
senior Executives from ONGC side.
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 15/44
Tender Policy• New domestic bidders to be considered
for placement of development ordersupto 20% of the tendered quantity.
•
Vintage criteria of vessels deleted.Prospective bidders to offer vesselsmeeting ONGC specifications along withthe Statutory certificates conforming theclass requirement at all times, IMO codesand having a minimum residual life tocover Primary period plus extension also.
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 16/44
Tender Processing• From September 2002 all the NITs are
being published on ONGCs TenderWebsite “ongctenders .net” .
• Action on hand to improve the Websiteso that the complete tender document
can be accessed by the prospectivebidders.
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 17/44
Tender Processing
• Standard time frame of 30 days(Non-EPCCases) and 45 days(EPC Cases) laiddown for award of contract from the date
of bid submission.• Technical Bid evaluation on “GO” or “NO
GO” basis. One time clarificationstopped. Bids with any deviation to berejected.
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 18/44
Tender Processing
• LOI to be placed within 5 days (Non-EPC cases) or 15 days (EPC Cases)ofPrice Bid opening.
• Tender Documents to be issued only tothose bidders who meet the major Pre-Qualification criteria specified in NIT.
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 19/44
Tender Processing
• PBG to be submitted within 15 days ofLOI failing which LOI stands lapsed.
• No delay permitted in submission oftenders.
• Tender Committee can not over-ride
specifications given by users/ indentors
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 20/44
Tender Processing
• Bidders to confirm in the Matrix that nodeviation taken by them in their bid.
Bids with deviations stands to besummarily rejected.
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 21/44
Tender Processing
• For ascertaining financial capability ofbidders, following Financial Criteria to beuniformly incorporated in BEC of alltenders exceeding Rs.5 Crs:
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 22/44
Tender Processing
Financial Criteria for Supply of Goods
1. Turnover of Bidders: 50% of annualizedcontract value
2. Net Worth of the bidders: Positive
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 23/44
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 24/44
Tender Processing
• Bidders should not submit any unsolicitedclarification / modification/ propositionsafter submission of bids.
•
Bidders should not attempt to induceexternal pressures/ interventions etc.• In case any bidder wants to represent
with regard to processing of tender, theyshould represent only to CompetentPurchase Authority directly, whose nameis specified in the tender document.
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 25/44
Tender Processing
• If requirement of tendered quantity cannot be met by L-1 bidder, negotiationswill be carried out with all otheracceptable bidders by advising them tosubmit their confirmations of matchingtheir rates with rates of L-1 bidder insealed envelopes.
• These covers will be opened in the orderof original ranking, till the totalrequirement is met.
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 26/44
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 27/44
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 28/44
Contract Management
• Payment to be released within 15 days(instead of 30 days earlier) in Service/Turnkey contracts from the date ofreceipt of clear/ undisputed invoice,complete in all respects.
• Amendment to LC, if required, to beissued immediately to avoid delay incontract execution.
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 29/44
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 30/44
Contract Management
• Delay in release of payments is beingmonitored at senior management level.
• Provisions have been introduced forrelease of payment to contractorsthrough Electronic Fund Transfer.
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 31/44
Contract Management
• Performance Bank Guarantee to bereleased within 60 days of successful
execution of the contract.• ONGC to pick up the variation in the
custom duty / Excise duty in case ofchange / abolition of Deemed ExportBenefits within contractual deliveryperiod.
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 32/44
Internal Processes
• Review of ONGCs standard terms andconditions vis-à-vis World Bank, ADB andEU is being taken up.
• ONGC personnel on deputation toforeign tour not to accept any kind ofservices or facilities or considerationsfrom the Contractors and theirassociates.
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 33/44
Internal Processes
• All MM heads to fix one day in a month toattend to suppliers complaints forresolution of issues.
• Key Executives to review of all pendingissues with respect to old cases with a
view to resolve them expeditiously.
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 34/44
Dispute Resolution
• Cases of disputes valuing above Rs.1Crs, which are for/ under Arbitration, canbe referred to Outside Expert Committee(OEC), after obtaining written consent ofthe Contractor, for speedy disputeresolution.
• OEC members are selected at C&MD s level.
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 35/44
Legal Conditions
• In case of delay in supply/completionbeyond the scheduled date, LiquidatedDamages to be imposed as per the terms
of the contract. Hon ble Supreme Courthas laid down the Law that LD amountstipulated in the contract is a genuine pre-
estimate and the contractor who is indefault is liable to pay the sum stipulated.
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 36/44
Legal Conditions
• Total liability of the supplier arising out ofthe sale or use of the equipment /material/ goods supplied by them , iffound defective, will now be limited to thecontract value.
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 37/44
Legal Conditions•
New provisions have been incorporatedstipulating that the goods purchased would beused by ONGC for Exploration and Exploitationof Hydrocarbons in India only, as required underExport / Re-export control regulations of someparent countries. Further, if for any reasonswhatsoever, if these goods are to be taken foruse outside India, ONGC would request thesupplier to obtain consent from the concernedauthorities in their country.
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 38/44
Implementation Results• Tender Processing expedited. Examples
are:Hiring of MWD equipment & Services – Tender finalized in 21 days of bidopening.Hiring of SDMM equipment & services – Tender finalized in 23 days of bidopening.Hiring of Whipstock & Window millingservices – Tender finalized in 10 days ofbid opening.
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 39/44
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 40/44
Implementation ResultsSuccess Stories• In a high value tender, a bid was
technically rejected by the EvaluationCommittee. On review, the ApprovingAuthority found the offer to betechnically acceptable and authorizedopening of Price Bid. This offer turned out
to be lower than the earlierrecommended offer by US $ 12 million.Award was accordingly made. Decisionsustained not withstandingrepresentations from various quarters.
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 41/44
Implementation Results
•
Success Stories
– Decision for purchase of software for
Virtual Reality center implemented. – Charter hiring of Modular rig
accomplished in record time. – The last case of hiring of Jack up rig
was finalized in 100 days.
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 42/44
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 43/44
7/30/2019 Vender Meet 1406
http://slidepdf.com/reader/full/vender-meet-1406 44/44
THANKYOU