Board of Supervisors’ Meeting April 23, 2018
District Office: 9530 Marketplace Road, Suite 206
Fort Myers, Florida 33912 (239) 936-0913
www.venetiancdd.org
VENETIAN COMMUNITY DEVELOPMENT DISTRICT AGENDA
April 23, 2018 at 9:30 a.m.
To be held at the Venetian River Club, 502 Veneto Boulevard, North Venice, Florida 34275.
District Board of Supervisors Jerry Jasper Chair Harry Orenstein Vice Chair David Lusty Assistant Secretary Susie Lentile Assistant Secretary Richard Bracco Assistant Secretary
District Manager Belinda Blandon Rizzetta & Company, Inc.
District Counsel Andrew Cohen Persson & Cohen, P.A.
District Engineer Rick Schappacher Schappacher Engineering, LLC
All Cellular phones and pagers must be turned off while in the meeting room.
The District Agenda is comprised of five different sections:
The meeting will begin promptly at 9:30 a.m. with the first section which is called Public Comment. The Public Comment portion of the agenda is where individuals may comment on matters for which the Board may be taking action or that may otherwise concern the District. Each individual is limited to three (3) minutes for such comment. The Board of Supervisors or Staff is not obligated to provide a response until sufficient time for research or action is warranted. IF THE COMMENT CONCERNS A MAINTENANCE RELATED ITEM, THE ITEM WILL NEED TO BE ADDRESSED BY THE DISTRICT MANAGER OUTSIDE THE CONTEXT OF THIS MEETING. The second section is called Business Items. The business items section contains items for approval by the District Board of Supervisors that may require discussion, motion and votes on an item-by-item basis. Occasionally, certain items for decision within this section are required by Florida Statute to be held as a Public Hearing. During the Public Hearing portion of the agenda item, each member of the public will be permitted to provide one comment on the issue, prior to the Board of Supervisors’ discussion, motion and vote. The third section is called Business Administration. The Business Administration section contains items that require the review and approval of the District Board of Supervisors as a normal course of business. The fourth section is called Staff Reports. This section allows the District Manager, Engineer, and Attorney to update the Board of Supervisors on any pending issues that are being researched for Board action. The final section is called Supervisor Requests and Comments. This is the section in which the Supervisors may request Staff to prepare certain items in an effort to meet residential needs. Agendas can be reviewed by contacting the Manager’s office at (239) 936-0913 at least seven days in advance of the scheduled meeting. Requests to place items on the agenda must be submitted in writing with an explanation to the District Manager at least fourteen (14) days prior to the date of the meeting.
Public workshops sessions may be advertised and held in an effort to provide informational services. These sessions allow staff or consultants to discuss a policy or business matter in a more informal manner and allow for lengthy presentations prior to scheduling the item for approval. Typically no motions or votes are made during these sessions.
Pursuant to provisions of the Americans with Disabilities Act, any person requiring special accommodations to participate in this meeting is asked to advise the District Office at (239) 936-0913, at least 48 hours before the meeting. If you are hearing or speech impaired, please contact the Florida Relay Service at 711, who can aid you in contacting the District Office.
Any person who decides to appeal any decision made by the Board with respect to any matter considered at the meeting is advised that this same person will need a record of the proceedings and that accordingly, the person may need to ensure that a verbatim record of the proceedings is made, including the testimony and evidence upon which the appeal is to be based.
VENETIAN COMMUNITY DEVELOPMENT DISTRICT DISTRICT OFFICE • 9530 MARKETPLACE ROAD • SUITE 206 • FORT MYERS, FLORIDA 33912
www.venetiancdd.org
April 16, 2018
Board of Supervisors
Venetian Community
Development District
AGENDA
Dear Board Members:
The regular meeting of the Board of Supervisors of Venetian Community Development
District will be held on Monday, April 23, 2018 at 9:30 a.m. at the Venetian River Club located
at 502 Veneto Boulevard, North Venice, Florida 34275. The following is the agenda for this
meeting:
1. CALL TO ORDER/ROLL CALL
2. PUBLIC COMMENT
A. Committee Reports
1. Facilities Committee
2. Pool and Fitness Committee
3. River Club Renovation
4. Social and Dining Committee
5. Tennis Committee
3. DISTRICT ENGINEER STAFF REPORT
4. BUSINESS ITEMS
A. Review and Consideration of River Club Renovation
Contract (Under separate cover)
B. Update Regarding RFID Transition
C. Update Regarding Lennar Landscape Plans
D. Consideration of BrightView Landscape Services Annual Replacement
Estimate………………………………………………………… Tab 1
5. BUSINESS ADMINISTRATION
A. Consideration of the Minutes of the Board of Supervisors’
Meeting held on April 9, 2018 ..................................................... Tab 2
B. Consideration of the Operations and Maintenance Expenditures
for the Month of March 2018....................................................... Tab 3
C. Review of March 2018 Financials ............................................... Tab 4
6. CONSENT ITEMS
A. Acceptance of Committee Meeting Minutes ............................... Tab 5
• River Club Renovation Committee, March 12, 2018
• River Club Renovation Committee, March 19, 2018
• Facilities Committee, March 5, 2018
• Pool and Fitness Committee, February 19, 2018
7. STAFF REPORTS
A. District Counsel
B. River Club
C. Field Manager
D. District Manager
Venetian Community Development District April 16, 2018
Agenda - Page 2
8. SUPERVISOR REQUESTS AND COMMENTS
9. ADJOURNMENT
We look forward to seeing you at the meeting. In the meantime, if you have any questions,
please do not hesitate to contact me at (239) 936-0913.
Very truly yours,
Belinda Blandon
Belinda Blandon
District Manager
cc: Andrew Cohen, Persson & Cohen, P.A.
Proposal for Extra Work at
Venetian Community Development
April 13, 2018
Page 1 of 2
North Venice , FL 34275
FT. Myers , FL 33912
c/o Rizzetta & Company Inc 9530Marketplace Rd Ste 206
c/o Rizzetta & Company, Inc. 102Pesaro Drive
Venetian Community Development District
Kareen Richard
Billing Address
To
ContactVenetian Community Development
Project Description
Project Name
Property Address
Property Name
Annual change out for April-May
Install 3000 pentas 1500 pink and 1500 purple for the venetian CDD
Scope of Work
TotalUnit PriceMaterial/DescriptionUoM/SizeQTY
$4,500.00$3.00Install 1500 Pink Pentas for Venetian CDD 4.5 inch.EACH1,500.00
$4,500.00$3.00Install 1500 Purple Pentas for Venetian CDD 4.5 inch.EACH1,500.00
$.00$.00fertilization and up keep per month on all flower bedsincluded in price.
LUMP SUM1.00
Service Line
344100125JOB#
SO# 6604123
130
For internal use only
$9,000.00Total Price
THIS IS NOT AN INVOICE
530 Rusty Marshall Drive, Englewood, FL 34223 ph. (941) 473-3800 fax (941) 473-3811
This proposal is valid for 60 days unless otherwise approved by BrightView Landscape Services, Inc.
VENETIAN COMMUNITY DEVELOPMENT DISTRICT
April 9, 2018 Minutes of Meeting
Page 1
MINUTES OF MEETING 1 2
Each person who decides to appeal any decision made by the Board with respect to any matter considered at the meeting is advised that the person 3 may need to ensure that a verbatim record of the proceedings is made, including the testimony and evidence upon which such appeal is to be based. 4
VENETIAN 5 COMMUNITY DEVELOPMENT DISTRICT 6
7 The regular meeting of the Board of Supervisors of the Venetian Community Development 8
District was held on Monday, March 26, 2018 at 9:30 a.m. at the Venetian River Club, 502 9
Pesaro Drive, North Venice, Florida 34275. 10 11
Present and constituting a quorum were: 12 13
Jerry Jasper Board Supervisor, Chairman 14 Harry Orenstein Board Supervisor, Vice Chairman 15
David Lusty Board Supervisor, Assistant Secretary 16 Richard Bracco Board Supervisor, Assistant Secretary 17 18
Also present were: 19 20
Belinda Blandon District Manager, Rizzetta & Company, Inc. 21 David Jackson District Counsel, Persson & Cohen, P.A. 22 Rick Schappacher District Engineer, Schappacher Engineering 23
Scott Kissell General Manager, River Club 24 Kareen Richard Field Manager, Venetian CDD 25
Audience 26 27
FIRST ORDER OF BUSINESS Call to Order 28 29
Ms. Blandon called the meeting to order and conducted the roll call. 30 31 SECOND ORDER OF BUSINESS Public Comment 32
33 Ms. Blandon opened the floor to audience comments. 34
35 Mr. Kleinglass provided an update to the Board regarding the River Club renovation. He 36 advised there are struggles related to sound attenuation; he advised Noller has a sound attenuation 37
company that has provided a price that is quite expensive. Mr. Kleinglass advised other options and 38 pricing are being obtained based on calculations obtained for the needed sound attenuation. He 39 advised of a visit to Lakewood Ranch where this other company was used and the outcome was 40 favorable. Mr. Kleinglass advised this other vendor will be attending the Committee meeting being 41
held tomorrow. Mr. Orenstein asked if Noller is willing to work this other vendor. Mr. Kleinglass 42 advised he believes they will. Mr. Kleinglass advised two contracts may be required; one for the 43 renovation and a separate one for sound attenuation. Ms. Lentile inquired regarding the difference 44 between the two companies. Mr. Kleinglass advised the difference is $75,000.00 to $80,000.00. Mr. 45 Bracco inquired regarding the timing of the two separate contacts. Mr. Kleinglass advised the two 46 contracts may be phased. Mr. Jasper inquired regarding coordination of the two contracts. Mr. 47 Kleinglass advised the relationship with Noller is good though they are getting frustrated with the 48 Committee regarding pricing. He advised he believes Noller wants the community to be happy with 49
VENETIAN COMMUNITY DEVELOPMENT DISTRICT
April 9, 2018 Minutes of Meeting
Page 2
the outcome and his preference is to have Noller involved with the sound attenuation contractor. Mr. 50 Jasper suggested possibly offering Noller a small management fee to manage the contract with the 51 other sound attenuation company. Mr. Kleinglass advised that at this point, the design and renovation 52
is coming in under budget. Mr. Kissell provided positive input regarding Noller and the processes 53 related to the renovation. Mr. Lusty stated he had hoped to have a contract ready for this meeting; but 54 $70,000.00 to $80,000.00 is too much to ignore; he advised this additional company has a good 55 reputation with everyone he has spoken with, they have a nice product which is the same as the sound 56 attenuation product as Noller’s vendor. Mr. Cohen advised Noller provided a contract which he has 57 reviewed and provided comments to Noller. Mr. Orenstein advised Noller may not want to be held 58
responsible for the separate vendor and so for the sound attenuation Noller may require a hold 59 harmless agreement in order to manage to the outside vendor. Discussion ensued. Mr. Kissell clarified 60 that the company Noller has issue with is out of Miami and the Committee is currently dealing with 61
the Tampa branch; same company but different branch. Mr. Lusty inquired with the Board as to 62 whether they expect the Committee to see the project though to the end or would the Committee be 63 disbanded after execution of the contract. Mr. Kleinglass advised the Committee would like to see it 64
through. Mr. Orenstein asked Mr. Kissell if he thinks the Committee should stay in place throughout 65 the duration of the contract. Mr. Kissell confirmed. 66
67 A resident of 301 Cipriani thanked the Board for having Brightview review the oak tree 68 located in front of her property. She advised that the tree has roots that are heading toward her 69
foundation. She advised that Brightview has advised her that the tree could be removed; she advised 70 the City has advised that a permit can be issued to remove the two oak trees and be replaced with hard 71
wood trees. The resident asked that the trees be removed in order to protect her foundation. Mr. Jasper 72 inquired as to whether Brightview did the trimming of the trees on behalf of the CDD. The resident 73
advised she paid for the trimming; she provided information related to pick up of the limbs. Mr. Jasper 74 advised the Board will need time to review the request as historically the procedure has been to allow 75 the resident to trim the limbs and roots encroaching onto their property. Mr. Orenstein inquired with 76
Counsel regarding liability should the tree roots damage the foundation. Discussion ensued. Mr. Lusty 77 inquired regarding the length of the residents’ property. Mr. Jasper advised the standard is 130 feet. 78
Mr. Lusty advised the root barrier would be $2,000.00. Discussion ensued. Mr. Lusty advised it may 79 be more cost effective to install a barrier rather than removing the trees. He asked if the root barrier 80 would be acceptable to the homeowner. She confirmed and advised the root barrier is guaranteed for 81
ten years. Discussion ensued. Mr. Bracco advised he would like the Board to look into this request. 82 Mr. Cohen asked if the Board would like him to do any research regarding this matter. The Board 83 advised they would like a legal opinion in order to make an informed decision. Mr. Lusty asked that 84 Ms. Richard obtain a quote for the root barrier and a quote for removal and replacement. 85 86
A resident of 118 Savona Way inquired regarding the lack of plantings and landscaping at the 87 Costello entrance as well as broken tiles. She asked if there is a schedule for irrigation and landscape 88 improvements at this location. Ms. Lentile inquired with the remainder of the Board as to whether or 89 not they have seen the pictures. The resident provided the pictures for Board review. Mr. Jasper asked 90
that Ms. Richard address the tiles. Ms. Richard advised she will have John make repairs to the tiles, 91 the landscaping is being replaced, and the irrigation has been repaired but has broken again. Ms. 92 Richard advised she will have Brightview review the irrigation again. Mr. Jasper advised the CDD 93 cannot maintain the irrigation at private residences and he reviewed the wet check process. 94 95 A resident of 166 Portofino inquired regarding the entrance of her community being inspected 96 for aesthetics. She reviewed photos of landscaping throughout the community. Mr. Bracco addressed 97
the resident advising that a new landscaping company has been hired to replace the landscape vendor 98
VENETIAN COMMUNITY DEVELOPMENT DISTRICT
April 9, 2018 Minutes of Meeting
Page 3
who let the community go and that the new vendor advised it would take three years to get the 99 community back to where the it used to be. Discussion ensued. Mr. Jasper advised $25,000.00 per 100 year is being set aside for landscape replacements and the Field Services Manager has been tasked to 101
create a priority list for landscape requirements; he advised the budget has to be considered as well. 102 103 A resident of 126 Martellago addressed the Board regarding alligators of various sizes seen 104 within the community. Mr. Jasper advised residents should contact Ms. Richard should they see 105 aggressivealligators. Mr. Lusty advised that if FWC is called they will trap and destroy the alligators; 106 he suggested that residents leave the alligators alone. 107
108 Mr. Lusty addressed the Board and audience regarding the budget line item for annuals; he 109 advised that if the community is willing, the Board can reallocate some of the budget line item for 110
annuals to permanent landscaping. 111 112 The President of Tisiano I thanked Mr. Lusty for meeting with him to discuss the feral pigs. 113
He advised the Tisiano I Board voted to remove the pigs and they would like the District to assist with 114 the efforts. Mr. Lusty advised a contract has been received to put out traps on CDD property. Mr. 115
Jasper confirmed the contract has been executed. 116 117 THIRD ORDER OF BUSINESS District Engineer Staff Report 118
119 Mr. Schappacher advised the asphalt restoration technology proposal is forthcoming. He 120
further advised that after the last meeting he reviewed lake three in phase 3F; he advised he walked 121 the banks and prepared a drawing for Lennar to perform repairs prior to the CDD taking ownership 122
of those lakes. Mr. Schappacher advised that common area 6 in phase 5 is where WCI/Lennar is 123 planning to plant trees; this area has not been taken over by the CDD and he has been working 124 with Lennar on the plantings and he is trying to get the trees planted close to the preserve in order 125
to reduce maintenance activities by the CDD. Mr. Schappacher advised that regarding the lake 126 bank repairs, there was one area added that was not completed by the contractor but they are still 127
working on it. He advised that regarding the signage replacement, additional 3-way signs, stop 128 signs, and speed signs will be replaced next week. Mr. Schappacher advised that Mr. Jasper 129 inquired regarding the pricing for an easement for a lake aerator and pump, that price is $150.00. 130
Mr. Schappacher advised a survey and sketch have been prepared for the pickleball courts; he 131 advised the size is 30’ by 60’ which is the absolute minimum that is recommended. Mr. Orenstein 132 asked if the ideal size of 34’ by 64’ is possible, Mr. Schappacher advised the area is really too tight 133 to fit the 34’ by 64’. He advised alternate plans are being put together in an attempt to obtain 134 pricing. Mr. Orenstein inquired regarding timing for budget purposes. Mr. Kissell advised that 135
once a site plan is completed he can obtain cost estimates. Mr. Kissell further advised that sound 136 is a concern of his and a living barrier could possibly be installed in order to reduce the sound to 137 the Condo area. Discussion ensued regarding the sound of pickleball and possibly recording the 138 difference between tennis and pickleball. Mr. Jasper discussed landscape concerns. Mr. Cohen 139
discussed possible solutions to allowing the entire Board to attend a sound demonstration. Mr. 140 Schappacher spoke regarding the feral pigs; he advised of additional damage on pond 35, he 141 advised he will review the damage after the meeting. Mr. Jasper inquired regarding the timing for 142 repairs. Ms. Richard advised that her concern is due to the damage being at the water line. 143 Discussion ensued regarding conducting repairs prior to the rainy season in order to avoid 144 additional erosion. 145 146
147
VENETIAN COMMUNITY DEVELOPMENT DISTRICT
April 9, 2018 Minutes of Meeting
Page 4
Mr. Lusty inquired regarding moving the discussion of the Feral Pigs to be held as the first 148 Business Item. 149 150
FOURTH ORDER OF BUSINESS Discussion Regarding Feral Pigs 151 152 Mr. Lusty advised he has spoken with representatives of Tisiano and Palermo as well as 153 the Golf Club. He advised that he was told the Golf Club has never had a pig problem. The Board 154 advised that is not correct. Mr. Lusty advised of the costs to repair damages due to Feral Pigs and 155 the attendees of the meeting asked that the District assist in trapping of the hogs. Mr. Lusty advised 156
he was provided with a contract for trapping which was forwarded on to Ms. Blandon. Mr. Jasper 157 advised of conversations held with Ms. Blandon regarding the costs for trapping of the Feral Pigs. 158 Ms. Blandon provided background to the conversations held prior to execution of the contract for 159
trapping as the trapping is being conducted on CDD property. Ms. Blandon clarified that the 160 contract amount of $1,789.00 is within the Chairman’s spending authority. Mr. Lusty clarified that 161 if the District is to take up trapping expenses then the trapping must occur on District property. A 162
resident addressed the Board regarding individual home owners paying for trapping on their 163 property. Mr. Jasper advised of his concerns regarding the District incurring the costs for the 164
trapping. Ms. Blandon advised that Mr. Jasper wanted to move forward with trapping efforts in an 165 attempt to reduce damage to CDD property. Mr. Lusty advised the trapping is not a permanent 166 solution and the costs should be shared amongst the various entities; he further suggested the CDD 167
Board budget for trapping efforts. Mr. Cohen suggested that each entity pay for trapping conducted 168 on its property. Mr. Lusty advised the District does not own the pigs and the pigs merely cross 169
District property. Ms. Blandon cautioned the Board that Animal Activists could be within the 170 community and could possibly damage the traps or set the trapped pigs free. Mr. Orenstein inquired 171
regarding action taken by other communities. Mr. Cohen advised some Districts do not take on 172 trapping efforts and some do. Mr. Jasper suggested moving forward with the two-week contract to 173 see what effects are noticed. Ms. Blandon suggested Mr. Schappacher assist in determining the 174
location for the traps. A resident inquired regarding the corralling method versus the trapping 175 method. Mr. Bracco inquired regarding euthanizing the feral pigs on site. Ms. Blandon advised 176
they are not euthanized on site. 177 178 FIFTH ORDER OF BUSINESS Consideration of M&W Proposal for Pine 179
Straw Mulch Material and Installation 180 181 Ms. Blandon reviewed the proposal received from M&W Supply for mulch installation. 182 Ms. Blandon confirmed this is a budgeted item. Mr. Lusty asked if additional proposals were 183 received. Ms. Richard confirmed. Ms. Richard advised this is for the lake bank areas where there 184
are decorative grasses in Artisti and the Medici berm. 185 186
On a Motion by Mr. Lusty, seconded by Mr. Jasper, with all in favor, the Board Approved the M&W
Mulch Proposal for Materials and Labor for Installation of Pine Straw Mulch, in the amount of
$23,010.00, and further Provided Authorization for the Chairman to Execute a Contract, for the
Venetian Community Development District.
187
SIXTH ORDER OF BUSINESS Consideration of Frontier Lighting 188 Proposal for Landscape Lighting 189
190 191
VENETIAN COMMUNITY DEVELOPMENT DISTRICT
April 9, 2018 Minutes of Meeting
Page 5
Mr. Lusty asked if this lighting is for the front strip. Ms. Richard confirmed. Ms. Richard 192 showed a sample of the light to be installed. The Board asked that Ms. Richard move forward. 193 194
SEVENTH ORDER OF BUSINESS Update Regarding Lennar Proposed 195 Landscape Drawings for Palazzo and 196 Palermo Neighborhoods 197
198 Mr. Jasper provided background to the landscaping regarding the problem between Lennar 199 and the City; he advised the quantity of hard wood trees has become an issue. He advised 346 trees 200
have not been planted as required by the City, so Lennar is resubmitting to the City to have 322 201 trees installed on CDD property. Mr. Jasper advised the CDD’s involvement is that the CDD has 202 to provide the okay to plant the trees on CDD property; he advised there are additional costs to the 203
CDD to maintain the trees in a natural state. He advised that the first year the trees would need 204 irrigation and after that they would not be formally maintained within mulch beds as that would 205 be more expensive. Mr. Jasper advised each homeowner would have to pay to maintain the trees 206
on CDD property; the alternative is for Lennar to plant these trees on individual homeowners’ 207 property. Mr. Jasper suggested that Lennar inquire with the City regarding whether or not the trees 208
must be placed within Venetian or could a mitigation area be created. Mr. Jasper advised he has 209 concerns with crowding around the wetlands and a lot of the areas where they want to put the trees 210 already have vegetation. Mr. Jasper advised he would like direction from the Board for 211
Wednesdays’ meeting. He advised this is a community issue and he would suggest the trees be 212 maintained in a natural state with Lennar paying for the maintenance for the first year. Mr. 213
Orenstein suggested reaching middle ground so that it is not an all or nothing situation; putting 214 some on CDD property and some on POA property. He suggested everyone getting together to 215
come to a mutually beneficial solution. Discussion ensued. Mr. Orenstein suggested going back to 216 Lennar to identify rules for planting in the community. Mr. Cohen clarified; he advised for example 217 go back to Lennar and advise that the CDD would take 100 trees and Lennar would then need to 218
find an additional location for the remaining 200. Mr. Bracco asked for clarification regarding 219 placement of the trees. Mr. Cohen advised Lennar cannot simply place the trees on CDD property 220
but they are asking. Mr. Jasper reminded the Board that the property in Palermo is not owned by 221 the CDD at this time. Mr. Lusty asked for clarification regarding the $9,000.00 maintenance fee 222 for the first year. Mr. Jasper advised that the $9,000.00 is a maintenance quote received from 223
Brightview. Mr. Lusty inquired regarding ongoing maintenance. Mr. Jasper advised Brightview is 224 reluctant to provide pricing at this time. Discussion ensued regarding maintenance of the various 225 types of trees. Mr. Lusty suggested having a conversation with Lennar regarding the option 226 available. Mr. Jasper advised the City is being very particular regarding the planting of the trees. 227 Mr. Jasper asked if there is consensus that the CDD is receptive to the CDD receiving some of the 228
trees on CDD property subject to mitigating conditions. Mr. Cohen inquired regarding Lennar’s 229 timing. Mr. Jasper advised discussions get more difficult after Lennar leaves the community. The 230 President of the Palermo Association advised her residents are not happy about having the trees 231 and they would like to limit the number of trees being placed in Palermo. Mr. Jasper discussed the 232
difference between the bald cypress, holly, and magnolia trees. The president advised the Palermo 233 residents would also like to attend a meeting with the City and Lennar to hear the discussion 234 regarding the trees and to discuss options. A Valenza Loop resident spoke regarding their position 235 on the issue; he advised the residents are not happy. Discussion ensued regarding possible 236 placement of some of the trees within the various communities. 237 238 239
240
VENETIAN COMMUNITY DEVELOPMENT DISTRICT
April 9, 2018 Minutes of Meeting
Page 6
EIGHTH ORDER OF BUSINESS Consideration of the Minutes of the Board 241 of Supervisors’ Meeting held on March 26, 242 2018 243
244 Ms. Blandon presented the minutes of the Board of Supervisors’ Meeting held on March 245 26, 2018 and asked if there were any questions. She advised that Mr. Schappacher provided one 246 change. There were no further corrections to the minutes. 247 248
On a Motion by Mr. Bracco, seconded by Ms. Lentile, with all in favor, the Board Approved the
Minutes of the Board of Supervisors’ Meeting held on March 26, 2018, Subject to the Correction Noted
on the Record, for the Venetian Community Development District.
249 NINTH ORDER OF BUSINESS Staff Reports 250 251
A. District Counsel 252
Mr. Cohen provided an update regarding issues related to the golf course; the issues 253 surrounding University Park and rights related to if the golf course were to be 254
developed. Mr. Orenstein advised the issue is what the CDD’s recourse could be 255 should the developer threaten to turn the golf course into condos or something 256 similar. Mr. Cohen advised that at University Park the developer has threatened to 257
turn the golf course into a development should the community not purchase the golf 258 course there. He further advised University Park is not a CDD and the solution the 259
residents are proposing is to create a recreation district in order to issue bonds to 260 finance the purchase of the golf course. Mr. Bracco inquired regarding the offering 261
that was made. Mr. Cohen advised he does not have detail related to the pricing. 262 Mr. Cohen advised that Mr. Jackson also prepared the Catalina Construction 263
contract as well. 264 265
B. River Club 266
Mr. Kissell advised Catalina Construction is the company who will be installing the 267 paver patio; he advised the work is being scheduled between June 4th and June 8th. He 268 further advised he has received bids to relocate the irrigation which will be under $500 269
and he will be obtaining pricing for tables, chairs, and umbrellas. Mr. Kissell advised 270 the tennis court roller has been received and the court is being rolled this week. He 271 further provided an overview of recent events that were held. Mr. Lusty complimented 272 Mr. Kissell on the car show that was held. 273
274 C. Field Manager 275
Ms. Richard advised the aerators in pond #23 seems to be impossible as there are 276
no electrical sources available. She advised she has requested a proposal for aquatic 277 plantings in the pond to aid in filtering the water and sediments and also provide 278 oxygen. Ms. Richard advised a homeowner contacted her and advised that he would 279 not be opposed to a electric meter being installed on his property and his neighbor 280 has agreed to the same. She asked the Board for direction. Discussion ensued 281 regarding seeking an easement to have the meter installed at the homeowner’s 282 property. Ms. Richard advised Phase I of the RFID transition is complete and Phase 283 II is beginning; she further advised that Saturday will be an opportunity for those 284
who work full time during the day, to come to the River Club parking lot between 285
VENETIAN COMMUNITY DEVELOPMENT DISTRICT
April 9, 2018 Minutes of Meeting
Page 7
9:00 a.m. and 12:00 p.m. to have their RFID stickers installed. Mr. Orenstein 286 advised he will be asking for Board input related to cut off of the current clicker 287 system once a certain point is reached with the completion of the RFID installation. 288
Discussion ensued regarding collection and disposal of the clickers. Ms. Blandon 289 advised the last day for the temporary assistant was approximately a week ago and 290 Ms. Richard has asked for additional time with the temporary assistant. Ms. 291 Blandon asked that the Board approve an additional two weeks for the temporary 292 assistant. Discussion ensued regarding the need for the temporary assistant for two 293 weeks. Ms. Richard advised the first temporary assistant made some mistakes that 294
need to be corrected. Mr. Lusty suggested reducing the payment for the temporary 295 assistant who made the mistakes or seeking a reduction in future billing based on 296 those mistakes. Mr. Bracco inquired regarding the cost for temporary assistant. Ms. 297
Blandon advised the hourly rate is $21.18 and extending for 80 hours would be 298 approximately $1,600.00. Discussion ensued. 299
300
Ms. Blandon asked if there were any audience comments related to the hiring of a 301 temporary assistant for an additional two weeks. There were none. Mr. Lusty 302
suggested reaching out to the company being utilized for the temporary assistant to 303 inquire about receiving a reduction in billing based on past mistakes. Discussion 304 ensued. 305
306
On a Motion by Mr. Jasper, seconded by Ms. Lentile, with all in favor, the Board approved an
Additional Two Weeks for Temporary Assistant for the RFID System, for the Venetian
Community Development District.
307
Ms. Richard advised that a field inspection report was conducted on April 4th, and 308 Mr. Toborg advised that he observed overall improvement of the condition of the 309
landscaping. Mr. Lusty inquired regarding removal of the dead palm tree stumps 310 on Laurel. Ms. Richard advised those tree stumps are being removed this week. Mr. 311 Jasper inquired regarding mailbox painting. Ms. Richard advised she is still looking 312
into that. 313 314
D. District Manager 315 Ms. Blandon advised the next regular meeting of the Board of Supervisors’ is 316
scheduled for Monday, April 23, 2018 at 9:30 am. 317 318
Ms. Lentile advised she will not be able to attend the April 23rd meeting. Mr. 319 Kleinglass asked that the River Club Renovation contract be placed on the Agenda for 320 the April 23rd meeting. Mr. Orenstein asked that an update regarding the RFID system 321 be placed on the Agenda for the April 23rd meeting. Mr. Jasper asked that an update 322 regarding the Lennar trees be placed on the Agenda for the April 23rd meeting. 323
324 TENTH ORDER OF BUSINESS Supervisors Requests and Comments 325 326
Ms. Blandon opened the floor to Supervisor requests and comments. 327 328 329 330
VENETIAN COMMUNITY DEVELOPMENT DISTRICT
April 9, 2018 Minutes of Meeting
Page 8
Mr. Lusty advised he would like to have a public hearing regarding the River Club Rules 331 regarding amendment to the dining room attire. Mr. Bracco advised he will bring that up at the 332 next Social and Dining Committee meeting. Mr. Orenstein suggested hearing the opinion of the 333
Social and Dining Committee and then discussing it at the Board level and then schedule a public 334 hearing if necessary. Mr. Lusty further advised of a possible Sunshine violation regarding the River 335 Club Renovation Committee. Mr. Lusty read a statement he prepared out loud it is attached to the 336 minutes for the record. He advised that Mr. Jackson, District Counsel, advised that a disclosure 337 regarding the possible Sunshine violation is necessary; and Mr. Lusty advised the disclosure was 338 made at the River Club Renovation Committee and reflected in the minutes. Mr. Lusty further 339
advised he wanted to ensure disclosure was also made to CDD Board of Supervisors. Mr. Lusty 340 spoke regarding his concerns regarding the Committee Member; he asked that the Committee 341 Member be removed from the Committee. Mr. Orenstein asked if the Committee has taken a 342
position on the Member continuing to serve on the Committee. Mr. Lusty advised it has not; the 343 possible Violation was disclosed and reflected in the minutes but the situation was not discussed. 344 The Committee Member, who was in attendance, was provided the opportunity to respond. Mr. 345
Kleinglass provided his input regarding the situation. Board discussion ensued. The Committee 346 Member addressed the Board advising that he would like to continue on the Committee to see the 347
River Club Renovation through to the end. The Board determined that recommendation of removal 348 of the Committee Member should come from the Committee. 349
350
Mr. Jasper advised that on March 27th he and Ms. Richard met with Brightview and they 351 will be putting together a Washingtonian Removal Program for the 142 Washingtonians located 352
on CDD property. Discussion ensued. Mr. Jasper further advised that regarding the Dona Bay 353 water storage facility; a second meeting with the County will be held on April 23rd to discuss 354
primarily the noise due to dewatering activities as well as lake levels. Mr. Jasper advised that the 355 SWFWMD Water Use Permit renewal is coming due and he is having a hard time with Kimley 356 Horn being responsive; he advised he will continue to push for a response from Kimley Horn and 357
will push for Lennar to do the same. 358 359
Mr. Lusty asked if there would be only one meeting in May. Ms. Blandon confirmed. 360 361 A resident inquired regarding the pond behind her home at 126 Martellago; she asked if it 362
is golf course property behind her home to the lake. Mr. Jasper advised the golf course is 363 responsible for maintenance of the lake bank on the golf course side of the lake. The resident spoke 364 regarding maintenance of the lake bank on the residential side. Mr. Jasper advised the maintenance 365 of the bank is the responsibility of the CDD. 366
367
ELEVENTH ORDER OF BUSINESS Adjournment 368 369
On a Motion by Mr. Bracco, seconded by Mr. Orenstein, with all in favor, the Board adjourned the
meeting at 12:42 p.m., for the Venetian Community Development District.
370 371 372
Secretary / Assistant Secretary Chairman / Vice Chairman 373 374
VENETIAN COMMUNITY DEVELOPMENT DISTRICT
Operation and Maintenance Expenditures
March 2018
For Board Approval
The total items being presented: $154,708.05
Approval of Expenditures:
__________________________________
______ Chairperson
______ Vice Chairperson
______ Assistant Secretary
Attached please find the check register listing the Operation and Maintenance
expenditures paid from March 1, 2018 through March 31, 2018. This does not include
expenditures previously approved by the Board.
DISTRICT OFFICE · 9530 MARKETPLACE ROAD · SUITE 206 · FT. MYERS, FLORIDA 33912
Venetian Community Development DistrictPaid Operation & Maintenance Expenditures
March 1, 2018 Through March 31, 2018
Vendor Name Check Number Invoice Number Invoice Description Invoice Amount
AAA Striping Plus Sod & Signs, Inc. 002460 1041 Installation of Thermo Striping 02/18 1,239.68$
AMF Mark Mobile Welding, LLC 002461 1678 Weld Mailbox - 126 Portafino 75.00$
Aquatic Systems Inc 002480 0000404021 Monthly Lake and Wetland Services
03/18
2,994.00$
Aquatic Systems Inc 002480 0000404473 Semi-Annual Aerator Maintenance
03/18
518.00$
Brightview Landscape Services, Inc. 002451 5629117 Monthly Landscape and Irrigation 02/18 24,833.34$
Brightview Landscape Services, Inc. 002451 5631376 Fertilization 02/17 10,602.50$
Brightview Landscape Services, Inc. 002474 5640318 Oak Stump Removal- Hurricane Related 300.00$
Brightview Landscape Services, Inc. 002474 5640321 Install Geraniums due to Frost Damage 1,468.50$
Brightview Landscape Services, Inc. 002474 5640325 Remove Palms 975.00$
Brightview Landscape Services, Inc. 002474 5646987 Trim Oak & Remove Lager Leads 150.00$
Brightview Landscape Services, Inc. 002482 5652277 Monthly Landscape and Irrigation 03/18 24,833.34$
Brightview Landscape Services, Inc. 002474 5669510 Fertilization 03/18 100.00$
Clean Sweep Parking Lot Maintenance
Inc
002452 37650 Street Sweeping 02/18 395.00$
Comcast Communications 002462 8535100500435487
03/18
Gatehouse Internet 03/18 104.85$
Comcast Communications 002483 8535100500439604
04/18
Guardhouse Phone & Internet 04/18 167.83$
Crosscreek Environmental Inc. 002453 5232 Lake Bank Restoration-20% Per
Contract
5,379.50$
David Lusty 002494 DL010518 BOS Meeting 01/05/18 100.00$
David Lusty 002494 DL011518 BOS Meeting 01/15/18 100.00$
David Lusty 002494 DL022618 BOS Meeting 02/26/18 100.00$
David Lusty 002494 DL032618 BOS Meeting 03/26/18 100.00$
Dye, Harrison, Kirkland, Petruff, Pratt
& St. Paul, PLLC
002463 971292 Legal Services-Hydraulic Spills 01/18 1,400.00$
Dye, Harrison, Kirkland, Petruff, Pratt
& St. Paul, PLLC
002463 971685 Legal Services-Hydraulic Spills 02/18 1,453.96$
Florida Power & Light 002464 Electric Summary 02/18 FPL Electric Summary 02/18 2,274.47$
Frontier Florida LLC 002446 941-485-8500-120513-
02/18
941-485-8500 02/18 248.84$
Venetian Community Development DistrictPaid Operation & Maintenance Expenditures
March 1, 2018 Through March 31, 2018
Vendor Name Check Number Invoice Number Invoice Description Invoice Amount
Frontier Florida LLC 002485 941-485-8500-120513-5
03/18
941-485-8500 03/18 220.37$
Harry Orenstein 002490 HO010518 BOS Meeting 01/05/18 100.00$
Harry Orenstein 002490 HO011518 BOS Meeting 01/15/18 100.00$
Harry Orenstein 002490 HO021218 BOS Meeting 02/12/18 100.00$
Harry Orenstein 002490 HO022618 BOS Meeting 02/26/18 100.00$
Harry Orenstein 002490 HO032618 BOS Meeting 03/26/18 100.00$
HD Supply Facilities Maintenance
LTD
002465 9161369532 Hardware Supplies 03/18 87.37$
Hoover Pumping Systems Corporation 002475 139613 Install Filter controller & Fuse 1,317.96$
Jerry Jasper 002487 JJ010518 BOS Meeting 01/05/18 100.00$
Jerry Jasper 002487 JJ011518 BOS Meeting 01/15/18 100.00$
Jerry Jasper 002487 JJ021218 BOS Meeting 02/12/18 100.00$
Jerry Jasper 002487 JJ022618 BOS Meeting 02/26/18 100.00$
Jerry Jasper 002487 JJ032618 BOS Meeting 03/26/18 100.00$
Office Team 002466 50415730 Temporary Staffing 03/18 331.89$
Office Team 002489 50467230 Temporary Staffing Week Ending
03/09/18
622.92$
Office Team 002489 50514585 Temporary Staffing Week Ending
03/16/18
322.20$
Persson & Cohen P.A. 002454 Venetian 02/18 Legal Services 02/18 6,754.44$
Richard Bracco 002481 RB010518 BOS Meeting 01/05/18 100.00$
Richard Bracco 002481 RB011518 BOS Meeting 01/15/18 100.00$
Richard Bracco 002481 RB021218 BOS Meeting 02/12/18 100.00$
Richard Bracco 002481 RB022618 BOS Meeting 02/26/18 100.00$
Richard Bracco 002481 RB032618 BOS Meeting 03/26/18 100.00$
Rizzetta & Company, Inc. 002455 INV0000030663 District Management Fees 03/18 5,220.84$
Rizzetta Amenity Services, Inc. 002447 INV00000000004530 Amenity Bi-Weekly Payroll Services
01/18
4,883.61$
Venetian Community Development DistrictPaid Operation & Maintenance Expenditures
March 1, 2018 Through March 31, 2018
Vendor Name Check Number Invoice Number Invoice Description Invoice Amount
Rizzetta Amenity Services, Inc. 002456 INV00000000004660 Amenity Bi-Weekly Payroll Services
02/18
4,192.72$
Rizzetta Amenity Services, Inc. 002467 INV00000000004710 Cell phone 02/18 50.00$
Rizzetta Amenity Services, Inc. 002467 INV00000000004736 Amenity Bi-Weekly Payroll Services
03/18
4,907.61$
Rizzetta Amenity Services, Inc. 002491 INV00000000004763 Amenity Bi-Weekly Payroll Services
03/18
4,179.07$
Rizzetta Technology Services, LLC 002457 INV0000003180 Website Email & Hosting Services
03/18
575.00$
Schappacher Engineering LLC 002476 1059 Engineering Services 02/18 4,925.00$
Staples Advantage 002448 8048654576 Supplies Purchased 276.97$
Staples Advantage 002468 8048747510 Credit Memo (4.40)$
Staples Advantage 002468 8048839066 Supplies Purchased 56.49$
Staples Advantage 002477 8048939730 Supplies Purchased 51.49$
Staples Advantage 002492 8049045665 Supplies Purchased 180.54$
Sunrise Landscape 002449 S-1257 Irrigation Repairs - Valve Replacement 95.00$
Sunrise Landscape 002449 S-1258 Irrigation Repairs - Replaced Modular
Controller
172.00$
Sunrise Landscape 002449 S-1259 Irrigation Repairs - Installation of
Battery Controller
60.00$
Sunrise Landscape 002449 S-1260 Irrigation Repairs - Installed Battery
Controller
60.00$
Susie E Dunn-Lentile 002484 SL010518 BOS Meeting 01/05/18 100.00$
Susie E Dunn-Lentile 002484 SL011518 BOS Meeting 01/15/18 100.00$
Susie E Dunn-Lentile 002484 SL021218 BOS Meeting 02/12/18 100.00$
Susie E Dunn-Lentile 002484 SL022618 BOS Meeting 02/26/18 100.00$
SWFWMD 002469 031218SWF VCDD half of SWFWMD WUP fee 750.00$
T3F Ventures, Inc. 002486 11724 Signs 129.24$
Tri-County Landscape Services Inc 002470 9175 Remove & Install New Sod -Hurricane
Damage
1,400.00$
Venetian CDD CD150 Debit Card Replenishment 255.45$
Venetian Golf & River Club 002471 43159 Effluent Water Use 02/18 773.63$
Venetian Community Development DistrictPaid Operation & Maintenance Expenditures
March 1, 2018 Through March 31, 2018
Vendor Name Check Number Invoice Number Invoice Description Invoice Amount
Verizon Wireless 002458 9801950972 Wireless Telephone Services 02/18 77.78$
Victory Security Agency II, LLC 002450 2526 Security Services 02/11/18-02/17/18 5,908.60$
Victory Security Agency II, LLC 002459 2530 Security Services 02/18/18-02/24/18 5,908.60$
Victory Security Agency II, LLC 002472 2617 Security Services 02/25/18-03/03/2018 5,908.60$
Victory Security Agency II, LLC 002478 2675 Security Services 03/04/-03/10/18 5,908.60$
Victory Security Agency II, LLC 002493 2744 Security Services 03/11-03/17/18 5,755.30$
Victory Security Agency II, LLC 002493 2745 Security Services 03/11-03/17/18-RFID 405.15$
Water Boy Inc 002479 2162078 Water Delivery 03/18 24.20$
Water Equipment Technologies of
Southwest Florida LLC
002473 12353 Weekly Maintenance-Entrance
Fountains 02/18
150.00$
Report Total 154,708.05$
Date Vendor Description GL Code Amount
01/17/18 Constant Contact. Email Blast Provider January 001-51300-4903 (45.00)
01/16/18 Publix Supplies 001-51300-4903 (9.80)
02/20/18 Constant Contact. Email Blast Provider February 001-51300-4903 (45.00)
03/01/18 Amazon Golf Barrier & Containment Netting 001-53900-4785 (102.80)
03/15/18 Constant Contact. Email Blast Provider March 001-51300-4903 (45.00)
True Up 001-53900-4785 (7.85)
Total debit card expenses (255.45)
SunTrust Replenish Balance to $500.00 255.45
001-10105
Date
Venetian CDD
SunTrust Debit Card Account #xxxxxxxxx6835 Balance $500
3/5/2018
District Manager
3/5/2018
1
Natasha Dhanpat
From: Kareen Richard <[email protected]>
Sent: Wednesday, February 28, 2018 2:58 PM
To: Natasha Dhanpat
Subject: FW: Your Amazon.com order of "10' High X 20' Wide Golf...".
Follow Up Flag: Follow up
Flag Status: Flagged
Natasha,
FYI, I just charged this to my debit card.
Kind regards,
Kareen Richard Field Manager Venetian Community Development District 102 Pesaro Drive, North Venice, FL 34275 Tel: 941-485-8500; Fax: 941*485-8510 Cell: 908-208-2059 [email protected]
From: Amazon.com [mailto:[email protected]] Sent: Wednesday, February 28, 2018 2:56 PM To: Kareen Richard Subject: Your Amazon.com order of "10' High X 20' Wide Golf...".
Right-click or tap and hold here to download pictures. To help protect your privacy, Outlo ok
prevented auto matic download of this pictu re from the In ternet.Amazo n.co m
| Your Account | Amazon.com
Order ConfirmationOrder #112-3025403-9722621
PO# 20180228
Hello Kareen Richard, Thank you for shopping with us. We’ll send a confirmation once your item has shipped. Your order details are indicated
below. The payment details of your transaction can be found on the order invoice. If you would like to view the status of
your order or make any changes to it, please visit Your Orders on Amazon.com.
This order is placed on behalf of Venetian Community Development District.
2
Your estimated delivery date is: Tuesday, March 6 - Thursday, March 8
Your shipping speed: Standard Shipping
Right-click or tap and hold here to download pictures. To help protect your privacy, Outlo ok
prevented auto matic download of this pictu re from the
Your order will be sent to: Venetian Community Development District 102 PESARO DR NORTH VENICE, FL 34275-6626 United States
Order DetailsOrder #112-3025403-9722621
Placed on Wednesday, February 28, 2018
Right-click or tap and hold here to download pictures. To help protect your privacy, Outlo ok
prevented auto matic download of this pictu re from the In ternet.
10' High X 20' Wide Golf Barrier & Containment Netting,
#21 Polypro Netting, Serged Cord Edge Bordering, Golf,
Baseball, Softball, Hockey, Lacrosse, Soccer, Basketball,
Tennis, Multipurpose
Misc. Sold by Gourock Netting Supply
Condition: New
$89.00
Item Subtotal: $89.00 Shipping & Handling: $13.80
Total Before Tax: $102.80 Estimated Tax: $0.00
Order Total: $102.80
To learn more about ordering, go to Ordering from Amazon.com.
If you want more information or need more assistance, go to Help.
Thank you for shopping with us.
Amazon.com
Recommended for you based on 10' High X 20' Wide Golf Barrier...
Right-click or tap and hold here to download pictures. To help protect yo ur privacy, Outlook prevented automatic download of this pictu re from the Internet.In -G round POLE for Barrier Netting Installations: 10' Tall (1 pole), Steel, w/Ground-Sleeve
In-Ground POLE for Barrier Netting...$59.00
Right-click or tap and hold here to download pictures. To help protect yo ur privacy, Outlook prevented automatic download of this pictu re from the Internet.Kotap BB-6B Ball Bungee, 6-Inch, Black, 25-Piece
Kotap BB-6B Ball Bungee, 6-Inch, Black, 25-Piece
$7.95Right-click or tap and hold here to download pictures. To help protect your privacy, Outlook prevented automatic download of this picture from the Internet.
Right-click or tap and hold here to download pictures. To help protect yo ur privacy, Outlook prevented automatic download of this pictu re from the Internet.Country Club Elite Golf Ball Tray
Country Club Elite Golf Ball Tray$29.99
3
The payment for your invoice is processed by Amazon Payments, Inc. P.O. Box 81226 Seattle, Washington 98108-1226. If you need more
information, please contact (866) 216-1075
By placing your order, you agree to Amazon.com’s Privacy Notice and Conditions of Use. Unless otherwise noted, items sold by Amazon.com
are subject to sales tax in select states in accordance with the applicable laws of that state. If your order contains one or more items from a
seller other than Amazon.com, it may be subject to state and local sales tax, depending upon the seller's business policies and the location of
their operations. Learn more about tax and seller information.
This email was sent from a notification-only address that cannot accept incoming email. Please do not reply to this message.
Current Month Prior Year
172288 311351900 900
210178 015 0
14439 2434397821 314685
72881 616678253 8799
802389 5973090 (56,842)0 (6,752)
883523 604182
26142 155609939 78721464 4323944 4422390 689
3599 490045478 33875
3419 30223419 3022
1750 1750485 485
2235 2235
1332476 957999
AssetsCash AccountsOperating AccountCash Drawers / BanksPayroll AccountCheck ClearingVisa/MC ClearingTotal Cash Accounts
Accounts ReceivableA/R - MembershipA/R - EventsA/R - CDD - Annual AssessmentsAdvances to/from CDDAllowance for Doubtful AcctsTotal Accounts Receivable
InventoryFood InventoryLiquor InventoryBeer InventoryWine InventoryPerishable InventoryTennis HardgoodsTotal Inventory
Other AssetsPrepaid ExpensesTotal Other Assets
DepositsBeverage DepositsSecurity DepositsTotal Deposits
Total Assets
River ClubBalance Sheet
Report Date: 3/31/2018
Current Month Prior Year
River ClubBalance Sheet
Report Date: 3/31/2018
31941 2678337031 130927059 5570
100000 078049 7186117390 4035
783924 754704(39) (851)
0 3554000 4500
1059355 880048
1059355 880048
181449 46691672 77485
273121 779511332476 957999
LiabilitiesCurrent Liabilities
Deferred Membership DuesEmployee Christmas FundGratuities PayableEvent Deposits
Accounts PayableInsurance PayableSales & Use Tax PayablePayroll Deposit CDDAccrued Payroll
EquityRetained EarningsCurrent Year Net IncomeTotal EquityTotal Liabilities and Equity
Total Current Liabilities
Long Term LiabilitiesTotal Liabilities
Accrued Operating Expenses
Curr Mth Act Plan Var % YTD Actual Final Plan Plan Var %
Dues Revenue 129982 0 0.00% 779892 779892 0 0%
Restaurant Revenue 98397 20397 26.15% 498319 399003 99316 25%Other Revenue 2376 (3,317) (58.27%) 27014 36067 (9,053) (25%)Total Revenue 230755 17080 7.99% 1305224 1214962 90262 7%
Tennis Cost of Sales 622 372 37.43% 5029 6673 1644 25%F&B Cost of Sales 35802 (4,415) (14.07%) 196965 160557 (36,408) (23%)Total Cost of Goods Sold 36424 (4,043) (12.49%) 201994 167230 (34,764) (21%)
Salaries & Wages 73590 2236 2.95% 409257 432660 23403 5%Lessons - Fitness 2166 111 4.87% 12659 13662 1003 7%Contract Services 1200 720 37.50% 7280 11520 4240 37%Employee Benefits 28651 (533) (1.90%) 163636 160677 (2,959) (2%)Outside Training 0 0 0.00% 100 0 (100) 0%Total Salaries and Benefits 105607 2534 2.34% 592931 618519 25588 4%
Repairs & Maintenance - Equipment 2803 (1,153) (69.88%) 16223 13100 (3,123) (24%)Maintenance Contracts 12481 (74) (0.59%) 72678 74367 1689 2%Shop & Hand Tools 35 40 53.92% 689 450 (239) (53%)Building Maintenance 2822 (822) (41.12%) 10626 12050 1424 12%Soil & Seed 0 0 0.00% 675 7000 6325 90%Chemicals 373 377 50.30% 3874 3145 (729) (23%)Total Repairs and Maintenance 18513 (1,631) (9.66%) 104765 110112 5347 5%
Postage 32 18 36.08% 263 300 37 12%Telephone 1138 62 5.14% 6987 7200 213 3%Printing 0 0 0.00% 725 250 (475) (190%)Office Supplies 364 86 19.21% 2812 2850 38 1%Total Office Expense 1534 166 9.77% 10787 10600 (187) (2%)
Employee Meals 2039 0 0.00% 12131 12131 0 0%Meals & Entertainment 0 25 100.00% 0 150 150 100%Travel 42 123 74.77% 218 990 772 78%Electricty 6362 1038 14.02% 42881 42650 (231) (1%)Personnel Supplies 97 3 2.76% 1713 2400 687 29%Laundry 4750 (25) (0.53%) 26435 24850 (1,585) (6%)Music & Entertainment 4640 (2,203) (90.40%) 21818 16922 (4,896) (29%)Cleaning Supplies (168) 168 0.00% (336) 0 336 0%Equipment Replacement 2838 (1,923) (210.12%) 14325 9210 (5,115) (56%)Operating Supplies 5909 (4,809) (437.16%) 13219 9025 (4,194) (46%)China Glass Silver 0 0 0.00% 1507 3170 1663 52%Paper/Plastic 2329 (969) (71.24%) 11361 7745 (3,616) (47%)Decorations 655 (380) (138.21%) 10964 9275 (1,689) (18%)Equipment Rental 2021 (724) (55.80%) 9136 7782 (1,354) (17%)Gas Diesul Fuel and Oil 864 (84) (10.81%) 4969 4520 (449) (10%)
River Club CDD ReportReport Date: 3/31/2018
Final PlanREVENEUE
129982
780005693
213675
OPERATING EXPENDITURES COST OF GOODS SOLD
99431387
32381
SALARIES & BENEFITS7582622771920
281180
108141
REPAIRS & MAINTENANCE1650
1240775
20000
75016882
OFFICE EXPENSE50
12000
4501700
OPERATING EXPENSE2039
25165
7400100
4725
11000
1360275
24370
915
1297780
Water & Sewer 4400 0 0.00% 29691 24400 (5,291) (22%)Sanitation Disposal 645 0 0.00% 4969 3870 (1,099) (28%)Licenses and Fees 0 1960 100.00% 6007 7930 1923 24%Total Operating Expense 37423 (7,800) (26.33%) 211009 187020 (23,989) (13%)
Legal Fees 0 100 100.00% 947 600 (347) (58%)Total Legal and Professional 0 100 100.00% 947 600 (347) (58%)
Dues & Subscriptions 0 0 0.00% 495 1033 538 52%Com Related Promotion/Security 7645 1437 (98) (7.32%) 7865 7629 (236) (3%)Misc Expense/CC Fees 7652/Cash 2365 (565) (31.40%) 12794 10800 (1,994) (18%)Employee Relations 0 0 0.00% 253 2500 2247 90%Bad Debt Expense 0 75 100.00% 0 450 450 100%Management Fees-Administration 6000 0 0.00% 36000 36000 0 0%Amenities Marketing 76 (76) 0.00% 3303 9090 5787 64%Insurance-Administration 1808 (13) (0.71%) 10847 10770 (77) (1%)Total Other Administrative Cost 11686 (677) (6.15%) 71557 78272 6715 9%
Non-Recurring Expense 0 7409 100.00% 19563 44450 24887 56%
TOTAL EXPENDITURES 174763 101 0.06% 1011559 1049573 38014 4%
REVENUE LESS EXPENDITURES 19568 13138 204.32% 91672 (1,841) 93513 (5,079%)
4400645
196029623
LEGAL & PROFESSIONAL100
100
OTHER ADMINISTRATIVE COST0
13391800
075
60000
1795
6430
11009
7409
174864
Curr Mth Act Plan Var % YTD Actual Final Plan Plan Var %Tennis Revenue 839 (891) (51.53%) 8016 9843 (1,827) (18.56%)
Tennis COS - Hardgoods-Tennis 622 372 37.43% 5029 6673 1644 24.64%Total Amenity Operating COS 622 372 37.43% 5029 6673 1644 24.64%
Gross Profit 217 (519) (70.58%) 2988 3170 (182) (5.75%)
Salaries and Wages-Tennis 3088 59 1.88% 18528 18477 (51) (0.27%)Salaries and Wages-Tennis 1 2239 (183) (8.90%) 12682 12071 (611) (5.06%)Salaries and Wages-Tennis 2 1804 (19) (1.06%) 9308 10587 1279 12.09%Employee Benefits Allocated-Tennis 2581 (65) (2.58%) 13682 14809 1127 7.61%Total Salaries and Benefits 9712 (208) (2.19%) 54199 55944 1745 3.12%
Repairs and Maintenance Equipment-Tennis 490 (490) 0.00% 2971 3000 29 0.96%Total Repairs and Maintenance 490 (490) 0.00% 2971 3000 29 0.96%
Office Supplies-Tennis 41 159 79.62% 817 600 (217) (36.14%)Total Office Expense 41 159 79.62% 817 600 (217) (36.14%)
Employee Meals-Tennis 181 0 0.00% 1086 1086 0 0.00%Personnel Supplies-Tennis 0 0 0.00% 0 250 250 100.00%Equipment Replacement-Tennis 733 (483) (193.18%) 5074 500 (4,574) (914.83%)Operating Supplies-Tennis 1081 (1,081) 0.00% 4039 2500 (1,539) (61.55%)Total Operating Supplies 1995 (1,564) (362.85%) 10199 4336 (5,863) (135.21%)
Subscriptions-Tennis 0 0 0.00% 0 300 300 100.00%ComRel Promo/Security-Tennis 423 (173) (69.17%) 1307 800 (507) (63.41%)Total Other Administrative Cost 423 (173) (69.17%) 1307 1100 (207) (18.84%)
Total General and Administrative 12661 (2,276) (21.91%) 69493 64980 (4,513) (6.95%)
Profit/(Loss) - Tennis (12,444) (2,795) 28.97% (66,505) (61,810) (4,695) 7.60%
Venetian River ClubIncome Statement - Tennis
Report Date: 3/31/2018Final Plan
1730
Amenity Operating COS994
994
736
Salaries and Benefits3147205617852516
9504
Repairs and Maintenance00
Office Expense200
200
Operating Supplies181
0250
0431
General and Administrative0
250250
10385
(9,649)
Curr Mth Act Plan Var % YTD Actual Final Plan Plan Var %Fitness Revenue 1125 (1,213) (51.88%) 6916 11029 (4,113) (37%)
Salaries and Wages-Fitness 1323 26 1.90% 7940 7919 (21) (0%)Salaries and Wages-Fitness 1 521 406 43.80% 3317 5352 2035 38%Salaries and Wages-Fitness 2 1068 (8) (0.78%) 6018 6223 205 3%Classes-Fitness 2166 111 4.87% 12659 13662 1003 7%Salaries and Wages-Fitness 3 1452 (43) (3.02%) 8597 8273 (324) (4%)Contract Services-Fitness 1200 720 37.50% 7280 11520 4240 37%Employee Benefits Allocated-Fitness 1396 1132 44.78% 10637 14915 4278 29%Outside Training (Non HR)-Fitness 0 0 0.00% 100 0 (100) 0%Total Salaries and Benefits 9126 2344 20.44% 56548 67864 11316 17%
Repairs and Maintenance Equipment-Fitness 0 100 100.00% 37 600 563 94%Total Repairs and Maintenance 0 100 100.00% 37 600 563 94%
Employee Meals-Fitness 161 0 0.00% 966 966 0 0%Personnel Supplies-Fitness 0 0 0.00% 0 400 400 100%Laundry-Fitness 2117 383 15.31% 12415 11500 (915) (8%)Equipment Replacement-Fitness 387 (287) (286.91%) 1702 550 (1,152) (209%)Operating Supplies-Fitness 83 17 16.59% 483 550 67 12%Total Operating Supplies 2748 113 3.93% 15566 13966 (1,600) (11%)
Subscriptions-Fitness 0 0 0.00% 0 400 400 100%Total Other Admin Cost 0 0 0.00% 0 400 400 100%
Total General and Admin 11875 2557 17.72% 72152 82830 10678 13%
Profit/(Loss) - Fitness (10,750) 1344 (11.11%) (65,236) (71,801) 6565 (9%)
Venetian River ClubIncome Statement - Fitness
Report Date: 3/31/2018Final Plan
2338
Salaries and Benefits1349927
10602277140919202528
011470
Repairs and Maintenance100100
Operating Supplies161
02500100100
2861
Other Admin Cost00
14431
(12,093)
Curr Mth Act Plan Var % YTD Actual Final Plan Plan Var %
Turf-Clubhouse Maintenance 0 0 0.00% 0 1000 1000 100%Pine Mulch-Clubhouse Maintenance 0 0 0.00% 675 6000 5325 89%Total Repairs and Maintenance 0 0 0.00% 675 7000 6325 90%
Total Expense 0 0 0.00% 675 7000 6325 90%
Venetian River ClubIncome Statement - Maintenance
Report Date: 3/31/2018Final Plan
Repairs and Maintenance000
0
Curr Mth Act Plan Var % YTD Actual Final Plan Plan Var %
Food 70501 12781 22.14% 371366 295260 76106 25.78%Liquor 12452 2858 29.79% 62582 49077 13505 27.52%Beer 2341 508 27.69% 11411 9378 2033 21.67%Wine 8423 1130 15.49% 45388 37308 8080 21.66%Revenue - Other 4681 3121 200.04% 7572 7980 (408) (5.12%)Total Operating Revenue 98397 20397 26.15% 498319 399003 99316 24.89%
COS - Food 28500 (3,103) (12.22%) 161509 129915 (31,594) (24.32%)COS - Liquor 2913 (131) (4.72%) 14759 14232 (527) (3.70%)COS - Beer 702 (115) (19.64%) 3698 3001 (697) (23.22%)COS - Wine 3327 (706) (26.94%) 15213 13409 (1,804) (13.45%)COS - Other 360 (360) 0.00% 1786 0 (1,786) 0.00%Total COS 35802 (4,415) (14.07%) 196965 160557 (36,408) (22.68%)
Gross Profit 62595 15982 34.29% 301354 238446 62908 26.38%
Salaries and Wages-Executive Chef 4469 1281 22.28% 31969 34500 2531 7.34%Salaries and Wages-F&B Asst Mgr 3625 (29) (0.81%) 21458 21576 118 0.55%Salaries and Wages-F&B Banquet Mgr 0 2917 100.00% 342 17502 17160 98.05%Salaries and Wages-F&B Servers 15139 (2,000) (15.22%) 71833 69837 (1,996) (2.86%)Salaries and Wages-Chef Mgr 3917 (92) (2.40%) 23500 22950 (550) (2.40%)Salaries and Wages-F&B Line Cook 18454 (2,374) (14.76%) 99021 86642 (12,379) (14.29%)Employee Benefits Allocated-F&B 19728 (3,417) (20.95%) 109138 91083 (18,055) (19.82%)Total Salares & Benefits 65331 (3,713) (6.03%) 357260 344090 (13,170) (3.83%)
Repairs and Maintenance Equipment-F&B 0 200 100.00% 466 1200 734 61.19%Maintenance Contracts-F&B 166 (166) 0.00% 1692 725 (967) (133.44%)Chemicals-F&B 373 377 50.30% 3874 3145 (729) (23.17%)Total Repairs and Maintenance 539 411 43.29% 6032 5070 (962) (18.97%)
Telephone-F&B 160 40 20.00% 520 1200 680 56.67%Total Office Expense 160 40 20.00% 520 1200 680 56.67%
Venetian River ClubIncome Statement - Food & Beverage
Report Date: 3/31/2018Final Plan
Food & Beverage577209594183372931560
78000
Restaurant COS253972782587
26210
31387
46613
Salaries & Benefits575035962917
131393825
1608016311
61618
Repairs and Maintance200
0750
950
Office Expense200
200
Curr Mth Act Plan Var % YTD Actual Final Plan Plan Var %
Venetian River ClubIncome Statement - Food & Beverage
Report Date: 3/31/2018Final Plan
Employee Meals-F&B 1445 0 0.00% 8567 8567 0 0.00%Travel-F&B 0 40 100.00% 0 240 240 100.00%Personnel Supplies-F&B 0 0 0.00% 1271 750 (521) (69.40%)Laundry-F&B 2633 (408) (18.34%) 14020 13350 (670) (5.02%)Music and Entertainment-F&B (200) 200 0.00% 0 0 0 0.00%Cleaning Supplies-F&B (168) 168 0.00% 0 0 0 0.00%Equipment Replacement-F&B 1454 (1,204) (481.56%) 2501 4000 1499 37.49%Operating Supplies-F&B 4033 (3,783) (1,513.38%) 6371 1425 (4,946) (347.09%)Dinnerware-F&B 0 0 0.00% 1507 3170 1663 52.46%Paper /Plastic-F&B 1823 (788) (76.16%) 7146 5795 (1,351) (23.32%)Decorations-F&B 195 (20) (11.60%) 3906 1050 (2,856) (271.96%)Equipment Rental-F&B 2021 (1,181) (140.56%) 8820 5040 (3,780) (75.00%)Gas,Diesel Fuel and Oil-F&B 784 (429) (120.88%) 2173 1950 (223) (11.44%)Total Operating Expense 14021 (7,406) (111.95%) 56281 45337 (10,944) (24.14%)
ComRel Promo/Security-F&B 50 (25) (100.00%) 300 50 (250) (500.00%)Cash Over/Under-F&B (4) 4 0.00% (4) 0 4 0.00%Total Other Admin Cost 46 (21) (84.00%) 296 50 (246) (492.00%)
Total General & Admin 80096 (10,688) (15.40%) 420389 395747 (24,642) (6.23%)
Profit/(Loss) - F&B (17,501) 5294 (23.22%) (119,035) (157,301) 38266 (24.33%)
Operating Expense1445
40
2500
02225
00
250
1035175840355
6615
69408
(22,795)
Other Admin Cost250
25
Curr Mth Actual Plan Var % YTD Actual Final Plan Plan Var %
Dues Revenue 129982 0 0.00% 779892 779892 0 0%Other Admin Rev 412 (1,213) (74.63%) 12081 15195 (3,114) (20%)Total Operating Revenue 130394 (1,213) (0.92%) 791973 795087 (3,114) (0%)
Salaries and Wages-Administration 16492 2294 12.21% 94745 110751 16006 14%Employee Benefits Allocated-Administration
4947 1816 26.86% 30179 39870 9691 24%Total Salaries & Benefits 21438 4111 16.09% 124924 150621 25697 17%
Repairs and Maintenance Equipment- 2313 (963) (71.31%) 12749 8300 (4,449) (54%)Maintenance Contracts-Administration 12315 92 0.74% 70986 73642 2656 4%Shop & Hand Tools-Administration 35 40 53.92% 689 450 (239) (53%)Building Maintenance-Administration 2822 (822) (41.12%) 10626 12050 1424 12%Total Repairs & Maintenance 17484 (1,652) (10.44%) 95049 94442 (607) (1%)
Postage-Administration 32 18 36.08% 263 300 37 12%Telephone-Administration 978 22 2.17% 6467 6000 (467) (8%)Printing & Duplicating-Administration 0 0 0.00% 725 250 (475) (190%)Office Supplies-Administration 323 (73) (29.12%) 1995 2250 255 11%Total Office Expense 1333 (33) (2.55%) 9450 8800 (650) (7%)
Employee Meals-Administration 252 0 0.00% 1512 1512 0 0%Meals & Entertainment-Administration 0 25 100.00% 0 150 150 100%Travel-Administration 42 83 66.70% 218 750 532 71%Electric-Administration 6362 1038 14.02% 42881 42650 (231) (1%)Personnel Supplies-Administration 97 3 2.76% 443 1000 557 56%Music and Entertainment-Administration 4840 (2,403) (98.61%) 21818 16922 (4,896) (29%)Cleaning Supplies-Administration 0 0 0.00% (336) 0 336 0%Equipment Replacement-Administration 264 51 16.23% 5048 4160 (888) (21%)Operating Supplies-Administration 711 39 5.21% 2326 4550 2224 49%Paper /Plastic-Administration 506 (181) (55.55%) 4215 1950 (2,265) (116%)Decorations-Administration 460 (360) (359.78%) 7058 8225 1167 14%Equipment Rental-Administration 0 457 100.00% 316 2742 2426 88%Gas,Diesel Fuel and Oil-Administration 80 345 81.13% 2796 2570 (226) (9%)Water and Sewer-Administration 4400 0 0.00% 29691 24400 (5,291) (22%)Sanitation Disposal-Administration 645 0 0.00% 4969 3870 (1,099) (28%)Licenses and Fees-Administration 0 1960 100.00% 6007 7930 1923 24%Total Operating Expense 18659 1057 5.36% 128963 123381 (5,582) (5%)
Legal Fees-Administration 0 100 100.00% 947 600 (347) (58%)Total Legal & Professional 0 100 100.00% 947 600 (347) (58%)
Venetian River ClubIncome Statement - Administration
Report Date: 3/31/2018Final Plan
Operating Revenue129982
1625131607
Salaries & Benefits187866763
25549
Repairs & Maintenance1350
1240775
200015832
Office Expense50
10000
2501300
Operating Expense25225
1257400100
24370
315750325100457425
4400645
196019716
Legal & Professional100
100
Curr Mth Actual Plan Var % YTD Actual Final Plan Plan Var %
Venetian River ClubIncome Statement - Administration
Report Date: 3/31/2018Final Plan
Subscriptions-Administration 0 0 0.00% 495 333 (162) (49%)ComRel Promo/Security-Administration 964 100 9.39% 6258 6779 521 8%Credit Card Fees-Administration 2369 (569) (31.62%) 12798 10800 (1,998) (19%)Employee Relations-Administration 0 0 0.00% 253 2500 2247 90%Bad Debt Expense-Administration 0 75 100.00% 0 450 450 100%Total Other Admin Costs 3333 (394) (13.42%) 19804 20862 1058 5%
Total General & Administration 62248 3188 4.87% 379137 398706 19569 5%
Capital Expenditures 0 7409 100.00% 19563 44450 24887 56%Management Fee 6000 0 0.00% 36000 36000 0 0%Amenities Marketing 76 (76) 0.00% 3303 9090 5787 64%Insurance - Allociation Off Budget 1808 (13) (0.71%) 10847 10770 (77) (1%)Total Other Expenses 7884 7320 48.15% 69713 100310 30597 31%
Profit/(Loss) - Administration 60263 9296 18.24% 343123 296071 47052 16%
Other Admin Costs0
10641800
075
2939
65436
Other Expenses74096000
01795
15204
50967
Venetian
Community Development District
Financial Statements (Unaudited)
March 31, 2018
Prepared by: Rizzetta & Company, Inc.
venetiancdd.org rizzetta.com
Venetian Community Development District
Balance Sheet
As of 3/31/2018
(In Whole Numbers)
General Fund Reserve Fund FundDebt Service
Enterprise Fund Reserve FundRiver Club
FundsGovernmental
Total
GroupAssets Account General Fixed
GroupDebt Account
Long-Term General
Assets
Cash In Bank 97,556 0 0 1,138,389 0 1,235,945 0 0
Investments 809,306 0 2,520,714 0 0 3,330,019 0 0
Investments - Reserves 0 970,069 0 0 591,729 1,561,799 0 0
Accounts Receivable 58,302 147 52,522 55,647 8,410 175,028 0 0
Accounts Receivable - Other 0 0 0 19,795 0 19,795 0 0
Interest & Dividents Receivable 0 0 0 0 0 0 0 0
Advances to Vision 0 0 0 (2,229) 0 (2,229) 0 0
Prepaid Expenses and Inventory 0 0 0 35,667 0 35,667 0 0
Deposits 18,124 0 0 2,235 0 20,359 0 0
Due From Other Funds 21,518 0 0 0 0 21,518 0 0
Amount Available for Debt Service 0 0 0 0 0 0 0 2,573,235
Amount To Be Provided Debt Service 0 0 0 0 0 0 0 14,546,765
Fixed Assets 0 0 0 0 0 0 24,168,958 0
Total Assets 1,004,806 970,217 2,573,235 1,249,504 600,140 6,397,902 24,168,958 17,120,000
Liabilities
Accounts Payable 40,869 0 0 31,941 0 72,810 0 0
Accrued Expenses Payable 6,125 0 0 0 0 6,125 0 0
Other Current Liabilities 0 0 0 0 0 0 0 0
Deposits 0 0 0 7,450 0 7,450 0 0
Due To Other Funds 0 21,518 0 0 0 21,518 0 0
Revenue Bonds Payable--Long Term 0 0 0 0 0 0 0 17,120,000
Total Liabilities 46,994 21,518 0 39,391 0 107,903 0 17,120,000
Fund Equity & Other Credits
Beginning Fund Balance 157,072 809,789 1,543,765 349,255 377,499 3,237,380 24,168,958 0
Net Change in Fund Balance 800,740 138,909 1,029,471 860,858 222,641 3,052,619 0 0
Total Fund Equity & Other Credits 957,812 948,699 2,573,235 1,210,113 600,140 6,289,999 24,168,958 0
Total Liabilities & Fund Equity 1,004,806 970,217 2,573,235 1,249,504 600,140 6,397,902 24,168,958 17,120,000
See Notes to Unaudited Financial Statements
Venetian Community Development District
Statement of Revenues and Expenditures
001 - General Fund
From 10/1/2017 Through 3/31/2018
(In Whole Numbers)
BudgetAnnual
YTD Budget YTD Actual YTD Variance RemainingBudget
Percent Annual
Revenues
Interest Earnings
Interest Earnings 0 0 1,296 1,296 0.00%
Special Assessments
Tax Roll 1,424,662 1,424,662 1,424,658 (4) 0.00%
Off Roll 8,205 8,205 8,205 0 0.00%
Other Miscellaneous Revenues
Transponder Revenue 9,000 4,500 1,512 (2,988) 83.19%
Total Revenues 1,441,867 1,437,367 1,435,671 (1,696) 0.43%
Expenditures
Legislative
Supervisor Fees 12,000 6,000 4,300 1,700 64.16%
Financial & Administrative
Administrative Services 8,000 4,000 3,068 932 61.65%
District Management 33,400 16,700 15,392 1,308 53.91%
District Engineer 30,000 15,000 16,583 (1,583) 44.72%
Disclosure Report 1,500 100 100 0 93.33%
Trustees Fees 4,172 2,788 2,788 0 33.17%
Assessment Roll 5,000 5,000 5,000 0 0.00%
Financial & Revenue Collections 5,000 2,500 2,500 0 49.99%
Accounting Services 20,000 10,000 10,000 0 49.99%
Auditing Services 6,000 0 0 0 100.00%
Arbitrage Rebate Calculation 650 0 0 0 100.00%
Public Officials Liability Insurance 2,475 2,475 2,500 (25) (1.01)%
Legal Advertising 2,000 1,000 1,450 (450) 27.50%
Dues, Licenses & Fees 175 175 175 0 0.00%
Miscellaneous Fees 500 250 280 (30) 44.04%
Website Hosting, Maintenance, Backup (and Email)
7,980 3,990 3,345 645 58.08%
Miscellaneous Mailings 2,000 1,000 577 423 71.13%
Legal Counsel
District Counsel 72,000 36,000 36,075 (75) 49.89%
Security Operations
Security Services & Patrols 288,978 144,489 136,157 8,332 52.88%
Guard & Gate Facility Maintenance 15,000 7,500 4,739 2,761 68.40%
Gate Transponders 7,500 3,750 1,200 2,550 84.00%
Entry System Upgrade 0 0 821 (821) 0.00%
Electric Utility Services
Utility Services 29,176 14,588 14,117 471 51.61%
Water-Sewer Combination Services
Utility Services-Effluent & Guardhouse 15,000 7,500 4,413 3,087 70.57%
See Notes to Unaudited Financial Statements
Venetian Community Development District
Statement of Revenues and Expenditures
001 - General Fund
From 10/1/2017 Through 3/31/2018
(In Whole Numbers)
BudgetAnnual
YTD Budget YTD Actual YTD Variance RemainingBudget
Percent Annual
Stormwater Control
Aquatic Maintenance 44,952 22,476 17,964 4,512 60.03%
Fountain Service Repairs & Maintenance
4,340 2,170 4,473 (2,303) (3.06)%
Lake/Pond Bank Maintenance 5,000 2,500 0 2,500 100.00%
Mitigation Area Monitoring & Maintenance
35,592 17,796 16,978 818 52.29%
Stormwater System Maintenance 7,000 3,500 0 3,500 100.00%
Other Physical Environment
Office & Administration 4,000 2,000 1,869 131 53.28%
Staff Salaries/Payroll 121,500 60,750 60,389 361 50.29%
Telephone, Fax, Internet 5,058 2,529 2,291 238 54.70%
General Liability Insurance 4,950 4,950 4,500 450 9.09%
Property Insurance 3,655 3,655 3,889 (234) (6.40)%
Landscape Maintenance 332,922 166,461 142,339 24,122 57.24%
Irrigation Repairs 16,000 8,000 6,811 1,189 57.43%
Irrigation Maintenance 7,000 3,500 3,141 359 55.13%
Holiday Decorations 4,000 4,000 3,745 255 6.37%
Landscape Replacement Plants, Shrubs & Trees
7,000 3,500 2,608 892 62.74%
Landscape - Pinestraw 25,000 12,500 0 12,500 100.00%
Landscape - Flower Program 21,800 10,900 6,172 4,728 71.68%
Landscape - Miscellaneous 20,800 10,400 3,876 6,524 81.36%
Landscape - Mulch 65,000 32,500 53,635 (21,135) 17.48%
Field Services 6,600 3,300 3,300 0 50.00%
Landscape - Hurricane Recovery 0 0 6,300 (6,300) 0.00%
General Repairs & Maintenance 8,500 4,250 2,393 1,857 71.84%
Road & Street Facilities
Street/Parking Lot Sweeping 4,740 2,370 2,370 0 50.00%
Street Light Decorative Light Maintenance
2,000 1,000 2,216 (1,216) (10.78)%
Roadway Repair & Maintenance 15,000 7,500 8,348 (848) 44.34%
Street Sign Repair & Replacement/Traffic Enforcement
19,800 9,900 8,834 1,066 55.38%
Contingency
Entry System Upgrade 35,000 17,500 0 17,500 100.00%
Non-Recurring Expenses 46,152 23,076 909 22,167 98.03%
Total Expenditures 1,441,867 727,788 634,931 92,857 55.96%
Excess of Revenues Over (Under) Expenditures
0 709,579 800,740 91,161 0.00%
See Notes to Unaudited Financial Statements
Venetian Community Development District
Statement of Revenues and Expenditures
001 - General Fund
From 10/1/2017 Through 3/31/2018
(In Whole Numbers)
BudgetAnnual
YTD Budget YTD Actual YTD Variance RemainingBudget
Percent Annual
Excess of Rev./Other Sources Over (Under) Expend./Other Uses
0 709,579 800,740 91,161 0.00%
Fund Balance, Beginning of Period
0 0 157,072 157,072 0.00%
Fund Balance, End of Period 0 709,579 957,812 248,233 0.00%
See Notes to Unaudited Financial Statements
Venetian Community Development District
Statement of Revenues and Expenditures
005 - Reserve Fund
From 10/1/2017 Through 3/31/2018
(In Whole Numbers)
Annual Budget ActualCurrent Period
VarianceBudget To Actual
RemainingBudget Percent
Revenues
Interest Earnings
Interest Earnings 0 2,455 2,455 0.00%
Special Assessments
Tax Roll 204,437 204,440 3 0.00%
Off Roll 1,178 1,178 0 0.00%
Total Revenues 205,615 208,073 2,458 1.20%
Expenditures
Contingency
Capital Reserve 205,615 69,633 135,983 66.13%
Total Expenditures 205,615 69,633 135,983 66.13%
Excess of Revenues Over (Under) Expenditures
0 138,440 138,440 0.00%
Other Financing Sources (Uses)
Unrealized Gain/Loss on Investments 0 469 469 0.00%
Exc. of Rev./Other Sources Over (Under) Expend./Other Uses
0 138,909 138,909 0.00%
Fund Balance, Beginning of Period
0 809,789 809,789 0.00%
Fund Balance, End of Period 0 948,699 948,699 0.00%
See Notes to Unaudited Financial Statements
Venetian Community Development District
Statement of Revenues and Expenditures
200 - Debt Service Fund
From 10/1/2017 Through 3/31/2018
(In Whole Numbers)
Annual Budget ActualCurrent Period
VarianceBudget To Actual
RemainingBudget Percent
Revenues
Interest Earnings
Interest Earnings 0 11,817 11,817 0.00%
Special Assessments
Tax Roll 1,460,440 1,460,440 0 0.00%
Off Roll 9,399 9,399 0 0.00%
Prepayments 0 23,706 23,706 0.00%
Total Revenues 1,469,839 1,505,361 35,522 2.42%
Expenditures
Debt Service Payments
Interest 934,839 470,891 463,948 49.62%
Principal 535,000 5,000 530,000 99.06%
Total Expenditures 1,469,839 475,891 993,948 67.62%
Excess of Revenues Over (Under) Expenditures
0 1,029,471 1,029,471 0.00%
Exc. of Rev./Other Sources Over (Under) Expend./Other Uses
0 1,029,471 1,029,471 0.00%
Fund Balance, Beginning of Period
0 1,543,765 1,543,765 0.00%
Fund Balance, End of Period 0 2,573,235 2,573,235 0.00%
See Notes to Unaudited Financial Statements
Venetian Community Development District
Statement of Revenues and Expenditures
400 - Enterprise Fund
From 10/1/2017 Through 3/31/2018
(In Whole Numbers)
BudgetAnnual
YTD Budget YTD Actual YTD Variance RemainingBudget
Percent Annual
Revenues
Special Assessments
Tax Roll 1,550,265 1,550,265 1,550,263 (1) 0.00%
Off Roll 9,139 9,139 9,139 0 0.00%
Dues Revenue -Lot Closings 4,383 2,192 523 (1,668) 88.06%
Amenity Center Revenue
Administration 52,250 26,125 27,014 889 48.29%
Restaurant Revenue 613,000 306,500 498,319 191,819 18.70%
Total Revenues 2,229,037 1,894,221 2,085,259 191,039 6.45%
Expenditures
Cost of Goods
Tennis Cost of Sales 9,564 4,782 5,029 (247) 47.41%
Restaurant Cost of Sales 246,671 123,336 196,965 (73,629) 20.15%
Salaries and Benefits
Salaries and Wages 809,551 404,775 409,257 (4,482) 49.44%
Lessons-Fitness 24,904 12,452 12,659 (207) 49.16%
Employee Benefits 300,404 150,202 163,636 (13,434) 45.52%
Employee Education & Training 900 450 100 350 88.88%
Contract Services 20,481 10,241 7,280 2,961 64.45%
Repairs and Maintenance
Chemicals 4,970 2,485 3,874 (1,389) 22.05%
Shop & Hand Tools 900 450 689 (239) 23.44%
Landscape Materials 12,500 6,250 0 6,250 100.00%
Sod & Seed 0 0 675 (675) 0.00%
Repairs & Maintenance-Equipment 28,700 14,350 16,223 (1,873) 43.47%
Maintenance Contracts 149,316 74,658 72,678 1,980 51.32%
Building Maintenance 18,533 9,267 10,626 (1,359) 42.66%
Office Expense
Printing 500 250 725 (475) (45.00)%
Postage 600 300 263 37 56.16%
Telephone 14,400 7,200 6,987 213 51.47%
Office Supplies 5,500 2,750 2,814 (64) 48.83%
Operating Expense
Employee Meals 22,126 11,063 12,131 (1,068) 45.17%
Meals & Entertainment 300 150 0 150 100.00%
Equipment Replacement 15,420 7,710 14,325 (6,615) 7.10%
Licenses and Fees 13,015 6,507 6,007 500 53.84%
Travel 1,980 990 218 772 88.98%
Utility Services 79,900 39,950 42,881 (2,931) 46.33%
Utility Services-Effluent & Guardhouse 46,200 23,100 29,691 (6,591) 35.73%
Sanitation Disposal 7,740 3,870 4,969 (1,099) 35.80%
See Notes to Unaudited Financial Statements
Venetian Community Development District
Statement of Revenues and Expenditures
400 - Enterprise Fund
From 10/1/2017 Through 3/31/2018
(In Whole Numbers)
BudgetAnnual
YTD Budget YTD Actual YTD Variance RemainingBudget
Percent Annual
Gas, Diesel Fuel and Oil 8,880 4,440 4,969 (529) 44.04%
Equipment Rental 15,114 7,557 9,136 (1,579) 39.55%
Personnel Supplies 3,500 1,750 1,713 37 51.05%
Laundry 46,700 23,350 26,435 (3,085) 43.39%
Music & Entertainment 28,094 14,047 21,818 (7,771) 22.33%
China, Glass, Silver 5,272 2,636 1,507 1,129 71.41%
Paper/Plastic 13,390 6,695 11,361 (4,666) 15.15%
Operating Supplies 16,200 8,100 12,883 (4,783) 20.47%
Decorations 11,400 5,700 10,964 (5,264) 3.82%
Legal & Professional
Legal Fees 1,200 600 947 (347) 21.08%
Other Administrative Cost
Com Related Promotion/Security 14,279 7,140 7,865 (725) 44.91%
Bad Debt Expense 900 450 0 450 100.00%
Management Fee 72,000 36,000 36,000 0 50.00%
Employee Relations 4,000 2,000 253 1,747 93.67%
Insurance 21,540 21,540 21,693 (153) (0.71)%
Misc Expense/Credit Card Fees 19,000 9,500 12,794 (3,294) 32.66%
Dues & Subscriptions 2,308 1,154 495 659 78.55%
Amenities Marketing 21,280 10,640 3,303 7,337 84.47%
Contingency
Non-Recurring Expenses 88,905 44,453 19,563 24,890 77.99%
Total Expenditures 2,229,037 1,125,288 1,224,401 (99,113) 45.07%
Excess of Revenues Over (Under) Expenditures
0 768,932 860,858 91,926 0.00%
Excess of Rev./Other Sources Over (Under) Expend./Other Uses
0 768,932 860,858 91,926 0.00%
Fund Balance, Beginning of Period
0 0 349,255 349,255 0.00%
Fund Balance, End of Period 0 768,932 1,210,113 441,181 0.00%
See Notes to Unaudited Financial Statements
Venetian Community Development District
Statement of Revenues and Expenditures
405 - River Club Reserve Fund
From 10/1/2017 Through 3/31/2018
(In Whole Numbers)
Annual Budget ActualCurrent Period
VarianceBudget To Actual
RemainingBudget Percent
Revenues
Interest Earnings
Interest Earnings 0 1,884 1,884 0.00%
Special Assessments
Tax Roll 234,309 234,299 (10) 0.00%
Off Roll - Reserve 1,381 1,381 0 0.00%
Lot Closings - Reserve 0 51 51 0.00%
Total Revenues 235,690 237,615 1,925 0.82%
Expenditures
Contingency
Capital Reserve 235,690 14,974 220,716 93.64%
Total Expenditures 235,690 14,974 220,716 93.65%
Excess of Revenues Over (Under) Expenditures
0 222,641 222,641 0.00%
Exc. of Rev./Other Sources Over (Under) Expend./Other Uses
0 222,641 222,641 0.00%
Fund Balance, Beginning of Period
0 377,499 377,499 0.00%
Fund Balance, End of Period 0 600,140 600,140 0.00%
See Notes to Unaudited Financial Statements
Balance as of
Account Investment March 31, 2018
The Bank of Tampa Money Market 200,268$
The Bank of Tampa ICS Program:
EagleBank Money Market 156
Flushing Bank Money Market 245,156
Pinnacle Bank Money Market 143,669
The Park National Bank Money Market 16
Western Alliance Bank Money Market 220,041
Total General Fund Investments 809,306$
Fidelity Investments Money Market 415$
Fidelity Investments US Treasury Notes-Fixed Coupon Moodys Semiannual Maturity 03/31/18 163,000
Fidelity Investments US Treasury Notes-Fixed Coupon Semiannual Maturity dtd 03/31/18 382,000
Fidelity Investments US Treasury Notes -Fixed Coupon Moodys Semiannual Maturity dtd 5/15/18 381,133
Fidelity Investments US Treasury Bills -Zero Coupon Maturity dtd 08/2819 42,825
Fidelity Subtotal 969,373
The Bank of Tampa ICS Program:
United Bank Money Market 45
SunTrust Bank Money Market 651
Total Reserve Fund Investments 970,069$
US Bank Series 2012 Revenue First American Government Obligation Fund Class Y 1,030,260$
US Bank Series 2012 Revenue US Treasury Note- Maturity dtd 04/30/18 510,571
US Bank Series 2012 Reserve First American Government Obligation Fund Class Y 956,142
US Bank Series 2012 Prepayment First American Government Obligation Fund Class Y 23,741
Total Debt Service Fund Investments 2,520,714$
The Bank of Tampa ICS Program:
EagleBank Money Market 245,011$
Pinnacle Bank Money Market 101,485
The Park National Bank Money Market 48
United Bank Money Market 245,122
Western Alliance Bank Money Market 63
Total River Club Reserve Fund Investments 591,729$
Venetian CDD
Investment Summary
March 31, 2018
Venetian Community Development District
Summary A/R Ledger
001 - General Fund
From 3/1/2018 Through 3/31/2018
Invoice Date Customer Name Invoice Number Current Balance
10/1/2017 Sarasota County Tax Collector FY17-18 57,276.35
11/30/2017 Alan R. Hazell 264-18-03 256.42
11/30/2017 David O. Posey 264-18-04 256.42
11/30/2017 Mitchell Rabinowitz 264-18-07 256.41
11/30/2017 Robert A. St. John 264-18-01 256.41
Total 001 - General Fund
58,302.01
See Notes to Unaudited Financial Statements
Venetian Community Development District
Summary A/R Ledger
005 - Reserve Fund
From 3/1/2018 Through 3/31/2018
Invoice Date Customer Name Invoice Number Current Balance
11/30/2017 Alan R. Hazell 264-18-03 36.80
11/30/2017 David O. Posey 264-18-04 36.80
11/30/2017 Mitchell Rabinowitz 264-18-07 36.79
11/30/2017 Robert A. St. John 264-18-01 36.79
Total 005 - Reserve Fund
147.18
See Notes to Unaudited Financial Statements
Venetian Community Development District
Summary A/R Ledger
200 - Debt Service Fund
From 3/1/2018 Through 3/31/2018
Invoice Date Customer Name Invoice Number Current Balance
10/1/2017 Sarasota County Tax Collector FY17-18 51,346.62
11/30/2017 Alan R. Hazell 264-18-03 293.72
11/30/2017 David O. Posey 264-18-04 293.72
11/30/2017 Mitchell Rabinowitz 264-18-07 293.74
11/30/2017 Robert A. St. John 264-18-01 293.74
Total 200 - Debt Service Fund
52,521.54
See Notes to Unaudited Financial Statements
Venetian Community Development District
Summary A/R Ledger
400 - Enterprise Fund
From 3/1/2018 Through 3/31/2018
Invoice Date Customer Name Invoice Number Current Balance
10/1/2017 Sarasota County Tax Collector FY17-18 54,504.67
11/30/2017 Alan R. Hazell 264-18-03 285.60
11/30/2017 David O. Posey 264-18-04 285.60
11/30/2017 Mitchell Rabinowitz 264-18-07 285.60
11/30/2017 Robert A. St. John 264-18-01 285.60
Total 400 - Enterprise Fund
55,647.07
See Notes to Unaudited Financial Statements
Venetian Community Development District
Summary A/R Ledger
405 - River Club Reserve Fund
From 3/1/2018 Through 3/31/2018
Invoice Date Customer Name Invoice Number Current Balance
10/1/2017 Sarasota County Tax Collector FY17-18 8,237.55
11/30/2017 Alan R. Hazell 264-18-03 43.16
11/30/2017 David O. Posey 264-18-04 43.16
11/30/2017 Mitchell Rabinowitz 264-18-07 43.16
11/30/2017 Robert A. St. John 264-18-01 43.16
Total 405 - River Club Reserve Fund
8,410.19
Report Balance 175,027.99
See Notes to Unaudited Financial Statements
Venetian Community Development District
Aged Payables by Invoice Date
Aging Date - 9/1/2017
001 - General Fund
From 3/1/2018 Through 3/31/2018
Vendor Name Invoice Date Invoice Number Invoice Description Current Balance
Halifax Media Holdings, LLC
9/30/2017 10014211 09/17 CR Legal Advertising-CR Memo for Summerwoods Ad Paid
(1,732.50)
Halifax Media Holdings, LLC
10/28/2017 SC68G0QOC5 Legal Advertising 10/17 76.85
Halifax Media Holdings, LLC
11/17/2017 SC52G0QPCV Legal Advertising 11/17 185.60
Halifax Media Holdings, LLC
11/25/2017 SC52G0QPFK Legal Advertising 11/17 79.75
Halifax Media Holdings, LLC
12/7/2017 SC52G0QQOE Legal Advertising 12/17 79.75
Halifax Media Holdings, LLC
12/20/2017 SC52G0QR09 Legal Advertising 12/17 81.20
Halifax Media Holdings, LLC
12/28/2017 SC52G0QR0A Legal Advertising 12/17 95.70
Halifax Media Holdings, LLC
1/5/2018 SC52G0Qs5I Legal Advertising 01/18 82.65
Halifax Media Holdings, LLC
2/1/2018 SC52G0QT04 Legal Advertising 02/18 81.20
Halifax Media Holdings, LLC
2/1/2018 SC52G0QTWF Legal Advertising 02/18 79.75
Halifax Media Holdings, LLC
2/12/2018 SC52G0QUSL Legal Advertising 02/18 81.20
Halifax Media Holdings, LLC
2/19/2018 SC52G0QVDC Legal Advertising 02/18 120.35
Halifax Media Holdings, LLC
2/22/2018 SC52G0QV3K Legal Advertising 02/18 87.00
Halifax Media Holdings, LLC
2/23/2018 SC52G0QVDB Legal Advertising 02/18 63.80
Office Team 2/27/2018 50368608 Temporary Staffing Week Ending 02/23/18
674.37
Halifax Media Holdings, LLC
2/28/2018 SC52G0QW2E Legal Advertising 02/18 85.55
Invision Communications 3/13/2018 4398 Repair Gate Operator- Extended Network to Main OFC
1,000.00
City of Venice 3/15/2018 44300-59516 03/18 Guardhouse Water-101 Veneto Bv 02/18
58.56
Verizon Wireless 3/19/2018 9803787446 Wireless Telephone Services 03/18
83.78
Brightview Landscape Services, Inc.
3/21/2018 5682379 Remove Wax Myrtle 250.00
Crosscreek Environmental Inc.
3/22/2018 5342 Lake Bank Restoration- Lake 33 & 34
21,518.00
UPS 3/24/2018 00000W59E2128 Delivery Service 03/16/18 9.43
Venetian Community Development District
Aged Payables by Invoice Date
Aging Date - 9/1/2017
001 - General Fund
From 3/1/2018 Through 3/31/2018
Vendor Name Invoice Date Invoice Number Invoice Description Current Balance
Victory Security Agency II, LLC
3/24/2018 2752 Security Services 03/18-03/24/18
5,755.30
Victory Security Agency II, LLC
3/24/2018 2753 RFID Program 416.10
Halifax Media Holdings, LLC
3/24/2018 SC52G0QXDG Legal Advertising 03/24/18 165.00
Office Team 3/28/2018 50575697 Temporary Staffing Week Ending 03/23/18
805.50
Florida Power & Light 3/29/2018 Electric Summary 03/18 FPL Electric Summary 03/18 2,502.35
Clean Sweep Parking Lot Maintenance Inc
3/31/2018 37862 Street Sweeping 03/18 395.00
Water Boy Inc 3/31/2018 9004786 Qtly Cooler Rental 15.00
Venetian CDD River Club 4/2/2018 040218 Sales Tax Transponder Sales Tax- March
23.94
Office Team 4/2/2018 50593438 Temporary Staffing Week Ending 03/30/18
483.30
Persson & Cohen P.A. 4/2/2018 Venetian 03/18 Legal Services 03/18 7,165.10
Total 001 - General Fund
40,868.58
Report Total 40,868.58
Venetian Community Development District Notes to Unaudited Financial Statements
March 31, 2018
Balance Sheet
1. Trust statement activity has been recorded through 03/31/18 2. See EMMA (Electronic Municipal Market Access) at https://emma.msrb.org for Municipal Disclosures and
Market Data. 3. For presentation purposes, the Reserves are shown in a separate fund titled Reserve Fund.
Summary A/R Ledger-Payment Terms
4. Payment terms for landowner assessments are (a) defined in the FY17-18 Assessment Resolution adopted by the Board of Supervisors, (b) pursuant to Florida Statutes, Chapter 197 for assessments levied via the county tax roll.
VENETIAN COMMUNNITY DEVELOPMENT DISTRICT
VENETIAN RIVER CLUB
502 VENETO BOULEVARD
NORTH VENICE, FLORIDA 34275
RIVERCLUB RENOVATION COMMITTEE
March 12, 2018
In Attendance: Steven Kleinglass, Rebecca O’Donnell, Annette Dwyer, Al Churilla & Israel Gopstein; Scott Kissell, River Club Manager; David Lusty VCDD Liason, Noller Design Group, & Alan (Brambiers)
1. Call to Order/Roll Call/Establish Quorum a. Meeting called to order March 12, 2018 at 11:00 am b. Quorum established
2. New Business:
A. Noeller design presented updated budget & suggestions for item removal to meet budget.
B. Alan from Brambiers reviewed acoustic locations with committee. C. Alan from Brambiers completed his discussions & excused himself. D. Noeller completed their discussions & were excused. E. Committee continued discussion of Acoustic pricing, exploring other vendors & review
acoustic reverberation calculations. F. Next meeting scheduled for 3/19.
3. Meeting adjourned at 1:40 pm
Respectfully submitted by Rebecca O’Donnell, Secretary
VENETIAN COMMUNNITY DEVELOPMENT DISTRICT
VENETIAN RIVER CLUB
502 VENETO BOULEVARD
NORTH VENICE, FLORIDA 34275
RIVERCLUB RENOVATION COMMITTEE
March 19, 2018
In Attendance: Steven Kleinglass, Rebecca O’Donnell, Annette Dwyer, Al Churilla & Israel Gopstein; Scott Kissell, River Club Manager; David Lusty VCDD Liason, Steve Smith (Armstrong/Tectum)
1. Call to Order/Roll Call/Establish Quorum a. Meeting called to order March 19, 2018 at 11:00 am b. Quorum established
2. New Business:
A. Steve Smith presented reverberation calculations to committee & answered questions on how results were derived.
B. Steve Smith presented product options & locations of installations. C. Rebecca O’Donnell will work with another acoustical installer for alternative pricing for
next meeting. D. Next meetings established as April 2nd @ 10am and April 4th @ 10am.
3. Meeting adjourned at 1:20 pm
Respectfully submitted by Rebecca O’Donnell, Secretary
VENETIAN COMMUNITY DEVELOPMENT DISTRICT
VENETIAN RIVER CLUB
502 VENETO BOULEVARD
NORTH VENICE, FLORIDA 34275
FACILITIES ADVISORY COMMITTEE (FAC)
March 5, 2018
Attending Members: Carl Chorba, John Dabney, Scott Kissell, David Lusty (VCDD Liaison), Jim Allen, Jerry Flood
Resident Guests: Steven Kleinglass
Absent: Debbie Gericke, Boris Yoffe
Discussion Topics:
A. Call to Order: Chairman Mr. Dabney called the meeting to order at 9:00 A.M. He declared that a quorum was present. All parties
introduced themselves.
B. Additions or Deletions to the Agenda: Carl Chorba presented the following additions:
1. Overhead Fans in the Fitness Center
2. Outside Lighting at eastern corner of Fitness Center for nighttime use.
3. Replacement of water coolers in the Fitness Center with moving and installation of the regulation height water
fountain inside the center (a cost saving feature).
4. Landscaping at the River Club (See management report)
C. Approval of minutes from prior meetings: Carl Chorba, acting as Secretary for Boris Yoffe, asked if there were any changes to the
February 5, 2018 meeting minutes. There were none. The committee approved these minutes.
D. Old Business: Old Business:
1. Interior Design: Steve Kleinglass provided the following updates:
i. Two presentations by the bidders were made to the community on February 22nd. Ninety per cent of the
community comments were favorable on the overall project; ten per cent were unfavorable.
ii. The committee presented its recommendation for the Noller group bid to the VCCD at its February 26th
meeting.
iii. The committee’s work is 95 per cent complete but work is still needed to bring the overall project within the
budget guidelines. There are some outstanding issues on sound abatement, lighting, accessories and art work.
iv. On March 12th the committee will meet with Noller’s sound attenuation engineer
v. The Noller group will provide its final package within budget guidelines to the design committee which will be
sent to the VCDD for approval of the contract.
2. Outside signage updates: Scott indicated additional stand-alone signs with contact information for residents to register
complaints/concerns about resident and guest non-compliance of the rules are in place (see Pool Monitor).
3. Hiring of Pool Monitor: Scott indicated a person was hired and quit within a day to address non-compliance issues on
weekends. The most significant infractions are:
i. Beverage and food usage inside the four foot perimeter of the pool; and
ii. Reserving of chairs and chaises lounges with towels when no one is using them.
iii. Scott has considered one of the food runners serving this function but is exploring other options.
1. His goal is to have someone in place no later than the Spring Break.
iv. The committee felt that a large part of the problem was attributable to guests and part-time renters. The last
is particularly a concern with properties in foreclosure with constant turnover with renters of the individual
property. Scott was directed to ask the VCCD attorney whether there was any recourse by turning off the card
access privileges in these instances.
1. The new entry system (RFID vs. clickers now in place) is believed to also, partially, address this issue
as these renters will have to enter the community via the guest lane at the gate. Because they must
sign in we will have a record of who these renters are.
4. Fitness Center:
i. Overhead Fans: Scott reported an electrician is coming out to assess placement. Overhead fans will not work
because of the A/C operates in the facility. Two wall mounted 30” oscillating fans have been ordered and
should be in shortly. These fans will be mounted in opposite corners.
ii. Outside Lighting at Far Corner of Fitness Center: This area has no lighting when it is dark and people are exiting
the bath facilities or enjoying events. Scott has not had an opportunity to research this and will follow up.
iii. Move and Installation of Regulation Height Water Fountain to inside the Fitness Center: Scott said he needs to
follow up on progress. NOTE: After the meeting a work crew was in the process of moving the water cooler
from its current location outside the fitness center to inside the facility.
E. Management Report:
1. Landscaping at the River Club: Scott said there were many dead plants around the circle by the River Club. He is waiting
for the freezing weather period to be over and will attend to this by the end of March
F. VCDD Report: David echoed comments by Steve on the Interiors Committee work. No further updates were made.
G. New Business:
1. Paver Project Proposal for Outside Event Area: Scott presented two RFQ’s for consideration of this project by our
committee. This is a 40’ X 24’ area which abuts, outside, the smaller dining room (where we meet) and the main dining
room on the lawn where outdoor events such as weddings is held. He said this would provide additional outside seating
for tables and seats for up to 40 people. It would include a grill set up for food and a temporary bar location. Currently
the Club has 300+ reservations for outdoor events.
i. Scott recommended Paver Mac as the low bidder at $7,265 for the project.
ii. Not quoted – some landscape softening on side nearest to main dining room.
iii. The committee approved Scott to bring this proposal to the VCDD board.
iv. Scott was requested to provide a background report on the vendor as to quality and reputation.
2. Pool Patio Furniture: Steve indicated there were several lounge chairs in the back of the pool area where the fabric was
ripped along the rails as well as some of the fabric on chairs having darkened areas. Scott said four chairs were redone
this season and he will conduct another inventory on condition of the pool chairs.
3. River Walk: Jim said the steps to the deck area overlooking the Myakka had a sign posted “This area closed, Do not
proceed” nailed to the walkway which has been up for two weeks.
i. Jerry and Carl inspected the area, found the sign and called the number posted on the sign. It was the POA
office. They were informed the issue is with the railing surrounding deck (which used to be a kayak area) and
work is to be done either this week or the week of March 12th to fix the issue. Their inspection found that front
part of the deck was also lower than the back half.
4. Power Wash: Jim asked that the tower (main pool side) be power washed as it appears dirty. David indicted the
underside of the front portico also required cleaning. Scott will address these two areas.
H. Next meeting and Adjournment:
1. Next meeting April 2, 2018.
2. Adjourn @ 09:45 a.m.
Respectfully submitted by Carl Chorba acting for Boris Yoffe, Secretary
MEETING MINUTES
VENETIAN COMMUNITY DEVELOPMENT DISTRICT
Pool and Fitness Advisory Committee Meeting
February 19, 2018
Page 1 of 4
Members: Management:
Joy Wolf, Chair Scott Kissell, River Club Manager
Peggy Palmer, Co-chair Charlie Sandomenico, Director of Tennis and Fitness
Dick Foster, Secretary Harry Orenstein, VCDD Board
Gwen Mengel, Member
Tisha Washington, Member/absent
Mary Ann (Max) McGee, Member
Gus Mantia, Member/absent
Boris Yoffe, Member
1. Call to Order/ Roll Call/Establish Quorum
a. Meeting was called to order February 19, 2018 at 2:02pm.
b. Quorum was established.
c. Committee welcomed new member Boris Yoffe
2. Additions and Adjustments to Agenda
a. No changes to the meeting agenda.
3. Resident Input
No residents were present.
4. VCDD Board Update / Harry Orenstein
a. Community members have requested that the VCDD Board consider building a pickleball court at the
VGRC due to the popularity of the sport. Initial proposal is to place the courts on the golf course
property at the corner of Veneto Dr. and Pesaro Dr. Some residents express concern about the noise
level if built at this location. Mgr. Kissell presented an alternative location for two pickleball courts near
the tennis courts at the River Club. VCDD Board directed Mgr. Kissell to review options for locations near
the River Club. Pickleball can not be played on the existing clay tennis courts. Existing budget does not
include funds for this project.
b. Implementation of the new gate entry system is moving forward. Next major step is to place stickers
(tags) on bottom edge of passenger side mirror. Residents will be asked to park their vehicle(s) in their
driveway at a designated date and time, and VCDD representatives will place he stickers (tags) at that
time.
c. There are two proposed plans for renovation of the River Club. Meetings on February 22 will discuss the
two proposals and residents will be able to ask questions. Also, the concept drawings will be displayed
at the Community Association Annual Meeting on February 26.
d. As follow-up to committee’s request, Harry reported that the only way to terminate the Fitness on
Demand (FOD) contract is to pay all the remaining monthly fees. The FOD system was originally
purchased to provide free fitness class when the $4 fee for instructor-led fitness classes was
implemented in 2016. Some residents are using fitness DVD’s in the system. However, this does not take
full advantage of the FOD subscription-based classes. Currently, staff members must initiate the FOD
classes at the kiosk. Committee would like to have a “self-service” process for residents to select a FOD
class from a list of available classes. Mgr. Kissell and Mgr. Sandomenico agreed to arrange a conference
call with the FOD customer experience manager, Beth Kahny, at the March 19 committee meeting to
discuss options to simplify use of the system and for selection of classes appropriate for our residents.
MEETING MINUTES
VENETIAN COMMUNITY DEVELOPMENT DISTRICT
Pool and Fitness Advisory Committee Meeting
February 19, 2018
Page 2 of 4
5. Management Update / Scott Kissell and Charlie Sandomenico
a. Water fountain vs water cooler in Fitness Center
Mgr. Kissell reported that one of the water fountains in the hallway outside the exercise room
will be moved to inside the exercise room later this week. The bottled water system will be
removed once the current supply is depleted.
b. Solar lights by hot tub
Solar lights have been installed in the hot tube area.
Gwen reported that the hot tub has been running early in the morning with no one using it. Mgr.
Sandomenico will check the timer.
c. A new sign-up board will be installed at the lap pool this week.
d. Fitness for golfers
Mgr. Sandomenico with continue discussion with instructors and plans to add this new fitness
class in March.
e. Video on Demand; feasibility of early cancelation
See discussion in item 4a.
f. Update on Fit February promotion
There are daily drawings (Monday through Friday) for a $5 River Club gift certificate. The goal is
to encourage fitness activity. Residents simply show up for any fitness activity and register for the
drawings in the Tennis Shop.
New Fitness Café has been well received by residents.
Over 50 residents participated in the Bocce event in February. More Bocce events will be
scheduled.
Meditation Demo Day is scheduled for March 4 at 1:00pm.
g. Introduction to Yoga Class
Joy reported concern from a resident about the new “Introduction to Yoga” class. The first class
was full; some people could not fully participate because it was too crowded.
Mgr. Sandomenico said the first class was full at 16 participants. However, there were several
“walk-ins” and the instructor allowed them to observe the class, which is why everyone could not
fully participate.
Due to interest in the class, committee recommended that classes be scheduled more than just
once a month. Mgr. Sandomenico will look into scheduling the class once a week.
The goal of the class is to introduce residents to the basics of yoga to prepare them for the other
yoga classes currently on the schedule. Residents should not expect to continue participating in
the Introduction to Yoga class on an ongoing basis.
Committee recommended that Mgr. Sandomenico explain the goal of this class in emails and in
the fitness calendar. Also, instructors should explain the goal at the beginning of each class.
Mgr. Sandomenico will talk with instructors about the maximum number of “Intro” yoga classes
before residents move to the “regular” yoga classes.
h. Comments dropped in “comment box”
“Bottle water jug is empty.” Response: Water fountain will be moved into the exercise room.
“Provide a sports class (golf, tennis, etc.)” Response: This is under consideration; see 5d above.
“Music is too loud at the hula class.” Response: Mgr. Sandomenico will investigate.
MEETING MINUTES
VENETIAN COMMUNITY DEVELOPMENT DISTRICT
Pool and Fitness Advisory Committee Meeting
February 19, 2018
Page 3 of 4
“New equipment requested: barbells, weighted plates, and squat rack.” Response: These are not
in the master plan for the exercise room and not appropriate for most residents.
“Not enough room for two people to use new functional trainer at the same time.” Response:
Equipment layout is best for space available. No further action.
“New benches are too hard and too narrow.” Response: These are standard size benches
currently available. No further action.
“Add ceiling fans in the exercise room.” Response: Mgr. Kissell will get a cost estimate.
i. New bands and weights now available in the Aerobic studio. More weights will be purchased later.
j. Free weights and scales in the exercise room have been moved for improved usage.
k. New rower machine: Mgr. Kissell plans to submit request to VCDD Board for approval in March.
l. At committee next meeting we will review the exercise room master plan and review the River Club
reserve fund to determine if any equipment needs to be replaced or upgraded.
m. Monthly Kayaking outings are available to VGRC residents and neighboring communities. Trips are
coordinated by Above Board Paddle Company, 267-466-7111.
n. Closet in the aerobics room will be “overhauled.” Provide suggestions to Mgr. Sandomenico.
o. 115 unique users in paid fitness classes last week; 138 unique users during the same week in 2016,
when fitness classes were free. This decline is consistent for the past few months.
p. The new “20/20/20” and TRX fitness classes has been well attended.
q. Suggestions for new fitness classes.
Ballroom dancing class. Perhaps two groups that meet weekly. At completion, have a
competition among participants during a River Club dinner.
Dance aerobics class, which would be lower key than Zumba.
Getting started class on proper use of equipment in the exercise room.
Mgr. Sandomenico to investigate these suggestions.
6. Business Administration
a. Consideration of minutes from prior Committee meeting
A correction to the January 15, 2017 committee meeting minutes was made and minutes were
approved as amended.
7. New Business Requests and Comments
a. Review long-range plan for the Fitness Center
Discussion delayed.
b. Committee recommendations for use of the Welcome Center (if purchased by VCDD).
Following a lengthy discussion, the committee decided to continue the discussion at the next
committee meeting.
A summary of the ideas discussed:
o Move the exercise room and aerobics room to Welcome Center and expand the size
o Meeting space for VCDD, committees, POA, Community Association, etc.
o Game room
o Rent office space to outside groups to generate income
o Conduct survey of residents before any purchase is finalized
Concerns expressed:
o Cost to purchase and renovate the Welcome Center
MEETING MINUTES
VENETIAN COMMUNITY DEVELOPMENT DISTRICT
Pool and Fitness Advisory Committee Meeting
February 19, 2018
Page 4 of 4
o Cost to operate and maintain facility
o Fitness center would be separated from the pool area
c. Committee ideas for enhanced well-being offerings at the River Club; mind/body/community
The brainstorming session generated the following ideas for future consideration: Cooking class
with fitness/healthy eating theme; kayaking; hiking; fishing club; garden club; knitting club.
Series of fitness-related seminars. Fitness with bunions; alleviating chronic back pain, etc.
Perhaps work with the Community Association.
Exercise room equipment: best practices for use of equipment; beginners guide for which
equipment to use; recommended workouts.
o Mgr. Sandomenico recommended that it’s best for beginners to talk with personal
trainers
o Consider scheduling a monthly class about proper use of equipment. Residents would
signup as they do for fitness classes.
“Sit for Fit” class for less physically capable residents.
“Discover the Fountain of Youth” exercise class to encourage non-physical residents to get
physical.
Class to improve your balance.
Daily drawing for anyone who shows up for any 30-minute fitness activity. Prizes could be t-shirt,
water tumbler, free coffee, free personal training session, credit in the dining room, etc.
Establish a fitness goal and reward program with points assigned for each fitness activity.
Set a personal weight loss goal for one month. Prize for attaining the goal.
Set “step” goal of 10,000 steps each day for a month. Prize for everyone who meets the goal.
Offer a nutrition class.
d. March VCDD meeting representation
Peggy agreed to provide the committee report at the February 26, 2018 VCDD Board meeting.
9. Adjournment
Motion made and passed to adjourn at 3:50pm.