verbus systems quant international introduction.pptx
DESCRIPTION
Modular build solution for Student Accommodationa and Budget HotelsTRANSCRIPT
![Page 1: Verbus Systems Quant International Introduction.Pptx](https://reader034.vdocument.in/reader034/viewer/2022052518/5591d3181a28abac658b469c/html5/thumbnails/1.jpg)
Verbus Systems
![Page 2: Verbus Systems Quant International Introduction.Pptx](https://reader034.vdocument.in/reader034/viewer/2022052518/5591d3181a28abac658b469c/html5/thumbnails/2.jpg)
The Shareholders
![Page 3: Verbus Systems Quant International Introduction.Pptx](https://reader034.vdocument.in/reader034/viewer/2022052518/5591d3181a28abac658b469c/html5/thumbnails/3.jpg)
![Page 4: Verbus Systems Quant International Introduction.Pptx](https://reader034.vdocument.in/reader034/viewer/2022052518/5591d3181a28abac658b469c/html5/thumbnails/4.jpg)
![Page 5: Verbus Systems Quant International Introduction.Pptx](https://reader034.vdocument.in/reader034/viewer/2022052518/5591d3181a28abac658b469c/html5/thumbnails/5.jpg)
The basic Verbus module comprises a “shell” of high tensilecorrosion resistant steel components with composite wall,floor and roof structure that provides superior insulation forsound, thermal & fire performance.
![Page 6: Verbus Systems Quant International Introduction.Pptx](https://reader034.vdocument.in/reader034/viewer/2022052518/5591d3181a28abac658b469c/html5/thumbnails/6.jpg)
![Page 7: Verbus Systems Quant International Introduction.Pptx](https://reader034.vdocument.in/reader034/viewer/2022052518/5591d3181a28abac658b469c/html5/thumbnails/7.jpg)
![Page 8: Verbus Systems Quant International Introduction.Pptx](https://reader034.vdocument.in/reader034/viewer/2022052518/5591d3181a28abac658b469c/html5/thumbnails/8.jpg)
![Page 9: Verbus Systems Quant International Introduction.Pptx](https://reader034.vdocument.in/reader034/viewer/2022052518/5591d3181a28abac658b469c/html5/thumbnails/9.jpg)
![Page 10: Verbus Systems Quant International Introduction.Pptx](https://reader034.vdocument.in/reader034/viewer/2022052518/5591d3181a28abac658b469c/html5/thumbnails/10.jpg)
Typical Projects
![Page 11: Verbus Systems Quant International Introduction.Pptx](https://reader034.vdocument.in/reader034/viewer/2022052518/5591d3181a28abac658b469c/html5/thumbnails/11.jpg)
Travelodge Heathrow Central307 Bedroom budget hotel, opened 15th December 2008.
• Programme 30 % shorter vs other traditional bidders
• 181 modular units giving 307 bedrooms.
• 3 Principal types of bedroom • Shower Room• Family Room• Disabled Room
• Erection of the modules averaged 30 bedrooms/ day
• Building is 7 stories high
![Page 12: Verbus Systems Quant International Introduction.Pptx](https://reader034.vdocument.in/reader034/viewer/2022052518/5591d3181a28abac658b469c/html5/thumbnails/12.jpg)
Travelodge Heathrow Central307 Bedroom budget hotel, opened 15th December 2008.
• Cladding made up of Cedar, render panel and aluminium panel. Fastened to the Verbus Units using standard cladding connections
• Units mounted onto a steel frame , and connected back to steel frame stair and lift cores
• Major acoustic challenges on the project as the hotel sits under the flight path to Heathrow, no complaints have been received regarding acoustic performance
![Page 13: Verbus Systems Quant International Introduction.Pptx](https://reader034.vdocument.in/reader034/viewer/2022052518/5591d3181a28abac658b469c/html5/thumbnails/13.jpg)
Travelodge Uxbridge Central120 Bedroom budget hotel, opened 5th August 2008.
• 125 bedrooms using 81 modular units
• Average 24 bedrooms erected each day
• Site is next to the West London 24 hour bus garage therefore logistics were extremely challenging, but delivered without any issues
![Page 14: Verbus Systems Quant International Introduction.Pptx](https://reader034.vdocument.in/reader034/viewer/2022052518/5591d3181a28abac658b469c/html5/thumbnails/14.jpg)
Premier Inn Fleming Way Gatwick• Currently on site
• 210 bedrooms using 114 modular units
• 6 stories of Verbus units
• Program 50 weeks. The contractor believes this could be reduced to less than 40 weeks
![Page 15: Verbus Systems Quant International Introduction.Pptx](https://reader034.vdocument.in/reader034/viewer/2022052518/5591d3181a28abac658b469c/html5/thumbnails/15.jpg)
Premier Inn Citadel Way Hull
• 125 Bedrooms, in 75 Verbus modules
• Total development 13 stories
• Verbus units mounted on top of the steel frame car park
![Page 16: Verbus Systems Quant International Introduction.Pptx](https://reader034.vdocument.in/reader034/viewer/2022052518/5591d3181a28abac658b469c/html5/thumbnails/16.jpg)
> Significantly improved programme times compared to
traditional construction.> Improved project costs.
> Deliverable anywhere in the world.> Up to 16 stories achievable with a
standard module.> Reduced on site project and
commercial managementrequiror.
Significantly improved programme times compared to traditional construction.
On average 30 bedrooms erected per day
Improved project costs.
Deliverable anywhere in the world.
Up to 16 stories achievable with a standard module
Reduced on site project and commercial management required by Main Contractor.
Consistent Factory controlled Quality
Acoustic performance up to 30% better than Building Control requirements
Simple connection method for modules avoiding unnecessary complexity
Benefits of using Verbus
![Page 17: Verbus Systems Quant International Introduction.Pptx](https://reader034.vdocument.in/reader034/viewer/2022052518/5591d3181a28abac658b469c/html5/thumbnails/17.jpg)
> Significantly improved programme times compared to
traditional construction.> Improved project costs.
> Deliverable anywhere in the world.> Up to 16 stories achievable with a
standard module.> Reduced on site project and
commercial managementrequiror.
Budget Hotels
Student Accommodation
Key Worker Accommodation
Care Homes
Prisons
Key Market Areas