version oct 2015 - sks group co wll & structural :design, engineering and constr uction of...
TRANSCRIPT
SKSGROUP CO W.L.L.
Version Oct 2015
P.O. Box: 46122, Fahaheel – 64012, Kuwait.
Phone: +965 23912074 / 75 Fax: +965 23917767
www.sksgroup.net - [email protected]. 1
S/N Description Page #
1 Table of Content 2
2 An Overview 3
3 Specized Activities / Operations 4-5
4 Safety Award Certificate 6
5 Copy of ISO 9001 : 2008 Certificate 7
6 Quality Policy 8
7 KNPC / KOC Category Approval status 9-10
8 List of Clients 11-12
9 List of Equipments, Vehicle & Machinery 13-14
10 List of Ongoing & Completed projects 15-24
11 Contact us 25
2
An OverviewSKS Group Co. W.L.L. is a corporate entity, rendering engineering, procurement & construction,
industrial maintenance, specized services and trading activities for Oil & Gas and Power sector in .
Over the years the company has grown as a dependable EPC building its assets base, including
skilled human resources. SKS Group is accredited with ISO 9001:2000 QUality management.
SKS Group was established by Mr. S K Shamsudeen, Founder & Managing Director as proprietary
company in 1980. Since the beginning, SKS Group has been in the fore-front, providing turnkey
engineering, procurement and construction of electromechanical works for Oil & Gas and other
Industrial sectors. Some of SKS Group's major customers are –
Kuwait Oil KOC
Kuwait National Petroleum KNPC
Petrochemical Industries PIC
EQUATE Petrochemical EQUATE
Kuwait Gulf Oil KGOC
Ministry of Energy MEW / MOE
Ministry of Defense MOD
SKS Group offers a wide range of construction services from concept to commissioning. With a
flexible and adaptive approach, the company is able to provide total solution to their clients.
3
Specialized Activities/ Operations
Providing Turnkey contracting services to Owners, Government, Ministry and many other international EPC contractors & private sector in Project Engineering, Construction Maintenance of Refinery units, petrochemical plants, Power Plants, Distillation units etc including refurbishment, repair, revamp of rotary, static equipment, valves, Manpower on secondmend,etc.,
Engineering & Construction
Civil & Structural :Design, Engineering and construction of buildings, Excavations, foundations, tank dykes, pre-cast concrete, geographical surveys, consultancy and all type of civil worksMechanical, Piping &Tank Construction :Piping fabrication and erection structural fabrication & erection, Equipment vessels & tank fabrication, heavy lifts, Critical Rigging and Equipments erection, pipinginstallation, start-up assistance and commissioningElectrical &Instrumentation: Installation of substation transformers and cabling, installation, calibration and commissioning of DCS, analogue and pneumatic process instrumentation.
MaintenanceCivil Maintenance: Maintenance of Tank Farm, Roads, and Foundations.Mechanical Maintenance :Piping refurbishment, repair, revamp of rotary, static equipment, valves etc.,Electrical &Instrumentation Maintenance :Maintenance services of power distribution,
Cabling, HT Transformers, HT< motors actuators, Switch gear motor control centers etc.,
4
Specialized & Support ServicesScaffolding and Access Systems:
Consultancy, installation, rental and removal in accordance with BS 1136 for materials and BS 5973 for erected systems of all types of access scaffolding. Hiring of equipments and / or skilled scaffolders.Insulation, Refractory and Fire Proofing:
Supply and application of Thermal (hot & cold) insulation to boilers, Turbines, piping, machinery, ducting etc., Refractory, Fire retarding and fire proofing barriers, Acoustic insulation.Blasting & Painting:
Painting System Design based on process temperature, Surface preparation by Automatic steel Shop blasting, manual grit blasting and /or power brushing and needle gunning, paint or coating application using air sprays, airless spray, brush or roller application.Procurement and Trading:
Activities to serve the Oil and Power sector – extensive pipe fittings, valves MOV, HVL & armored Electrical Cables etc,
5
Quality Policy Statement
SKS Group as an EPC contracting company is committed to meetcustomer expectations of quality and delivery in the most effective waythrough continual improvement of business process performance while
implementing good environmental and safety practices
Safety, Health & Environmental policySKS Group is committed to providing a safe and healthy environment
to all employees, clients and public considering the environmentalimpacts of our operations, activities, products and services
SKS Group will establish an effective environment managementprogram to minimize the impact on the environmental aspects and
the people who work and live in that environment.
SKS Group will strive to improve continually its processes incompliance with relevant safety, health and environment laws,
regulations and other applicable requirements by establishing andmeeting environmental targets and objectives
All employees are expected to understand, promote, and assist in theimplementation of this policy and the associated principles. We all are
accountable for conforming with anddeploying our SHE value and principles.
8
SN Approval CategoryRef. & Date Approval Category Contract Work Description
1 V/C-C1416-10-1375L dated 18.04.2010
5 02 A102.TANKS FOR PETROLEM PRODUCTS (TANK CONSTRUCTION & REPAIR) A1 CONSTRUCTION STEEL AND ALLOY TANKS
4 02 A3
02.TANKS FOR PETROLEM PRODUCTS (TANK CONSTRUCTION & REPAIR) A3 PLATE WELDING ROOF REPLACEMENT AND RE-BOTTOMING FOR FIXED & FLOATING ROOF TANKS
2 V/C-C-1416-07-2100L dated 02.09.2007
4 05 A105. PLANT INSTALLATION & MAINTENANCE A1. Plant Installations and Integrated Project Execution including Civil, Mechanical, Electrical & Instrument works
5 05 A105. PLANT INSTALLATION & MAINTENANCE : A1. Plant Installations and Integrated Project Execution including Civil, Mechanical, Electrical & Instrument works
3 V/C-C1416-07-0384L dated 17.03.2007
4 09 A109. INDUSTRIAL COATING & PLATING : A1 - Sand Blasting & Painting (Garnet & Grit / Shot blasting and Painting)
5 09 A109. INDUSTRIAL COATING & PLATING : A1 - Sand Blasting & Painting (Garnet & Grit / Shot blasting and Painting)
4 16 A1 16. INDUSTRIAL INSULATION & REFRACTORY WORKS : A1 - Insulation and Metal Sheet Works
5 16 A1 16. INDUSTRIAL INSULATION & REFRACTORY WORKS : A1 - Insulation and Metal Sheet Works
4 V/C-C-1416-05-0391 dated 23.03.2005
1 03 A103 - PIPING, VALVES AND ASSOCIATED WORKS : Field and Site Pipe Welding and Erection works A1 : Steel Pipes (Carbon / Alloy)
2 03 A103 - PIPING, VALVES AND ASSOCIATED WORKS : Field and Site Pipe Welding and Erection works A1 : Steel Pipes (Carbon / Alloy)
4-1 V/C-C-1416-05-0391 dated 23.03.2005
1 03 A203 - PIPING, VALVES AND ASSOCIATED WORKS : Field and Site Pipe Welding and Erection works A2 : Shop Fabrication
2 03 A203 - PIPING, VALVES AND ASSOCIATED WORKS : Field and Site Pipe Welding and Erection works A2 : Shop Fabrication
9
SN Approval CategoryRef. & Date Approval Category Contract Work Description
4-2 V/C-C-1416-05-0391 dated 23.03.2005
1 05 A105. PLANT INSTALLATION & MAINTENANCE A1. Plant Installations and Integrated Project Execution including Civil, Mechanical, Electrical & Instrument works
2 05 A105. PLANT INSTALLATION & MAINTENANCE A1. Plant Installations and Integrated Project Execution including Civil, Mechanical, Electrical & Instrument works
3 05 A105. PLANT INSTALLATION & MAINTENANCE A1. Plant Installations and Integrated Project Execution including Civil, Mechanical, Electrical & Instrument works
5 V/C-C-301-04-0964/4 dated 16.06.2004
'6-7 03 A103 - PIPING, VALVES AND ASSOCIATED WORKS : Field and Site Pipe Welding and Erection works A1 : Steel Pipes (Carbon / Alloy)
'6-7 03 A2 03 - PIPING, VALVES AND ASSOCIATED WORKS : Field and Site Pipe Welding and Erection works A2 : Shop Fabrication
'6-7 05 A105. PLANT INSTALLATION & MAINTENANCE A1. Plant Installations and Integrated Project Execution including Civil, Mechanical, Electrical & Instrument works
6 March 09, 2003
'6-7 09 A1 09. INDUSTRIAL COATING & PAINTING : A1 - Sand Blasting & Painting (Garnet & Grit / Shot blasting and Painting)
'6-7 14 A5 14. REFINERY PLANT MAINTENANCE AND SERVICES : A5 -Scaffolding services
'6-7 16 A1 16. INDUSTRIAL INSULATION & REFRACTORY WORKS : A1 -Insulation and Metal Sheet Works
7 'February 23, 2003
6 09 A1 09. INDUSTRIAL COATING & PAINTING : A1 - Sand Blasting & Painting (Garnet & Grit / Shot blasting and Painting)
6 14 A5 14. REFINERY PLANT MAINTENANCE AND SERVICES : A5 -Scaffolding services
6 16 A1 16. INDUSTRIAL INSULATION & REFRACTORY WORKS : A1 -Insulation and Metal Sheet Works
8 KOC - FSK/OMA/06/FX/36157 dated 15 Mar 2006 4 C Plant Installation & Piping works
9 Tanks - Maintenance, Repair, Painting and Fiberglass Treatment to Tanks 1C Tank Maintenance and Repair Work
10Pre – Qualification of Specialized Companies for Repair and Roof Replacement of Fuel Tanks at MEW Power & Water Distillation Stations
MEW Repair and Roof Replacement of Fuel Tanks at MEW Power & Water Distillation Stations
10
S.N Government Clients
1 Kuwait National Petroleum Company(KNPC)
2 Kuwait Oil Company(KOC)
3 Saudi Arabian CheveronOperations (JO)
4 Gulf Oil Company – Joint Operations (KGOC)
5 Ministry of Electricity & Water(MEW)
6 Ministry of Public Works(MPW)
7 Ministry of Interior (MOI)
8 Ministry of Defense (MOD)
9 Ministry of Energy (MOE)
10 Petroleum Industries Company (PIC),Shuaiba
11 Kuwait Aviation Fuelling Company(KAFCO)
S.N International Clients
1 US Army, Arifjan (CIRCLEX Group)
2 BTEC Turbines Corp., USA
3 SK Engineering &ConstructionCompany (SKEC),KOREA
4 TORR CANADA Inc., CANADA
5 Hyundai Engineering & ConstructionCompany, KOREA
6 FFE Minerals India Ltd., INDIA
7 Hyundai Heavy Industries Co.,KOREA
8 Larsen & Toubro Ltd.,(ECC Division), INDIA
9 Human & Technologies Corp.,KOREA
10 Metalex Construction Industry Trading Co. Inc.,Turkey
11
S.N Local Clients
1Petroleum Coke Industries
Company,
2Alghanim Gen. Trading &
Contracting
3 Kuwait Catalyst Company (KCC)
4Kuwait Lube Oil Company
(KLOC)
5 Kharafi National Company
6 Consolidated Contractors Co.
7F & K Ibrahim Al- Shuwayer &
Partners
8 Khalid Ali Al Kharafi & Bros. Co.
S.N Local Clients
9 Kuwait Refinery Maintenance Co.
10SBC General Trading &Contracting Co.
11 Gulf Spic Contracting Co .W.L.L.
12Mechanical Engineering & Const. Co. (MECC)
13SAFWAN Petroleum Technology Co. W.L.L.
14Arab Information Management Services
15 Combined Group Contracting Co.
16 Al-Julaiah Petroleum Services Co.
12
S.N Description Range /Capacity Quantity Available
1 Welding Diesel / Tig / Plasma Cutting Machines
Various Range 95
2 Compressors 200CFM ~ 825CFM 25
3 Generators 5KVA – 100KVA 324 Special Machineries Various Range 295 Blasting & Painting Equipments Various Range 1206 Insulation, Refractory Equipments Various Range 28
7 Scaffolding materials with accessories Various Range / Size
~50,000 CuMeter
8 Pre Heating Units Various 4
9 Painting Automatic Blasting M/c Electrical Automatic 1
13
S.N Description Range /Capacity Quantity Available
1 Bus Various capacity 162 Pickup Various capacity 233 Cars Various capacity 184 Hydraulic Cranes 20 Ton – 160 Ton 35 Truck Various capacity 156 Fork Lifts 3 Ton - 8 Ton 37 Bobcat S130 1
14
S. N Project Title Location Scope of work Duration Client Status
1Procurement & Construction for Mechanical Projects with Associated Civil, Electrical & Instrumentation Works - CA 3903
Mina AhmadiRefinery
Mechanical, Civil, Electrical & Instrumentation 60 Month Kuwait National Petroleum
Co.Completion Jan
2017
2 Construction of 10 Nos Tanks for AGRP Project @ MAA Refinery
KNPC MAA Tank Construction 35 Month TecnimontCompletion Feb
2016
3 Kettle Replacement & Related Works KLOC Repair & Maintenance – Machinery Equipments 1 Month KLOC Completion Nov
2015
15
S. N Project Title LocationStart / End
DateBrief Scope Duration Client
Mechanical & General Projects
1 Installation of Air Intake System & Exhaust Stack for Al-Zour GTPS - MEW/L-00410 Al-Zour
Feb-2004 Heavy Haulage, Mechanical & Structural Erection, Stack & Air Intake - Ere action and Pre commissioning Works
8 Month
Ministry of Electricity & Water / Alghanim Intl. Sep-2004
2 Replacement of fresh water pumps at pump house No:2 - CA/PD/3616
Mina Ahmadi Refinery
Aug-2005 Civil, Structural & Mechanical Erection & Related Scaffolding, Piping, Electrical, Instrumentation &
Painting works
12 Month
Kuwait National Petroleum Co. / Alghanim Int'lSep-2006
3
Erection commissioning & start-up of modifications of existing ARD off-gas compressors C-48-051 & C-88-051 -CA/PD/3631
Mina Ahmadi Refinery
Jun-2006Mechanical erection , Electrical & Instrumentation,
Structural, painting, piping19
MonthKuwait National Petroleum
CompanyFeb-2008
4EPC For Provision of Electrostatic Precipitator in Fluid Catalyst Cracking Unit (FCCU) -CA/PD/3603
Mina Ahmadi Refinery
Aug-2005 Mechanical Erection , Civil, Electrical, Instrumentation, structural, painting, insulation, scaffolding & piping
12 Month
Kuwait National Petroleum Co. / Alghanim Int'lAug-2006
5Erection and site Installation of Acid Gas Incinerator, Tail Gas Incinerator and Flare Stack at EPF Site at North Kuwait.
GC - 24Feb-2008
Heavy Haulage, Alignment & Mechanical Erection & Pre commissioning.
1 Month
SAFWAN Petroleum Technologies Co.W.L.L.
Mar-2008
6Fire Hydrant, Civil, Electrical & Structural Works At POD Village ( US Army Arifjan Camp ) - W 912d1-06-C-0019
Arifjan Camp
Jun-2006Electrical, Civil, Fire Hydrant & Structural works 1
Month Circle X Group Kuwait.Jul-2006
7 Repair & Painting of CBM Buoys & Mooring Buoys Al-Zour
Jul-2008 Mechanical Refurbishment & Structural Repair & Hyghbuild Epoxy Painting works
4 Month Saudi Arabian Chevron Inc.
Nov-2008
8LM/0045 Supply,Installation,Commissioningand one year Maintenance of Paintbooth At KNPC Sabhan Depot Painting Work shop
KNPC -Local
Marketing -SabhanDepot
Jun-2010Supply,Installation,Commissioning and one year
Maintenance of Paintbooth6
Month KNPC - Local Marketing
Dec-2010
16
S. N Project Title Location Start / End Date Brief Scope Duration Client
Mechanical & General Projects
9CS-1983 -Refurnishing of Sea water system with other Associated works at Shuaiba refinery -SHUTDOWN WORKS
KNPC -Shuaiba Refinery
Apr-2011Fabrication, Piping, Scaffolding,NDT,Glass Flake
internal coating and painting works20 Days Kuwait National Petroleum Co
May-2011
10
Installation of Markers for Flow lines, Transit lines and other facilities in South, East, North and West Kuwait field areas
KOC Field Areas
Sep-2008Site Survey,Design,Drawing,procurement &
Installation of Pipe line Markers36 Month Kuwait Oil Company
Aug-2011
11
Procurement & Construction for Mechanical Projects with Associated Civil, Electrical & Instrumentation Works - CA 3527
Mina AhmadiRefinery
Jun-2005Mechanical, Civil, Electrical & Instrumentation 72 Month Kuwait National Petroleum Co.
/Alghanim int'lOct-2011
12Additional dry slop cooler for RMP & FUP units at MAA Refinery -CA/PD-3672
Mina AhmadiRefinery
Jul-2007Additional dry slop cooler 6 Month Kuwait National Petroleum
CompanyDec-2007
13 GSEC - NLTF Demolition Package (3) KNPC MAAJul-2011 Demolition of Pipe Line, Equipment 15, Steel
Structures and Tank Insulation removal 6 Month GSEC - KOREA
Dec-2011
14 Construction of 15 MT lube oil Purification Plant KLOC
Sep-2014 Plant Piping ( Supply, Fabrication & Installation) with Electrical works at New lube oil company 6 Month KLOC
Feb-2015
17
S. N Project Title LocationStart / End
DateBrief Scope Duration Client
Tank Projects
1 Provision of Side entry Mechanical Mixtures on Tank-61-620 & Tank-61-621 - CA/PD/3638
Mina Ahmadi Refinery
May-2006 Mechanical Erection & Related Piping, Electrical, Painting & Civil works
11Month
Kuwait National Petroleum Company Apr-2007
2 Project and Construction services Tank-00 2B repairs at MGC - JO/SC 18/MP0 JO, Wafra
Jul-2003 Tank Refurbishment, Total Roof Replacement, Mechanical, Piping, Elec. & Instrumentation, Painting
5 Month Joint Operations Wafra
Jan-2004
3 Project and construction services - MGC -Tank - 07 - JO/SC-106/SC-0017/MP # 770 JO, Wafra
Aug-2005Tank Refurbishment, Mechanical, Piping & Internal &
External Painting5
Month
Joint Operations / Combined Group Co. For
Trading & Contracting W.L.L.
Dec-2005
4Engineering, Procurement & construction of 1000 Cu.m,307 Cu.m & 100 Cu.m & Tank Farm
KLOC, MAB Industrial Area
Oct-2006Mech., Civil, Elec. & Inst, Scaff., Ins. & Painting works 5
MonthKuwait Lube Oil
CompanyMar-2007
5 Design,Supply,Fabrication,Installation of 500K Gallon Water Tank
Ali Al-Salem Air Base
May-2009 Engineering Procurement & Construction - Fabrication, Erection, Testing and Commissioning of Fresh Water
Tank
6 Month
Ministry Of Defense / PRIMEONE 1 Construction.Dec-2009
6 Modification and repair work - TK-61-821 Mina AhmadiRefinery
Dec-2007 Roof Repair, Structural Apprentuces replacement, Shell replacement, Bottom repair Scaffolding, Insulation &
Painting works11
Month
Kuwait National Petroleum Co. /
Alghanim Int'lNov-2008
7 JO-LV200/MM09 - Demolition of Tanks JO WafraJun-2010
Demolition of tanks - T-02J-03 & T04 at SUG Area 6 Month KGOC - SAC : JO Wafra
Dec-2010
8 Mechanical Modification of Tank 1100, TK,12,TK06 AT MGC Wafra
JO Wafra Oct-2009 Modification, Replacement of tank internal, Shell nozzle, bottom shell plate repair, Blasting & painting of piping &
internal, Hydro test and commissioning
18 Month KGOC - JO Wafra /CGC
Mar-2011
9 Installation of 2nos of Stiffner Rings at TK-34-051 Shuaiba
Jun-2012Installation of 2nos of Stiffner Rings at TK-34-051
4 Month
Kuwait National Petroleum Company
Oct-2012
10 Construction of 2 Tanks @ KNPC KNPC MAAMar-2012
Storage Tank Works-LPG Train-4 at MAA. 15 Month Daelim –KNPC
Jun-2013
11 SAC#345 for cleaning & Desludging of Tanks1 &16 SAC
Jun-2012Mechanical & Painting Works 23 Month Bin Nowiran(SAC)
April 2014
18
S. N Project Title Location Start / End Date Brief Scope Duration Client
Piping Projects
1 Extension works of sea water pipelines to Tank nos.950 & 951 - CA/PD/3626
Mina Ahmadi Refinery
Mar-2006 Mech.,Civil, Inst., piping, painting, struct. & Scaffolding 16 Month Kuwait National Petroleum
Company Jun-2007
2Replacement of 20" dia LSFO/HFO Filling system & 16" HFO pipe line -CA/PD/3563
Mina Ahmadi Refinery
Dec-2004Mechanical and Painting 18 Month Kuwait National Petroleum
Co. /Alghanim int'lJun-2006
3Providing Individual Bank Isolation Facilities for Air Coolers at Shuaiba Refinery - CS/PD/1768
Shuaiba Refinery
Dec-2005 Mech., Piping, Civil, Elect.&Inst., Painting, Struct., Insulation, Scaff., & Tie-in works 8 Month Kuwait National Petroleum
CompanyAug-2006
4 Segregation of HP Condensate Headers from IP & LP Headers - CB/1208
Mina Abdulla Refinery
May-2006 Mech.,Piping, Painting, Inst., Insulation, Scaff., & Tie-in works 6 Month Kuwait National Petroleum
CompanyDec-2006
5 Enhanced (42 MBPD) VRSD Spiking into MAA ARDR for MAB - CA/PD/3520
Mina Ahmadi Refinery
May-2004 Mechanical, Piping, Electrical, Instrumentation & Painting 15 Month Kuwait National Petroleum
Co. / TGM GTCAug-2005
6Provision of Manpower and equipment for GC-15 stream outlet lines for KOC -KOC 21109
GC-15Mar-2004
Manpower supply for piping work 12 MonthKuwait Oil Company /
Ahmed Ghuloom Redha Ashkanani Co., W.L.L.Mar-2005
7 Eocene Upgrade project for joint operations - JO/SC19/MP03 JO, Wafra
Oct-2003Mechanical, Piping, Painting & Insulation 4 Month
Joint Operations / F & K Ibrahim Al-Shuwayer &
Partners GTCJun-2004
8 Mechanical Shut Down Works @ Various GC's
8 GC's (Burgan / Magwa)
Jun-2009 Mechanical Piping, Fabrication, Replacement of MOV & ESVD 5 Month Mushrif Construction Co.
KSCCNov-2009
9 Piping works at GC-24 GC - 24 (North Kuwait)
Nov-2008Piping Prefabrication and Welding 6 Month Gulf Spic/SKEC/KOC
Feb-2009
19
S. N Project Title Location Start / End Date Brief Scope Duration Client
Piping Projects
10 Replacement of ERW Pipes at Unit-08 /05/ 10 , Shuaiba Refinery Shuaiba Refinery
Apr-2007Mechanical Piping shutdown works 1
MonthKuwait National Petroleum
Co. / KREMENCOMay-2007
11 Replacement of ERW Pipes at Unit-7A, Shuaiba Refinery Shuaiba Refinery
Feb-2008 Fabrication, Piping, Scaffolding & Insulation works
45 Days
Kuwait National Petroleum Co. / KREMENCOMar-2008
12Mechanical Works for Utilities & Associated systems for Petroleum Coke Calcinations Plant Project, PCIC, Shuaiba
PCIC, Shuaiba Authority Area
Sep-2007Mechanical, Piping, Civil, Insulation, Painting,
Scaffolding & Structural works12
MonthHuman & Technologies
Corporation, KoreaAug-2008
13 Removal of Redundant line at MAA refinery for KOC
MAA Refinery area (KOC property)
July-2005 Draining , Gas freeing , Excavation and Removal of Redundant line and reinstatement
of earth and construction of Valve Pits.
8 Month Alganim / KOC
Mar-2006
14Piping, Pipeline, Civil and other misc. works inside MAA Refinery - NDP -KAFCO
Mina Ahmadi Refinery
Dec-2007 Underground & above Ground Piping Works & Civil Works
4 Month Larsen & Toubro Limited
Mar-2008
15Replacement of convection section tubes of Hydrogen Heaters H-02-01 &H-62-01 in SHU Refinery
Shuaiba RefineryJun-2009 Super Heated Steam Pipe and Conventional
Tube replacement, Piping & Erection, Scaffolding works
10 Month
Kuwait National Petroleum CompanyApr-2010
16Install Blinds on unused pipelines at Amm.III / New instrument Air Compressor C-901 A
PIC-ShuaibaSep-2007
Fabrication,Pipings works 1 Month
Petrochemical Industries Company – KuwaitSep-2007
17 Piping Works at SabiyaCombined Cycle Gas Turbine Project (CCGT) at SUBIYA
SABIYA - NORTH KUWAIT
Dec-2010Fabrication, Piping, Scaffolding,NDT,Works 6
MonthKuwait National Petroleum
Co. /Alghanim int'lMay-2011
18 Field Installation of A/G Piping works at ISBL area KNPC MAA
Mar-2013Field Installation of A/G Piping works 10
Month DAELIM - KNPCDec-2013
20
S. N Project Title Location Start / End Date Brief Scope Duration Client
Industrial Surface Coating & Lining / Painting & Insulation Projects
1KOC Crude Export Facilities Piping works at NPP & MS, STF Area - Internal & External Paint works, KOC
KOC North Tank Farm Area
Jan-2007 Surface preparation Internal Blasting & Painting And Application of Heat Shrinking
Sleeves & Ultra High Built Epoxy works
8 Month
Hyundai Heavy Industries Co. Ltd. / Mechanical
Engg. & Cont. Co.W.L.L.Aug-2007
2FMP Blasting and Painting of Steel Structure as per KOC Specification (3 Phases)
MAB YARDJan-2007 Surface preparation, Blasting & Painting
works 7 Month SK Engg. & Const. Co.Ltd., KuwaitJul-2007
3 Blasting & Painting External, Internal & Cut Back Spools
KOC Crude Export Facility NORTH &
SOUTH TANK FARM Area
Mar-2007Surface preparation, Blasting & Painting
works4
MonthMechanical Engg. & Cont.
Co.W.L.L., KuwaitJun-2007
4Painting works for Utilities & Associated systems for Petroleum Coke Calcinations Plant Project, PCIC, Shuaiba
PCIC, Shuaiba Authority Area
Jan-2007Painting & Civil Works 6
MonthHuman & Technologies
Corporation, KoreaJul-2007
5 Tank Painting Works
KOC Crude Export Facility North &
South Tank Farm Area
Sep-2007Surface preparation, Blasting & Painting
works for Mega Tanks: Internal and External8
MonthKuwait Oil Company /
Hyundai Heavy IndustriesMay-2008
6 Surface Preparation & Painting Works with KPPC Equate
Jul-2007 Surface preparation, Blasting & Painting works
22 Month
SBC General Trading & Contracting. Co. - KPPC,
KuwaitMay-2009
7 Painting works for structural steel GC - 11Dec-2008 Surface preparation, Blasting, Painting and
scaffolding works4
MonthSK Engg. & Const. Co.Ltd.,
KuwaitMar-2009
8 KOC-42375 - HBE Coating for Pipes KOC South, East Area
Apr-2010 Wrapping Tape removal.insitu Blasting & External Coating with HBE(Interzone
485)inside KOC South and East Kuwait
21 Month
Kuwait Oil Company /ArabiEntertech
Dec-2011
21
S. N Project Title Location Start / End Date Brief Scope Duration Client
Industrial Surface Coating & Lining / Painting & Insulation Projects
9 JOHC092FEB09-Wafra Trunk lines Replacement at JO Wafra JO Wafra
Jan-2011External Painting works in 20inch Pipe 2
MonthKGOC - JO Wafra /F&K
Ibrahim Al-Shuwayer Mar-2011
10 Blasting & Painting KOCFeb-2008
Blasting & Painting of Pipes & Spools 6 Month Metalex /KOC
Apr-2008
11 Blasting & Painting for pipe spools KOC
Mar-2007
Blasting & Painting of Pipes & Spools 5 Month National Kharafi
Jul-2007
12 Contract No :42153 - Installation of Flow line and Associated works in SEK area SEK Area -Kuwait
Jan-2010 Blasting (External & Internal) application, Internal epoxy lining & external Highbuld
epoxy
34 Month MECC / KOC
Oct-2012
13 Spool Pipes Painting of work MABSep-2012
Spool Pipes painting work 10 Month Daelim -KNPC
July-2013
14 JO-SC-214-CD-008- Project and Construction Services JO Wafra
Feb-2010 Blasting ,External & Internal Painting, wrapping and insulation
61 Month KGOC - JO Wafra /CGC
Feb-2015
15 Painting (SMP-1) Works North LPG Tank Project KNPC MAA
May-2013Painting Works 24
Month GS EngineeringApr-2015
22
S. N Project Title Location Start / End Date Brief Scope Duration Client
Industrial Insulation
1 Insulation & HVAC Ducting works at Symphony
Symphony Complex
Mar-2011Insulation and HVAC Ducting works 6 Month National Kharafi
Sep-2011
2 Piping & Equipment Insulation works KOC - FUPApr-2007
Insulation works in Piping and Equipment 5 Month National KharafiSep-2007
3 Carry out Insulation and Fire proofing Work Shuaiba Refinery
Sep-2008 Carry out Installation and Fire proofing Work 1 Month ABJ Engineering
Oct-2008
4
Installation of Aluminum Cladding Works for all insulated Ducts & Chilled water Pipes at the roof of Entertainment and Market Building
Al-Khot –Fahaheel
Jul-2004
Insulation & Cladding 4 Month The National Company
Oct-2004
5 KOC EPF 120 MBOPD KOC North Kuwait
Jun-2010 Supply and Installation of insulation,Clading and Metallic materials -
TK-310 & TK-4003 Month Processes Unlimited / KOC
Aug-2010
6 HEISCO- HFO Thermal Insulation HEISCO
May-2010
Insulation & Cladding for HFO 1 Month HEISO
Jun-2010
23
S. N Project Title Location Start / End Date Brief Scope Duration Client
Manpower Supply
1 Supply of Technical Manpower to H & TC PCIC, Shuaiba
Feb-2007Manpower supply 9
MonthHuman & Technologies
Corporation, KoreaOct-2007
2 Supply of Technical Manpower to PCIC PCIC, ShuaibaFeb-2007
Manpower supply 8 Month
Petroleum Coke Industries Company , KuwaitSep-2007
3 Supply of Certified Welders KNPC Shuaiba KNPC Shuaiba
Nov-2006Manpower supply 3
MonthKNPC Shuiba engineering
MaintenanceJan-2007
4Service & Maintenance of Electrical equipments in 6th Brigade, KOC, Abdely, North Kuwait
KOC, AbdelyDec-2004
Maintenance works 32 Month
Military Engineering Projects, Ministry of Defense, KuwaitJul-2007
5 Supply of Shutdown Crew to KOC Area KOC GC 09Feb-2008
Shutdown works to TVS Project 3 Month HEISCO
Apr-2008
6 Manpower Supply to EPC for Proves ion Of ESP in FCC Unit @ MAA Refinery CA/PD/3603
Aug-2005Specified Manpower Supply 5
Month AGITC / MAADec-2005
7 Supply of Shutdown Mechanical Crew KOC Area KOC GC 28
Feb-2009Shutdown works & Emergency Tie Ins 45
Days GulfspicMar-2009
8 Providing Services to KOC Jurassic Wells at North Kuwait KOC North Kuwait
Mar-2010Supply of Technical Manpower & Vehicles 11
Month Kuwait Oil CompanyFeb-2011
9Provision of Specialized Technical manpower for Border Security Sector, Kuwait
MOIApr-2007
Specialized Manpower supply 48 Month
Ministry of Interior (MOI), Kuwait. / AIMS.Sep-2011
10 PCIC Annual Maintenance Manpower Supply Shuaiba
May-2011 Specialized, Skilled and Semi Skilled Manpower Supply
24 Month PCIC
April-2013
24
E.mail:[email protected] www.sksgroup.net Phone: +965 23912074 / 75 Fax: +965 23917767 P.O. Box: 46122, Fahaheel – 64012, Kuwait