victoria embankment display board
TRANSCRIPT
8/3/2019 Victoria Embankment display board
http://slidepdf.com/reader/full/victoria-embankment-display-board 1/1
www.thamestunnelconsultation.co.uk
Victoria Embankment
Victoria
Embankment
Gardens
Golden JubileeFootbridges
C h a r i n g C r o s s
S t a t i o n
S t r a
n d
V i c
t o r i a
E m
b a n
k m e n
t
N o r t h u m b e r l a n d Av e n u e HungerfordBridge
Low LevelSewer No.1
RegentStreet CSO
NorthumberlandStreet CSO
N
CITY OF WESTMINSTER
LAMBETH
Local authorityboundary
Draft limit of land tobe acquired or used
Proposed tunnelroute – centreline
Existing sewer
Existing CSO
Location plan
Jack up bargeservicing pilingoperations
Two waytraffic
Initial closure of westboundcarriageway (advance
works only – diversion of underground utilities)
TattershallCastle to berelocated
Possible location of permanently relocatedTattershall Castle
Westbound carriagewaypartly re-opened on
completion of advance works,part closed for site access
Barge
N
Maximum extentof construction sitefor phase 1
Site hoarding/traffic barrier
Cofferdam
Local authorityboundary
Site support/welfare
Traffic lane coned off for site access
Site access
Existing Thames Path
Thames Path diversion
CITY OF WESTMINSTER
LAMBETH
Phase one construction plan Phases two and three construction plan
N
Option for contractorto transport materials
using barges
Cranes
Drop shaft
Maximum extent of construction site forphases 2 and 3
Site hoarding/traffic barrier
Cofferdam
Local authority boundary
Site support/welfare
Excavated materialstorage and processing
Maintenance workshopand storage
Internal site road
Traffic lane coned off for site access
Site access
Existing Thames Path
Thames Path diversion
CITY OF WESTMINSTER
LAMBETH
Possible location of permanently relocated
Tattershall Castle
Aerial view of the completed works
Viewing platformsalong southern edge
Ramps providestep free access toviewing platformGranite paving
Stone clad electricaland control kiosks
Central section of canopy removable formaintenance access
Canopy plantedwith jasmine
New Regent StreetCSO outlet
Ventilation columns
Access hatches withbrass inlay panels
Replacementtree planting
Raised viewing platformwith balustrade edgeprotection and stoneseating
V i c t o
r i a E
m b
a n k
m e n t
N
Layout of the site once construction works complete
[Tames Water to provide plan]
N
Option for contractorto transport materials
using barges
Cranes
Drop shaft
Maximum extent of construction site for
phase 4
Site hoarding/traffic barrier
Cofferdam
Local authorityboundary
Site support/welfare
Excavated materialstorage and processing
Maintenanceworkshop and storage
Internal site road
Traffic lane coned off for site access
Site access
Existing Thames Path
Thames Path diversion
CITY OF WESTMINSTER
LAMBETH
Possible location of permanently relocated
Tattershall Castle
Phase four construction plan