villa savoye joseph bloom

14
Scale Project number Date Drawn by Checked by ABBREVIATIONS MATERIAL LEGEND SYMBOL LEGEND 10 A100 4 2 3 1 A100 1 A100 A100 1 1 1 101 2 2 1 U1 CABINET UNIT HEATER CERAMIC TILE DEMOLISH, DEMOLITION DUPLEX RECEPTACLE DOUBLE HUNG DOUBLE-ACTING ELECTRICAL PANELBOARD ENCLOSE (URE) ELECTRIC (AL) EACH WAY EACH FACE EXPANSION, EXPOSED EXPANSION JOINT EXPANSION BOLT ELECTRIC WATER COOLER FIRE EXTINGUISHER FIRE HOSE CABINET FIRE HOSE STATION FIRE HYDRANT FINISHED FLOOR FLUID APPLIED WATERPROOFING FIRE EXTINGUISHER CABINET FACE OF CONCRETE FLUORESCENT FACE OF FINISH FIRE-RESISTANT COATING CEMENTITIOUS BOARD FIBER REINFORCED FACE OF STUD FEET PER MINUTE FRAME (D) (ING) FACE OF MASONRY FEMININE NAPKIN RECEPTACLE FLEXIBLE SHEET ROOFING FIRE STAND PIPELINE FINNED TUBE RADIATION FURRED (ING) FIRE-RETARDANT GENERAL CONTRACT (OR) FOC CL CENTER LINE CSK COUNTER SINK(SUNK) CASEMENT CAST STONE CS CSMT GC GB GRAB BAR CEMENT PLASTER (PORTLAND) CONCRETE MASONRY UNIT CONTINUOUS or CONTINUE COMPRESS (ED,ION,IBLE) COPPER CARPET CORRIDOR COORDINATE CONCRETE CONNECTION CONTRACT (OR) CONSTRUCTION CARPET TILE CORR CPR CONT CONTR CONC CONN CONST COORD CPTT CPT CEILING COLUMN CLEAN CLEANOUT COMBINATION CLEAR (ANCE) CONTRACT LIMIT LINE CLG CO COL CLN CLR CLL COMB COMP CMPL CMU FSP FRT FTG FUT FUR FTR FT FSR GA FOOTING FUTURE FOOT, FEET GAGE, GAUGE FOF FPM FPL FOS FP FRCB FRC FR FOM FLOOR PLATE FIREPROOF FASTEN (ER) FAS BRICK BRK CATCH BASIN, CORNER BEAD CUBIC FEET PER MINUTE CAST IN PLACE CONCRETE CUBIC FOOT (FEET) COUNTERFLASHING CIRCLE CAST IRON CONTROL JOINT CIRCUMFERENCE CEILING HEIGHT CORNER GUARD CF CFM CFLG CI CIR CH CJT CIRC CIPC CG CEMENT CABINET COURSE BOTH WAYS BASEMENT BOTH SIDES BUILT-UP ROOFING BRITISH THERMAL UNIT BW BS BTU BSMT BUR C CAB CB CEM FHS FIN FHC FLUR FNR FLX FLG FL FJT FIXT FINISH (ED) FLASHING FLEXIBLE FLUSH JOINT FLOOR (ING) FIXTURE FBD FAWP FD FB FDN FEC FE FF FGL FH FACE BRICK FIBERBOARD FLOOR DRAIN FOUNDATION FIBERGLASS BIT,BITUM BITUMINOUS BUILDING BLOCK BLOCKING BOTTOM OF CURB BENCH MARK BACKER ROD BEARING BEARING PLATE BOTTOM BM BLK BOC BLDG BLKG BKR BPL BRG BOT BOARD AVENUE BETWEEN BELOW AUTOMATIC AMERICAN SOCIETY BRICK COURSE ABOVE TOP OF SLAB for TESTING MATERIALS BD AVE BC ATS AUTO ASTM BET BEL EXISTING EXIST EXPN BLT EXH EXP EXIST EXT EXP JT FA F EXHAUST EXISTING EXTERIOR FIRE ALARM FAHRENHEIT ELEC ELEV EMER ENC EQPT EQ EP EST EWEF EWC EQUAL ESTIMATE ELEVATOR EMERGENCY EQUIPMENT ABOVE FINISHED FLOOR AGG AGGREGATE ANODIZED ASPHALT ALUMINUM ASSEMBLY ANNEALED ACCESS PANEL ARCHITECT (URAL) APPROXIMATE ANCHOR, ANCHORAGE ALTERNATE AL AP ANC ASPH ASSEM ANOD ARCH ANLD APPROX ALT ACCESS ACCESS FLOOR ACOUSTICAL PLASTER AREA DRAIN ADJACENT ADDENDUM ADJUSTABLE ARCHITECT/ENGINEER ACOUSTIC CEILING TILE ACC ACPL ACFL AD ADD ADJ AFF A/E ADJT ACT DIMENSION DIM DR DWG DTL EA EF E ELAS EL DN DRAWING DETAIL EACH EAST ELEVATION ELASTOMERIC EACH FACE DOWN CY D DIFF DIAG DEP DH DIA DEM DA DRAIN CUBIC YARD DIFFUSER DIAMETER DIAGONAL DEPRESSED ABOVE ACOUSTICAL ANCHOR BOLT AIR CONDITIONING ABV AC AB A/C CT CTR CUH CW COUNTER COLD WATER WC WATER CLOSET RAILING RLG METER (S) M WATERPROOF (ING), WATER RESISTANT WEATHERSTRIPPING WELDED WIRE FABRIC EXISTING TO REMAIN WATER REPELLANT SCHED SHTHG METAL MULLION METAL STUD MTL MULL MTL ST SM SNT SP MARBLE MEMBRANE MODULAR MEDIUM MEMBER MAXIMUM MASONRY MANHOLE MIRROR MINIMUM MECHANIC (AL) MACHINE BOLT METAL FLOOR DECK MISCELLANEOUS METAL FURRING MOUNT (ED) (ING) MANUFACTURE (R) MOLDING, MOULDING METAL ROOF DECK MASONRY OPENING MH MO MLDG MFR MISC MIR MRD MIN MTFR MT MAR MB MEMB MECH MDL MBR MAX MFD MED MAS SF SIM SKYLT SFGL SHT SECT SD SLV SLR RM S SC SCRN RTN RWC R/W RO SHEET METAL SOUND PROOF SEALANT SHEATHING SQUARE FOOT (FEET) SAFETY GLASS STORM DRAIN SIMILAR SKYLIGHT SHEET SECTION SLEEVE SEALER SCHEDULE SOILD CORE RAIN WATER CONDUCTOR RIGHT OF WAY ROUGH OPENING ROOM SOUTH SCREEN RETURN WR W/R WSCT WWF WST XTR WAINSCOTT WD WH WIN WP WM W/O WPT WGL WOOD WIRE MESH WALL HUNG WINDOW (S) WITHOUT WEATHERPROOF WORKING POINT WIRED GLASS STAINLESS STEEL TOP AND BOTTOM TONGUE AND GROOVE TERNE COATED STAINLESS TEMPORARY, TEMPERED TRAFFIC DECK COATING TOP OF EXISTING SLAB TOP OF ROOFING TOP OF CONCRETE, CURB TOILET TISSUE DISPENSER TOILET PAPER HOLDER TOP OF STEEL/ TOP OF SLAB VINYL COVE BASE VINYL COMPOSITION TILE VAPOR BARRIER, VINYL VAPOR RETARDER UNLESS OTHERWISE NOTED VINYL WALL FABRIC PLYWD R KD KNOCK-DOWN KILOVOLT KILOWATT KITCHEN LIMESTONE LOCATION LIVE LOAD LAVATORY LENGTH LABEL LINTEL LIGHT LOUVER LABORATORY LEFT HAND KILOVOLT-AMPERE LIGHT SWITCH LIGHTWEIGHT CONCRETE LIGHTPROOF, LOW POINT LL LOC LMS LTL LT LWC LVR LSW LP KW KV KIT KVA L LH LAB LBL LAV REG REINF REM RES REV RFG RFL RGD RH REQD RCB RAD RB RBT RC REF RECP REC RCP RD HEIGHT HEATING INVERT INTERIOR JOIST JOINT HARDWOOD INSIDE DIAMETER JOINT FILLER IRON PIPE SIZE JUNCTION BOX INCLUDE (D) (ING) INSULATE (D) (ION) HOT WATER, HEADWALL HEATING/VENTILATING/ AIR CONDITIONING KIPS (1000 LBS) INT INV J IPS JB JF K JT HT HW ID HVAC HTG HWD INSUL INCL PTD PVT PTN PVMT PVC PTH "R" QT PRF PLAS PLF PNL PNT PL PLAM PSI PSF VARNISH VAR RADIUS, RISER REINFORCED CONCRETE PIPE REINFORCE (D) (ING) REVISION (S), REVISED REFLECT (ED) (IVE) RIGHT HAND REGISTER REMOVED RESILIENT ROOFING RIGID REQUIRED RUBBER BASE-STRAIGHT REINFORCED CONCRETE RUBBER COVE BASE RABBET, REBATE REFERENCE RECESSED RECEPTACLE ROOF DRAIN RADIATOR VR VJT VNR VT W VWF W/ WB VRM VENEER V-JOINT (ED) VINYL TILE WOOD BASE WITH WEST VERMICULITE VC VB VCT VCB VERT VEST VIF VG VIN VESTIBULE VINYL VERTICAL BASE-STRAIGHT VINYL COATED VERTICAL GRAIN VERIFY IN FIELD POUNDS PER SQUARE FOOT POUNDS PER SQUARE INCH PAPER TOWEL DISPENSER PAVER TILE PAVEMENT POLY VINYL CHLORIDE PAPER TOWEL HOLDER THERMAL RESISTANCE QUARRY TILE PARTITION PAINT (ED) IN FIELD PREFORMED PLASTIC LAMINATE POUNDS PER LINEAL FOOT PLASTER PLYWOOD PANEL PLATE TPH TYP TTD UNF UC UNEX VAC UON UNFINISHED UNDERCUT TYPICAL UNEXCAVATED VACUUM TOES TOR TO TOP TOF TOC TOL THRU TOW TOS TOLERANCE THROUGH TOP OF TOP OF PLANK TOP OF FOOTING TOP OF WALL HARDENED GROUT GRANITE HARDWARE HOUR GRILLE GLASS FIBER GALVANIZED GLAZING COMPOUND HOSE BIBB HORIZONTAL HEAD JOINT HEAVY DUTY HIGH POINT HOLLOW METAL HOLLOW CORE HARDBOARD GLAZED STRUCTURAL TILE GALVANIZED STEEL SHEET GYPSUM WALL BOARD HARDN HB HD HC HM HR HP HOR HJT HDW HBD GLF GLV GLCOM GT GWB GST GSS GRN GRL OPNG OPP PER PRKG PCC PCF PCP PED PAR PBD NOM NRC OA OC OD OFF OH NTS GASKET (ED) GRADE, GRADING GLASS BLOCK GLASS, GLAZING GD GL GKT GLB N NIC N0,# NAT OPENING PERIMETER PRECAST CONCRETE PARTICLE BOARD POUNDS PER CUBIC FOOT PRECAST CONCRETE PLANK OPPOSITE PARKING PEDESTAL PARALLEL COEFFICIENT NOISE REDUCTION OVERHEAD OUTSIDE DIAMETER ON CENTER (S) NOT TO SCALE NOMINAL OVERALL OFFICE T & B TB TEMP TCS T&G TDC TEL THK THRESH TC THRESHOLD TELEPHONE STEEL TEST BORING THICK (NESS) TERRA COTTA STR STL SURF T TAP SYS SYN SYM SUSP STEEL SURFACE STRUCTURAL SYNTHETIC SYSTEM TREAD TAPERED SYMMETRY (ICAL) SUSPENDED NOT IN CONTRACT NUMBER NATURAL NORTH SPEC SQ SST STD STANDARD SQUARE SPECIFICATION COLUMN LINE ALUMINUM ENLARGED DETAIL PLAN OR SECTION NEW (PROPOSED) ELEVATION EXISTING ELEVATION INTERIOR ELEVATION MARK NORTH REVISION PARTITION TYPE ROOM NUMBER WINDOW TYPE DOOR TYPE WALL OR DETAIL SECTION BUILDING SECTION ELEVATION GYPSUM WALLBOARD CERAMIC OR QUARRY TILE STEEL MARBLE, GRANITE PLYWOOD RIGID INSULATION BLUSTONE FLAGGING SOAP STONE (GRAVEL, STONE) POROUS FILL SLATE RUBBLE STONE EARTH BATT INSULATION SHIM WOOD, ROUGH CONCRETE CMU BRICK WOOD, FINISHED LOCATION MAP DRAWING LIST Villa Savoye 82 Rue de Villiers 78300 Poissy, France 12" = 1'-0" 4/23/2013 3:04:35 PM A000 Cover Sheet Project Number Villa Savoye Joseph Bloom 4/25/2013 Author Checker No. Description Date A000 Cover Sheet A001 Site Plan A100 Ground Floor A101 First Floor A102 Solarium A201 Elevations A202 Elevations A301 Building Sections A302 Building Sections A501 Stair Detail A502 Exploded Views A600 Schedules A901 Perspective Views A902 Section Perspective

Upload: dinesh-ramamoorthy-r

Post on 10-Nov-2015

67 views

Category:

Documents


5 download

DESCRIPTION

villa savoye

TRANSCRIPT

  • Scale

    Project number

    Date

    Drawn by

    Checked by

    ABBREVIATIONSMATERIAL LEGENDSYMBOL LEGEND

    10

    A100

    4 2

    3

    1

    A100

    1

    A100

    A100

    1

    1

    1

    101

    2

    2

    1

    U1

    CABINET UNIT HEATER

    CERAMIC TILE

    DEMOLISH, DEMOLITION

    DUPLEX RECEPTACLE

    DOUBLE HUNG

    DOUBLE-ACTING

    ELECTRICAL PANELBOARDENCLOSE (URE)

    ELECTRIC (AL)

    EACH WAY EACH FACE

    EXPANSION, EXPOSEDEXPANSION JOINTEXPANSION BOLT

    ELECTRIC WATER COOLER

    FIRE EXTINGUISHER

    FIRE HOSE CABINETFIRE HOSE STATION

    FIRE HYDRANT

    FINISHED FLOOR

    FLUID APPLIED WATERPROOFING

    FIRE EXTINGUISHER CABINET

    FACE OF CONCRETE

    FLUORESCENT

    FACE OF FINISH

    FIRE-RESISTANT COATING

    CEMENTITIOUS BOARDFIBER REINFORCED

    FACE OF STUD

    FEET PER MINUTEFRAME (D) (ING)

    FACE OF MASONRY

    FEMININE NAPKIN RECEPTACLE

    FLEXIBLE SHEET ROOFINGFIRE STAND PIPELINE

    FINNED TUBE RADIATIONFURRED (ING)

    FIRE-RETARDANT

    GENERAL CONTRACT (OR)

    FOCCL CENTER LINE

    CSK COUNTER SINK(SUNK)

    CASEMENTCAST STONECS

    CSMTGCGB GRAB BAR

    CEMENT PLASTER (PORTLAND)CONCRETE MASONRY UNIT

    CONTINUOUS or CONTINUE

    COMPRESS (ED,ION,IBLE)

    COPPERCARPET

    CORRIDORCOORDINATE

    CONCRETECONNECTION

    CONTRACT (OR)

    CONSTRUCTION

    CARPET TILE

    CORRCPR

    CONTCONTR

    CONCCONNCONST

    COORD

    CPTTCPT

    CEILING

    COLUMN

    CLEAN

    CLEANOUT

    COMBINATION

    CLEAR (ANCE)

    CONTRACT LIMIT LINECLG

    COCOL

    CLNCLR

    CLL

    COMBCOMP

    CMPLCMU

    FSPFRT

    FTG

    FUTFURFTR

    FTFSR

    GA

    FOOTING

    FUTURE

    FOOT, FEET

    GAGE, GAUGE

    FOF

    FPMFPL

    FOSFP

    FRCBFRCFR

    FOM

    FLOOR PLATEFIREPROOF

    FASTEN (ER)FASBRICKBRK

    CATCH BASIN, CORNER BEAD

    CUBIC FEET PER MINUTE

    CAST IN PLACE CONCRETE

    CUBIC FOOT (FEET)COUNTERFLASHING

    CIRCLE

    CAST IRON

    CONTROL JOINTCIRCUMFERENCE

    CEILING HEIGHTCORNER GUARD

    CF

    CFMCFLG

    CI

    CIR

    CH

    CJTCIRC

    CIPC

    CG

    CEMENT

    CABINETCOURSE

    BOTH WAYS

    BASEMENTBOTH SIDES

    BUILT-UP ROOFINGBRITISH THERMAL UNIT

    BW

    BS

    BTUBSMT

    BUR

    CCABCBCEM

    FHSFIN

    FHC

    FLUR

    FNRFLX

    FLGFLFJTFIXT

    FINISH (ED)

    FLASHING

    FLEXIBLE

    FLUSH JOINTFLOOR (ING)

    FIXTURE

    FBD

    FAWP

    FD

    FB

    FDN

    FECFE

    FFFGLFH

    FACE BRICKFIBERBOARDFLOOR DRAINFOUNDATION

    FIBERGLASS

    BIT,BITUM BITUMINOUS

    BUILDINGBLOCKBLOCKING

    BOTTOM OF CURBBENCH MARK

    BACKER ROD

    BEARINGBEARING PLATEBOTTOM

    BM

    BLK

    BOC

    BLDG

    BLKG

    BKR

    BPLBRG

    BOT

    BOARD

    AVENUE

    BETWEENBELOW

    AUTOMATIC

    AMERICAN SOCIETY

    BRICK COURSE

    ABOVE TOP OF SLABfor TESTING MATERIALS

    BD

    AVE

    BC

    ATSAUTO

    ASTM

    BETBEL

    EXISTINGEXIST

    EXPN BLT

    EXH

    EXPEXIST

    EXT

    EXP JT

    FAF

    EXHAUSTEXISTING

    EXTERIOR

    FIRE ALARMFAHRENHEIT

    ELECELEVEMERENC

    EQPTEQEP

    EST

    EWEFEWC

    EQUAL

    ESTIMATE

    ELEVATOREMERGENCY

    EQUIPMENT

    ABOVE FINISHED FLOORAGG AGGREGATE

    ANODIZED

    ASPHALT

    ALUMINUM

    ASSEMBLY

    ANNEALED

    ACCESS PANEL

    ARCHITECT (URAL)APPROXIMATE

    ANCHOR, ANCHORAGEALTERNATE

    AL

    AP

    ANC

    ASPHASSEM

    ANOD

    ARCH

    ANLD

    APPROX

    ALT

    ACCESSACCESS FLOORACOUSTICAL PLASTER

    AREA DRAIN

    ADJACENTADDENDUM

    ADJUSTABLEARCHITECT/ENGINEER

    ACOUSTIC CEILING TILE

    ACC

    ACPLACFL

    ADADDADJ

    AFFA/EADJT

    ACT

    DIMENSIONDIMDR

    DWGDTL

    EAEF

    E

    ELASEL

    DN

    DRAWINGDETAIL

    EACHEAST

    ELEVATIONELASTOMERIC

    EACH FACE

    DOWN

    CY

    D

    DIFFDIAG

    DEPDHDIA

    DEMDA

    DRAIN

    CUBIC YARD

    DIFFUSER

    DIAMETERDIAGONAL

    DEPRESSED

    ABOVEACOUSTICAL

    ANCHOR BOLTAIR CONDITIONING

    ABVAC

    ABA/C CT

    CTRCUHCW

    COUNTER

    COLD WATER

    WC WATER CLOSETRAILINGRLGMETER (S)M

    WATERPROOF (ING),

    WATER RESISTANT

    WEATHERSTRIPPINGWELDED WIRE FABRIC

    EXISTING TO REMAIN

    WATER REPELLANTSCHED

    SHTHG

    METAL

    MULLIONMETAL STUD

    MTL

    MULLMTL ST

    SMSNTSP

    MARBLE

    MEMBRANE

    MODULAR

    MEDIUM

    MEMBER

    MAXIMUMMASONRY

    MANHOLE

    MIRRORMINIMUM

    MECHANIC (AL)

    MACHINE BOLT

    METAL FLOOR DECK

    MISCELLANEOUS

    METAL FURRINGMOUNT (ED) (ING)

    MANUFACTURE (R)

    MOLDING, MOULDING

    METAL ROOF DECKMASONRY OPENING

    MH

    MOMLDG

    MFR

    MISCMIR

    MRD

    MIN

    MTFRMT

    MAR

    MB

    MEMB

    MECHMDLMBR

    MAX

    MFD

    MED

    MAS

    SF

    SIMSKYLT

    SFGLSHT

    SECTSD

    SLVSLR

    RM

    SSC

    SCRN

    RTNRWCR/W

    RO

    SHEET METAL

    SOUND PROOFSEALANT

    SHEATHING

    SQUARE FOOT (FEET)SAFETY GLASS

    STORM DRAIN

    SIMILARSKYLIGHT

    SHEET

    SECTION

    SLEEVESEALER

    SCHEDULESOILD CORE

    RAIN WATER CONDUCTORRIGHT OF WAY

    ROUGH OPENINGROOM

    SOUTH

    SCREEN

    RETURN

    WRW/RWSCT

    WWFWST

    XTR

    WAINSCOTT

    WD

    WHWIN

    WP

    WMW/O

    WPT

    WGLWOOD

    WIRE MESH

    WALL HUNGWINDOW (S)

    WITHOUT

    WEATHERPROOFWORKING POINT

    WIRED GLASS

    STAINLESS STEEL

    TOP AND BOTTOM

    TONGUE AND GROOVE

    TERNE COATED STAINLESS

    TEMPORARY, TEMPERED

    TRAFFIC DECK COATING

    TOP OF EXISTING SLAB

    TOP OF ROOFING

    TOP OF CONCRETE, CURB

    TOILET TISSUE DISPENSERTOILET PAPER HOLDER

    TOP OF STEEL/ TOP OF SLAB

    VINYL COVE BASEVINYL COMPOSITION TILE

    VAPOR BARRIER, VINYL

    VAPOR RETARDER

    UNLESS OTHERWISE NOTED

    VINYL WALL FABRIC

    PLYWD

    RKD KNOCK-DOWN

    KILOVOLT

    KILOWATT

    KITCHEN

    LIMESTONELOCATION

    LIVE LOAD

    LAVATORY

    LENGTH

    LABEL

    LINTELLIGHT

    LOUVER

    LABORATORY

    LEFT HAND

    KILOVOLT-AMPERE

    LIGHT SWITCH

    LIGHTWEIGHT CONCRETE

    LIGHTPROOF, LOW POINT

    LL

    LOCLMS

    LTLLT

    LWCLVR

    LSWLP

    KW

    KVKIT

    KVA

    L

    LH

    LAB

    LBLLAV

    REGREINFREM

    RESREVRFGRFLRGDRH

    REQD

    RCB

    RADRBRBTRC

    REFRECPREC

    RCPRD

    HEIGHTHEATING

    INVERTINTERIOR

    JOIST

    JOINT

    HARDWOOD

    INSIDE DIAMETER

    JOINT FILLER

    IRON PIPE SIZE

    JUNCTION BOX

    INCLUDE (D) (ING)INSULATE (D) (ION)

    HOT WATER, HEADWALL

    HEATING/VENTILATING/AIR CONDITIONING

    KIPS (1000 LBS)

    INTINV

    J

    IPS

    JBJF

    K

    JT

    HT

    HW

    ID

    HVACHTG

    HWD

    INSULINCL

    PTD

    PVT

    PTN

    PVMTPVC

    PTH

    "R"

    QT

    PRF

    PLASPLF

    PNLPNT

    PLPLAM

    PSIPSF

    VARNISHVARRADIUS, RISER

    REINFORCED CONCRETE PIPE

    REINFORCE (D) (ING)

    REVISION (S), REVISED

    REFLECT (ED) (IVE)

    RIGHT HAND

    REGISTER

    REMOVED

    RESILIENT

    ROOFING

    RIGID

    REQUIRED

    RUBBER BASE-STRAIGHT

    REINFORCED CONCRETERUBBER COVE BASE

    RABBET, REBATE

    REFERENCE

    RECESSEDRECEPTACLE

    ROOF DRAIN

    RADIATOR

    VR

    VJTVNR

    VT

    W

    VWF

    W/WB

    VRM

    VENEERV-JOINT (ED)

    VINYL TILE

    WOOD BASEWITHWEST

    VERMICULITE

    VC

    VB

    VCTVCB

    VERTVEST

    VIFVG

    VIN

    VESTIBULE

    VINYL

    VERTICAL

    BASE-STRAIGHTVINYL COATED

    VERTICAL GRAINVERIFY IN FIELD

    POUNDS PER SQUARE FOOTPOUNDS PER SQUARE INCHPAPER TOWEL DISPENSER

    PAVER TILEPAVEMENTPOLY VINYL CHLORIDE

    PAPER TOWEL HOLDER

    THERMAL RESISTANCE

    QUARRY TILE

    PARTITION

    PAINT (ED) IN FIELDPREFORMED

    PLASTIC LAMINATE

    POUNDS PER LINEAL FOOTPLASTER

    PLYWOODPANEL

    PLATE

    TPH

    TYPTTD

    UNF

    UCUNEX

    VAC

    UONUNFINISHED

    UNDERCUT

    TYPICAL

    UNEXCAVATED

    VACUUM

    TOES

    TOR

    TO

    TOP

    TOF

    TOC

    TOL

    THRU

    TOWTOS

    TOLERANCE

    THROUGHTOP OF

    TOP OF PLANK

    TOP OF FOOTING

    TOP OF WALL

    HARDENED

    GROUT

    GRANITE

    HARDWARE

    HOUR

    GRILLE

    GLASS FIBERGALVANIZED

    GLAZING COMPOUND

    HOSE BIBB

    HORIZONTAL

    HEAD JOINT

    HEAVY DUTY

    HIGH POINT

    HOLLOW METAL

    HOLLOW COREHARDBOARD

    GLAZED STRUCTURAL TILEGALVANIZED STEEL SHEET

    GYPSUM WALL BOARD

    HARDNHB

    HDHC

    HM

    HRHPHOR

    HJTHDW

    HBD

    GLFGLV

    GLCOM

    GTGWB

    GSTGSSGRNGRL

    OPNGOPP

    PERPRKG

    PCCPCFPCPPED

    PARPBD

    NOMNRC

    OAOCODOFFOH

    NTS

    GASKET (ED)GRADE, GRADING

    GLASS BLOCKGLASS, GLAZING

    GD

    GLGKT

    GLB

    N

    NICN0,#

    NAT

    OPENING

    PERIMETER

    PRECAST CONCRETEPARTICLE BOARD

    POUNDS PER CUBIC FOOTPRECAST CONCRETE PLANK

    OPPOSITE

    PARKING

    PEDESTAL

    PARALLEL

    COEFFICIENTNOISE REDUCTION

    OVERHEAD

    OUTSIDE DIAMETERON CENTER (S)

    NOT TO SCALE

    NOMINAL

    OVERALL

    OFFICE

    T & BTB

    TEMP

    TCS

    T&G

    TDCTEL

    THKTHRESH

    TC

    THRESHOLD

    TELEPHONE

    STEEL

    TEST BORING

    THICK (NESS)

    TERRA COTTA

    STRSTL

    SURF

    TTAP

    SYSSYNSYMSUSP

    STEEL

    SURFACESTRUCTURAL

    SYNTHETICSYSTEM

    TREADTAPERED

    SYMMETRY (ICAL)SUSPENDED

    NOT IN CONTRACTNUMBER

    NATURALNORTH SPEC

    SQSSTSTD STANDARD

    SQUARESPECIFICATION

    COLUMN LINE

    ALUMINUM

    ENLARGED DETAILPLAN OR SECTION

    NEW (PROPOSED) ELEVATION

    EXISTING ELEVATION

    INTERIOR ELEVATION MARK

    NORTH

    REVISION

    PARTITION TYPE

    ROOM NUMBER

    WINDOW TYPE

    DOOR TYPE

    WALL OR DETAIL SECTION

    BUILDING SECTION

    ELEVATION

    GYPSUM WALLBOARD

    CERAMIC OR

    QUARRY TILE

    STEEL

    MARBLE, GRANITE

    PLYWOOD

    RIGID INSULATION

    BLUSTONE

    FLAGGINGSOAP STONE

    (GRAVEL, STONE)POROUS FILL

    SLATE

    RUBBLE STONE

    EARTH

    BATT INSULATION

    SHIM

    WOOD, ROUGH

    CONCRETE

    CMU

    BRICK

    WOOD, FINISHED

    LOCATION MAP

    DRAWING LIST

    Villa Savoye82 Rue de Villiers78300 Poissy, France

    12" = 1'-0"

    4

    /

    2

    3

    /

    2

    0

    1

    3

    3

    :

    0

    4

    :

    3

    5

    P

    M

    A000

    Cover Sheet

    Project Number

    Villa SavoyeJoseph Bloom

    4/25/2013Author

    Checker

    No. Description Date

    A000 Cover SheetA001 Site PlanA100 Ground FloorA101 First FloorA102 SolariumA201 ElevationsA202 ElevationsA301 Building SectionsA302 Building SectionsA501 Stair DetailA502 Exploded ViewsA600 SchedulesA901 Perspective ViewsA902 Section Perspective

  • 20

    '

    -

    2

    "

    Scale

    Project number

    Date

    Drawn by

    Checked by

    1/16" = 1'-0"

    4

    /

    2

    3

    /

    2

    0

    1

    3

    3

    :

    1

    1

    :

    3

    5

    P

    M

    A001

    Site Plan

    Project Number

    Villa SavoyeJoseph Bloom

    4/25/2013Joseph Bloom

    Checker

    1/16" = 1'-0"1Site

    No. Description Date

  • UP

    A2022

    A201

    A201

    A202

    1

    2

    1

    1 2 3 4 5

    A

    B

    C

    D

    E

    C.4

    C.5

    C.6

    B.5

    2.7 3.3

    D.3

    D.4

    1A301

    2A301

    006-2

    005-2 006-1

    001-1

    Linen Room005

    Salle006

    Chambre004

    Chambre003 Garage

    007

    Foyer001

    005-1

    003-1

    004-1

    002-1

    W.C.002

    0

    '

    -

    4

    "

    2

    '

    -

    8

    "

    0

    '

    -

    4

    "

    9

    '

    -

    3

    "

    0

    '

    -

    4

    "

    7

    '

    -

    1

    "

    0

    '

    -

    4

    "

    7

    '

    -

    3

    "

    0

    '

    -

    4

    "

    0' - 1"

    A5011

    D.5

    1A302

    2A302

    5

    '

    -

    1

    0

    "

    0

    '

    -

    1

    0

    "

    1

    '

    -

    1

    "

    1

    '

    -

    6

    "

    2

    '

    -

    7

    "

    7

    '

    -

    2

    "

    9' - 11" 5' - 4" 5' - 4" 9' - 11"

    3' - 8"

    0' - 4"

    4' - 0"

    0' - 8"

    4' - 0"

    R 31' - 0"

    R 20

    ' - 8

    "

    0' - 1"

    6' - 0"

    001-2

    WC008

    RAMP UP

    Scale

    Project number

    Date

    Drawn by

    Checked by

    1/4" = 1'-0"

    4

    /

    2

    3

    /

    2

    0

    1

    3

    3

    :

    1

    1

    :

    3

    8

    P

    M

    A100

    Ground Floor

    Project Number

    Villa SavoyeJoseph Bloom

    4/25/2013Author

    Checker

    1/4" = 1'-0"1Ground Level

    No. Description Date

  • UP

    DN

    A2022

    A201

    A201

    A202

    1

    2

    1

    1 2 3 4 5

    A

    B

    C

    D

    E

    C.4

    C.5

    C.6

    B.5

    2.7 3.3

    D.3

    D.4

    1A301

    2A301

    105-1104-2

    104-1

    102-1

    114-2 113-1

    112-2

    112-1

    101-1

    107-1

    106-1 110-1

    109-1

    Chambre105

    Boudoir110

    Chambre106

    Salle112

    Cuisine114

    Office113

    Chambre102

    Bains104

    1616 16 16 16 16 2216

    22

    29

    24

    22

    2929292929292929

    29

    29

    29

    29

    24

    22

    24

    D.5

    1A302

    2A302

    108-1 WC109

    WC108

    WC103

    A5014

    Terrasse101

    RAMP DN RAMP UP

    Scale

    Project number

    Date

    Drawn by

    Checked by

    1/4" = 1'-0"

    4

    /

    2

    3

    /

    2

    0

    1

    3

    3

    :

    1

    1

    :

    3

    9

    P

    M

    A101

    First Floor

    Project Number

    Villa SavoyeJoseph Bloom

    4/25/2013Author

    Checker

    1/4" = 1'-0"1Level 1

    No. Description Date

  • DN

    1 2 3 4 5

    A

    B

    C

    D

    E

    C.4

    C.5

    C.6

    B.5

    2.7 3.3

    D.3

    D.4

    1A301

    2A301

    D.5

    1A302

    2A302

    Open toBelow

    A5015

    Roof Access201 RAMP DN

    20' - 0"

    Scale

    Project number

    Date

    Drawn by

    Checked by

    1/4" = 1'-0"

    4

    /

    2

    3

    /

    2

    0

    1

    3

    3

    :

    1

    1

    :

    5

    0

    P

    M

    A102

    Solarium

    Project Number

    Villa SavoyeJoseph Bloom

    4/25/2013Author

    Checker

    No. Description Date

    1/4" = 1'-0"1Solarium

  • Ground Level0' - 0"

    Level 110' - 0"

    Solarium20' - 0"

    Roof28' - 6"

    1 2 3 4 52.7 3.32A301

    2' - 4" 8' - 4" 8' - 4" 8' - 4" 8' - 4" 8' - 4" 8' - 4" 8' - 4" 1' - 8"0' - 8"

    4

    '

    -

    7

    "

    3

    '

    -

    5

    "

    3

    '

    -

    6

    "

    1A302

    2A302

    Open to Beyond

    Ground Level0' - 0"

    Level 110' - 0"

    Solarium20' - 0"

    Roof28' - 6"

    ABCDE C.4C.5C.6 B.5D.3D.4

    1A301

    3

    '

    -

    6

    "

    3

    '

    -

    5

    "

    4

    '

    -

    7

    "

    4' - 5" 7' - 6" 7' - 6" 0' - 8" 7' - 6" 7' - 6" 0' - 8" 3' - 4" 1' - 8"0' - 8" 9' - 3" 0' - 8" 7' - 6" 7' - 6" 4' - 5"

    D.5

    Open to Beyond

    Scale

    Project number

    Date

    Drawn by

    Checked by

    1/4" = 1'-0"

    4

    /

    2

    3

    /

    2

    0

    1

    3

    3

    :

    1

    2

    :

    2

    5

    P

    M

    A201

    Elevations

    Project Number

    Villa SavoyeJoseph Bloom

    4/25/2013Author

    Checker

    No. Description Date

    1/4" = 1'-0"1South

    1/4" = 1'-0"2West

  • Ground Level0' - 0"

    Level 110' - 0"

    Solarium20' - 0"

    Roof28' - 6"

    12345 2.73.3 2A301

    0' - 8" 7' - 6" 7' - 6" 0' - 8" 7' - 6" 7' - 6" 0' - 7" 7' - 6" 7' - 6" 7' - 6" 7' - 6" 1' - 5"

    1A302

    2A302

    Ground Level0' - 0"

    Level 110' - 0"

    Solarium20' - 0"

    Roof28' - 6"

    A B C D EC.4 C.5 C.6B.5 D.3 D.4

    1A301

    5' - 1" 1' - 8" 7' - 6" 5' - 0"1' - 6"

    45' - 5" 4' - 5"

    4

    '

    -

    7

    "

    3

    '

    -

    5

    "

    3

    '

    -

    6

    "

    D.5

    Open to Beyond

    Scale

    Project number

    Date

    Drawn by

    Checked by

    1/4" = 1'-0"

    4

    /

    2

    3

    /

    2

    0

    1

    3

    3

    :

    1

    2

    :

    4

    9

    P

    M

    A202

    Elevations

    Project Number

    Villa SavoyeJoseph Bloom

    4/25/2013Author

    Checker

    No. Description Date

    1/4" = 1'-0"1North

    1/4" = 1'-0"2East

  • Ground Level0' - 0"

    Level 110' - 0"

    Solarium20' - 0"

    Roof28' - 6"

    12345 2.73.3 2A3011

    A3022

    A302

    Ground Level0' - 0"

    Level 110' - 0"

    Solarium20' - 0"

    Roof28' - 6"

    ABCDE C.4C.5C.6 B.5D.3D.41

    A301

    D.5

    Scale

    Project number

    Date

    Drawn by

    Checked by

    1/4" = 1'-0"

    4

    /

    2

    3

    /

    2

    0

    1

    3

    3

    :

    1

    3

    :

    0

    6

    P

    M

    A301

    Building Sections

    Project Number

    Villa SavoyeJoseph Bloom

    4/25/2013Author

    Checker

    No. Description Date

    1/4" = 1'-0"1Section B

    1/4" = 1'-0"2Section A

  • Ground Level0' - 0"

    Level 110' - 0"

    Solarium20' - 0"

    Roof28' - 6"

    ABCDE C.4C.5C.6 B.5D.3D.41

    A301

    D.5

    Ground Level0' - 0"

    Level 110' - 0"

    Solarium20' - 0"

    Roof28' - 6"

    A B C D EC.4 C.5 C.6B.5 D.3 D.41

    A301

    D.5

    Scale

    Project number

    Date

    Drawn by

    Checked by

    1/4" = 1'-0"

    4

    /

    2

    3

    /

    2

    0

    1

    3

    3

    :

    1

    3

    :

    1

    8

    P

    M

    A302

    Building Sections

    Project Number

    Villa SavoyeJoseph Bloom

    4/25/2013Author

    Checker

    No. Description Date

    1/4" = 1'-0"1Section C

    1/4" = 1'-0"2Section D

  • UP

    UP

    DN

    DN

    2

    B.5

    2A501

    Ground Level0' - 0"

    Level 110' - 0"

    Solarium20' - 0"

    Roof28' - 6"

    2 2.7

    2

    B.5

    2A501

    2

    B.5

    2A501

    Scale

    Project number

    Date

    Drawn by

    Checked by

    1/2" = 1'-0"

    4

    /

    2

    3

    /

    2

    0

    1

    3

    3

    :

    1

    4

    :

    2

    2

    P

    M

    A501

    Stair Detail

    Project Number

    Villa SavoyeJoseph Bloom

    4/25/2013Author

    Checker

    No. Description Date

    1/2" = 1'-0"1Callout of Ground Level

    1/2" = 1'-0"2Stair Section3 Stair Axon

    1/2" = 1'-0"4Callout of Level 1

    1/2" = 1'-0"5Callout of Solarium

  • Scale

    Project number

    Date

    Drawn by

    Checked by

    4

    /

    2

    3

    /

    2

    0

    1

    3

    3

    :

    1

    8

    :

    2

    3

    P

    M

    A502

    Exploded Views

    Project Number

    Villa SavoyeJoseph Bloom

    4/25/2013Author

    Checker

    No. Description Date

    1 Ground Floor NW

    2 First Floor NW

    3 Solarium NW

    4 Gound Floor SE

    5 First Floor SE

    6 Solarium SE

  • Scale

    Project number

    Date

    Drawn by

    Checked by

    4

    /

    2

    3

    /

    2

    0

    1

    3

    3

    :

    1

    8

    :

    2

    4

    P

    M

    A600

    Schedules

    Project Number

    Villa SavoyeJoseph Bloom

    4/25/2013Author

    Checker

    No. Description Date

    Room ScheduleFloor Number Name Floor Finish Area

    Not Placed 3 Room Not PlacedNot Placed 10 Room Not Placed

    Ground Level 001 Foyer 821 SFGround Level 002 W.C. 14 SFGround Level 003 Chambre 131 SFGround Level 004 Chambre 87 SFGround Level 005 Linen Room 152 SFGround Level 006 Salle 220 SFGround Level 007 Garage 505 SFGround Level 008 WC 10 SF

    Level 1 101 Terrasse 100 SFLevel 1 102 Chambre 162 SFLevel 1 103 WC 11 SFLevel 1 104 Bains 53 SFLevel 1 105 Chambre 256 SFLevel 1 106 Chambre 437 SFLevel 1 108 WC 11 SFLevel 1 109 WC 11 SFLevel 1 110 Boudoir 195 SFLevel 1 112 Salle 921 SFLevel 1 113 Office 112 SFLevel 1 114 Cuisine 176 SF

    Solarium 201 RoofAccess

    114 SF

    Window ScheduleWindow

    ID # Count Family TypeRoughHeight

    RoughWidth Height Width Sill Height

    Level 116 7 Slider with Trim Corbu Slider 8' 4" 3' - 5" 8' - 4" 3' - 0"22 4 Fixed Corbu 20" fixed 3' - 5" 1' - 8" 3' - 0"24 3 Fixed Corbu 40" Fixed 3' - 5" 3' - 4" 3' - 0"29 15 Slider with Trim Corbu Slider 7' 5 1/2" 3' - 5" 7' - 5 1/2" 3' - 0"30 1 Corbu Opening Fixed20" 3' - 5" 9' - 2 1/2" 3' - 0"Solarium29 1 Slider with Trim Corbu Slider 7' 5 1/2" 3' - 5" 7' - 5 1/2" 3' - 0"

    Door Schedule

    Door ID # Count Family Type HeightRoughHeight

    RoughWidth Width Fire Rating

    Ground Level4 1 Single-Flush 30" x 84" 7' - 0" 2' - 6"4 1 Single-Flush 30" x 84" 7' - 0" 2' - 6"4 1 Single-Flush 30" x 84" 7' - 0" 2' - 6"8 1 Single-Flush 24" x 84" 7' - 0" 2' - 0"8 1 Single-Flush 24" x 84" 7' - 0" 2' - 0"3 1 Single-Flush 32" x 84" 7' - 0" 2' - 8"3 1 Single-Flush 32" x 84" 7' - 0" 2' - 8"14 1 Curtain Wall Dbl Glass Curtain Wall Dbl Glass 6' - 10 1/2" 5' - 11"16 1 Curtain Wall Sgl Glass Curtain Wall aluminum 7' - 7 1/2" 2' - 11"Level 14 1 Single-Flush 30" x 84" 7' - 0" 2' - 6"8 1 Single-Flush 24" x 84" 7' - 0" 2' - 0"8 1 Single-Flush 24" x 84" 7' - 0" 2' - 0"1 1 Single-Flush 36" x 84" 7' - 0" 3' - 0"4 1 Single-Flush 30" x 84" 7' - 0" 2' - 6"4 1 Single-Flush 30" x 84" 7' - 0" 2' - 6"3 1 Single-Flush 32" x 84" 7' - 0" 2' - 8"3 1 Single-Flush 32" x 84" 7' - 0" 2' - 8"3 1 Single-Flush 32" x 84" 7' - 0" 2' - 8"3 1 Single-Flush 32" x 84" 7' - 0" 2' - 8"3 1 Single-Flush 32" x 84" 7' - 0" 2' - 8"3 1 Single-Flush 32" x 84" 7' - 0" 2' - 8"8 1 Single-Flush 24" x 84" 7' - 0" 2' - 0"8 1 Single-Flush 24" x 84" 7' - 0" 2' - 0"Solarium16 1 Curtain Wall Sgl Glass Curtain Wall aluminum 6' - 6 1/2" 2' - 8 1/16"

    Floor Material Takeoff

    Level Type Material: NameMaterial:

    AreaMaterial:

    Cost

    Ground Level Generic - 12" Default Floor 4442 SFGround Level Generic - 8" GFRC 2134 SF 0.00Ground Level Tile foyer Tile 8x8 785 SF 0.00Ground Level Tile bath Tile 4x4 bath 89 SF 0.00Ground Level Generic - 6 Ramp interior Default Floor 114 SFGround Level Generic - 6 Ramp interior Concrete, Cast-in-Place gray 114 SF 0.00Ground Level Generic - 6 Ramp interior Default Floor 35 SFGround Level Generic - 6 Ramp interior Concrete, Cast-in-Place gray 35 SF 0.00Ground Level Generic - 6 Ramp interior Default Floor 114 SFGround Level Generic - 6 Ramp interior Concrete, Cast-in-Place gray 114 SF 0.00Ground Level wood floor Wood Planks 132 SF 0.00Ground Level wood floor Wood Planks 88 SF 0.00Ground Level wood floor Wood Planks 221 SF 0.00

    Level 1 Generic - 6" GFRC 4006 SF 0.00Level 1 Generic - 6 Ramp Default Floor 114 SFLevel 1 Generic - 6 Ramp Granite, Cut, Rough(1) 114 SF 0.00Level 1 Generic - 6 Ramp Default Floor 35 SFLevel 1 Generic - 6 Ramp Granite, Cut, Rough(1) 35 SF 0.00Level 1 Generic - 6 Ramp Default Floor 114 SFLevel 1 Generic - 6 Ramp Granite, Cut, Rough(1) 114 SF 0.00Level 1 Tile level 1 outside Granite, Cut, Rough 1089 SF 0.00Level 1 Dirt Earth 56 SF 0.00Level 1 Skylight Glass 10 SF 0.00Level 1 Skylight Glass 7 SF 0.00Level 1 Tile bath Tile 4x4 bath 11 SF 0.00Level 1 Tile bath Tile 4x4 bath 190 SF 0.00Level 1 Tile bath Tile 4x4 bath 11 SF 0.00Level 1 Tile bath Tile 4x4 bath 53 SF 0.00Level 1 Tile bathtub Tile, Mosaic, Gray 17 SF 0.00Level 1 Tile bathtub 2 Tile, Mosaic, Gray 11 SF 0.00Level 1 Tile bathtub 3 Tile 4x4 bath 2 SF 0.00Level 1 wood floor Wood Planks 482 SF 0.00Level 1 Floor Salle Tile, Porcelain, 6in 921 SF 0.00Level 1 wood floor Wood Planks 257 SF 0.00Level 1 wood floor Wood Planks 163 SF 0.00Level 1 Tile Slate Slate 293 SF 0.00Level 1 wood floor Wood Planks 176 SF 0.00Level 1 wood floor Wood Planks 113 SF 0.00Level 1 Tile level 1 outside Granite, Cut, Rough 101 SF 0.00

    Solarium Solarium Cobble Stone Default Floor 3076 SFSolarium Solarium Cobble Stone Gravel 3076 SF 0.00Solarium Generic - 6" solarium Plaster 202 SF 0.00Solarium Dirt Earth 111 SF 0.00Solarium Skylight Glass 4 SF 0.00Solarium Generic - 6" solarium Plaster 17 SF 0.00Solarium Skylight Glass 7 SF 0.00Solarium Skylight Glass 15 SF 0.00Solarium Skylight Glass 7 SF 0.00Solarium Tile level 1 outside Granite, Cut, Rough 310 SF 0.00Solarium Tile Slate Slate 70 SF 0.00

  • Scale

    Project number

    Date

    Drawn by

    Checked by

    4

    /

    2

    3

    /

    2

    0

    1

    3

    3

    :

    2

    4

    :

    1

    8

    P

    M

    A901

    Perspective Views

    Project Number

    Villa SavoyeJoseph Bloom

    4/25/2013Author

    Checker

    No. Description Date

    1 Perspective 1

    2 Perspective 2 3 Perspective 3

  • Scale

    Project number

    Date

    Drawn by

    Checked by

    4

    /

    2

    3

    /

    2

    0

    1

    3

    3

    :

    3

    1

    :

    1

    8

    P

    M

    A902

    Section Perspective

    Project Number

    Villa SavoyeJoseph Bloom

    4/25/2013Author

    Checker

    No. Description Date

    1 Section Perspective 1

    2 Section Perspective 2 3 Section Perspective 3

    coverpast2past3past4past5