village of asset management plan - newbury,...

50
7 Candle Crescent, Kitchener Ontario, N2P 2K7 www.4roads.ca Village of Newbury Asset Management Plan

Upload: others

Post on 24-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

 

   

  

7 Candle Crescent, Kitchener Ontario, N2P 2K7 

                             www.4roads.ca 

 

Village of Newbury

Asset Management Plan

 7 Candle Crescent, 

Kitchener Ontario, N2P 2K7  

Rpt_Newbury_amp_fin_20140427.docx 

 

May 14, 2014 

Village of Newbury 22910 Hagerty Road, PO Box 130, Newbury, Ontario, N0L 1Z0  Attention:  Ms. Betty Gordon, Clerk Treasurer 

Subject:  Village of Newbury, Asset Management Plan   Dear Ms. Gordon, 

4 Roads Management Services Inc. (4 Roads), on behalf of CIMA+, is pleased to provide this Asset Management Plan to the Village of Newbury.  

Report information and analysis is drawn from the following documents: 

‘2013 Road Needs Study Report’ Stantec Consulting 2013 

‘York Street Drainage Improvements’, CIMA Canada, 2013 

‘State of the Infrastructure’, CIMA Canada, 2014 

The Asset Management Plan references the above noted documents. Content is only repeated in this document as required. Given the nature of the Village of Newbury, we have adopted a simpler approach that we believe would better serve the provincial intent of requiring and Asset Management Plan without necessarily fulfilling all of the requirements. We trust that the information provided in this report will be beneficial to the Village of Newbury in the continuing evolution of their Asset Management Plans. 

Please do not hesitate to call or email if you require any further information or discussion on any aspect of the report. Thank you for the opportunity to prepare this report. If 4 Roads Management Services Inc. may be of any further service, please do not hesitate to contact the undersigned. 

Yours truly, 

 

 

David Anderson, CET President, 4 Roads Management Services Inc. [email protected] 519 505 5065  Cc  Tom Montgomery, P.Eng, Vice President Municipal Infrastructure, CIMA Canada   Stuart Winchester, P.Eng, Partner, Manager, Municipal Infrastructure  

    

 

7 Candle Crescent, Kitchener Ontario, N2P 2K7 

www.4roads.ca 

 

April 28, 2014 

 

 

 

 

 

 

 

 

 

Village of Newbury 

Asset Management Plan

Village of Newbury, Asset Management Plan April 28, 2014 

 

 Rpt_Newbury_amp_fin_20140427.docx 

i

Executive Summary 

In the fall of 2012, the Province of Ontario, introduced a requirement for an Asset Management Plan (AMP) as a prerequisite for municipalities seeking funding assistance for capital projects, from the province; effectively creating a conditional grant. To qualify for future infrastructure grants, an AMP has to be developed and approved by a municipal council by December 31, 2013. On April 26, 2013 the province announced that it had created a $100 million Infrastructure Fund for small, rural and northern municipalities. 

The province requires AMP’s for Roads Structures, Water Collection and Distribution Facilities, Waste Water Collection and Treatment Facilities and Social Housing. The Village of Newbury (VoN) has responsibility for the local roads, water and waste water collection and distribution and waste water treatment. The VoN does not have any bridge or culvert structures with a greater than 3m span.  Accordingly, the scope of this plan includes all of the aforementioned assets.  

 

Project  Overview  and  Approach  

The Village of Newbury is located in Middlesex County in South West Ontario. The Village has very limited resources, both financial and staffing; the population is 439, and only one employee. The approach to this project is predicated upon these circumstances and as such, represents a higher level approach to the development of an Asset Management Plan that recognizes the immediate physical deficiencies that have to be addressed in the ten year horizon, and provides recommendations for fuller development of other aspects of a plan. 

The following documents form the basis of the analysis and resultant plan:  

‘2013 Road Needs Study Report’ Stantec Consulting, 2013 

‘York Street Drainage Improvements’, CIMA Canada, 2013 

‘State of the Infrastructure’, CIMA Canada, 2014 

 

The scope of this report is to develop an AMP following the provincial guidelines producing an AMP with the following content 

1. Executive Summary 2. Introduction 3. State of Local Infrastructure (SotI) 4. Desired Levels of Service 5. Asset Management Strategy 6. Financing Strategy 

   

Village of Newbury, Asset Management Plan April 28, 2014 

 

 Rpt_Newbury_amp_fin_20140427.docx 

ii

In order to develop the AMP, the following approach was adopted  

1. Review of documentation that has been developed. 2. Development of Draft Asset Management and Financing Strategies 3. Village of Newbury staff review and comment on Draft 4. Presentation of Draft AMP to Council 5. Revision / Finalization of Asset Management and Financing Strategies 6.  Final Report preparation 7.  AMP presentation to, and adoption by, Council 

 

State  of  the  Infrastructure  (SotI) 

CIMA prepared a SotI Report Card in January 2014. The CIMA report integrates the findings of the Roads Needs Study, (Stantec Consulting 2013) with the other assets. The 2014 SotI provides an overview of the physical condition and replacement value of the assets the VoN is responsible for, in their entirety. The existing inventory data and condition ratings were used to develop programming and budgets. However, once an asset reaches the project design stage, further detailed review, investigation, and design will be required to address the specific requirements of each project. The York Street Drainage Improvements Report is an example of the detailed review and analysis that is required to reach the project stage.  

For road assets, data and road condition ratings were completed generally in accordance with the Ministry of Transportation Ontario (MTO) Inventory Manual for Municipal Roads from 1991  during a survey in the summer of 2013 (Stantec Consulting Newbury 2013 Road Needs Study). 

The remainder of the assets were evaluated in a report card format similar to what has recently been done by many different cities throughout Canada (such as Hamilton, Calgary, and Montreal). From the CIMA SotI report ‘The methodology used in preparing this analysis was based on the methodology developed by the American Society of Civil Engineers, which periodically prepares such a Report Card for American public infrastructure’. The SotI Report Card is shown as Table ES.1 immediately following the Executive Summary 

In very general terms, the road and storm water assets are in the poorest condition and the thrust of the asset management plan will be to upgrade/replace the storm sewer drainage infrastructure in conjunction with the roads program over the next 10 years. The water and waste water and waste water treatment assets are relatively new and are believed to be in good condition. 

The 2013 Road Needs Study (Stantec 2013) identifies that most road sections require drainage as there is minimal storm sewer servicing provided and most roads are built to a semi‐urban standard. The pavement condition itself is in fair condition, and could be sustained through regular resurfacing. However, the resurfacing cycle would be shortened due to the impact of the road bases not being drained. Adopting that approach would also not resolve the flooding problems that have been identified. 

All Village of Newbury assets are in an Excel database. The 2013 Road Needs Study was developed in WorkTech Asset Manager Foundation and approximately 35 data fields were exported to Excel, 

   

Village of Newbury, Asset Management Plan April 28, 2014 

 

 Rpt_Newbury_amp_fin_20140427.docx 

iii

Asset Valuation 

The CIMA SotI report identified replacement costs for each asset group. That information has been supplemented with the addition of additional information and calculations that identify the life cycle and the annualized capital replacement costs. 

Asset Valuation and Annualized Replacement Costs 

Asset Category  Replacement Cost  Life Cycle Yrs Annualized 

Cost 

Water Linear  $3,793,000  75  $50,573 

Wastewater Linear  $3,220,550  100  $32,206 

Wastewater Facilities  $5,305,000  40  $132,625 

Stormwater Linear  $3,453,800  100  $34,538 

Roads Systems  $3,885,150  50  $77,700 

TOTAL Newbury  $19,657,500     $393,150 

 

Asset Management Plan (AMP) 

As noted in the SotI, in very general terms, the road and storm water assets are in the poorest condition and the thrust of the AMP will be to maintain the average condition of the road system and to upgrade/replace the storm sewer drainage infrastructure in the York Street area with the remainder of the road system being managed in a holding strategy (Overlay Program) over the next 10 years. The planned construction of an outlet for York Street and the reconstruction of the adjacent road sections will only occur if the VoN receives assistance from Provincial Infrastructure Grants. 

The York Street Drainage Improvements report (CIMA, 2013) provides a solution to the drainage problem immediately in the area of the York Street, from James Street to approximately 65m east of Tucker Street. The roads in that area are also in poor condition and have to be reconstructed.  

Notwithstanding the York Street Drainage Improvements report, the entire VoN appears to lack a comprehensive drainage plan. Going forward, a Stormwater Master Plan should be prepared for the entire Village. 

 

Financial  Plan  

The financial plan/strategy is integral to the asset management plan. The supporting studies provide financial and costing information useful for the preparation of the long term plan; 

State of the Infrastructure – Replacement Costs of the assets 

Road Needs Study ‐  Recommended improvements and associated costing for each asset and a calculated replacement cost for each asset (integrated into SotI) 

Road Needs Study ‐ Return on Investment analysis through a Performance model that integrates capital and maintenance activities based on the cost versus the improvement to the asset. 

York Street Drainage Improvements ‐  Specific cost calculations for the proposed storm sewer construction 

Village of Newbury, Asset Management Plan April 28, 2014 

 

 Rpt_Newbury_amp_fin_20140427.docx 

iv

4 Roads understands that although there are established water and sewer rates, the current rates are subsidized through the levy supported budget.  

The replacement cost of the asset is only one component of the total annualized costs to manage, operate and sustain the assets. The following graphic is excerpted from the Provinces’ ‘Building Together‐ Guide for Municipal Asset Management Plans’ document.  

 

 

 

With the water and waste water asset being in the earlier part of their life cycle, the Village has an opportunity to establish appropriate user rates now to ensure that sufficient reserves are developed to perform the maintenance and replacement of the assets.  

The Road Needs Study used a performance model to establish a ‘Preservation Budget’ that integrates operation and maintenance activities with capital improvements by assessing the Return on Investment versus the cost of the improvement, and the effect on the condition of the asset. 

4 Roads understands that currently, the Town of Newbury is debt free therefore there should be sufficient borrowing capacity to debenture the improvement costs identified in the 10 year plan.   

However, in reviewing the VoN 2012 FIR a number of issues are noted.  

In 2012 VoN recorded a deficit of approximately $103,000 based on full accrual accounting. Furthermore, there were no funds placed in reserves for future replacement of tangible capital assets. 

Village of Newbury, Asset Management Plan April 28, 2014 

 

 Rpt_Newbury_amp_fin_20140427.docx 

v

2012 year end reserve levels are approximately Water ‐ $33,000, Waste Water ‐ $14,000 and General ‐ $44,000. Annual amortization for 2012 was Water ‐ $39,000, Waste Water ‐ $133,000 and General ‐ $40,000. VoN should consider making annual contributions to replacement reserves to ensure sustainable financing into the future. 

The 2012 FIR (Schedule 81) also indicates a maximum debt capacity of $583,000. This is based on a maximum annual debt payment limit of $131,000 (25% of own source revenues). While having capacity is beneficial, borrowing to the full capacity level would result in a major tax increase (Additional $133,000 on a base of $218,000). VoN should review its FIR debt capacity calculation as the 5 year term used in its calculation seems unreasonably short. 

The Asset Management  

Asset management strategies are critical to managing the performance of an asset group, more so, if funding is limited. Funding constraints should push the strategy toward those programs that extend the life cycle of the road by providing the correct treatment at the optimum time. For roads, resurfacing, rehabilitation, and preservation projects should be a higher priority than reconstruction projects. The objective is to “keep the good roads good”. 

In addition to the budgetary recommendations, the following recommendations are provided for the management of the road and structures inventories; 

1. The Village should develop an Asset Management Policy that may be adapted to all assets as plans for the other assets are developed. 

2. Consider the Asset Management and budget recommendations included in this report to further 

develop the longer term asset management plan in conjunction with a longer term financial 

plan. 

3. A Rate Study should be undertaken for the water and waste water assets to ensure that the 

rates are sufficient to ensure long term viability of the water and waste water facilities.  

4. The cycle for review of the road system should be continued, reviewing the entire system on a maximum four year cycle. 

5. A Master Drainage Plan should be developed prior to reconstruction of the road network to 

ensure that there is a legal, adequate outlet. The plan should be completed with consideration 

to the Municipal Drain Systems. 

6. Traffic counts should be undertaken to confirm the traffic volume and percentage of truck traffic 

on roads in order to have adequate geometric and structural design and Regulation 239/02 

classification. 

7. Annual budget adjustments should account for inflation and increases for each asset group. 

8. Capital reserves should be established for the road assets. 

9. Capital Reserves Should be established for the rate supported assets 

10. The asset management plan should be reviewed and revised annually from both condition and financial perspectives. 

Village of Newbury, Asset Management Plan April 28, 2014 

 

 Rpt_Newbury_amp_fin_20140427.docx 

vi

11. Programming for roads should be reviewed to ensure that resurfacing and preservation programs are optimized. 

12. Traffic counts should be updated and repeated on a regular basis. The counting should include the percentage of truck traffic.

Village of Newbury, Asset Management Plan April 28, 2014 

 

 Rpt_Newbury_amp_fin_20140427.docx 

vii

Summary Information 

Table ES 1: State of the Infrastructure Report Card (From CIMA SotI) 

Asset Category Mean  

Grade Trend  Comment 

Water Linear  B+  ↓ 

This group of asset is globally in good condition, but its condition is anticipated to deteriorate in the next few years given the current practices and level of investment. There is adequate capacity, and limited service interruptions. All water lines do not have a sufficient investment level to maintain the current condition.   

Wastewater Linear  B+  → 

All assets from this group are considered in very good condition. There is adequate capacity and no reported service interruptions However, there has been insufficient investment level to maintain the current condition, and it is anticipated that the system condition will deteriorate over time. 

Wastewater Facilities 

B+  → 

The wastewater facilities are overall in good condition. Most of the components of the wastewater treatment plant seem in fair to good condition and have adequate capacity. Current maintenance practices appear to be keeping the facility on good condition. 

Stormwater Linear  C‐  ↓ 

This  group  of  assets  is  globally  in  fair  to  poor  condition,  and  its  condition  is anticipated to deteriorate given the current practices and level of investment. The system  has  capacity  constraints,  and  localized  flooding  has  occurred  during frequent storm event, resulting in flooded basements and property damage.  

Roads Systems  C  ↓ All  assets  from  this  group  are  considered  in  fair  to  poor  condition,  and  are anticipated to degrade within the next few years given the current practices and level of investment. 

Village Grade  B‐  ↓ 

Newbury’s  linear water and wastewater  infrastructure  is  in good  to very good condition, due primarily to the relatively recent construction of these works. The wastewater facilities are also in very good condition with adequate funding. The Village’s  linear  stormwater  system  is  in  fair  condition,  but  has  capacity  and performance  issues. As a result of poor drainage, the Village’s road network  is being  impacted,  such  that  the  road will need  replacement much earlier  than typically anticipated.  

 

Table ES 2: Roadside Environment and Surface Type (Stantec 2013) 

Surface Type 

Roadside Environment Total  % Total 

Rural  Semi‐Urban 

Cl‐km  Lane‐km  Cl‐km Lane‐km 

Cl‐km Lane‐ km 

Cl‐km Lane‐ km 

High Class Bit.‐asphalt  0.15  0.29      0.15  0.29  2.55%  2.55% 

Gravel  0.66  1.32  4.88  9.76  5.54  11.08  97.45%  97.45% 

Total  0.81  1.61  4.88  9.76  5.69  11.37     

% of Total  14.16%  14.16%  85.84%  85.84%         

 

Village of Newbury, Asset Management Plan April 28, 2014 

 

 Rpt_Newbury_amp_fin_20140427.docx 

viii

 

 

Table ES 3: Roadside Environment and Functional Class (Stantec 2013) 

Road Classification 

Roadside Environment Total  % Total 

Rural  Semi‐Urban 

Cl‐km Lane‐ km 

Cl‐km Lane‐km 

Cl‐km Lane‐ km 

Cl‐km Lane‐ km 

200  0.15  0.29      0.15  0.29  2.55%  2.55% 

300  0.66  1.32      0.66  1.32  11.61%  11.61% 

C/R      0.12  0.25  0.12  0.25  2.16%  2.16% 

L/R      3.94  7.88  3.94  7.88  69.25%  69.25% 

LCI      0.82  1.64  0.82  1.64  14.44%  14.44% 

TOTAL  0.81  1.61  4.88  9.76  5.69  11.37     

% of Total  14.16%  14.16%  85.84%  85.84%         

 

 

Table ES.4: Condition by Road Class (Stantec 2013) 

Need Year 

MMS Class Total 

4  5 

Cl‐km  Lane‐km  Cl‐km  Lane‐km  Cl‐km  Lane‐km 

NOW  0.41  0.83  1.22  2.43  1.63  3.26 

1‐5      0.12  0.24  0.12  0.24 

6‐10  0.25  0.49  3.55  7.09  3.79  7.58 

ADEQ  0.15  0.29      0.15  0.29 

Total  0.81  1.61  4.88  9.76  5.69  11.37 

% of Total  14.16%  14.16%  85.84%  85.84%     

System Adequacy %  49.4  48.4  75.0  75.1  71.4  71.3 

Good to Very Good %  49.4  48.4  72.5  72.6  69.2  69.2 

 

   

Village of Newbury, Asset Management Plan April 28, 2014 

 

 Rpt_Newbury_amp_fin_20140427.docx 

ix

 

Table ES.6: Summary of Improvements by Time of Needs (Stantec 2013*) 

    1 to 5  6 to 10  ADEQ  NOW  TOTAL 

Imp. Class Imp 

ID Cl‐km 

Imp. 

Cost Cl‐km  Imp. Cost  Cl‐km 

Imp. 

Cost Cl‐km  Imp. Cost  Cl‐km  Imp.Cost 

Const  REC      1.24  853,329      1.16  755,949  2.4  1,609,278 

Const  RSS  0.12  191,159  0.36  565,511      0.47  748,704  0.95  1,505,373 

Maint  SD      1.95  0  0.15  0      2.1  0 

Rehab  R1      0.25  25,856          0.25  25,856 

TOTAL    0.12  191,159  3.79  1,444,696  0.15  0  1.63  1,504,653  5.69  3,140,507 

% of Total    2.11%  6.09%  66.66%  46.00%  2.55%    28.68%  47.91%     

*Revised to reflect changes to York Street 

Graph ES1: Remaining Service Life ‐Road Structural Adequacy Rating vs. Length 

 *Service life as it relates to pavement surface only 

Data is from the 2013 Study (Stantec)

Village of Newbury, Asset Management Plan April 28, 2014 

 

 Rpt_Newbury_amp_fin_20140427.docx  x 

Table ES 9: 10 Year Asset Management Plan and Financial Plan 

 

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Grand Total

Roads and Storm Sewer‐ Levy Supported

CRK‐ Crack Sealing 986 470 706 470 450 3,082

GRR2 ‐ add 150mm Gravel 6,107 6,107 12,214

R1‐ Resurface 50mm 25,856 24,183 23,109 11,192 22,798 22,328 129,466

REC‐ Rural  Reconstruction 91,083 91,083

RSS‐ Reconstruct with Storm Sewers 211,000 203,200 190,000 604,200

SD‐ York Street Outlet 155,500 155,500

SWMeng ‐Storm Water Master Plan 50,000 50,000

Total Levy Supported 166,939      155,500      31,276         211,000      23,579         203,200      18,005         190,000      23,268         22,778         1,045,545  

Water and Waste Water ‐ Rated Supported

Water ‐Linear

Waste Water Linear

Waste Water Treatment

Total Rate Supported 0 0 0 0 0 0 0 0 0 0

Grand Total  166,939      155,500      31,276         211,000      23,579         203,200      18,005         190,000      23,268         22,778         1,045,545  

Funding

Capital  Reserve ‐ Levy 5,000 5,000

Operating Budget ‐ Levy 75,968 52,870 31,276 71,740 23,579 69,088 18,005 64,600 23,268 22,778 453,172

Capital  Reserve ‐ Rate 0

Operating Budget ‐ Rate 0

Provincial  Grant (@66%) 85,971 102,630 139,260 134,112 125,400 587,373

Contibutions  from Others 0

Grants 0

Gas Tax 0

Debentures 0

Total Funding 166,939 155,500 31,276 211,000 23,579 203,200 18,005 190,000 23,268 22,778 1,045,545

Improvement Type / Area

Year

Village of Newbury, Asset Management Plan April 28, 2014 

  

 

Contents 

INTRODUCTION AND BACKGROUND .................................................................................................... 1

PROJECT APPROACH OVERVIEW ........................................................................................................... 2

ASSET CONDITION RATING METHODOLOGY ........................................................................................ 33.1 Asset Condition Rating Methodology ‐ Roads ...................................................................................... 3

3.1.1 Inventory Manual History ..................................................................................................... 33.2 Asset Condition Methodology – Water, and Waste Water, Collection and Distribution and Waste 

Water Treatment .................................................................................................................................. 4

STATE OF THE INFRASTRUCTURE (SOTI) ............................................................................................... 54.1 State of the Infrastructure –Roads ........................................................................................................ 54.2 State of the Infrastructure – Water Linear (CIMA 2014) ...................................................................... 84.3 State of the Infrastructure ‐ Waste Water Linear (CIMA 2014) ............................................................ 84.4 State of the Infrastructure Waste Water Treatment (CIMA 2014) ....................................................... 9

RECORD OF ASSUMPTIONS –TON, IMPROVEMENT AND REPLACEMENT COSTS ............................... 10

REPLACEMENT COST VALUATIONS ..................................................................................................... 116.1 Replacement Cost Valuation –Roads (Stantec 2013) .......................................................................... 116.2 Replacement Cost Valuation – Water Linear (CIMA 2014) ................................................................. 116.3 Replacement Cost Valuation – Waste Water Linear (CIMA 2014) ...................................................... 116.4 Replacement Valuation – Storm Water Linear (CIMA 2014) .............................................................. 116.5 Replacement Cost Valuation – Waste Water Treatment (CIMA 2014) .............................................. 12

ASSET CONDITION ASSESSMENT AND PLAN UPDATES ....................................................................... 137.1 Condition Assessment Cycle Recommendation ‐ Roads ..................................................................... 137.2 Condition Assessment Cycle Recommendation – Waste Water Linear .............................................. 137.3 Condition Assessment Cycle Recommendation –Storm Water Linear ............................................... 137.4 Condition Assessment Cycle Recommendation – Water Linear ......................................................... 137.5 Condition Assessment Cycle – Waste Water Treatment Facilities ..................................................... 137.6 Asset Management Plan Updates ....................................................................................................... 13

LEVEL OF SERVICE (LOS) ...................................................................................................................... 148.1 LOS‐ Roads........................................................................................................................................... 148.2 LOS – Water and Waste Water ........................................................................................................... 14

PROGRAM FUNDING RECOMMENDATIONS ....................................................................................... 169.1 Overview ............................................................................................................................................. 169.2 Budget Recommendations ‐ Roads ..................................................................................................... 17

Village of Newbury, Asset Management Plan April 28, 2014 

  

9.3 Budget Recommendations – Water and Waste Water, Collection, Distribution and Treatment ...... 189.4 Budget Recommendations – Storm Sewers ........................................................................................ 189.5 Performance Modeling‐ Budget Effect on Road System Performance and Proposed Storm Sewer 

Upgrades ............................................................................................................................................. 199.5.1 Asset Management Plan and Strategy Analysis ................................................................. 199.5.2 Performance Model Overview ........................................................................................... 20

9.6 10 Year Program .................................................................................................................................. 20

ASSET MANAGEMENT STRATEGY ....................................................................................................... 2210.1Asset Management Overview ............................................................................................................. 2210.2Priority Rating vs. Condition Rating‐ Roads ........................................................................................ 2310.3Cross Asset Integration and Project Prioritization .............................................................................. 24

FINANCIAL STRATEGY AND PLAN ........................................................................................................ 2611.1Financial Plan Overview ...................................................................................................................... 2611.2Asset Management Plan / Financial Plan Decision Matrix .................................................................. 27

11.2.1 Non‐Infrastructure Solutions .............................................................................................. 2711.2.2 Maintenance Activities and Renewal / Rehabilitation Activities ....................................... 2711.2.3 Replacement Activities ....................................................................................................... 2811.2.4 Disposal Activities ............................................................................................................... 2811.2.5 Expansion Activities ............................................................................................................ 2811.2.6 Funding Sources ................................................................................................................. 28

11.3Asset/ Financial Plan ........................................................................................................................... 28

RECOMMENDATIONS .......................................................................................................................... 30 

List of Tables Table 4.1:   Surface Type Vs Roadside Environment ................................................................................... 5Table 4.2:   Functional Classification vs Roadside Environment ................................................................. 5Table 4.3:   MMS Class and Time of Need ................................................................................................... 6Table 4.4:   Road Improvement Needs ....................................................................................................... 6Table 4.5:   Water Linear (CIMA 2014) ........................................................................................................ 8Table 4.6:   Waste Water Linear .................................................................................................................. 8Table 4.7:   Waste Water Treatment (CIMA 2014) ..................................................................................... 9Table 6.1:   Replacement Cost Valuations and Replacement Costs .......................................................... 11Table 11.1:   Proposed AMP and Funding ................................................................................................... 29 

   

Village of Newbury, Asset Management Plan April 28, 2014 

  

 

List of Figures 

Figure 4.1   Remaining Service Life‐ Roads .................................................................................................. 7Figure 9.1:   Asset Life Cycle Costs (Building Blocks, MOI 2012) ................................................................ 16Figure 9.2:   10 Year Program – Annual Budget vs Average Budget .......................................................... 18Figure 10.1: Treatment Cost vs. Deterioration ........................................................................................... 24 

List of Appendices 

Appendix A: 10 Year Plan for Roads and York Street Drainage ...................................................................... Appendix B: York Street Outlet Plan ...............................................................................................................  

 

Village of Newbury, Asset Management Plan April 28, 2014 

 Rpt_Newbury_amp_fin_20140427.docx 

Introduction and Background  In the fall of 2012, the Province of Ontario, introduced a requirement for an Asset Management Plan (AMP) as a prerequisite for municipalities seeking funding assistance for capital projects, from the province; effectively creating a conditional grant. To qualify for future infrastructure grants, municipalities are required to develop an AMP that is approved by council by December 31, 2013. On April 26, the province announced that it had created a $100 million Infrastructure Fund for small, rural and northern municipalities. Accessing these funds requires an asset management plan. 

The province requires AMP’s for Roads, Structures, Water and Waste Water treatment collection and distribution and Social housing. The Village of Newbury (VoN) has responsibility for the local roads, water and waste water collection and distribution and waste water treatment. The VoN does not have any bridge or culvert structures with a greater than 3m span.  Accordingly, the scope of this plan includes all of the aforementioned assets.  

The provincial requirements for content of an AMP include; 

1. Executive Summary 2. Introduction 3. State of the Local infrastructure 4. Expected Levels of Services 5. Asset Management Strategy and, 6. Financing Strategy 

The Village of Newbury is located in Middlesex County in South West Ontario. The Village has very limited resources, both financial and staffing; the population is 439, and only one employee. The approach to this project is predicated upon these circumstances and as such, represents a higher level approach to the development of an Asset Management Plan that recognizes the immediate physical deficiencies that have to be addressed in the ten year horizon, and provides recommendations for fuller development of other aspects of a plan. 

Key to the development of an AMP is a ‘State of the Infrastructure’ (SotI) review of the asset or asset group. Understanding the composition and replacement and maintenance costs of an asset group is essential to development of an AMP. This report incorporates the condition information from the following documents;  

‘2013 Road Needs Study Report’ Stantec Consulting, 2013 

‘York Street Drainage Improvements’, CIMA Canada, 2013 

‘State of the Infrastructure’, CIMA Canada, 2014 

 

 

   

Village of Newbury, Asset Management Plan April 28, 2014 

 Rpt_Newbury_amp_fin_20140427.docx 

Project Approach Overview The VoN has been developing the background information for the preparation of the plan over the last 1 to 2 year period with the production of the Roads Needs Study, The State of the Infrastructure and the York Street Drainage Report. The provincial requirements for content of an AMP include are identified in Section 1 of this report. 

In order to develop the AMP, the following approach was adopted  

In order to develop the AMP, the following approach was adopted  

1. Review of documentation that has been developed. 2. Development of Draft Asset Management and Financing Strategies 3. Village of Newbury staff review and comment on Draft 4. Presentation of Draft AMP to Council 5. Revision / Finalization of Asset Management and Financing Strategies 6. Final Report preparation 7. AMP presentation to, and adoption by, Council 

 

   

Village of Newbury, Asset Management Plan April 28, 2014 

 Rpt_Newbury_amp_fin_20140427.docx 

Asset Condition Rating Methodology 

3.1 Asset Condition Rating Methodology ‐ Roads 

The provincial requirements for AMP’s include asset condition assessment in accordance with standard engineering practices. The road section reviews follow the methodology of the Ministry of Transportation Inventory Manual for Municipal Roads, 1991. 

The condition of the road system is mandated by provincial Legislation by the following:  

Municipal Act 2001, Section 44 (1).The municipality that has jurisdiction over a highway or bridge shall keep it in a state of repair that is reasonable in the circumstances, including the character and location of the highway or bridge.  2001, c. 25, s. 44 (1). 

Regulation 239/02 –Minimum Maintenance Standards for Municipal Highways ‐is a result of Section 44 

3.1.1 Inventory Manual History 

From the 1960’s until the mid‐1990’s, the Ministry of Transportation (MTO) required municipalities to regularly update the condition ratings of their road systems in a number of key areas. The process was originally created by the MTO, as a means to distribute conditional funding, on an equitable basis, between municipalities. The reports were referred to as a ‘Road Needs Study’ (RNS) and were required in order to receive a conditional grant to subsidize the municipal road programs. After the introduction in the 1960’s by the MTO, the methodology evolved into the current format by the late 1970’s. The most current version of the Inventory Manual is dated 1991, and is the methodology used for this report. The practice was discontinued by a number of municipalities, when conditional funding for roads was eliminated in the mid 1990’s.  To put this in a more current context, a Road Needs Study is essentially the ‘State of the Infrastructure’. 

A more detailed discussion on the Inventory Manual Methodology is included in the 2013 Road Needs Study (Stantec) 

 

    

Village of Newbury, Asset Management Plan April 28, 2014 

 Rpt_Newbury_amp_fin_20140427.docx 

3.2 Asset Condition Methodology – Water, and Waste Water, Collection and 

Distribution and Waste Water Treatment 

The condition and performance of all aspects of water and waste water collection, distribution and 

treatment is covered by Legislation and many Regulations. Standards for water and waste water quality 

are set out in: 

Safe Drinking Water Act, 2002 

Ontario Regulation 169/03 (Water Quality Standards) 

Ontario Regulation 170/03 (Drinking Water Systems) 

Ontario Water Resources Act 

Environmental Protection Act 

The methodology used in preparing the analysis on the water and waste water infrastructure was based on the methodology developed by the American Society of Civil Engineers, which periodically prepares such a Report Card for American public infrastructure. The SotI report (CIMA 2014) indicates that this would be similar to the approach taken in other centres. A fuller description of the methodology is include in the CIMA SotI Report. 

 

 

 

 

 

 

   

Village of Newbury, Asset Management Plan April 28, 2014 

 Rpt_Newbury_amp_fin_20140427.docx 

State of the Infrastructure (SotI) 

4.1 State of the Infrastructure –Roads 

The Road Needs Study (Stantec 2013) is a detailed account of the SotI for the road assets. The following 

information is excerpted from that report. 

Table 4.1: Surface Type Vs Roadside Environment 

Surface Type 

Roadside Environment Total  % Total 

Rural  Semi‐Urban 

Cl‐km  Lane‐km  Cl‐km Lane‐km 

Cl‐km Lane‐ km 

Cl‐km Lane‐ km 

High Class Bit.‐asphalt  0.15  0.29      0.15  0.29  2.55%  2.55% 

Gravel  0.66  1.32  4.88  9.76  5.54  11.08  97.45%  97.45% 

Total  0.81  1.61  4.88  9.76  5.69  11.37     

% of Total  14.16%  14.16%  85.84%  85.84%         

 

 

Table 4.2: Functional Classification vs Roadside Environment 

Road Classification 

Roadside Environment Total  % Total 

Rural  Semi‐Urban 

Cl‐km Lane‐ km 

Cl‐km Lane‐km 

Cl‐km Lane‐ km 

Cl‐km Lane‐ km 

200  0.15  0.29      0.15  0.29  2.55%  2.55% 

300  0.66  1.32      0.66  1.32  11.61%  11.61% 

C/R      0.12  0.25  0.12  0.25  2.16%  2.16% 

L/R      3.94  7.88  3.94  7.88  69.25%  69.25% 

LCI      0.82  1.64  0.82  1.64  14.44%  14.44% 

TOTAL  0.81  1.61  4.88  9.76  5.69  11.37     

% of Total  14.16%  14.16%  85.84%  85.84%         

 

   

Village of Newbury, Asset Management Plan April 28, 2014 

 Rpt_Newbury_amp_fin_20140427.docx 

Table 4.3: MMS Class and Time of Need 

Need Year 

MMS Class Total 

4  5 

Cl‐km  Lane‐km  Cl‐km  Lane‐km  Cl‐km  Lane‐km 

NOW  0.41  0.83  1.22  2.43  1.63  3.26 

1‐5      0.12  0.24  0.12  0.24 

6‐10  0.25  0.49  3.55  7.09  3.79  7.58 

ADEQ  0.15  0.29      0.15  0.29 

Total  0.81  1.61  4.88  9.76  5.69  11.37 

% of Total  14.16%  14.16%  85.84%  85.84%     

System Adequacy %  49.4  48.4  75.0  75.1  71.4  71.3 

Good to Very Good %  49.4  48.4  72.5  72.6  69.2  69.2 

 

Table 4.4: Road Improvement Needs 

    1 to 5  6 to 10  ADEQ  NOW  TOTAL 

Imp. 

Class 

Imp 

ID Cl‐km 

Imp. 

Cost Cl‐km  Imp. Cost  Cl‐km 

Imp. 

Cost Cl‐km  Imp. Cost  Cl‐km  Imp.Cost 

Const  REC      1.24  853,329      1.16  755,949  2.4  1,609,278 

Const  RSS  0.12  191,159  0.36  565,511      0.47  748,704  0.95  1,505,373 

Maint  SD      1.95  0  0.15  0      2.1  0 

Rehab  R1      0.25  25,856          0.25  25,856 

TOTAL    0.12  191,159  3.79  1,444,696  0.15  0  1.63  1,504,653  5.69  3,140,507 

% of 

Total  

2.11%  6.09%  66.66%  46.00%  2.55%    28.68%  47.91%     

 

System Adequacy 

The system adequacy is the ration of the “NOW’ need roads to the total system. This is a holistic measure, using the Inventory Manual Methodology, as needs are identified in six critical areas, not just the distress on the road surface. The current system adequacy is 71.4%. 

Physical Condition 

Physical condition is the Structural Adequacy rating multiplied by five to produce a rating of between 5 and 100. This is a measure of the amount of distress on the road however the scale is not linear. The current average Physical Condition of the road system is 62.5. 

Village of Newbury, Asset Management Plan April 28, 2014 

 Rpt_Newbury_amp_fin_20140427.docx 

MPMP Good to Very Good 

The province requires annual reporting on the percentage of roads that are rated as good to very good. It has been assumed that the 6‐10 and adequate roads are good to very good and this has been expressed as a percentage of the system. Good to very good roads represent 69.2% of the road system. 

Remaining Service Life ‐Roads 

As indicated previously, the Time of Need is really a prediction model in terms of an estimate based on current condition to the time for reconstruction. The TON then also provides an estimate of the remaining life in the road system/section. The following figure summarizes the structural adequacy ratings of the road system and illustrates the estimated remaining service life of the road system. 

Figure 4.1 Remaining Service Life‐ Roads 

 

 

Drainage 

Adequate drainage is critical to the performance of a road to maximize its’ life expectancy. Roads are designed, constructed, and maintained in order to minimize the amount of water that may enter, or flow over, the road structure.  

In the case of water flowing over the road, assessment must be made of the circumstances on a site‐specific basis. Factors that should be considered include the traffic volumes of the road section, economic impacts to the loss of the use of the road, upgrade costs, and risks. There is further detailed discussion on drainage in the Road Needs Study Report (Stantec 2013). 

Village of Newbury, Asset Management Plan April 28, 2014 

 Rpt_Newbury_amp_fin_20140427.docx 

4.2 State of the Infrastructure – Water Linear (CIMA 2014) 

Engineering staff currently from the CIMA firm have been providing engineering services while working 

for other firms to the Village of Newbury for approximately 20 years. Their role over that time period 

would be similar to that of ‘Engineer of Record’. As such, their knowledge of the water and waste water 

infrastructure is significant. 

Inventory analysis was been completed by extracting available data from Record Drawings provided by 

the Village. A detailed condition assessment of the linear water asset has not been undertaken and, as 

such, the condition assessment is age based only. The Water Mains are constructed of PVC material. 

Further detail is available from the State of the Infrastructure Report, CIMA 2014) 

Table 4.5: Water Linear (CIMA 2014) 

Asset Category  Asset 

Grades 

Mean  

Grade Trend 

Condition 

Perform

ance 

Cap

acity  

vs. n

eeds 

Funding  

vs. n

eeds 

Water Linear  Water Lines ‐ Primary  A‐  A  A  D  B+ 

B+ 

↓ 

↓ Water Lines ‐ Secondary  A‐  A  A  D  B+  ↓ 

Hydrants  A‐  A  A  D  B+  ↓ 

Service Connections  A‐  A  A  D  B+  ↓ 

 

4.3 State of the Infrastructure ‐ Waste Water Linear (CIMA 2014) 

Inventory analysis was been completed by extracting available data from Record Drawings provided by 

the Village. A detailed condition assessment of the linear waste water assets has not been undertaken 

and, as such, the condition assessment is age based only. The Waste Water sewers are constructed of 

PVC material. The low pressure force mains are constructed of HDPE. Further detail is available from the 

State of the Infrastructure Report, CIMA 2014) 

Table 4.6: Waste Water Linear 

Asset Category 

Asset 

Grades 

Mean  

Grade Trend 

Condition 

Perform

ance 

Capacity  

vs. needs 

Funding  

vs. needs 

Wastewater Linear 

Sewer Pipes  A  A  A+  D  B+ 

B+ 

↓ 

↓ Sewer Laterals  A  A  A+  D  B+  ↓ 

Manholes  A  A  A+  D  B+  ↓ 

Village of Newbury, Asset Management Plan April 28, 2014 

 Rpt_Newbury_amp_fin_20140427.docx 

 

4.4 State of the Infrastructure Waste Water Treatment (CIMA 2014) 

Further detail is available from the State of the Infrastructure Report, (CIMA 2014) on the Waste Water 

Treatment Facility and Pumping Station. 

 

Table 4.7: Waste Water Treatment (CIMA 2014) 

Asset Category 

Asset 

Grades 

Mean  

Grade Trend 

Condition 

Perform

ance 

Cap

acity 

vsneeds

Funding 

vsneeds

Wastewater Facilities 

Wastewater Treatment Plant 

Structure  A  A  A+  D  B+ 

B+ B+ 

→ 

→ → 

Electrical & Control Systems 

A  A  A+  D  B+  → 

Headworks (screen & grit removal) 

A  A  A+  D  B+  → 

Secondary Treatment –   Sequencing Batch Reactor 

A  A  A+  D  B+  → 

Secondary Treatment – Digester 

A  A  A+  D  B+  → 

Phosphorus Removal  A  A  A+  D  B+  → 

Tertiary Treatment (equalization & sand 

filtration) A  A  A+  D  B+  → 

UV Disinfection  A  A  A+  D  B+  → 

Main Lift Station  A  A  A+  D  B+  → 

 

 

   

Village of Newbury, Asset Management Plan April 28, 2014 

10 

 Rpt_Newbury_amp_fin_20140427.docx 

Record of Assumptions –TON, Improvement and Replacement Costs  For the road system, the methodology of this report is such that a number of the Inventory Manual itself forms the basis of a large number of assumptions in terms of; 

Dimensional requirements for the development of improvement and replacement costs 

Structural requirements based on road classification 

Time of needs based on the ratings and subsequent calculations 

For life cycle and performance modeling, Appendix B includes a description of the deterioration curves that were utilized for development of the asset management plan. 

For water and waste water infrastructure, assumption for replacement and life cycles are as shown Sections 6 of this report.  

 

   

Village of Newbury, Asset Management Plan April 28, 2014 

11 

 Rpt_Newbury_amp_fin_20140427.docx 

Replacement Cost Valuations Table 5.1 is from the SotI Report (CIMA2014), in part. Additional columns have been added to identify 

the anticipated life cycle and annualized capital depreciation based on that the replacement cost and 

the life cycle. Costs are in 2014 dollars. 

Table 6.1: Replacement Cost Valuations and Replacement Costs 

Asset Category  Replacement Cost  Life Cycle Yrs Annualized 

Cost 

Water Linear  $3,793,000  75  $50,573 

Waste Water Linear  $3,220,550  100  $32,206 

Waste Water Facilities  $5,305,000  40  $132,625 

Stormwater Linear  $3,453,800  100  $34,538 

Roads Systems  $3,885,150  50  $77,700 

TOTAL Newbury  $19,657,500     $393,150 

 

6.1 Replacement Cost Valuation –Roads (Stantec 2013) 

The budget recommendations bear a direct relationship to the value of the road system. 4 Roads estimates the cost to replace the road system, to its current standard, at $3,885,150. This estimate is based on the Village’s unit costs. The estimates are in accordance with the Inventory Manual and the Roadside Environment indicated in the database. The majority of the roads are indicated as Semi‐Urban, therefore storm sewer costs are not included in that estimate. Further detail on cost estimates is available in the Road Needs Study Report (Stantec 2013). 

6.2 Replacement Cost Valuation – Water Linear (CIMA 2014) 

The replacement values were calculated with the following unit costs: $5,250 /hydrant, $400,000/km for the primary distribution main, $300,000/km for the local watermains, and $150,000/km for water services. The replacement cost of the water linear infrastructure is $3,793,000. 

6.3 Replacement Cost Valuation – Waste Water Linear (CIMA 2014) 

The replacement values were calculated assuming the following unit costs: $5,000/manhole, $285,000/km for the laterals, $450,000/km for the sewer mains, and $250,000/km for the low pressure sewers. The replacement cost of the wastewater linear infrastructure is $3,220,550. 

6.4 Replacement Valuation – Storm Water Linear (CIMA 2014) 

The replacement values were calculated with the following unit costs: $5,000/manhole, $3,500/catch basins, and between $300,000 and $600,000/km for the storm sewer, depending on the pipe diameter. The replacement cost of the stormwater linear infrastructure is $3,453,800. 

Village of Newbury, Asset Management Plan April 28, 2014 

12 

 Rpt_Newbury_amp_fin_20140427.docx 

6.5 Replacement Cost Valuation – Waste Water Treatment (CIMA 2014) 

The replacement value for the WWTP was calculated based on the 2003 cost with an allowance for escalation at 5% annually. The replacement cost for the lift station is based on current construction costs for similar stations. The replacement costs for Waste Water Treatment and Facilities is $5,305,000. 

   

Village of Newbury, Asset Management Plan April 28, 2014 

13 

 Rpt_Newbury_amp_fin_20140427.docx 

Asset Condition Assessment and Plan Updates 

7.1 Condition Assessment Cycle Recommendation ‐ Roads  

4 Roads would recommend a four year cycle – maximum ‐ for review and update of road system condition ratings. 

7.2 Condition Assessment Cycle Recommendation – Waste Water Linear 

The gravity systems should be flushed and videoed every 10 to 15 years. 

The low pressure system should be pressure tested every 10 to 15 years 

7.3 Condition Assessment Cycle Recommendation –Storm Water Linear 

The systems should be flushed and videoed every 10 to 15 years. 

7.4 Condition Assessment Cycle Recommendation – Water Linear 

Water Valves should be exercised and inspected annually. 

Hydrant flows should be checked every 10 years 

7.5 Condition Assessment Cycle – Waste Water Treatment Facilities 

Waste water treatment facilities are complex facilities that include a number of different infrastructure 

types that have varying lifecycle. 

The waste water treatment facility should be reviewed every 5 years. 

7.6 Asset Management Plan Updates 

The Asset Management Plan should be reviewed annually to update the condition and financial 

requirements to maintain the plan. This will ensure that fluctuations in market conditions and other 

circumstances may be incorporated into the plan. 

 

 

   

Village of Newbury, Asset Management Plan April 28, 2014 

14 

 Rpt_Newbury_amp_fin_20140427.docx 

Level of Service (LOS)  Level of Service has a different meaning for different interests. For instance, the cost per unit may not have an impact to a ratepayer whose chief concern may be service delivery. Similarly, cost or expenditure per unit may not illustrate the condition of the asset to the end user. Further, municipalities are required to report on various Municipal Performance Measures (MPMP) 

4 Roads believes that multiple service measures may be required to adequately relate the condition of an asset to the various user groups; condition, operating costs, and end user. The following sections identify various measurements of service of the road system  

8.1 LOS‐ Roads 

System Adequacy 

The system adequacy is the ration of the “NOW’ need roads to the total system. This is a holistic measure, using the Inventory Manual Methodology, as needs are identified in six critical areas, not just the distress on the road surface. The current system adequacy is 71.4%. 

The System Adequacy should be 60% as a minimum. 

 

Physical Condition 

Physical condition is the Structural Adequacy rating multiplied by five to produce a rating of between 5 and 100. This is a measure of the amount of distress on the road however the scale is not linear. The current average Physical Condition of the road system is 62.5. 

The Average Physical condition should be 70 as a minimum 

 

MPMP Good to Very Good 

The province requires annual reporting on the percentage of roads that are rated as good to very good. It has been assumed that the 6‐10 and adequate roads are good to very good and this has been expressed as a percentage of the system. Good to very good roads represent 69.2% of the road system. 

The good to very good roads should be 70% as a minimum. 

8.2 LOS – Water and Waste Water 

Water 

The LOS targets for the water system are to provide uninterrupted service and have zero boil water advisories. 

Waste Water 

The LOS for the Waste Water Collection System is ensure the system has zero exfiltration and infiltration and that the linear assets have regular inspections to ensure rehabilitation to the system occur at the optimum time. 

 

Village of Newbury, Asset Management Plan April 28, 2014 

15 

 Rpt_Newbury_amp_fin_20140427.docx 

Waste Water Treatment 

The LOS targets for the Waste Water Treatment system are: 

To be in compliance with the Certificate of Approval for operation of the plant. 

To have zero bypass events 

   

Village of Newbury, Asset Management Plan April 28, 2014 

16 

 Rpt_Newbury_amp_fin_20140427.docx 

Program Funding Recommendations 

9.1 Overview 

Budgetary recommendations in this report do not include items related to development and growth. The Village should consider those items as additional to the recommendations in this report. Generally, that type of improvement or expansion to the system would be funded from a different source, such as Development Charges. 

Program funding recommendations are a function of the dimensional information, surface or material type, roadside environment, functional class of the individual assets and current unit costing. Recommended funding for an asset should ideally include sufficient capital expenditures that would allow the replacement of infrastructure as the end of design life is approached, in addition to sufficient funding for maintenance, to ensure that that full life expectancy may be realized. As a minimum, the funding level should be such the current average condition of the asset group may be maintained. 

The budget recommendations bear a direct relationship to the value of the asset group. 

Figure 9.1: Asset Life Cycle Costs (Building Blocks, MOI 2012) 

 

In general terms, the budget for any given asset should include all applicable expenses to sustain an asset over its’ life cycle, including capital, operating, depreciation, interest etc. Figure 9.1 illustrates the cost components that would be included in determining the life cycle cost. 

Village of Newbury, Asset Management Plan April 28, 2014 

17 

 Rpt_Newbury_amp_fin_20140427.docx 

There are alternate approaches that may be used to determine a budget that will sustain or improve the asset condition. For instance, a performance model that includes maintenance and capital improvements and treatments may also be used to develop a program and a sustainable budget. 

In reviewing the VoN 2012 FIR a number of issues are noted. In 2012 VoN recorded a deficit of approximately $103,000 based on full accrual accounting. Furthermore, there were no funds placed in reserves for future replacement of tangible capital assets. 2012 year end reserve levels are approximately Water ‐ $33,000, Waste Water ‐ $14,000 and General ‐ $44,000. Annual amortization for 2012 was Water ‐ $39,000, Waste Water ‐ $133,000 and General ‐ $40,000. VoN should consider making annual contributions to replacement reserves to ensure sustainable financing into the future. 

The 2012 FIR (Schedule 81) also indicates a maximum debt capacity of $583,000. This is based on a maximum annual debt payment limit of $131,000 (25% of own source revenues). While having capacity is beneficial, borrowing to the full capacity level would result in a major tax increase (Additional $133,000 on a base of $218,000). VoN should review its FIR debt capacity calculation as the 5 year term used in its calculation seems unreasonably short. 

There may be additional financing schemes available such as local improvements, municipal drain programs, grants, fundraising and all alternatives should be actively pursued.   

 

9.2 Budget Recommendations ‐ Roads  

Based on the composition of the road system, budget recommendations have been developed for annual capital and maintenance programs as follows: 

$77,700 for the roads capital/depreciation, excluding resurfacing, based upon a 50‐year life cycle. (this would be similar to the PSAB 3150 amortization value) 

$28,100 for annual hot mix resurfacing, based upon a 20‐year cycle. 

$2,200 annually for crack sealing 

4 Roads has created a number of performance modeling scenarios for this project. The models are tied to a series of deterioration curves and maintenance and capital treatments that are required a certain condition levels. The improvement types include crack sealing, resurfacing either one or two lifts, and reconstruction. 

The small size of the road system does not lend itself to a modeling scenario where the annual budget limit is the capital depreciation funding level. An annual budget cap of $77,000 would not permit the majority of projects to be completed as the reconstruction of a single block is typically greater than $77,700. 

Modelling to maintain the condition of the existing road system performs well. However, it will result in annual expenditures greater than the average in some years. For this reason 4 Roads recommends the creation of Capital Reserves for asset Groups. Figure 9.2 below illustrates the annual versus average funding requirements for the proposed 10 year plan. The program includes road improvements to maintain the overall system condition and construct a storm sewer and outlet on York Street. The details of the 10 year program are included in Appendix A of this report. 

Village of Newbury, Asset Management Plan April 28, 2014 

18 

 Rpt_Newbury_amp_fin_20140427.docx 

Figure 9.2: 10 Year Program – Annual Budget vs Average Budget 

 

 

9.3 Budget Recommendations – Water and Waste Water, Collection, Distribution 

and Treatment 

The water and waste water systems are being treated collectively as together they form a complete cycle of delivery and collection and treatment of water. The Sustainable Water and Sewage Systems Act, 2002 came into force August 2007 that required that these utilities be supported by user fees or rates that would make the utility financially viable. However, it is understood that this didn’t necessarily mean full cost recovery. 

4 Roads understands that the VoN has established user rates for Water and Waste Water (WWW) and further understands that the WWW rates are subsidized by an annual contribution from the Levy supported budget. No further information, such a Rate Study, has been provided. 

Given that the WWW rates are subsidized through the tax supported budget, it is recommended that a rate study be undertaken to develop appropriate user rates for WWW. The rates should be developed based on a minimum 50 years of anticipated capital and operating costs. Figure 9.1 illustrates the factors that should be included in the development of an appropriate rate.  

 

9.4 Budget Recommendations – Storm Sewers 

The storm water systems in municipalities, for the most part, tend to tied directly to the road system. 

Regardless of roadside environment, the road allowance is typically designed to convey both major and 

minor events. The life cycle is typically the same as for the waste water conveyance piping. 

Village of Newbury, Asset Management Plan April 28, 2014 

19 

 Rpt_Newbury_amp_fin_20140427.docx 

In South West Ontario, the Drainage Act is used to create legal outlets, usually for farmland but it has 

been used to create outlets for developed lands also. 4 Roads understands that there is a number of 

municipal drains in the VoN and that this is the storm sewer asset that has been identified in the SotI 

Report (CIMA 2014).  

Generally, Municipal Drains are not designed to a municipal standard for storm water and are therefore 

much smaller in diameter than would be anticipated for drainage in an urban area. Further, municipal 

drains are typically constructed of pipes with a butt joint to allow groundwater infiltration (to drain 

farmland). Whereas the VoN appears to be serviced by a number of municipal drains, they do not 

provide the same standard of service as a storm sewer. As roads within the VoN are reconstructed the 

drainage system should be upgraded to a municipal standard. 

Under the Drainage Act, the parties benefitting from the drainage afforded by the drain pay in 

proportion to their benefit. This would be very similar to a ‘rate’ supported system except the costs are 

not annualized, they are dealt with a required for maintenance and repairs.  

A Master Drainage Plan is recommended for the VoN and the servicing of developed land that is 

currently service by Municipal Drains be integrated into the Study.  

9.5 Performance Modeling‐ Budget Effect on Road System Performance and 

Proposed Storm Sewer Upgrades 

9.5.1 Asset Management Plan and Strategy Analysis 

The asset management plan is a function of the strategy and available financing. The development process for all elements is iterative, concurrent and holistic on a number of levels.  It is complex. 

The provincial guidelines for the preparation of an AMP indicate that the following must be considered; 

Options must be compared on Lifecycle cost‐ the total cost of constructing, maintaining, renewing and operating an infrastructure asset throughout its service life. Future costs must be discounted and inflation must be incorporated. 

Assessment of all other relevant direct and indirect costs and benefits associated with each option. 

o Direct benefits and Costs  Efficiencies and network effects  Investment scheduling to appropriately time expansion in asset lifecycles  Safety  Environmental  Vulnerability to climate change 

o Indirect Benefits and Costs  Municipal wellbeing and costs  Amenity values  Value of culturally or historically significant sites 

Village of Newbury, Asset Management Plan April 28, 2014 

20 

 Rpt_Newbury_amp_fin_20140427.docx 

Municipal image 

Assessment of Risks associated with all potential options. Each option must be evaluated based on its potential risk, using an approach that allows for comparative analysis. Risks associated with each option can be scored based on quantitative measures when reasonable estimates can be made of the probability of the risk event happening and the cost associated with the risk event. Qualitative measures can be used when reasonable estimates of probability and cost associated with the risk event cannot be made. 

 

Significant effort (and expense) will be required to meet all of these requirements. 

 

9.5.2 Performance Model Overview 

A properly developed performance model will satisfy the majority of the requirements identified in the foregoing. Key elements of a Performance Model will include; 

Deterioration Curves identifying anticipated deterioration of an appropriately constructed asset over the life cycle of the asset 

‘Trigger’ points throughout the deterioration curve identifying appropriate treatments at condition ranges 

Current costing for all treatments identified  

To capture the essence of the provincial requirements, development and use of a Performance Model is recommended. Through modeling and the resultant outputs the following may be addressed; 

Review of options and lifecycle effects based on a Return on Investment Analysis 

Efficiencies and network effects 

Budget requirements to achieve LOS goals  

It is respectfully suggested that a 10 year AMP can be developed through a Performance model, however, 4 Roads is of the opinion a number of other requirements that the province has identified should not be addressed until they reach the project stage. Further, a number of those requirements would be addressed through a Class Environmental Assessment process. 

Through performance modeling appropriate budget levels, programming and associated costs can be determined, delivering key elements of any plan that can be refined or revisited as circumstances change. Once a model is developed, then the effect of any alternatives may also be measured. 

9.6 10 Year Program 

4 Roads developed a model whose outcome is presented in this report as the 10 year capital plan. The model is designed to select maintenance and capital projects to maintain the system in its current condition and committed projects were identified to correct the York Street drainage problem. A Return on Investment (ROI) Performance Model scenario has been developed as the initial project selection process for the roads program. The details of the 10 year program are included in Appendix A of this report.  

Village of Newbury, Asset Management Plan April 28, 2014 

21 

 Rpt_Newbury_amp_fin_20140427.docx 

The plan is predicated on the SotI report and the basic assumption that due to the WWW asset being at an early stage of their life cycle, there shouldn’t anything other than operating needs in the next 10 years. 

   

Village of Newbury, Asset Management Plan April 28, 2014 

22 

 Rpt_Newbury_amp_fin_20140427.docx 

Asset Management Strategy 

10.1 Asset Management Overview 

Asset management has as almost as many definitions as there are agencies that manage assets. The American Association of State Highway and Transportation Officials (AASHTO) defines asset management as 

 “...  a  strategic  approach  to  managing  transportation  infrastructure.  It  focuses  on  business processes  for  resource  allocation  and utilization with  the objective of better decision‐making based upon quality information and well‐defined objectives.”  

The document entitled Managing Public Infrastructure Assets, 2001, prepared by AMSA, AMWA, WEF, and AWWA, defines asset management as;  

’managing infrastructure assets to minimize the total cost of owning and operating them, while continuously delivering the service levels customers desire, at an acceptable level of risk.’ 

The Province of Ontario’s document ‘Building Together‐ Guide for Municipal Asset Management Plans’ indicates 

‘The asset management strategy  is the set of actions that, taken together, has the  lowest total cost‐ not the set of actions that each has the lowest cost individually’ 

Regardless of the source of the definition, the key themes that keep being repeated are; 

Managing 

Strategic 

Effective 

Efficient 

$$$$$  !! 

Service 

Optimizing asset life cycle 

Risk Management 

As an absolute minimum, the objective of any asset management plan, or strategy, should be to ensure that the overall condition of an asset group does not does not diminish over time. The asset management strategy of an agency is heavily predicated, and inextricably linked to the available funding. 

Focus should be on an asset management strategy that utilizes available funding on maintenance, preservation and rehabilitation programs as a priority. Reconstruction and replacement candidate will remain reconstruction and replacement candidates and cost increases will be incremental with inflation. Maintenance and Preservation opportunities that are missed will escalate in cost by several hundred percent depending on site specifics. 

A similar approach should be considered for all asset groups 

Develop the financial plan in order that there is sufficient funding to maintain the condition of, or make viable, the asset groups. 

Village of Newbury, Asset Management Plan April 28, 2014 

23 

 Rpt_Newbury_amp_fin_20140427.docx 

Adjust / confirm the plan and funding requirements annually. 

10.2 Priority Rating vs. Condition Rating‐ Roads 

Information in a database may be sorted and analyzed in numerous ways. Understanding what information a data field represents, is key to the analysis. The Inventory Manual has many rated and calculated data fields and thus provides for many ways to sort data. Some commonly used representations, or sorting of information, from the database include: 

Priority Rating 

Priority Guide Number 

Structural Adequacy (Condition) 

Priority Rating is a calculated field in the Inventory Manual, and is a function of the traffic count and the overall condition rating of the road section. This approach adds weight to the traffic count of the section. Although the word ‘priority’ is included in the field name, a road section that has a higher calculated ‘Priority Rating’ is not necessarily a higher priority in the broader sense of asset management. 

Similarly, a municipality may choose to sort the road sections based on condition and cost per vehicle. The Priority Guide Number data field would assist in providing that analysis, as sorting on that parameter would prioritize road sections that have higher traffic and thus a lower cost per vehicle. 

Developing a road capital program around the Priority Rating or Priority Guide Number fields will likely result in programming that would lead to more rapid and widespread deterioration of the overall road system, as road sections with high traffic and in poor condition would be selected first, as opposed to selecting the best rehabilitation candidates at the appropriate time in their life cycles. The exception to this statement would be cases where rehabilitation funding is at a high enough level to ensure that the preservation program requirements can be met. 

From a more current asset management perspective, project selection should be predicated by condition. (Structural Adequacy or PCI). Figure 10.1 clearly illustrates the financial advantages of managing the road system by performing the right treatment at the right time of the asset life cycle. If appropriate strategies are not undertaken at the correct time, there is a less effective usage of the available funding. Similar concepts may be applied to the structures inventory and other most assets 

 

 

   

Village of Newbury, Asset Management Plan April 28, 2014 

24 

 Rpt_Newbury_amp_fin_20140427.docx 

Figure 10.1: Treatment Cost vs. Deterioration 

 

 

If an agency’s budget is fully funded, the programming will include reconstruction, resurfacing, and preservation programs. Prioritization within the different programs will vary as demands are different. However, within the resurfacing and preservation programs, the pavement condition should drive the decision making. 

Where funding is limited, resurfacing and preservation programs should be prioritized over the construction program. The effect of this approach will be that ‘NOW’ need roads will remain ‘NOW’ needs. However, by virtue of their ‘NOW’ need condition, ‘NOW’ need roads will require increased maintenance and likely generate increased complaints from the driving public. To deal with this eventuality, a municipality should create a ‘maintenance paving budget’, over and above the resurfacing budget. The purpose of this budget is to defer the reconstruction needs, and reduce maintenance efforts and complaints until the road can be reconstructed.  

For structures, resurfacing and bridge deck waterproofing and rehabilitations offer a very good return on investment. When bridge structures are rehabilitated the opportunity to convert the structure to an integral or semi‐integral structure will improve performance of over the longer term. 

10.3 Cross Asset Integration and Project Prioritization 

Prioritizing projects from a purely asset management perspective is a relatively straightforward exercise, regardless of funding level. Complications arise when the specific needs, commitments of the agency, and priorities of other utilities factor into the decision making process. 

The road system is, in reality, a utility corridor. Multiple utilities in both urban and rural roadside environments will present conflicting demands and priorities in advancing projects. The Road Needs 

Village of Newbury, Asset Management Plan April 28, 2014 

25 

 Rpt_Newbury_amp_fin_20140427.docx 

Study provides ratings that deal strictly with the condition of various factors as they relate to the road section. Those factors have to be considered in conjunction with needs and priorities that may exist for other utilities or pending development. In fact, the condition of other infrastructure within the road allowance may be the key element in the prioritization. For example, a road rated as a reconstruction project may have a relatively low priority rating, but a trunk storm sewer servicing a greater area may require immediate installation. The priority of the road is then dictated by the other utility, and should be integrated into the capital plan, to best serve all interests. 

Less tangible priorities may also be project prioritization tools for some agencies. For example, an agency may want to advance projects that also include bus routes or bike lanes. 

As a municipal road program is developed, opportunities to complete work on smaller sections adjacent to the main project, at a lesser cost than if completed as a stand‐alone project, should be considered to realize economies of scale, and complete improvements that may otherwise be passed over.  

   

Village of Newbury, Asset Management Plan April 28, 2014 

26 

 Rpt_Newbury_amp_fin_20140427.docx 

Financial Strategy and Plan 

11.1 Financial Plan Overview 

The financial plan/strategy is integral to the asset management plan. 

The overall condition of the system was above the minimum target set by the province when prior to the removal of conditional grants in the mid 1990’s. This relates more to the history of construction that occurred approximately 20 years ago, more than it does to ongoing capital programming. 

Approximately 20 years ago, the VoN was fortunate to have a hot mix resurfacing program, that allowed the VoN to resurface the majority of their streets. The asphalt is nearing the timeframe where it should be resurfaced. Most of the roads do not have adequate if any drainage. As such most of the road system is identified as having drainage and aged asphalt defects to some degree. 

Shortly after the resurfacing of the roads, sanitary sewers and watermains were also installed in the VoN. Since that time, there really has not been a capital improvement program as all that should have been required would be maintenance. 

Given the foregoing, it does not appear that there is an annual capital expenditure budget for any asset group. 

It is not anticipated that there will be any WWW improvements required in the next 10 year period. 

As such, the thrust of the AMP has to be to develop funding for the 10 year period to ensure that the road system is maintained in its current condition and the York Street Flooding problem is corrected. . The funding gap is significant, which leaves few alternatives other than debt financing and provincial assistance. 4 Roads understands that currently, the VoN is debt free therefore there should be sufficient borrowing capacity to debenture the new construction and improvement costs. 

From the York Street Drainage Improvements (CIMA 2013), the gross cost of drainage works is $517,750 Roadworks to maintain the system in its current condition adds an additional $527,795, bringing the total funding requirement to $1,045,545.  If the work were to be financed through debenture, assuming a 5% interest rate and a 10 year payback period, the annual debt repayment is $135,400 annually. 

An additional $135,400 annually is a significant increase to the Village’s budget. Through discussions with staff it was agreed that the plan would be developed assuming a 66% grant on the major projects and that if the grant was not received, the projects would not proceed. 

Asset management strategies are critical to managing the performance of an asset group, more so, if funding is limited. Funding constraints should push the strategy toward those programs that extend the life cycle of the road by providing the correct treatment at the optimum time. For roads, resurfacing, rehabilitation, and preservation projects should be a higher priority than reconstruction projects. There is saying for Asset Management of road assets and that is to “keep the good roads good”. This concept should be borne in mind for all assets. 

 

Village of Newbury, Asset Management Plan April 28, 2014 

27 

 Rpt_Newbury_amp_fin_20140427.docx 

11.2 Asset Management Plan / Financial Plan Decision Matrix 

The provincial guide for Municipal Asset Management Plans suggests that the detailed plan review include the following elements; 

Non‐Infrastructure Solutions 

Maintenance Activities 

Renewal / Rehabilitation Activities 

Replacement Activities 

Disposal Activities 

Expansion Activities 

The VoN considers that an AMP is a dynamic document and will remain in a continuing state of evolution. As condition ratings, technology, site specific circumstances and funding levels change, the asset management plan will also. With respect to the above noted, the VoN will integrate those considerations as identified in the following discussion. 

11.2.1 Non‐Infrastructure Solutions 

The VoN adheres to the Class Environmental Assessment regulation when considering the advancement of projects as part of its standard service delivery practice. The Class EA provides for public notification and involvement and further requires the consideration and analysis of alternatives, as the final solution. Alternatives include analysis of whether an asset is still required and/or required for the same function and purpose. 

11.2.2 Maintenance Activities and Renewal / Rehabilitation Activities 

Maintenance and renewal /rehabilitation activities have been combined for this discussions as definitions can vary between agencies and may be a reflection of a cost threshold rather than the nature of the activity. 

For development of appropriate funding levels, and system performance at varying funding levels, the VoN uses Worktech Asset Manager Foundation. The software’s performance modeling capabilities have been used to develop the initial program recommendations and provide information on the longer term effect on the overall road system. 

Essentially, the model will provide a recommended treatment based on Return on Investment, current or projected condition of each asset, current recommendation, and current funding level. The analysis is based on the current unit costs for activities and the anticipated effect on the asset if the treatment is applied. Appendix F provides additional detail on the model. 

Maintenance and renewal/rehabilitation activities for road assets include  

crack sealing,  

slurry sealing/ Microsurfacing 

Renewal of the surface wearing course.  

Removal and replacement of all asphalt, including minor drainage improvements 

New technologies may be used in lieu of replacement of both layers of asphalt, such as cold in place recycling, or expanded asphalt  

Village of Newbury, Asset Management Plan April 28, 2014 

28 

 Rpt_Newbury_amp_fin_20140427.docx 

Maintenance and renewal/ rehabilitation activities for Sewer Assets include 

Video and flushing 

Minor rehabilitations, at joints and in manholes where infiltration is occurring  

Relining 

Maintenance and renewal/ rehabilitation activities for Watermain Assets include 

Valve Exercising and Inspection 

Flushing 

Relining 

Flow monitoring and pressure testing 

Cathodic Protection Checks  

11.2.3 Replacement Activities 

Replacement activities are different for the different asset groups; a bridge, culvert structure, sewer or watermain will have to be removed completely and replaced whereas there is usually some element of the road asset that may be salvageable. 

11.2.4 Disposal Activities 

As noted in 11.2.3 there is a distinct difference between road and structure assets in terms of disposal. The disposal of a road cannot be accomplished in the same manner as a piece of equipment; the road allowance is the road allowance and even as rehabilitation occurs, the road is never totally removed and rarely closed completely. Most other assets disposal is complete at the end of the service life. 

11.2.5 Expansion Activities 

In concert with the non‐infrastructure solutions, expansion requirements will be a consideration in the final project detail. The VoN will consider the Official Plan as an element of any project going forward. The Official plan may indicate a growth potential in the twenty to twenty five year planning horizon and this will be incorporated into the final decision at the project level on a site specific basis. The VoN has very limited expansion potential.  

11.2.6 Funding Sources 

Going forward, the VoN will consider all funding options in order to maintain and enhance the overall condition of the asset groups. Funding sources will include debentures, capital reserves, operating budgets, gas tax and grants. 

11.3 Asset/ Financial Plan 

Table 11.1 identifies the high level program and project costs for the 10 year plan. Appendix A of this 

report proves the details of the plan. 

.

Village of Newbury, Asset Management Plan April 28, 2014 

29 

 Rpt_Newbury_amp_fin_20140427.docx 

Table 11.1: Proposed AMP and Funding 

 

 

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Grand Total

Roads and Storm Sewer‐ Levy Supported

CRK‐ Crack Sealing 986 470 706 470 450 3,082

GRR2 ‐ add 150mm Gravel 6,107 6,107 12,214

R1‐ Resurface 50mm 25,856 24,183 23,109 11,192 22,798 22,328 129,466

REC‐ Rural  Reconstruction 91,083 91,083

RSS‐ Reconstruct with Storm Sewers 211,000 203,200 190,000 604,200

SD‐ York Street Outlet 155,500 155,500

SWMeng ‐Storm Water Master Plan 50,000 50,000

Total Levy Supported 166,939      155,500      31,276         211,000      23,579         203,200      18,005         190,000      23,268         22,778         1,045,545  

Water and Waste Water ‐ Rated Supported

Water ‐Linear

Waste Water Linear

Waste Water Treatment

Total Rate Supported 0 0 0 0 0 0 0 0 0 0

Grand Total  166,939      155,500      31,276         211,000      23,579         203,200      18,005         190,000      23,268         22,778         1,045,545  

Funding

Capital  Reserve ‐ Levy 5,000 5,000

Operating Budget ‐ Levy 75,968 52,870 31,276 71,740 23,579 69,088 18,005 64,600 23,268 22,778 453,172

Capital  Reserve ‐ Rate 0

Operating Budget ‐ Rate 0

Provincial  Grant (@66%) 85,971 102,630 139,260 134,112 125,400 587,373

Contibutions  from Others 0

Grants 0

Gas  Tax 0

Debentures 0

Total Funding 166,939 155,500 31,276 211,000 23,579 203,200 18,005 190,000 23,268 22,778 1,045,545

Improvement Type / Area

Year

Village of Newbury, Asset Management Plan April 28, 2014 

30 

 Rpt_Newbury_amp_fin_20140427.docx 

Recommendations 

In addition to the budgetary recommendations, the following recommendations are provided for the management of the road and structures inventories; 

1. The Village should develop an Asset Management Policy that may be adapted to all assets as plans for the other assets are developed. 

2. Consider the Asset Management and budget recommendations included in this report to further 

develop the longer term asset management plan in conjunction with a longer term financial plan. 

3. A Rate Study should be undertaken for the water and waste water assets to ensure that the rates 

are sufficient to ensure long term viability of the water and waste water facilities.  

4. The cycle for review of the road system should be continued, reviewing the entire system on a maximum four year cycle. 

5. A Master Drainage Plan should be developed prior to reconstruction of the road network to 

ensure that there is a legal, adequate outlet. The plan should be completed with consideration to 

the Municipal Drain Systems. 

6. Traffic counts should be undertaken to confirm the traffic volume and percentage of truck traffic 

on roads in order to have adequate geometric and structural design and Regulation 239/02 

classification. 

7. Annual budget adjustments should account for inflation and increases for each asset group. 

8. Capital reserves should be established for the road assets. 

9. Capital Reserves Should be established for the rate supported assets 

10. The asset management plan should be reviewed and revised annually from both condition and financial perspectives. 

11. Programming for roads should be reviewed to ensure that resurfacing and preservation programs are optimized. 

12. Traffic counts should be updated and repeated on a regular basis. The counting should include the percentage of truck traffic. 

 

 

Village of Newbury, Asset Management Plan April 28, 2014 

 

 Rpt_Newbury_amp_fin_20140427.docx 

 

 

 

 

Appendix A: 10 Year Plan for Roads and York Street Drainage 

   

Village of Newbury 10 Year Construction Program

Year Asset ID Street Name Description Imp. Type Cost

Start 

Cond End Cond Yrs Hold

Start 

Value

End 

Value

2015 300 COLTSFOOT DRIVE ( to ) PINE ROAD‐to‐245 METRES NORTH OF PINE ROAD R1 25,856$          70 97 119,373    165,417  

2015 100 COLTSFOOT DRIVE ( to ) HAGGERTY ROAD‐to‐YORK STREET REC 91,083$         10 100 9,108       91,083   

2015 700 YORK STREET ( to ) EMMOT STREET‐to‐TUCKER STREET SWMeng 50,000$         30 30 24,152    24,152   

2016 700 YORK STREET ( to ) EMMOT STREET‐to‐TUCKER STREET SD 155,500$       30 30 24,152    24,152   

2017 2200 TUCKER STREET ( to ) END [130 METRES SOUTH OF BROADWAY STREET]‐to‐BROADWAY STREET CRK 262$              87.85 87.85 2 72,652    72,652   

2017 3100 WELLINGTON STREET ( to ) BROADWAY STREET‐to‐HAGERTY ROAD CRK 232$              93.09 93.09 2 77,605    77,605   

2017 300 COLTSFOOT DRIVE ( to ) PINE ROAD‐to‐245 METRES NORTH OF PINE ROAD CRK 492$              95.86 95.86 2 163,473  163,473

2017 4300 PINE ROAD ( to ) SOUTHWEST MIDDLESEX BOUNDARY‐to‐COLTSFOOT DRIVE GRR2 6,107$           54.27 74.27 48,250    66,031   

2017 3600 OMARA STREET ( to ) WASHINGTON STREET‐to‐ELGIN STREET R1 12,254$         56.5 97 46,751    80,264   

2017 3300 THOMPSON STREET ( to ) HAGERTY ROAD‐to‐DURHAM STREET R1 11,929$         56.5 97 45,276    77,731   

2018 700 YORK STREET ( to ) EMMOT STREET‐to‐TUCKER STREET RSS 211,000$       29.36 100 23,637    80,507   

2019 3300 THOMPSON STREET ( to ) HAGERTY ROAD‐to‐DURHAM STREET CRK 230$              95.86 95.86 2 76,817    76,817   

2019 3600 OMARA STREET ( to ) WASHINGTON STREET‐to‐ELGIN STREET CRK 240$              95.86 95.86 2 79,320    79,320   

2019 2400 TUCKER STREET ( to ) HAGERTY ROAD‐to‐YORK STREET R1 11,284$         56.5 97 43,762    75,130   

2019 1200 BROADWAY STREET ( to ) JAMES STREET‐to‐EMMOT STREET R1 11,825$         56.5 97 44,882    77,055   

2020 600 YORK STREET ( to ) JAMES STREET‐to‐EMMOT STRET RSS 203,200$       22.17 100 17,580    79,298   

2021 100 COLTSFOOT DRIVE ( to ) HAGGERTY ROAD‐to‐YORK STREET CRK 246$              95.86 95.86 2 87,312    87,312   

2021 1200 BROADWAY STREET ( to ) JAMES STREET‐to‐EMMOT STREET CRK 228$              95.86 95.86 2 76,149    76,149   

2021 2400 TUCKER STREET ( to ) HAGERTY ROAD‐to‐YORK STREET CRK 232$              95.86 95.86 2 74,247    74,247   

2021 4300 PINE ROAD ( to ) SOUTHWEST MIDDLESEX BOUNDARY‐to‐COLTSFOOT DRIVE GRR2 6,107$           61.55 81.55 54,722    72,504   

2021 3800 ELGIN STREET ( to ) HAGERTY ROAD‐to‐DURHAM STREET R1 11,192$         56.5 97 43,658    74,952   

2022 800 YORK STREET ( to ) TUCKER STREET‐to‐DUNDAS STREET RSS 190,000$       22.73 100 17,667    77,724   

2023 3800 ELGIN STREET ( to ) HAGERTY ROAD‐to‐DURHAM STREET CRK 234$              95.86 95.86 2 74,071    74,071   

2023 700 YORK STREET ( to ) EMMOT STREET‐to‐TUCKER STREET CRK 236$              97 97 2 78,092    78,092   

2023 1600 BROADWAY STREET ( to ) QUEEN STREET‐to‐WELLINGTON STREET R1 11,055$         56.5 97 42,403    72,798   

2023 1300 BROADWAY STREET ( to ) EMMOT STREET‐to‐TUCKER STREET R1 11,743$         56.5 97 44,803    76,919   

2024 1300 BROADWAY STREET ( to ) EMMOT STREET‐to‐TUCKER STREET CRK 230$              97 97 2 76,919    76,919   

2024 1600 BROADWAY STREET ( to ) QUEEN STREET‐to‐WELLINGTON STREET CRK 220$              97 97 2 72,798    72,798   

2024 3200 RAILWAY STREET ( to ) HAGERTY ROAD‐to‐YORK STREET R1 11,437$         59.1 97 45,642    74,912   

2024 2700 DUNDAS STREET ( to ) YORK STREET‐to‐END [105 METRES NORTH OF YORK STREET] R1 10,891$         59.1 97 43,242    70,972   

Village of Newbury, Asset Management Plan April 28, 2014 

 

 Rpt_Newbury_amp_fin_20140427.docx 

 

 

 

 

Appendix B: York Street Outlet Plan 

 

VILLAGE OF NEWBURY

T000107A-C-6001.DWG 09/01/2013

YORK STREET DRAINAGE IMPROVEMENTFIGURE 1

SW

105m-450-STM 70m-450-STM40m-375-

STM 65m-375-STM

120m

-525

-STM

YORK STREET

YORK STREET

JAM

ES S

TREE

T

EMM

OTT

STR

EET

TUCK

ER S

TREE

T

OUTFALL

HAGERTY CREEK

(GOVERNMENT DRAIN)

MH1 MH2MH5

MH4 MH3

EX. SAN

EX. WM

EX. SAN

EX. WMEX

. SAN