Virginia Street Corridor Plan
From our Tier One University, world
renowned recreation and our Midtown
entertainment area to abundant cutting edge
business support services, entrepreneurs
find all the features they need to excel.
- Sharon Zadra, RTC Vice Chair and Reno Council Member
Do you have suggestions?Better lighting, better public transportation, incentives for carpooling, better bike paths-Midtown Parking Survey, 2014
Improve Walkability• Meet ADA standards• Encourage outdoor
activity• Improve access to transit
stops
Midtown sidewalks are narrow & have many obstructions
Improve Walkability• Meet ADA standards• Encourage outdoor
activity• Improve access to transit
stops
Midtown sidewalks are narrow & have many obstructions
People walk in the street & wheelchair access is limited
Midtown Design Concepts
Sidewalk space for walking
Midtown Design Concepts
Outdoor dining
Midtown Design Concepts
Improved access to bus stops
Midtown Concept
• Narrower travel lanes• Wider sidewalks• Slower speed (25 mph)• Bike parking
• Center turn lane• Improved lighting• Wayfinding signage
University TownLink UNR to Midtown with bike facilities• Bike facility on Evans/Sinclair• Share the Road signage on
Virginia• Improved E-W bike access• Off-street bike parking &
wayfinding signage
Evans Ave Bike Facility
Existing Holcomb Bike
Route
Midtown Bicycle Improvements
• Existing Bike Lane on Holcomb
Existing Bike Lane on Holcomb
Planned Bike Path on Evans
Planned Evans Bike Path (2014/2015
Construction)
RAPID Extension to UNRUniversity Town
• Extend RAPID• Link campus to community
Link today’s 7,200+ trips on Virginia Street to the 20,000+
people at UNR
RAPID Station Location Concepts
Manzanita Hall Area• Pedestrian-only
signal• Consolidate
crosswalks
RAPID station
RAPID station
Consolidate crosswalks at
Pedestrian Signal
RAPID Station Location Concepts
Lawlor Area• Roundabout for
traffic calming• Gateway
opportunity• Station near
Knowledge Center & the Joe
1 curbside station to serve north and
southbound travel
Gateway roundabout as RAPID terminus
South Reno Concept
• South of Patriot• Fatal crash locations• Low traffic volumes• Existing 50-55 mph
Project Development Process
Planning Study
February 2013
Apply for Entry into FTA Small Starts Project Development
March 2013
Environmental & Preliminary Design
2013-2014
Final Design
2015-2016
ROW, Utilities & Construction
2017-2018
Community Outreach
• Outreach will continue throughout the environmental and engineering phases
THANK YOU!