This is an example of a funded virtualization assessment provided for one of our customers.TRANSCRIPT
A c c e l e r a t i n g Y o u r S u c c e s s ™
November 14, 2008
David Koester Account MangerJim Wallburg Project ManagerTom Lorenz Technology ArchitectMike Fee IT Financial Consultant
Customer in Cincinnati, OHWindows® Server Consolidation ProjectInitial Presentation
2A c c e l e r a t i n g Y o u r S u c c e s s ™ 2
Agenda
• Introductions
• Overview of Project
• Review and discuss captured performance metrics
• Review initial analysis and confirm architecture assumptions
• Review initial analysis and confirm financial assumptions
• Solicit changes to prepare for the final presentation and report
• Next Steps
3A c c e l e r a t i n g Y o u r S u c c e s s ™ 3
Business Goals of Consolidation•Server hardware approaching end of life
•Control data center footprint
•Reduce electricity and cooling expense
4A c c e l e r a t i n g Y o u r S u c c e s s ™ 4
Consolidation Impact Assessment• Considers both the Technical and Financial Impact of Server and
Storage Consolidation• Uses the VMware Capacity Planner tool
– Non-disruptively captures hardware and software inventory from current environment
– Measures actual utilization of servers and records the peak workloads– Uses peak workloads to create consolidation scenario(s)– Used data collected by VMware from July 19 to September 5, 2008
• Model Financial Impact using Brigham-Gapenski Methodology– Based on Intermediate Financial Management, 5th Edition (1996)– Follows the model for evaluating asset replacement “Investment Decisions”– Provides a familiar analysis for those in finance who support IT– Develops a Total Cost of Ownership (TCO) baseline of current environment– Compares the baseline to the TCO of the recommended environment(s)– Provides a detailed Return On Investment analysis
5A c c e l e r a t i n g Y o u r S u c c e s s ™ 5
High Level View – A Dashboard
6A c c e l e r a t i n g Y o u r S u c c e s s ™ 6
Inventory Details - Chassis
7A c c e l e r a t i n g Y o u r S u c c e s s ™ 7
Inventory Details – CPU
8A c c e l e r a t i n g Y o u r S u c c e s s ™ 8
Inventory Details – NIC’s
9A c c e l e r a t i n g Y o u r S u c c e s s ™ 9
Weekly Loads – Business Hours
10A c c e l e r a t i n g Y o u r S u c c e s s ™ 10
Weekly Loads – Peak Hours
11A c c e l e r a t i n g Y o u r S u c c e s s ™ 11
Processor Peak Load & Peak Hour
12A c c e l e r a t i n g Y o u r S u c c e s s ™ 12
Vintage System
13A c c e l e r a t i n g Y o u r S u c c e s s ™ 13
Created Scenarios
NameServers
In ConsolidatedNot
ConsolidatedNew
Servers
Consolidation
Ratios x:1
All servers to BL460c 3.0Ghz (2-QC) 32GB 33 33 0 3 (*) 10
All servers to DL380 G5 3.0Ghz (2-QC) 32GB 33 33 0 3 (*) 10
All servers to BL460c 3.0Ghz (2-QC) 16GB 33 32 1 5 >6
All servers to DL380 G5 3.0Ghz (2-QC) 16GB 33 32 1 5 >6
* NOTE: Add (N+1) BL460c Server for redundancy
14A c c e l e r a t i n g Y o u r S u c c e s s ™ 14
Defining Target Server and Thresholds BL460c 2QC 32GB Servers
15A c c e l e r a t i n g Y o u r S u c c e s s ™ 15
Consolidation Recommendations Server Assignments
16A c c e l e r a t i n g Y o u r S u c c e s s ™ 16
Server Disk Inventory
Path Type Total Size (MB) Total Free (MB) Count
C: NTFS 1,557,806 1,090,814 33
D: FAT32 13,134 9,964 1
D: NTFS 503,876 395,683 9
D: UDF 445 0 1
Totals 2,075,261 1,496,461
Total Used Space 578,800
17A c c e l e r a t i n g Y o u r S u c c e s s ™ 17
All Local and Local Attached Storage = 3TB
Current External Storage CapacityPath Type Total Size (MB) Total Free (MB) Count
E: NTFS 4,990,394 2,830,960 18
F: NTFS 1,647,389 508,033 6
G: NTFS 2,024,914 835,385 8
H: NTFS 2,485,956 150,833 5
I: NTFS 2,919,520 973,370 5
J: NTFS 669,984 254,506 4
K: NTFS 389,984 146,663 4
L: NTFS 558,357 261,729 4
M: NTFS 629,978 378,900 3
N: NTFS 629,978 356,598 3
O: NTFS 757,674 156,897 4
P: NTFS 374,416 321,211 3
Q: NTFS 147,352 128,076 3
R: NTFS 139,424 137,218 2
T: NTFS 230,227 22,027 3
U: NTFS 416,561 255,711 2
V: NTFS 842,232 328,476 3
W: NTFS 139,973 104,840 1
Z: NTFS 476,938 140,368 1
External Storage 20,471,251 8,291,801
18A c c e l e r a t i n g Y o u r S u c c e s s ™ 18
Example C3000, C7000, EVA4400 Rack Placement
C7000 Chassis C3000 ChassisEVA4400
19A c c e l e r a t i n g Y o u r S u c c e s s ™ 19
End of Technical Portion
Questions?
20A c c e l e r a t i n g Y o u r S u c c e s s ™ 20
Financial AssumptionsWindows Server Budget (built from following)
1. System Administration
2. Growth
3. Lifecycle Management / Replacement
4. Maintenance
5. Power and Cooling
21A c c e l e r a t i n g Y o u r S u c c e s s ™ 21
Financial Assumptions (continued)
System Administration Windows Server Budget1. Three (3) Full Time Equivalent (FTE) for Core Windows System
Management (50 servers)
2. 100% utilized for actual server management
3. $75,000 assumed average annual fully burdened cost per FTE
4. Prorated to the actual number of servers modeled for each consolidation scenario
22A c c e l e r a t i n g Y o u r S u c c e s s ™ 22
Financial Assumptions (continued)
Growth and Replacement Budget1. 8% net new physical server annual growth rate
2. 6.3% Lifecycle Management rate (16 years)
a) Average four year expected useful life
b) Using one fourth of servers as candidates for replacements
c) IT actually replaces 25% of the replacement candidates
3. $5,500 average current server cost
a) Hardware only
b) Includes any warranty uplift
c) No OS, middleware, application, etc.
23A c c e l e r a t i n g Y o u r S u c c e s s ™ 23
Financial Assumptions (continued)
Maintenance Budget 1. 24 months average server age calculated from Average
Server CPU MHz (2647)
2. Servers greater than 36 months in age
a. On average calculated to be 24.8% of total
b. Using $0 per server per year
3. Servers less than or equal to 36 months in age
a. On average calculated to be 75.2% of total
b. Using $0 per server per year
24A c c e l e r a t i n g Y o u r S u c c e s s ™ 24
Financial Assumptions (continued)
Power and Cooling Budget Not Assessed to IT Budget – Included in Analysis
1. $0.09 per KWH
2. Use server plate input wattage
$684.11 average per existing server per year (33)
25A c c e l e r a t i n g Y o u r S u c c e s s ™ 25
Financial Assumptions (continued)
Financial Metrics1. Model of Future Servers
a. All growth servers are implemented via virtualization
b. Model accounts for additional VI3 Host Servers for years two and three
2. Recommended environment gear is purchased up front i.e. implementation is completed over the course of first year
3. IT budget assessed using five year straight line method
4. Tax rate 25% and 12% Hurdle Rate
26A c c e l e r a t i n g Y o u r S u c c e s s ™ 26
Breakdown:
Sys Admin Costs: $481,140 (~17 servers : 1 FTE ratio)
Break/Fix Maintenance: $0
IT Assessed Charge: $31,037
Power / Cooling: $73,145
Growth (Capital): $43,560 (~3 servers / year)
Refresh/Replace (Capital): $34,031 (~2 servers / year)
Financial FindingsThree Year TCO Baseline Summary – 33 Servers
Current TCO = $585,322
27A c c e l e r a t i n g Y o u r S u c c e s s ™ 27
Financial Findings (continued)
Three Year Payback Summary – 33 Servers
ScenarioHW/SW Cost1
3 Year TCO2
IT Budget Reduction
Payback (months)
ROI (IRR%)
BL460c 2-QC 32GB4 New ESX Hosts3000 ChassisEVA4400 22TB Storage
$222,327 $527,291 $58,031 31.2 8.3
BL460c 2-QC 32GB4 New ESX Hosts7000 ChassisEVA4400 22TB Storage
$225,559 $529,230 $56,092 31.5 7.7
DL380G5 2-QC 32GB4 New ESX HostsEVA4400 22TB Storage
$204,955 $525,733 $59,589 30.3 10.2
2Includes estimated implementation budget, $33,000
1Includes budgetary pricing for server, software, support and storage capacity ($130,636),
Current TCO = $585,322
28A c c e l e r a t i n g Y o u r S u c c e s s ™ 28
Breakdown:
Sys Admin Costs: $379,421
Break/Fix Maintenance: $0
IT Assessed Charge: $133,396
Power / Cooling: $14,474
Growth (Capital): $0 (0 Yr 2; 0 Yr 3)
Refresh/Replace (Capital): $0
Financial Findings (continued)
Three Year TCO Proposed Summary – BL460 2-QC 32GB
Proposed TCO = $527,291
29A c c e l e r a t i n g Y o u r S u c c e s s ™ 29
Breakdown:
Today:
33 Existing Servers: $73,145
Proposed:
4 BL460 32GB $14,474
Financial Findings (continued)
Three Year Power and Cooling Summary
30A c c e l e r a t i n g Y o u r S u c c e s s ™ 30
Breakdown:
Sys Admin Costs: $379,421
Break/Fix Maintenance: $0
Power / Cooling: $0
IT Assessed Charge: $133,396
Growth (Capital): $0 (0 Yr. 2: 0 Yr. 3)
Refresh/Replace (Capital): $0
Financial Findings (continued)
Three Year TCO Proposed Summary – BL460 2-QC 32GB
Current TCO = $512,817
Payback increases from 31.2 monthsto 38.6 months
31A c c e l e r a t i n g Y o u r S u c c e s s ™ 31
Thank you for your time!
Questions?
32A c c e l e r a t i n g Y o u r S u c c e s s ™ 32
Server Administration Tasks (for reference only)
1. Deploying servers, 2. Software installation and configuration, 3. Physical installation (conventional server), 4. Proactive upgrading servers (patches/service packs/applications), 5. Monitoring, 6. Backup/Recovery, 7. Labor hours for unplanned downtime, 8. Problem resolution, 9. User Support, 10.Training, Security, 11.HW Procurement/Inventory, and 12.Miscellaneous (e-mail, staff meetings/reporting, etc.)