VRP Checklist
Presented by:Rob Timmins – Remediation Project OfficerWilliam Lindsay – Remediation Project OfficerChris Evans – Remediation Project OfficerKyle Newman – Risk Assessor
VRP Application and Process Checklist
• It is a tool for DEQ staff to use to– Verify completeness– Improve consistency among projects and staff– Improve technical content to support lines of evidence
• Decrease time spent by letting you know what we are looking for
• It is a working draft and may not be all encompassing
• It is not official guidance
Application Completeness
VRP Regulation 40.A.1
• A written notice of intent to participate in the program
VRP Application• The application is
considered to be the written notice
Application CompletenessStatement of eligibility to participate Yes No
For Applicant/Participant (40.A.2):___Proof of Ownership___Operator*___Security Interest*___Contract to Purchase*___Other*_________________
*Is an Authorized Agent identified (40.A.3)? Yes NoIf yes, is a letter of authorization included from the owner?
Yes No N/AFor Site (30.C):___Remediation is not clearly mandated___Jurisdiction has been waived
Application Completeness
Legal Description (40.A.4)
Near Vicinity Map showing:Property boundaryVRP Site boundarySurrounding property usage
Area Map
An Area Map is good to have to show location within a region.
Application Completeness
General operational history of the site (40.A.5)
General description of (40.A.6):
Nature and extent of contamination and
Past and present releases
Onsite and contiguous to site
Identify Areas of Concern and sources.Summarize the results of any Phase I’s or Phase II’s. Copies of Phase I’s and II’s can be included but will not be reviewed for anything other than the eligibility determination.
Application Completeness
Discussion of potential regulatory jurisdiction (40.A.7)
This is a review of regulatory applicability to the site and is used in the eligibility determination.
Address each item thoroughly.
Identify the cause of the contamination
Provide dates of releases and operation
Address present and past status. Don’t just say, “the site does not have a permit”.
Application Completeness
Notarized Certification of Accuracy by the applicant (40.A.8)
Notarized???
Eligibility DeterminationII Eligibility Determination (9 VAC 20-160-40)Eligibility Determination Due: ___/___/___ (within 60 days of receipt)Regional Office: ________ Sent: ___/___/___ Received: ___/___/___Office of Waste Programs: Sent: ___/___/___ Received: ___/___/___Applicant eligible to participate Yes NoSite eligible to participate Yes NoAccept Application: _____ Reject Application: _____ (See 9VAC20-160-40.C)Notification of Eligibility and Fee Request Letter: ___/___/____
Fee and Enrollment
III Fee Payment and Enrollment (9 VAC 20-160-60)1% of Estimated of Remedial Cost: $________ or Statutory Maximum ($5000)Amount Received: $_________ Date Received: ___/___/___Fee and Enrollment Confirmation Letter Sent w/ BF Tax Form: ___/___/___
• The fee is held in escrow until certificate issuance and will be reconciled at that time
Questions?
VRP ChecklistSite Characterization
Presented by:Chris Evans – VRP Project OfficerRob Timmins – VRP Project OfficerWilliam Lindsay – VRP Project OfficerKyle Newman – Risk Assessor
Work To Be Performed• Site Characterization
– Consistent with Conceptual Site Model– Consider lines of evidence– Complete and accurate delineation of the nature and extent of
contamination• Onsite and offsite
– DEQ recognizes the challenges of offsite characterization and determining resulting risk
– A complete and well prepared & presented SCR significantly helps us during review• You know the site well, we don’t• Detailed and up to date plans, maps, and drawings can present a lot of
information quickly– Helps us better understand a site about which we know little– Helps reduce questions resulting in much less extensive comment letters
» Shortens the overall time, which we all want
– We use the checklist as a tool
Work to be Performed• Complete figures are
very helpful • Illustrates the story• include scale,
complete legend, legible text and markings
• Accurately dated figures with sample dates
Property and VRP Site Boundaries
Groundwater Potentiometric Map
Vapor Sampling Locations
Work To Be Performed• Boring methods and
logs• Well construction• Helps us understand
subsurface, groundwater, and surface water relationships
Well Construction
Log
Work To Be Performed
• Consider CSM• Extremely informative and
helpful• Tells a big part of the story• Indicate source location(s)• Scale, legend, legible text
and markings• Utility locations
Vertical and Horizontal Delineation• Refer to conceptual
site model• Evaluate each media
as necessary• Consider all
appropriate analytes