wa-362-p and wa-363-p permits both renewed for first 5 ... · 3 wa-323-p & wa-330-p location...

24
ABN 61 005 632 315 Level 21 500 Collins Street Melbourne Victoria 3000 Australia Tel: +61 (0)3 8610 4700 Fax: +61 (0)3 8610 4799 Email: [email protected] Website: www.octanex.com.au QUARTERLY ACTIVITY REPORT TO 30 SEPTEMBER 2012 HIGHLIGHTS FOR THE QUARTER Operational Matters Interpretation and mapping of new Winchester 3D data acquired in WA-323-P and WA-330-P well advanced WA-362-P and WA-363-P permits both renewed for first 5-year terms Renewal applications lodged for the 100% held permits WA-386-P and WA-387-P Rig arrives to drill the Palta-1 well for Shell in WA-384-P during Q4 2012 Interpretation and mapping of the three new 2D and one new 3D seismic surveys in Southern Bonaparte Basin permits well advanced Re-processing of additional 2D seismic data in PEP 53473 nears completion Corporate Activity Release of Financial Report for the year ended 30 June 2012 Appointment of additional Company Secretary PERMIT INTERESTS HELD Octanex N.L. (ASX Code: OXX), in its own name and through its wholly-owned subsidiaries, currently holds working interests in 17 petroleum exploration permits and residual and royalty interests in three other such permits that are situated in the offshore basins of Australia and New Zealand. The Australian permits are concentrated on the Greater North West Shelf and in the Bonaparte Basin, both offshore from Western Australia, in regions of moderate to intense exploration activity. In addition to the Australian based permits, Octanex holds interests in four highly strategic located permits in the offshore Taranaki Basin of New Zealand, a region of intense exploration activity – see following Location Map of Portfolio of Permits. The policy underlying the management of the Octanex group’s permits and related interests is one which, insofar as is practical and both legally and commercially expedient, does not differentiate between whether they are owned by Octanex N.L. directly, or indirectly through one or more of its wholly-owned subsidiaries. These interests and assets are all referred to in this report as being held by “Octanex” or “the Company” or “the Octanex Group”. For personal use only

Upload: others

Post on 25-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WA-362-P and WA-363-P permits both renewed for first 5 ... · 3 WA-323-P & WA-330-P Location Map Interpretation and mapping of the processed data commenced during the quarter and

ABN 61 005 632 315

Level 21 500 Collins Street Melbourne Victoria 3000 Australia Tel: +61 (0)3 8610 4700 Fax: +61 (0)3 8610 4799 Email: [email protected] Website: www.octanex.com.au

QUARTERLY ACTIVITY REPORT

TO 30 SEPTEMBER 2012

HIGHLIGHTS FOR THE QUARTER Operational Matters

Interpretation and mapping of new Winchester 3D data acquired in WA-323-P and WA-330-P well advanced

WA-362-P and WA-363-P permits both renewed for first 5-year terms

Renewal applications lodged for the 100% held permits WA-386-P and WA-387-P

Rig arrives to drill the Palta-1 well for Shell in WA-384-P during Q4 2012

Interpretation and mapping of the three new 2D and one new 3D seismic surveys in Southern Bonaparte Basin permits well advanced

Re-processing of additional 2D seismic data in PEP 53473 nears completion Corporate Activity

Release of Financial Report for the year ended 30 June 2012

Appointment of additional Company Secretary PERMIT INTERESTS HELD Octanex N.L. (ASX Code: OXX), in its own name and through its wholly-owned subsidiaries, currently holds working interests in 17 petroleum exploration permits and residual and royalty interests in three other such permits that are situated in the offshore basins of Australia and New Zealand. The Australian permits are concentrated on the Greater North West Shelf and in the Bonaparte Basin, both offshore from Western Australia, in regions of moderate to intense exploration activity. In addition to the Australian based permits, Octanex holds interests in four highly strategic located permits in the offshore Taranaki Basin of New Zealand, a region of intense exploration activity – see following Location Map of Portfolio of Permits. The policy underlying the management of the Octanex group’s permits and related interests is one which, insofar as is practical and both legally and commercially expedient, does not differentiate between whether they are owned by Octanex N.L. directly, or indirectly through one or more of its wholly-owned subsidiaries. These interests and assets are all referred to in this report as being held by “Octanex” or “the Company” or “the Octanex Group”.

For

per

sona

l use

onl

y

Page 2: WA-362-P and WA-363-P permits both renewed for first 5 ... · 3 WA-323-P & WA-330-P Location Map Interpretation and mapping of the processed data commenced during the quarter and

2

Location Map of the Octanex Group’s Portfolio of Permits OPERATIONAL MATTERS Carnarvon Basin Interests

WA-323-P & WA-330-P – Dampier Sub-Basin

These permits are held by a Joint Venture consisting of: Santos Offshore Pty Ltd 75% and Operator (subsidiary of Santos Limited)

Octanex Group 25% WA-323-P and WA-330-P comprise a discrete project area for the exploration of 640 km² – see the following WA-323-P & WA-330-P Location Map. The permits were each granted their first 5-year renewals in April 2011. As a result of the farmin agreement entered into with a subsidiary of Santos Limited (ASX Code: STO), Santos Offshore Pty Ltd (Santos), the Octanex Group will be free carried in respect of its 25% interest in both permits through the first well (Winchester-1) in one of the permits and all other exploration costs for the two permits up to the completion of that well. In Q4 2011, Santos acquired the new Winchester 3D seismic survey of approximately 720 km² of new data within and adjacent to the permits. Processing of the data was completed during the quarter.

For

per

sona

l use

onl

y

Page 3: WA-362-P and WA-363-P permits both renewed for first 5 ... · 3 WA-323-P & WA-330-P Location Map Interpretation and mapping of the processed data commenced during the quarter and

3

WA-323-P & WA-330-P Location Map Interpretation and mapping of the processed data commenced during the quarter and is advanced, with the specific aim of defining a drilling location on the Webley Horst for the Winchester-1 well. Santos has entered into an assignment agreement in relation to the Ensco 109, a jack-up drilling rig. The rig is contracted to drill the farmin obligation well into the Winchester prospect from a yet to be determined location within the area of the WA-323-P permit. The rig slot assigned to Santos has the well currently scheduled to be drilled in Q1 2013. WA-362-P &, WA-363-P – Exmouth Plateau The WA-362-P and WA-363-P Joint Ventures both consist of the following parties: Eni Australia Limited (Eni) 66.667% and Operator

Octanex Group 33.333% During the quarter, WA-362-P and WA-363-P were each granted their first 5-year renewals commencing on 23 August 2012. The two permits now comprise a combined exploration area of 10,956 km² – see the following WA-362-P & WA-363-P Renewed Permits Areas. Together with WA-386-P and WA-387-P detailed in the following section, these four permits are located on the northern margin of the Exmouth Plateau, 300 – 400 km north-west of the Western Australian coastline – see the Location Map of Exmouth Plateau Permits in the following section.

For

per

sona

l use

onl

y

Page 4: WA-362-P and WA-363-P permits both renewed for first 5 ... · 3 WA-323-P & WA-330-P Location Map Interpretation and mapping of the processed data commenced during the quarter and

4

WA-362-P & WA-363 Renewed Permit Areas At the end of their initial 6-year terms in December 2011, the Joint Venture of the Octanex Group and Eni lodged applications to renew both of WA-362-P and WA-363-P for 5-year terms. A regulatory requirement for the grant of a renewed term is that half of the original area of the permit be relinquished. The committed work programme in the first three years of both renewed terms calls for seabed coring and studies. This is then followed by a new 3D seismic survey and an exploration well in the last two years of each term. We remain carried by Eni though all exploration activity, including the next well in each permit WA-386-P & WA-387-P – Exmouth Plateau The initial 6-year terms of WA-386-P and WA-387-P both expired during the quarter on 20 August. With the respective work programmes for the initial terms of the two permits having been completed, both WA-386-P and WA-387-P are therefore in good standing. During the quarter, Eni gave the Company notice of its withdrawal from the WA-386-P and WA-387-P permits and their associated Joint Ventures. OMV Australia Pty Ltd (OMV) had previously given the same notice to Octanex and Eni. These withdrawals were effective from the expiry of the initial terms of both permits. As a consequence, the OMV and Eni interests have been re-assigned and the Octanex Group now holds a 100% participating interest in both WA-386-P and WA-387-P. The Company has lodged applications with the regulatory authority to renew both of WA-386-P and WA-387-P for their first 5-year terms. As noted in the previous section, a requirement for the grant of a renewed term is that a minimum of half of the current area of each permit will be relinquished on renewal. The areas of the WA-386-P and WA-387-P permits being sought for renewal are displayed above in the following Location Map of Renewal Areas Applied for.

For

per

sona

l use

onl

y

Page 5: WA-362-P and WA-363-P permits both renewed for first 5 ... · 3 WA-323-P & WA-330-P Location Map Interpretation and mapping of the processed data commenced during the quarter and

5

Location Map of Exmouth Plateau Permits(red) and Renewal Areas Applied for (blue). The work completed during the initial terms of WA-386-P and WA-387-P included acquiring new 2D seismic data and completing studies in conjunction with the two adjoining permits (WA-362-P and WA-363-P) that Octanex explored with Eni and OMV. Octanex will be looking to build on this work during any renewed terms that may be granted. Octanex will seek the interest of other exploration companies to join us in that work, with respect to the permits being renewed.

WA-384-P, WA-385-P & WA-394-P – Southern Exmouth Sub-Basin These three permits are located in the Southern Exmouth Sub-basin – see the following Location Map. The Company, some time ago, concluded an agreement with Shell Development (Australia) Pty Ltd (Shell) for the disposition to Shell of a 100% working interest in each of the WA-384-P, WA-385-P and WA-394-P permits. Octanex holds residual rights in each of the permits in the form of discovery payments and royalties, as well as rights of reconveyance. Subsequent to the end of the quarter, on 14 October, Shell commenced drilling the Palta-1 commitment well in WA-384-P – see the following Location Map. Shell contracted the semi-submersible rig, Noble Clyde Boudreaux, to drill the Palta-1 gas exploration well; which is expected to take between 60 and 90 days to drill. It is being drilled in water depths of approximately 1300m and to a possible total depth of greater than 5000m. The well is the final work programme obligation for the extended Year 6 of the permit’s initial term; which ends in August 2013.

For

per

sona

l use

onl

y

Page 6: WA-362-P and WA-363-P permits both renewed for first 5 ... · 3 WA-323-P & WA-330-P Location Map Interpretation and mapping of the processed data commenced during the quarter and

6

In Q1 2012, Shell acquired the 783 km Tortilla 2D marine seismic survey in the WA-385-P permit. The survey was acquired off the North West Cape of Western Australia, largely within the area of the permit. The survey also acquired ‘tie lines’ between the planned location for the Palta-1 well (being drilled in the WA-384-P permit to the north) and the previously drilled wells of Herdsman-1 and Pendock-1A to the south and Falcone-1A to the north-east.

The acquisition of the Tortilla 2D survey was timed to avoid the humpback whale migration. As part of a range of management measures, Shell elected that the seismic survey would not come within a 10 km buffer zone to the outer boundary of the Ningaloo World Heritage Area. The Tortilla 2D survey is the final work commitment for the WA-385-P permit in the current term. Shell will carry out a trial reprocessing of 110 km of existing seismic data from within the WA-394-P permit and is the final work commitment for the WA-394-P permit in the current term.

For

per

sona

l use

onl

y

Page 7: WA-362-P and WA-363-P permits both renewed for first 5 ... · 3 WA-323-P & WA-330-P Location Map Interpretation and mapping of the processed data commenced during the quarter and

7

Palta-1 Location Map

Southern Bonaparte Basin Interests Octanex holds interests in six petroleum exploration permits in the offshore Southern Bonaparte Basin. Those permits are WA-407-P, WA-420-P, WA-421-P, WA-422-P, WA-440-P and WA-441-P and they are displayed in the following Location Map of Southern Bonaparte Basin Permits. WA-407-P, WA-420-P, WA-421-P, WA-441-P & WA-440-P – Southern Bonaparte Basin Octanex holds a 100% interest in four adjacent permits (WA-407-P, WA-420-P, WA-421-P and WA-441-P) that encompass 232 graticular blocks and comprise approximately 18,950 km² in total in the Southern Bonaparte Basin. Octanex also holds a 100% interest in the WA-440-P permit that is situated south-east of the other four and is also within the Southern Bonaparte Basin. WA-440-P encompasses 52 graticular blocks and comprises approximately 4,310 km². These five permits are displayed in the Location Map. As detailed in the following section on the WA-422-P permit, Octanex farmed into and acquired a 60% interest in WA-422-P. That permit adjoins WA-420-P and WA-421-P (see the Location Map).

For

per

sona

l use

onl

y

Page 8: WA-362-P and WA-363-P permits both renewed for first 5 ... · 3 WA-323-P & WA-330-P Location Map Interpretation and mapping of the processed data commenced during the quarter and

8

Location Map of Southern Bonaparte Basin Permits and Seismic Surveys During Q4 2011 and Q1 2012, the Company acquired six new seismic surveys that fulfilled the Year 2 and 3 work programme commitments of their respective permits to acquire either new 2D or 3D data. One survey is located within each of the six permits detailed above. The Tamar Trend Play The new 2D seismic data acquired by the Kingfisher survey, when combined with relevant pre-existing and recently reprocessed 2D data, are expected to provide coverage of a play concept over an area of some 2,500 km² within the WA-421-P and WA-420-P permits. The play extends from WA-420-P into WA-421-P and the new Tamar 3D survey shot in WA-420-P was acquired to further evaluate what is an extensive play type. Processing of the Tamar 3D survey was continuing at the end of the quarter.

For

per

sona

l use

onl

y

Page 9: WA-362-P and WA-363-P permits both renewed for first 5 ... · 3 WA-323-P & WA-330-P Location Map Interpretation and mapping of the processed data commenced during the quarter and

9

Postulated Migration Pathways and 3D Seismic Coverage The Kingfisher and Tamar surveys are linked in their endeavour to identify potential oil and gas targets, based on a play concept where the inferred source of the hydrocarbons is the Sahul Syncline. The interpreted migration pathway is along the ‘Tamar Nose’ structural high in WA-420-P and into the north-eastern corner of the WA-421-P permit. The Tamar Nose is a north-east/south-west trending structural high that extends down into the Sahul Syncline source kitchen, and is seen as a natural focus for hydrocarbons migrating towards the southern Londonderry High. The Tamar 3D survey was located on the ‘Tamar Nose’, which was only lightly covered by vintage 2D seismic surveying that is not presently sufficient to define trap closures. Three of the four wells drilled on the ‘Tamar Nose’ have oil shows, while the fourth well, Tamar-1 drilled in 1979, was not located on a valid trap. To the north and west of the Tamar 3D survey area are two 3D seismic surveys; the Adventurer 3D and the Dunnart 3D. These vintage 3D surveys are being reprocessed and are expected to benefit from modern reprocessing. Octanex is carrying out this reprocessing as an adjunct to the newly acquired Tamar 3D data. Together, the two (reprocessed) vintage 3D surveys and the new Tamar 3D survey will constitute 3D seismic coverage of an exploration area of over 1200 km², most of which is contained within WA-420-P. Processing and integration of these surveys was still on-going at the end of the quarter. The target sandstone reservoirs of the Tamar Trend play are the Early Cretaceous to Late Jurassic, Sandpiper Sandstone, the Late Jurassic Elang Formation and the Middle Jurassic Plover Formation. The Sandpiper Sandstone and Elang Formation/Plover Formation reservoirs are separated by the Late Jurassic Frigate Shale sealing marine claystones.

For

per

sona

l use

onl

y

Page 10: WA-362-P and WA-363-P permits both renewed for first 5 ... · 3 WA-323-P & WA-330-P Location Map Interpretation and mapping of the processed data commenced during the quarter and

10

The Saratoga/Ascalon Gas Discovery The Ascalon 3D survey area is located on a north-east structural trend between the Saratoga-1 and Ascalon-1 gas discovery wells in the western sector of the WA-407-P permit. The objective of the survey was to enable more precise mapping of the Early Cretaceous Sandpiper Formation sandstone play and the deeper Late Permian, Tern and Cape Hay sandstone plays of the Hyland Bay Formation. Although gas was discovered in the Early Cretaceous Sandpiper sandstone in Saratoga-1, there is the possibility that oil may be present in the leads defined on vintage 2D in the Ascalon 3D survey area as, unlike the Saratoga discovery, they are not located directly over the main structural fault that would have provided a conduit for gas to reach the Early Cretaceous Sandpiper Formation. The Late Permian is a gas play. Processing of the new Ascalon 3D was continuing at the end of the quarter.

Location Map – WA-407-P

For

per

sona

l use

onl

y

Page 11: WA-362-P and WA-363-P permits both renewed for first 5 ... · 3 WA-323-P & WA-330-P Location Map Interpretation and mapping of the processed data commenced during the quarter and

11

The Hawk Shallow Oil Play The Hawk 2D survey was acquired over leads in the north-western and central part of the WA-441-P permit. Interpretation of vintage 2D seismic data in the area of the survey indicated the presence of targets draped over basement topography. The Hawk survey was designed to identify whether these leads may form closed traps.

Location Map WA-441-P

For

per

sona

l use

onl

y

Page 12: WA-362-P and WA-363-P permits both renewed for first 5 ... · 3 WA-323-P & WA-330-P Location Map Interpretation and mapping of the processed data commenced during the quarter and

12

The Bonaparte Gulf Oil Play – WA-440-P The Falcon 2D survey was acquired over leads in the north-eastern part of the WA-440-P permit where interpretation of vintage 2D seismic data in the area of the survey has defined several structural leads. As with the Hawk survey, the Falcon survey was designed to identify whether these leads may form closed traps.

Location Map WA-440-P WA-422-P – Londonderry High The Joint Venture for the permit consists of: Goldsborough Energy Pty Ltd 60.000% and Operator (subsidiary of Octanex N.L.)

National Oil Corporation Pty Ltd 22.500%*

Ultragas Pty Ltd 9.375%

Nations Natural Gas Pty Ltd 5.000%

(* subject to farmin)

Ultragas Resources Pty Ltd 3.125% (subsidiary of Ultragas Pty Ltd)

For

per

sona

l use

onl

y

Page 13: WA-362-P and WA-363-P permits both renewed for first 5 ... · 3 WA-323-P & WA-330-P Location Map Interpretation and mapping of the processed data commenced during the quarter and

13

Postulated Londonderry Migration Pathways In Q3 2011, Octanex acquired a 60% interest in this permit, which comprises approximately 4,605 km² in the Southern Bonaparte Basin, as displayed in the Location Map above. The Company’s wholly-owned subsidiary, Goldsborough Energy Pty Ltd (Goldsborough), holds the 60% interest and has become the Operator for the permit. The interest was acquired through a farmin arrangement and the transfer of the interest has received the necessary regulatory approvals. Under the terms of the farmin agreement, the Company agreed to conduct, at its cost, a new 3D seismic survey within the WA-422-P permit and meet the costs of reprocessing existing 2D seismic data. The Rissa 3D seismic survey fulfilled the seismic acquisition obligation of the farmin agreement, with acquisition completed during the previous quarter. The Rissa 3D survey area is located on the northern end of the Londonderry High, which is seen as a potential natural focus for oil migration. To the north of the Rissa survey area there are several oil fields (Kuda Tasi, Coralina, Laminaria, Jahal/Buffalo and Kitan); while the presence of residual oil columns in exploration wells within and to the south of the survey area indicates the existence of an oil migration route through the survey area. Leads identified on vintage 2D seismic data possess similar west to east oriented horsts and tilted fault blocks to those in the oil discoveries to the north of the Rissa survey area. The poor resolution of the vintage 2D restricts clear definition of trap closure and cross fault seal juxtaposition. Hence there was a need to acquire a modern 3D seismic dataset to better resolve the leads within the Rissa survey area at the target reservoirs of the Early Cretaceous Sandpiper sandstones and Jurassic Elang and Plover formations.

For

per

sona

l use

onl

y

Page 14: WA-362-P and WA-363-P permits both renewed for first 5 ... · 3 WA-323-P & WA-330-P Location Map Interpretation and mapping of the processed data commenced during the quarter and

14

Browse Basin Interests WA-342-P – Browse Basin The Operator of this permit is Cornea Resources Pty Ltd and the permit is held by the Cornea Joint Venture which consists of the following interests: Coldron Group 29.100%

Moby Oil & Gas Limited (ASX Code: MOG) 22.375%

Octanex Group 18.750%

Cornea Petroleum Pty Ltd 14.875%

Cornea Oil & Gas Pty Ltd 8.500%

Auralandia N.L. 6.400% The WA-342-P permit is currently in Year 2 of its first 5-year renewed term – see the WA-342-P Location Map below. The committed work programme in the first three years of the renewed term calls for studies and an exploration well; followed by reprocessing of 3D seismic and further studies in the last two years of the term. Field appraisal studies in relation to the permit and the Cornea structure continue, as do discussions with potential farminees. The Joint Venture is also considering what would be the best permit arrangement and work programme under which to evaluate the Cornea structure and its known oil resource. Consideration is being given to possibly converting the current exploration permit into a retention lease. To this end, preliminary discussions have been held with the regulatory authorities on what might be achieved in this regard.

WA-342-P Location Map

For

per

sona

l use

onl

y

Page 15: WA-362-P and WA-363-P permits both renewed for first 5 ... · 3 WA-323-P & WA-330-P Location Map Interpretation and mapping of the processed data commenced during the quarter and

15

Taranaki Basin Interests As displayed in the following Taranaki Basin Permit Location Map, the Company holds interests in four petroleum exploration permits in the offshore Taranaki Basin, namely PEP 51906, PEP 52593, PEP 53537 and PEP 53473. Octanex’s interests in the offshore Taranaki Basin covers over 7000 km² in New Zealand’s premier oil producing basin. The group subsidiary, Octanex NZ Limited, holds the interests in the four permits.

Taranaki Basin Permit Location Map

For

per

sona

l use

onl

y

Page 16: WA-362-P and WA-363-P permits both renewed for first 5 ... · 3 WA-323-P & WA-330-P Location Map Interpretation and mapping of the processed data commenced during the quarter and

16

PEP 51906 – TARANAKI BASIN

The PEP 51906 Joint Venture consists of: OMV New Zealand Limited (OMV) 65% and Operator

Octanex Group 35% The PEP 51906 permit covers an area of 1,613 km² and is adjacent to three producing fields; the Maui gas/condensate field to the east (which has been in production since 1979), the Tui oil field to the north-east (which has been producing since 2008) and the Maari/Manaia fields to the south (which commenced production in 2009) – see the Location Map below. In March 2011, the Company entered into a farmin agreement with OMV in relation to PEP 51906. Under the agreement, OMV became the Operator and was assigned a 65% participating interest in the permit; with Octanex retaining a 35% participating interest. Part of the farmin terms were that OMV would (at its cost) acquire, process, interpret and map a new 270 km² 3D seismic survey over the Matuku structure within PEP 51906. OMV undertook the Matuku 3D programme and completed the interpretation and mapping of the data in Q1 2012. As a result of the work done on the new 3D data, OMV advised Octanex that its mapping of Matuku confirmed it as a valid structural closure at the target levels, with estimated mean recoverable resource, if there are hydrocarbons in the Matuku prospect, of approximately 65 million barrels. In conjunction with the interpretation and mapping of the Matuku 3D data, OMV has undertaken a variety of studies. These include basin modelling, vitrinite reflectance analysis and a wide-ranging assessment of the potential for adequate reservoir within the area of the Matuku prospect. The central outcome from the interpretation, mapping and related studies that confirmed the prospect is that OMV commenced well planning and the acquisition of long lead time items required for a well. The studies undertaken by OMV indicate that the Matuku prospect is robust. It has a perceived low risk associated with the existence of the structure, presence of suitable reservoir rock and adequacy of seal. OMV’s basin modelling studies further suggest the presence of a substantial source kitchen (within the Kahurangi Trough to the immediate south and west of the prospect) that is mature for the generation of oil. In Q2 2012, OMV commenced the search for a suitable rig to drill Matuku-1 and, if a rig can be secured, the current objective is for drilling to commence mid to late 2013. Under the terms of the farmin agreement with OMV, OMV must commit to the drilling of a well within PEP 51906 or reassign its 65% participating interest to Octanex. If OMV makes that drilling commitment, it will then meet 100% of the costs of drilling the well. OMV is yet to make this drilling commitment, but must do so by 19 November 2012.

PEP 53537 – TARANAKI BASIN

The PEP 53537 Joint Venture consists of: OMV New Zealand Limited (OMV) 65% and Operator

Octanex Group 35% PEP 53537 adjoins the western boundary of PEP 51906 – see the Location Map above. It covers an area of 1,146 km² and has an extensive grid of 2D seismic data of various vintages covering the southern, western and north-eastern sections of the permit area. Based on previous successful drilling results in areas close to PEP 53537, the Kapuni Group plays are seen to be the most prospective for the permit, although possible targets in the Moki Formation are also being analysed.

For

per

sona

l use

onl

y

Page 17: WA-362-P and WA-363-P permits both renewed for first 5 ... · 3 WA-323-P & WA-330-P Location Map Interpretation and mapping of the processed data commenced during the quarter and

17

The work programme commitments for the initial period of PEP 53537 are to undertake geological studies, reprocess 400 km of existing 2D seismic data and acquire 100 km of new 2D seismic data and 18 km² of new 3D seismic data. In conjunction with the Matuku 3D seismic survey in PEP 51906 and PEP 53537, the seismic vessel carried out the 2D seismic survey in PEP 53537 required under the work programme. Processing of all the new data was completed in Q1 2012 and detailed interpretation and mapping is on-going in conjunction with the newly reprocessed data. The initial phase of that interpretation work was completed early in the quarter.

PEP 52593 – TARANAKI BASIN

Octanex holds a 100% interest in PEP 52593. The permit covers an area of over 3,500 km² and, like PEP 51906 and PEP 53537, is located in the offshore Taranaki Basin – see the Location Map above. Interpretation and mapping of the vintage seismic data in the permit that the Company had reprocessed was completed during the previous quarter. The outcome of this work was then reviewed during the quarter and a decision is to be reached on whether to commit to the next phase of the work obligations, which entails the acquisition of new 2D seismic data. That decision is due by the end of Q1 2013, but may well be made before the end of 2012 depending on the availability of a seismic vessel. Leads have been identified within PEP 52593 and further studies are underway in relation to them. The objective is to identify potential source, migration paths and the presence of adequate reservoir sequences that may x, onlap or drape the long structural high that is a feature of this permit. The terms of the PEP 52593 permit require that, by 1 April 2013, the Company can either surrender the permit or commit to acquire, process and interpret a minimum of 2,250 km of new 2D seismic data. Alternatively, the Company can surrender a minimum of 25% of the permit area and commit to a lesser 2D seismic programme of a minimum of 1,750 km. By not later than 1 April 2014, the Company must either commit to drill a well or surrender the permit.

PEP 53593 Leads and Seismic Shape Options

For

per

sona

l use

onl

y

Page 18: WA-362-P and WA-363-P permits both renewed for first 5 ... · 3 WA-323-P & WA-330-P Location Map Interpretation and mapping of the processed data commenced during the quarter and

18

PEP 53473 – TARANAKI BASIN

Octanex holds a 100% interest in PEP 53473. The permit covers an area of 853 km² and is located in the offshore Taranaki Basin, lying between the PEP 51906 and PEP 52593 permits (in which the Company holds 35% and 100% interests respectively), and is immediately adjacent to the north of the Tui oil field – see the Permit Location Map above. The permit is covered by an extensive grid of 2D seismic data of various vintages. However, despite its location adjacent to the producing Tui oil field, there has been little modern 3D seismic data acquired within the permit area to date; apart from approximately 40 km² of Tui 3D ingress seismic in the south of the permit. There have been two wells drilled within the permit area, Takapou-1 and Kopuwai-1, both of which encountered oil shows. PEP 53473 is being explored as a combined area with PEP 52593 and reprocessing of more than 2000 km of existing 2D data from within and adjacent to both permits has been completed. Detailed interpretation and mapping of the newly reprocessed data was then completed during the previous quarter, together with various geotechnical studies. This work fulfilled the permit requirements for reprocessing and geotechnical studies to be completed by 13 March 2013.

PEP 53473 Leads and Seismic Shape Options Following the reprocessing and studies, the Company can either surrender the permit or commit to acquire, process and interpret a minimum of 250 km² of new 3D seismic data by 19 March 2014. Should Octanex carry out the new 3D seismic survey, it must then either commit to and drill a well in the permit area by 19 March 2015 or surrender the permit.

For

per

sona

l use

onl

y

Page 19: WA-362-P and WA-363-P permits both renewed for first 5 ... · 3 WA-323-P & WA-330-P Location Map Interpretation and mapping of the processed data commenced during the quarter and

19

Outcomes from the work undertaken to date indicates the presence of two attractive leads within PEP 53473. A potential depth closure has been identified in the south-east corner of the permit that is interpreted to be within the extend of the Kapuni F Sand. It is located updip from the Taranui-1 well, which sampled oil in the overlying Kapuni D Sand. The second lead has been identified at the top North Cape Sand, to the north of Takapou-1. The locations of Taranui-1 and Takapou-1 are shown in the Location Map. As a result of the encouragement obtained from the identification of the updip Taranui lead, Octanex initiated the reprocessing of an additional 700 km of existing 2D data. The objective of this reprocessing work is to better assess the adequacy and extent of the structural closures so far identified in PEP 53573. That reprocessing work was completed during the quarter and interpretation is continuing. If the results obtained from the additional reprocessed data and studies in this permit and PEP 52593 are encouraging, Octanex will look to acquiring new 3D and 2D seismic programmes in PEP 53473 and PEP 52593 respectively. The commitment to such programmes will first require a suitable seismic vessel. Octanex is investigating an opportunity to join a seismic group shoot. CORPORATE MATTERS Annual Financial Report

The Company’s Annual Financial Report for the year ended 30 June 2012 was released at the end of the quarter and the 2012 Annual Report will be distributed to Shareholders in October. Appointment of additional Company Secretary

Mr Robert Wright was appointed an additional Company Secretary during the quarter - he is also the Company’s Chief Financial Officer. By Order of the Board

J G Tuohy Company Secretary Melbourne, Australia 26 October 2012

Risk Factors Various statements in this release constitute statements relating to intentions, future acts and events. Such statements are generally classified as forward looking statements and involve known and unknown risks, expectations, uncertainties and other important factors that could cause those future acts, events and circumstances to differ from the way or manner in which they are expressly or impliedly portrayed in this report. Furthermore, exploration for oil and gas is speculative, expensive and subject to a wide range of risks. Summaries of some of the risks inherent in an investment in Octanex N.L. are set out in the Company’s latest disclosure document (being the prospectus dated 24 September 2010 in support of the Company’s one for four rights issue as lodged with the Australian Securities and Investments Commission). Individual investors should consider these matters in light of their personal circumstances (including financial and taxation affairs) and seek professional advice from their accountant, lawyer or other professional adviser as to the suitability for them of an investment in the Company.

For

per

sona

l use

onl

y

Page 20: WA-362-P and WA-363-P permits both renewed for first 5 ... · 3 WA-323-P & WA-330-P Location Map Interpretation and mapping of the processed data commenced during the quarter and

Appendix 5B Mining exploration entity quarterly report

+ See chapter 19 for defined terms. 30/9/2001 Appendix 5B Page 1

Rule 5.3

Appendix 5B

Mining exploration entity quarterly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10, 17/12/10.

Name of entity

OCTANEX N.L. ABN Quarter ended (“current quarter”)

61 005 632 315 30 SEPTEMBER 2012

Consolidated statement of cash flows

Cash flows related to operating activities

Current quarter $A’000

Year to date (3 months) $A’000

1.1 Receipts from joint venture participant

1.2 Payments for (a) exploration and evaluation (b) development (c) production (d) administration

(439) (355)

(439) (355)

1.3 Dividends received 1.4 Interest and other items of a similar nature

received 73

73

1.5 Interest and other costs of finance paid 1.6 Income taxes paid 1.7 Other 20 20

Net Operating Cash Flows

(701)

(701)

Cash flows related to investing activities

1.8 Payment for purchases of: (a)prospects (b)equity investments (c) other fixed assets

1.9 Proceeds from sale of: (a)prospects (b)equity investments (c)other fixed assets

38

38

1.10 Loans to other entities 1.11 Loans repaid by other entities 1.12 Other – Cash from Acquired Company

Net investing cash flows 38 38

1.13 Total operating and investing cash flows (carried forward)

(663)

(663)

For

per

sona

l use

onl

y

Page 21: WA-362-P and WA-363-P permits both renewed for first 5 ... · 3 WA-323-P & WA-330-P Location Map Interpretation and mapping of the processed data commenced during the quarter and

Appendix 5B Mining exploration entity quarterly report

+ See chapter 19 for defined terms. Appendix 5B Page 2 30/9/2001

1.13 Total operating and investing cash flows

(brought forward) (663)

(663)

Cash flows related to financing activities

1.14 Proceeds from issues of shares, options, etc. 1.15 Proceeds from sale of forfeited shares 1.16 Proceeds from borrowings 1.17 Repayment of borrowings 1.18 Dividends paid 1.19 Share issue costs

Net financing cash flows

Net decrease in cash held

(663)

(663)

1.20 Cash at beginning of quarter/year to date 16,501 16,501 1.21 Exchange rate adjustments to item 1.20

1.22 Cash at end of quarter 15,838 15,838

Payments to directors of the entity and associates of the directors Payments to related entities of the entity and associates of the related entities

Current quarter $A'000

1.23

Aggregate amount of payments to the parties included in item 1.2

236

1.24

Aggregate amount of loans to the parties included in item 1.10

1.25

Explanation necessary for an understanding of the transactions

Non-cash financing and investing activities

2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows

2.2 Details of outlays made by other entities to establish or increase their share in projects in which the

reporting entity has an interest

For

per

sona

l use

onl

y

Page 22: WA-362-P and WA-363-P permits both renewed for first 5 ... · 3 WA-323-P & WA-330-P Location Map Interpretation and mapping of the processed data commenced during the quarter and

Appendix 5B Mining exploration entity quarterly report

+ See chapter 19 for defined terms. 30/9/2001 Appendix 5B Page 3

Financing facilities available Add notes as necessary for an understanding of the position.

Amount available $A’000

Amount used $A’000

3.1 Loan facilities

3.2 Credit standby arrangements

Estimated cash outflows for next quarter

$A’000

4.1 Exploration and evaluation 400

4.2 Development

4.3 Production

4.4 Administration 350

Total

750

Reconciliation of cash Reconciliation of cash at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts is as follows.

Current quarter $A’000

Previous quarter $A’000

5.1 Cash on hand and at bank 479 778

5.2 Deposits at call 15,359 15,723

5.3 Bank overdraft - -

5.4 Other (provide details) -

Total: cash at end of quarter (item 1.22) 15,838 16,501

Changes in interests in mining tenements Tenement

reference Nature of interest (note (2))

Interest at beginning of quarter

Interest at end of quarter

6.1 Interests in mining tenements relinquished, reduced or lapsed

See Activity Report Section

6.2 Interests in mining tenements acquired or increased

See Activity Report Section

For

per

sona

l use

onl

y

Page 23: WA-362-P and WA-363-P permits both renewed for first 5 ... · 3 WA-323-P & WA-330-P Location Map Interpretation and mapping of the processed data commenced during the quarter and

Appendix 5B Mining exploration entity quarterly report

+ See chapter 19 for defined terms. Appendix 5B Page 4 30/9/2001

Issued and quoted securities at end of current quarter Description includes rate of interest and any redemption or conversion rights together with prices and dates.

Total number Number quoted Issue price per security (see note 3) (cents)

Amount paid up per security (see note 3) (cents)

7.1 Preference +securities (description)

7.2 Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buy-backs, redemptions

7.3 +Ordinary securities

152,127,398 74,278,910 33,000,000

152,127,398 74,278,910

-

- 25 cents

-

- 15 cents

-

7.4 Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buy-backs

7.5 +Convertible debt securities (description)

7.6 Changes during quarter (a) Increases through issues (b) Decreases through securities matured, converted

7.7 Options (description and conversion factor)

500,000

-

Exercise price 45 cents

Expiry date 30/09/2013

7.8 Issued during quarter

7.9 Exercised during quarter

7.10 Expired during quarter

7.11 Debentures (totals only)

7.12 Unsecured notes (totals only)

For

per

sona

l use

onl

y

Page 24: WA-362-P and WA-363-P permits both renewed for first 5 ... · 3 WA-323-P & WA-330-P Location Map Interpretation and mapping of the processed data commenced during the quarter and

Appendix 5B Mining exploration entity quarterly report

+ See chapter 19 for defined terms. 30/9/2001 Appendix 5B Page 5

Compliance statement 1 This statement has been prepared under accounting policies which comply with

accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 5).

2 This statement does give a true and fair view of the matters disclosed.

Sign here: ............................................................ Date: 26/10/12 (Company Secretary)

Print name: J.G. TUOHY

Notes 1 The quarterly report provides a basis for informing the market how the entity’s

activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report.

2 The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in

mining tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2.

3 Issued and quoted securities. The issue price and amount paid up is not required in

items 7.1 and 7.3 for fully paid securities.

4 The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of

Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. 5 Accounting Standards ASX will accept, for example, the use of International

Financial Reporting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with. F

or p

erso

nal u

se o

nly