Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: CDTC Y Inside N Outside September 28, 2021
County:
Agency: WSDOT - NC
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
02 202804G 202804G 03 2.210 EIS Yes 001.46 003.67 58,494,729 21-09
SR 28/East Wenatchee Corridor Improvements
Widens SR 28 between 9th Street and 23rd Street and improves mobility and safety.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
RW 2021 0 CWA 21,749,998 0 21,749,998
Project Totals 0 21,749,998 0 21,749,998
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
RW 4,250,002 7,500,000 9,999,996 0 0
CN 0 0 0 0 31,000,000
Totals 4,250,002 7,500,000 9,999,996 0 31,000,000
Page 2
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: CDTC Y Inside N Outside September 28, 2021
County:
Agency: WSDOT - NC
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
02 228531B 228531B 03 1.600 CE Yes 2.77 4.37 18,005,300 21-09
SR 285/North Wenatchee Area - Intersection Improvements
The project will relieve congestion and provide safety enhancements through intersection improvements, access revisions, pedestrian and transit improvements, ITS solutions and environmental work.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
RW 2021 0 CWA 3,820,000 0 3,820,000
CN 2023 0 CWA 11,345,300 0 11,345,300
Project Totals 0 15,165,300 0 15,165,300
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
RW 1,000,000 1,820,000 1,000,000 0 0
CN 0 0 1,000,000 9,000,000 1,345,300
Totals 1,000,000 1,820,000 2,000,000 9,000,000 1,345,300
Page 3
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: CDTC Y Inside N Outside September 28, 2021
County:
Agency: WSDOT - NC
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
00 0097(187) 297100I 297100I 21 0.080 CE Yes 11.41 11.49 686,945 21-09
SR 971 Navarre Coulee Site 7 - Rock Slope Scaling
This project will scale the slope to increase highway safety and increase slope stability.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
CN 2021 STP 622,786 0 12,709 635,495
Project Totals 622,786 0 12,709 635,495
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 12,709 622,786 0 0 0
Totals 12,709 622,786 0 0 0
Page 4
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: CDTC Y Inside N Outside September 28, 2021
County:
Agency: WSDOT - NC
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
05 0097(187) 297100J 297100J 21 0.110 CE No 11.23 11.34 554,482 21-09
SR 971 Navarre Coulee Site 8 - Rock Slope Scaling
This project will scale the slope to increase highway safety and increase slope stability.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
CN 2021 STP 510,405 0 10,416 520,821
Project Totals 510,405 0 10,416 520,821
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 10,416 510,405 0 0 0
Totals 10,416 510,405 0 0 0
Page 5
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: CDTC Y Inside N Outside September 28, 2021
County:
Agency: WSDOT - NC
Func Cls
03
Project Number PIN
200204R
STIP ID
200204R
Imp Type
21
Total Project Length
0.060
Environmental Type
CE
RW Required
No
Begin Termini
142.69
End Termini
142.75
Total Est. Cost of Project
306,179
STIP Amend. No.
21-09
US 2/2 Mi E of Orondo - Rock Slope Scaling B
This project will enhance safety at this location by scaling the existing rock slope.
Funding
Phase PE
Start Date 2021
Federal Fund Code NHPP
Federal Funds
40,934 State Fund Code State Funds
0 Local Funds
4,048 Total
44,982
CN 2022 NHPP 255,973 0 5,224 261,197
Project Totals 296,907 0 9,272 306,179
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 20,982 24,000 0 0 0
CN
Totals
0
20,982
261,197
285,197
0
0
0
0
0
0
Page 6
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: CDTC Y Inside N Outside September 28, 2021
County:
Agency: WSDOT - NC
Func Cls
03
Project Number PIN
200204S
STIP ID
200204S
Imp Type
21
Total Project Length
0.060
Environmental Type
CE
RW Required
No
Begin Termini
143.00
End Termini
143.06
Total Est. Cost of Project
304,579
STIP Amend. No.
21-09
US 2/2 Mi E of Orondo - Rock Slope Scaling C
This project will enhance safety at this location by scaling the existing rock slope.
Funding
Phase PE
Start Date 2021
Federal Fund Code NHPP
Federal Funds
40,456 State Fund Code State Funds
0 Local Funds
4,001 Total
44,457
CN 2022 NHPP 254,920 0 5,202 260,122
Project Totals 295,376 0 9,203 304,579
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 20,000 24,457 0 0 0
CN
Totals
0
20,000
260,122
284,579
0
0
0
0
0
0
Page 7
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: CDTC Y Inside N Outside September 28, 2021
County:
Agency: WSDOT - NC
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
03 200208U 200208U 21 0.400 CE No 118.97 119.37 5,012,000 21-09
US 2/97 Easy Street - Roundabout
This project will construct a roundabout at the US2/97 Easy Street intersection.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
CN 2021 0 CWA 4,341,075 0 4,341,075
Project Totals 0 4,341,075 0 4,341,075
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 41,075 4,300,000 0 0 0
Totals 41,075 4,300,000 0 0 0
Federal Funds State Funds Local Funds Total
Agency Totals for WSDOT - NC 1,725,474 41,256,373 41,600 43,023,447
Page 8
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: LCV MPO Y Inside N Outside September 28, 2021
County: Asotin
Agency: Asotin Co.
Func Project Cls Number PIN
05 A022(022)
Grande Ronde Road BST
STIP ID
0241
Imp Type
04
Total Project Length
0.760
Environmental Type
CE
RW Required
No
Begin Termini
MP 10.15
End Termini
MP 10.91
Total Est. Cost of Project
190,000
STIP Amend. No.
21-09
Grade and prep existing gravel road for Bituminous Surface Treatment
Funding
Phase CN
Start Date 2021
Federal Fund Code STP(R)
Federal Funds
119,000 State Fund Code State Funds
0 Local Funds
18,000 Total
137,000
CN 2021 HIP(R) 41,790 0 6,522 48,312
Project Totals 160,790 0 24,522 185,312
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN
Totals
185,312
185,312
0
0
0
0
0
0
0
0
Agency Totals for Asotin Co.
Federal Funds
160,790 State Funds
0 Local Funds
24,522 Total
185,312
Page 9
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: LCV MPO Y Inside N Outside September 28, 2021
County:
Agency: WSDOT - SC
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
06 512902J 512902J02 21 1.510 CE No 41.28 42.55 2,458,875 21-09
SR 129/Highland Ave to US 12 and SR 129 Spur - ADA Compliance
Upgrade curb ramps and pedestrian signals to meet ADA Compliance. Pedestrian curb ramps and signals at various intersections on SR 129 in the city of Clarkston do not fully meet ADA standards. This project will upgrade the ramps and pedestrian signals to meet current standards and improve accessibility for pedestrians.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
PE 2021 STP 367,560 0 15,315 382,875
CN 2022 STP 2,034,480 0 41,520 2,076,000
Project Totals 2,402,040 0 56,835 2,458,875
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 115,265 267,610 2,049,383 26,617 0
Totals 115,265 267,610 2,049,383 26,617 0
Federal Funds State Funds Local Funds Total
Agency Totals for WSDOT - SC 2,402,040 0 56,835 2,458,875
Page 10
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: Peninsula RTPO Y Inside N Outside September 28, 2021
County: Mason
Agency: Shelton
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
06 5460 44 CE No Various Various 890,292 21-09
SRTS Crosswalk Improvements-State Funding
At Franklin St and 7th St, Railroad Ave and 9th St and Franklin and 7th Street install Rectangular Rapid Flashing beacons and ADA curb ramp replacement or upgrades. The project includes curb extensions, median refuge island, audible pedestrian signals, sidewalk and speed feedback sign.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
PE 2021 0 SRTS 88,857 13,869 102,726
CN 2022 0 SRTS 681,245 106,321 787,566
Project Totals 0 770,102 120,190 890,292
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 102,726 0 0 0 0
CN 0 787,566 0 0 0
Totals 102,726 787,566 0 0 0
Federal Funds State Funds Local Funds Total
Agency Totals for Shelton 0 770,102 120,190 890,292
Page 11
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside September 28, 2021
County: Kitsap
Agency: Bremerton
Total Project
Func Project Imp Length Environmental RW Begin Cls Number PIN STIP ID Type Type Required Termini
04 BRE-28 21 0.000 CE Yes N/A
Systemic Pedestrian Treatments - Rectangular Rapid Flashing Beacons
Install rectangular rapid flashing beacons, signage, curb ramps, and other improvements at 8 locations citywide.
End Termini
N/A
Total Est. Cost of Project
864,500
STIP Amend. No.
21-09
Funding
Phase PE
Start Date 2021
Federal Fund Code HSIP
Federal Funds
72,000 State Fund Code State Funds
0 Local Funds
8,000 Total
80,000
RW 2022 HSIP 72,000 0 8,000 80,000
CN 2022 HSIP 704,500 0 0 704,500
Project Totals 848,500 0 16,000 864,500
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL
Totals
80,000
80,000
784,500
784,500
0
0
0
0
0
0
Agency Totals for Bremerton
Federal Funds
848,500 State Funds
0 Local Funds
16,000 Total
864,500
Page 12
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside September 28, 2021
County: King
Agency: Federal Way
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
03 FW-48 06 0.240 CE No 9th Ave S Pacific Hwy S (SR 99) 1,116,000 21-09
S 348th St Preservation Project
Replacement of existing curb ramps and pedestrian push buttons to meet current ADA standards; full width planning bituminous pavement; HMA pavement repair; 2 1/2' thick HMA overlay; removal and replacement of existing dual-faced sloped mountable curb; replacement of traffic signal detection loops; channelization; and utility adjustments.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
PE 2021 NHPP 75,000 0 15,000 90,000
CN 2023 NHPP 855,000 0 171,000 1,026,000
Project Totals 930,000 0 186,000 1,116,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 90,000 0 1,026,000 0 0
Totals 90,000 0 1,026,000 0 0
Federal Funds State Funds Local Funds Total
Agency Totals for Federal Way 930,000 0 186,000 1,116,000
Page 13
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside September 28, 2021
County: Pierce
Agency: Pierce Co.
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
03 PCO-187 05 0.910 CE No 66th Ave. E 81st Ave. E 2,100,000 21-09
160th St. E. (66th Ave. E. to 81st Ave. E.)
Grind and overlay the existing pavement, pavement repair, and upgrade deficient curb ramp and pedestrian push buttons. Guardrail needs will be assessed during preliminary engineering and included within existing right of way where viable.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
PE 2022 NHPP 225,000 0 25,000 250,000
CN 2023 NHPP 1,665,000 0 185,000 1,850,000
Project Totals 1,890,000 0 210,000 2,100,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 250,000 1,850,000 0 0
Totals 0 250,000 1,850,000 0 0
Page 14
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside September 28, 2021
County: Pierce
Agency: Pierce Co.
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
04 PCO-185 28 0.360 CE Yes Golden Given Rd E 16th Ave E 1,356,000 21-09
Safe Routes to School - 104th St E
Construct new sidewalk and paved shoulder on south side of 104th St E; install RRFB and lighting at 16th Ave E intersection; improve existing ADA curb ramps and crosswalk.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
PE 2021 SRTS 259,000 0 5,000 264,000
RW 2023 SRTS 107,000 0 5,000 112,000
CN 2024 SRTS 970,000 0 10,000 980,000
Project Totals 1,336,000 0 20,000 1,356,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 264,000 0 112,000 980,000 0
Totals 264,000 0 112,000 980,000 0
Page 15
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside September 28, 2021
County: Pierce
Agency: Pierce Co.
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
03 PCO-186 05 1.080 CE No 116th St S / Steele St S 96th St S 2,854,000 21-09
Steele Street South
This preservation project will provide for the preservation of Steele St S by grinding and overlaying the existing asphalt pavement roadway. The project will also improve non-complaint ADA curb ramps and pedestrian push buttons to the maximum extent feasible. Existing vehicle detection systems at traffic signals using induction loops may be converted to video detection if loops are impacted.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
PE 2022 NHPP 288,000 0 31,000 319,000
CN 2023 NHPP 2,282,000 0 253,000 2,535,000
Project Totals 2,570,000 0 284,000 2,854,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 319,000 2,535,000 0 0
Totals 0 319,000 2,535,000 0 0
Federal Funds State Funds Local Funds Total
Agency Totals for Pierce Co. 5,796,000 0 514,000 6,310,000
Page 16
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside September 28, 2021
County: King
Agency: Seattle
Func Cls
03
Project Number PIN STIP ID
SEA-200
Imp Type
23
Total Project Length
2.400
Environmental Type
CE
RW Required
Yes
Begin Termini
1st Ave
End Termini
Martin Luther King Jr Way
Total Est. Cost of Project
134,728,800
STIP Amend. No.
21-09
Madison Corridor Bus Rapid Transit
Construct a high-capacity transit project from the Downtown and First Hill-Capitol Hill regional urban centers to Madison Valley, including dedicated transit lanes, level-boarding stations, left-door boarding, off-board fare payment, and real-time arrival Information. Project scope includes transit signal priority, deployment of 9-diesel hybrid vehicles (NEPA updated and approved by FTA), and pedestrian/bicycle infrastructure improvements including protected bike lanes as well as sidewalk repairs and upgrades. In addition to the termini on Madison from 1st Avenue to Martin Luther King Jr. Way, the project route also runs from 1st Avenue at Madison to 1st Avenue at Spring Street, Spring Street from 1st Avenue to 9th Avenue, and Spring Street at 9th Avenue to Madison at 9th Avenue. Construction will be phased. The Title change is to remain consistent with FTA Small Starts Grant Title.
Funding
Phase CN
Start Date 2021
Federal Fund Code 5309(NS)
Federal Funds
59,900,000 State Fund Code State Funds
0 Local Funds
0 Total
59,900,000
CN 2021 FTA Discretionary 10,897,354 0 0 10,897,354
CN 2022 0 OTHER 2,545,000 0 2,545,000
Project Totals 70,797,354 2,545,000 0 73,342,354
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 70,797,354 2,545,000 0 0 0
Totals 70,797,354 2,545,000 0 0 0
Page 17
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside September 28, 2021
County: King
Agency: Seattle
Func Cls
Project Number PIN STIP ID
Imp Type
Total Project Length Environmental
Type RW Required
Begin Termini
End Termini
Total Est. Cost of Project
STIP Amend. No.
03 SEA-240 23 13.500 CE Yes Westlake Ave N at 9th Ave N N 105th St at Aurora Ave N 24,400,000 (SR 21-09
Northgate to Downtown Transit Improvements
The City of Seattle will construct transit spot improvements and multimodal corridor improvements along King County Metro Route 40 to improve connections to major destinations in North and Central Seattle including Northgate, Greenwood, Crown Hill, Ballard ,Fremont, South Lake Union, and Downtown Seattle. Key features of the enhanced Route 40 corridor include: bus priority lanes, pavement improvements, traffic signal optimization, bus stop rebalancing, additional bus stops, and bicycle and pedestrian upgrades.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
PE 2021
PE 2022
RW 2021
CN 2023
Expenditure Schedule
Phase
ALL
Totals
CMAQ
5307
Project Totals
1st
3,600,000
3,600,000
0
1,000,000
0
3,000,000
4,000,000
2nd
1,200,000
1,200,000
OTHER
OTHER
OTHER
1,500,000
0
1,500,000
3,000,000
6,000,000
3rd
19,600,000
19,600,000
300,000
200,000
300,000
13,600,000
14,400,000
4th
0
0
1,800,000
1,200,000
1,800,000
19,600,000
24,400,000
5th & 6th
0
0
Agency Totals for Seattle
Federal Funds
74,797,354 State Funds
8,545,000 Local Funds
14,400,000 Total
97,742,354
Page 18
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside September 28, 2021
County: Snohomish
Agency: Snohomish Co.
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
03 SNOCO-155 06 3.120 CE No Seattle Hill Road SR 9 5,000,000 21-09
132nd/134th/Cathcart Way Overlay
Apply HMA overlay meeting current standards to the existing surface. Plane and repair as necessary. Re-stripe and repave existing bike lanes as necessary. Upgrade all non-compliant ramps to current standards.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
PE 2022 NHPP 472,000 0 0 472,000
CN 2023 NHPP 4,528,000 0 0 4,528,000
Project Totals 5,000,000 0 0 5,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 472,000 4,528,000 0 0
Totals 0 472,000 4,528,000 0 0
Page 19
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside September 28, 2021
County: Snohomish
Agency: Snohomish Co.
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
03 SNOCO-156 06 1.120 CE No Spruce Way Ash Way 3,301,000 21-09
164th Street SW Overlay
Asphalt overlay, pavement repair, and curb ramp upgrades.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
PE 2021 NHFP 33,000 0 47,000 80,000
PE 2021 NHPP 232,000 0 0 232,000
CN 2023 NHFP 294,000 0 448,000 742,000
CN 2023 NHPP 2,247,000 0 0 2,247,000
Project Totals 2,806,000 0 495,000 3,301,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 312,000 0 2,989,000 0 0
Totals 312,000 0 2,989,000 0 0
Page 20
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside September 28, 2021
County: Snohomish
Agency: Snohomish Co.
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
05 SNOCO-158 06 0.000 CE No N/A N/A 1,937,452 21-09
Red Bridge #537 Preventative Maintenance
Paint bridge and perform minor repairs as necessary.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
PE 2021 STP(BR) 341,869 0 46,152 388,021
CN 2024 STP(BR) 1,549,431 0 0 1,549,431
Project Totals 1,891,300 0 46,152 1,937,452
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 388,021 0 0 1,549,431 0
Totals 388,021 0 0 1,549,431 0
Page 21
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside September 28, 2021
County: Snohomish
Agency: Snohomish Co.
Func Project Cls Number PIN STIP ID
04 SNOCO-157
Snohomish River Bridge #1 Scour Mitigation
Seismic and scour structural improvements.
Imp Type
06
Total Project Length
0.000
Environmental Type
DCE
RW Required
No
Begin Termini
N/A
End Termini
N/A
Total Est. Cost of Project
3,039,631
STIP Amend. No.
21-09
Funding
Phase PE
Start Date 2021
Federal Fund Code STP(BR)
Federal Funds
578,012 State Fund Code State Funds
0 Local Funds
78,031 Total
656,043
CN 2024 STP(BR) 2,383,588 0 0 2,383,588
Project Totals 2,961,600 0 78,031 3,039,631
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL
Totals
656,043
656,043
0
0
0
0
2,383,588
2,383,588
0
0
Agency Totals for Snohomish Co.
Federal Funds
12,658,900 State Funds
0 Local Funds
619,183 Total
13,278,083
Page 22
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside September 28, 2021
County:
Agency: Sound Transit
Func Cls
Project Number PIN STIP ID
Imp Type
Total Project Length Environmental
Type RW Required
Begin Termini
End Termini
Total Est. Cost of Project
STIP Amend. No.
00 RTA-82 23 0.000 EIS Yes South 200th Street and 28th Av
South 316th Street and 23rd Av
2,451,535,00 0 21-09
Federal Way Link Extension
Engineering (including NEPA), design and construction to extend light rail approximately 7.8 miles from Angle Lake Station (SeaTac) to the Federal Way Transit Center. The alignment is adjacent to I-5 and includes 3 stations: one near Highline College in Kent / Des Moines, one station at South 272nd, and one station at the Federal Way Transit Center. Parking will be built at each of the three stations. This project is anticipated to be financed with an FTA Full Funding Grant Agreement and federal TIFIA Master Credit Agreement loan. The FFGA award is $790M with a total baseline cost estimate of $3.16B. When the TIFIA loan is executed, a total of $629,472,431 in TIFIA loan disbursements will be available 2019-2024. This is a multi-year project and the programming reflects the funds available within the span of the regional TIP.
Page 23
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside September 28, 2021
County:
Agency: Sound Transit
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
PE 2021 0 0 726,000 726,000
PE 2022 0 0 1,484,000 1,484,000
PE 2023 0 0 40,000 40,000
PE 2024 0 0 30,000 30,000
RW 2021 0 0 38,262,000 38,262,000
RW 2022 0 0 5,369,000 5,369,000
RW 2023 0 0 3,700,000 3,700,000
RW 2024 0 0 3,700,000 3,700,000
CN 2021 5309(NS) 97,710,967 0 369,832,000 467,542,967
CN 2021 FTA Discretionary 158,583,550 0 0 158,583,550
CN 2022 5309(NS) 100,000,000 0 472,958,000 572,958,000
CN 2023 5309(NS) 100,000,000 0 246,895,000 346,895,000
CN 2024 5309(NS) 100,000,000 0 56,679,000 156,679,000
Project Totals 556,294,517 0 1,199,675,000 1,755,969,517
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 665,114,517 579,811,000 350,635,000 160,409,000 0
Totals 665,114,517 579,811,000 350,635,000 160,409,000 0
Page 24
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside September 28, 2021
County:
Agency: Sound Transit
Func Cls
Project Number PIN STIP ID
Imp Type
Total Project Length Environmental
Type RW Required
Begin Termini
End Termini
Total Est. Cost of Project
STIP Amend. No.
00 RTA-78 23 8.000 EIS Yes Lynnwood Transit Center area
Northgate Transit Center 2,771,623,99 7 21-09
Lynnwood Link Extension
Extend Sound Transit's Link Light Rail project from Lynnwood to Northgate. This project is anticipated to be financed with a federal TIFIA Master Credit Agreement loan. When the loan is executed, a total of $657,863,164 in TIFIA loan disbursements will be available 2018- 2023. This is a multi-year project and the programming reflects the funds available within the span of the regional TIP.
Page 25
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside September 28, 2021
County:
Agency: Sound Transit
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
PE 2021 0 0 10,633,000 10,633,000
PE 2022 0 0 9,386,000 9,386,000
PE 2023 0 0 8,900,000 8,900,000
PE 2024 0 0 6,914,000 6,914,000
RW 2021 0 0 6,805,000 6,805,000
RW 2022 0 0 5,000,000 5,000,000
RW 2023 0 0 4,386,000 4,386,000
RW 2024 0 0 4,000,000 4,000,000
CN 2021 5309(NS) 97,710,967 0 575,712,000 673,422,967
CN 2021 FTA Discretionary 94,047,724 0 0 94,047,724
CN 2022 5309(NS) 100,000,000 0 502,969,000 602,969,000
CN 2023 5309(NS) 100,000,000 0 358,982,000 458,982,000
CN 2024 5309(NS) 100,000,000 0 163,805,000 263,805,000
Project Totals 491,758,691 0 1,657,492,000 2,149,250,691
Page 26
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside September 28, 2021
County:
Agency: Sound Transit
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 784,908,691 617,355,000 472,268,000 274,719,000 0
Totals 784,908,691 617,355,000 472,268,000 274,719,000 0
Federal Funds State Funds Local Funds Total
Agency Totals for Sound Transit 1,048,053,208 0 2,857,167,000 3,905,220,208
Page 27
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside September 28, 2021
County:
Agency: WSDOT - NW
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
01 140504G WDNW-2065 21 0.500 CE Yes MP 7.50 MP 8.00 10,000,000 21-09
I-405/Ripley Lane Stream Connection Project
The project will establish flow capacity and restore stream connection between I-405 and Lake Washington to address WSDOTs obligation to reconnect Streams 7.7A and 7.8 across the I-405 Corridor.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
PE 2021 0 CWA 833,113 0 833,113
PE 2022 0 CWA 185,934 0 185,934
RW 2021 0 CWA 4,491,126 0 4,491,126
RW 2022 0 CWA 410,541 0 410,541
CN 2022 0 CWA 1,600,000 0 1,600,000
CN 2024 0 CWA 1,400,000 0 1,400,000
Project Totals 0 8,920,714 0 8,920,714
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 5,324,239 2,196,475 0 1,400,000 0
Totals 5,324,239 2,196,475 0 1,400,000 0
Page 28
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside September 28, 2021
County:
Agency: WSDOT - NW
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
01 100520P WDNW-2066 24 2.130 CE No 162.97 165.1 537,648 21-09
I-5/Jackson St & S Forest St Vicinity - Fiber Repair
The conduits and fiber optic cables have been damaged by vandalism. The conduits and fiber optic lines will be replaced. The new fiber optic lines will keep the I-5 Express Lanes signs and gates functioning.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
PE 2021 0 0 123,952 123,952
CN 2022 NHPP 405,422 0 8,274 413,696
Project Totals 405,422 0 132,226 537,648
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 123,952 413,696 0 0 0
Totals 123,952 413,696 0 0 0
Page 29
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside September 28, 2021
County:
Agency: WSDOT - NW
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
01 0901(503) 109024S WDNW-1183 14 1.610 DCE No MP 4.28 MP 5.89 7,865,268 21-09
I-90/Lacey V Murrow Bridge - Anchor Cable Replacement
Several anchor cables on the Lacey V Murrow floating bridge have reached the end of their service life. This project will replace select anchor cables in order to maintain the operating integrity of the bridge.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
CN 2021 NHFP 7,275,367 0 148,483 7,423,850
Project Totals 7,275,367 0 148,483 7,423,850
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 7,423,850 0 0 0 0
Totals 7,423,850 0 0 0 0
Page 30
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside September 28, 2021
County:
Agency: WSDOT - NW
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
03 116717C WDNW-2053 04 1.630 CE No MP 17.95 MP 19.58 18,000,000 21-09
SR 167/SR 516 to S 277th St - Southbound Auxiliary Lane
Construct an auxiliary lane on SR 167 in the southbound direction between SR 516 and S 277th Street to mitigate changing traffic patterns along the corridor.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
CN 2021 0 0 557,948 557,948
CN 2022 0 0 950,293 950,293
CN 2023 0 0 4,241,758 4,241,758
CN 2024 0 0 7,500,000 7,500,000
Project Totals 0 0 13,249,999 13,249,999
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 557,948 950,293 4,241,758 7,500,000 0
Totals 557,948 950,293 4,241,758 7,500,000 0
Federal Funds State Funds Local Funds Total
Agency Totals for WSDOT - NW 7,680,789 8,920,714 13,530,708 30,132,211
Page 31
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: Quad-Co RTPO N Inside Y Outside September 28, 2021
County: Adams
Agency: Othello
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
04 WA-12892 28 0.030 CE No 40' North of Scootney Street 40' South of Scootney Street 450,000 21-09
14th Avenue and Scootney Street Pedestrian Improvements
Curb extensions, lane width reduction, road reconfiguration pavement markings for parking lane, ADA curb ramp retrofits, pedestrian hybrid beacon, pedestrian-scale lighting
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
PE 2021 0 SRTS 46,500 3,500 50,000
CN 2022 0 SRTS 372,000 28,000 400,000
Project Totals 0 418,500 31,500 450,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 50,000 0 0 0 0
CN 0 400,000 0 0 0
Totals 50,000 400,000 0 0 0
Federal Funds State Funds Local Funds Total
Agency Totals for Othello 0 418,500 31,500 450,000
Page 32
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: RTC N Inside Y Outside September 28, 2021
County: Skamania
Agency: Skamania Co.
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
07 WA-14018 11 0.010 DCE Yes Buck Creek Bridge Buck Creek Bridge 534,900 21-09
Buck Creek Bridge
Repair scour critical Buck Creek Bridge
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
PE 2021 STP(BR) 20,000 0 3,122 23,122
RW 2021 0 0 1,000 1,000
CN 2022 STP(BR) 510,778 0 0 510,778
Project Totals 530,778 0 4,122 534,900
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 23,122 0 0 0 0
RW 1,000 0 0 0 0
CN 0 510,778 0 0 0
Totals 24,122 510,778 0 0 0
Page 33
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: RTC N Inside Y Outside September 28, 2021
County: Skamania
Agency: Skamania Co.
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
05 000S(545) WA-12656 21 0.000 DCE No Countywide Countywide 472,800 21-09
Guardrail and Signage Project
Install/upgrade guardrail. Install/upgrade signing, sign post reflectors, and guideposts/delineators. Projects includes associated ADA and utility work as needed.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
CN 2021 HSIP 406,200 0 0 406,200
Project Totals 406,200 0 0 406,200
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 406,200 0 0 0 0
Totals 406,200 0 0 0 0
Federal Funds State Funds Local Funds Total
Agency Totals for Skamania Co. 936,978 0 4,122 941,100
Page 34
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: SRTC Y Inside N Outside September 28, 2021
County: Spokane
Agency: Spokane
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
03 WA-13882 05 3.220 CE Yes Various Various 6,176,000 21-09
29th / Washington / Monroe
Maintenance grind and overlay, pavement repair, crack seal, upgrade ADA ramps.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
PE 2022 NHPP 392,000 0 98,000 490,000
RW 2022 NHPP 40,000 0 10,000 50,000
CN 2023 NHPP 4,509,000 0 1,127,000 5,636,000
Project Totals 4,941,000 0 1,235,000 6,176,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 398,000 92,000 0 0
RW 0 25,000 25,000 0 0
CN 0 0 5,000,000 636,000 0
Totals 0 423,000 5,117,000 636,000 0
Page 35
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: SRTC Y Inside N Outside September 28, 2021
County: Spokane
Agency: Spokane
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
07 WA-13878 28 CE No Various Various 844,276 21-09
Bemiss Elementary Walk Route Improvements
Construct sidewalk along Liberty Ave. from Lee St. to Cook St. Construct curb extensions and crossing improvements at Liberty Ave./Cook St. Install lighting and RRFB at Crestline St./Courtland Ave. intersection.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
PE 2022 0 SRTS 59,803 10,553 70,356
CN 2023 0 SRTS 657,832 116,088 773,920
Project Totals 0 717,635 126,641 844,276
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 70,356 0 0 0
CN 0 0 773,920 0 0
Totals 0 70,356 773,920 0 0
Page 36
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: SRTC Y Inside N Outside September 28, 2021
County: Spokane
Agency: Spokane
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
04 WA-11841 28 1.000 CE Yes Northwest Blvd Garland Ave 2,489,869 21-09
Driscoll/Alberta/Cochran Sidewalk Infill and Finch Elem Walk Route
Sidewalk infill generally along both sides of the roadway. Transit stop improvements as appropriate. Marked crosswalk including illumination, median islands, RRFB and reconfigure roadway at NW Blvd. ADA ramp retrofits, sidewalk with curb and buffer separation, standard bike lanes and curb extensions.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
PE 2022 TAP(UL) 130,000 0 65,665 195,665
PE 2022 0 SRTS 55,433 9,783 65,216
RW 2022 0 0 80,000 80,000
CN 2023 TAP(UL) 575,200 0 308,387 883,587
CN 2023 CMAQ 335,525 0 179,888 515,413
CN 2023 0 SRTS 637,490 112,498 749,988
Project Totals 1,040,725 692,923 756,221 2,489,869
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 200,000 60,881 0 0
RW 0 80,000 0 0 0
CN 0 0 2,148,988 0 0
Totals 0 280,000 2,209,869 0 0
Page 37
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: SRTC Y Inside N Outside September 28, 2021
County: Spokane
Agency: Spokane
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
03 WA-13876 28 0.280 CE No Carlisle at Greene Carlisle at Freya 1,420,957 21-09
Greene/Carlisle Crosswalk Improvements
Install Pedestrian Hybrid Beacon and related crosswalk improvements at Greene/Carlisle. Construct path along the north side of Carlisle from Greene St. to Ralph St. Construct sidewalks and ADA ramps along Carlisle from Ralph St. to Freya St.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
PE 2022 0 Ped/Bike Program 116,260 12,918 129,178
CN 2023 0 Ped/Bike Program 1,162,601 129,178 1,291,779
Project Totals 0 1,278,861 142,096 1,420,957
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 129,178 0 0 0
CN 0 0 1,291,779 0 0
Totals 0 129,178 1,291,779 0 0
Page 38
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: SRTC Y Inside N Outside September 28, 2021
County: Spokane
Agency: Spokane
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
03 WA-13883 14 0.320 CE No south bridge approach north bridge approach 4,457,200 21-09
Maple Street Bridge Deck Repair
Bridge deck surface and joint repair.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
PE 2022 STP(BR) 725,735 0 113,265 839,000
CN 2024 STP(BR) 3,618,200 0 0 3,618,200
Project Totals 4,343,935 0 113,265 4,457,200
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 200,000 339,000 300,000 0
CN 0 0 0 3,000,000 618,200
Totals 0 200,000 339,000 3,300,000 618,200
Page 39
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: SRTC Y Inside N Outside September 28, 2021
County: Spokane
Agency: Spokane
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
03 WA-13880 05 2.400 CE Yes Various Various 4,558,000 21-09
Market / Monroe / 29th
Maintenance grind and overlay, pavement repair, crack seal and ADA ramp upgrades.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
PE 2022 NHPP 106,691 0 26,580 133,271
PE 2022 NHFP 182,309 0 45,420 227,729
RW 2022 NHPP 14,767 0 3,692 18,459
RW 2022 NHFP 25,233 0 6,308 31,541
CN 2023 NHPP 1,224,542 0 306,413 1,530,955
CN 2023 NHFP 2,092,458 0 523,587 2,616,045
Project Totals 3,646,000 0 912,000 4,558,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 300,000 61,000 0 0
RW 0 25,000 25,000 0 0
CN 0 0 3,500,000 647,000 0
Totals 0 325,000 3,586,000 647,000 0
Page 40
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: SRTC Y Inside N Outside September 28, 2021
County: Spokane
Agency: Spokane
Total Project
Func Project Imp Length Environmental Cls Number PIN STIP ID Type Type
03 WA-13879 21 CE
Nevada/Joseph Pedestrian Hybrid Beacon
Install a pedestrian hybrid beacon, ADA ramps and crosswalk improvements.
RW Required
Yes
Begin Termini
N/A
End Termini
N/A
Total Est. Cost of Project
570,620
STIP Amend. No.
21-09
Funding
Phase PE
Start Date 2022
Federal Fund Code Federal Funds
0 State Fund Code
SRTS State Funds
56,337 Local Funds
9,942 Total
66,279
RW 2022 0 SRTS 36,040 6,360 42,400
CN 2023 0 SRTS 392,650 69,291 461,941
Project Totals 0 485,027 85,593 570,620
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 66,279 0 0 0
RW 0 10,000 32,400 0 0
CN
Totals
0
0
0
76,279
461,941
494,341
0
0
0
0
Page 41
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: SRTC Y Inside N Outside September 28, 2021
County: Spokane
Agency: Spokane
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
04 WA-13877 28 0.640 CE No Cook St. Market St. 1,535,660 21-09
Shaw Middle School - Garland Ave. Pathway
Construct a shared-use path, curb extensions and ADA ramps along the north side of Garland Ave. from Cook St. to Market St. Construct a shared-use path along Regal St. from Garland Ave. to Rich Ave.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
PE 2022 SRTS 111,684 0 27,921 139,605
CN 2023 SRTS 1,116,844 0 279,211 1,396,055
Project Totals 1,228,528 0 307,132 1,535,660
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 139,605 0 0 0
CN 0 0 1,396,055 0 0
Totals 0 139,605 1,396,055 0 0
Page 42
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: SRTC Y Inside N Outside September 28, 2021
County: Spokane
Agency: Spokane
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
03 WA-13887 14 CE No Various Various 4,994,280 21-09
Washington St. South, Washington St. North Channel and Stevens St. Bridge Deck Repair
Bridge deck and joint repair.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
PE 2022 STP(BR) 564,646 0 375,354 940,000
CN 2024 STP(BR) 2,435,354 0 1,618,926 4,054,280
Project Totals 3,000,000 0 1,994,280 4,994,280
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 240,000 500,000 200,000 0
CN 0 0 0 4,054,280 0
Totals 0 240,000 500,000 4,254,280 0
Federal Funds State Funds Local Funds Total
Agency Totals for Spokane 18,200,188 3,174,446 5,672,228 27,046,862
Page 43
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: SRTC Y Inside N Outside September 28, 2021
County: Spokane
Agency: Spokane Co.
Func Cls
03
Project Number PIN STIP ID
WA-13972
Imp Type
05
Total Project Length
0.630
Environmental Type
CE
RW Required
No
Begin Termini
Wall St MP 1.21
End Termini
US 395 MP 1.84
Total Est. Cost of Project
590,000
STIP Amend. No.
21-09
Country Homes Blvd Preservation
Grind and inlay two north bound drive lanes
Funding
Phase PE
Start Date 2022
Federal Fund Code NHPP
Federal Funds
49,000 State Fund Code State Funds
0 Local Funds
12,000 Total
61,000
CN 2022 NHPP 423,000 0 106,000 529,000
Project Totals 472,000 0 118,000 590,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 61,000 0 0 0
CN
Totals
0
0
529,000
590,000
0
0
0
0
0
0
Page 44
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: SRTC Y Inside N Outside September 28, 2021
County: Spokane
Agency: Spokane Co.
Total Project Total Est. STIP
Func Project Imp Length Environmental RW Begin End Cost of Amend. Cls Number PIN STIP ID Type Type Required Termini Termini Project No.
03 WA-13826 04 1.560 CE Yes MP 0.25 MP 1.81 2,664,000 21-09
Harvard Road Reconstruction
Full-depth roadway reconstruction.
Funding
Federal Funds Phase Start Date Federal Fund Code State Fund Code State Funds Local Funds Total
PE 2021 NHPP 239,000 0 37,000 276,000
CN 2023 NHPP 2,066,000 0 322,000 2,388,000
Project Totals 2,305,000 0 359,000 2,664,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 276,000 0 0 0 0
CN 0 0 2,388,000 0 0
Totals 276,000 0 2,388,000 0 0
Federal Funds State Funds Local Funds Total
Agency Totals for Spokane Co. 2,777,000 0 477,000 3,254,000
Page 45
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: SRTC Y Inside N Outside September 28, 2021
County: Spokane
Agency: Spokane Transit
Total Project
Func Project Imp Length Environmental RW Begin Cls Number PIN STIP ID Type Type Required Termini
00 WA-13866 23 CE No N/A
Battery Electric Bus Purchases for Fixed Route Fleet Electrification
Purchase up to ten new, battery electric buses which will replace diesel buses that have exceeded the minimum useful life.
End Termini
N/A
Total Est. Cost of Project
11,815,000
STIP Amend. No.
21-09
Funding
Phase ALL
Start Date 2022
Federal Fund Code 5339(c)
Federal Funds
6,380,100 State Fund Code State Funds
0 Local Funds
5,434,900 Total
11,815,000
Project Totals 6,380,100 0 5,434,900 11,815,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL
Totals
0
0
11,815,000
11,815,000
0
0
0
0
0
0
Agency Totals for Spokane Transit
Federal Funds
6,380,100 State Funds
0 Local Funds
5,434,900 Total
11,815,000
Page 46
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: WWV Y Inside N Outside September 28, 2021
County: Walla Walla
Agency: Walla Walla
Total Project
Func Project Imp Length Environmental RW Begin End Cls Number PIN STIP ID Type Type Required Termini Termini
03 7198(003) WA-11548 04 0.360 CE Yes Colville Street 5th Avenue
Poplar Street - Colville to 5th
Reconstruct to convert an undivided four-lane roadway segment into a three-lane segment, allowing for the addition of bicycle and pedestrian facilities; pedestrian crossing, signal upgrades and replace water main.
Total Est. Cost of Project
5,507,650
STIP Amend. No.
21-09
Funding
Phase PE
Start Date 2021
Federal Fund Code STP(US)
Federal Funds
198,661 State Fund Code State Funds
0 Local Funds
375,757 Total
574,418
PE 2021 HIP(US) 126,339 0 19,718 146,057
RW 2021 0 0 130,000 130,000
CN 2022 0 OTHER 1,232,216 410,739 1,642,955
CN 2022 HSIP 1,250,000 0 350,225 1,600,225
CN 2024 STP(US) 998,615 0 415,380 1,413,995
Project Totals 2,573,615 1,232,216 1,701,819 5,507,650
Page 47
Washington State S. T. I. P.
2021 to 2024
MPO/RTPO: WWV
County: Walla Walla
Agency: Walla Walla
Expenditure Schedule
Phase
PE
RW
CN
Totals
Y Inside
1st
720,475
130,000
0
850,475
(Project Funds to Nearest Dollar)
N Outside
2nd
0
0
1,600,225
1,600,225
3rd
0
0
0
0
4th
0
0
1,413,995
1,413,995
September 28, 2021
5th & 6th
0
0
0
0
Agency Totals for Walla Walla
Federal Funds
2,573,615 State Funds
1,232,216 Local Funds
1,701,819 Total
5,507,650
Page 48