Initiatives of WAPDA in Monitoring Upper Indus Basin by Danial Hashmi Project Director Glacier Monitoring Research Centre WATER AND POWER DEVELOPMENT AUTHORITY 10 September 2013 Islamabad

Upload: others

Post on 31-Dec-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The

Initiatives of WAPDA in Monitoring Upper Indus Basin by

Danial Hashmi Project Director Glacier Monitoring Research Centre

WATER AND POWER DEVELOPMENT AUTHORITY

10 September 2013 Islamabad

Page 2: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The

Introduction

• WAPDA - Water and power Development

Authority of Pakistan was created in 1958

• Since its creation various steps to study

Upper Indus Basin cryoshpere and

establish Hydrometeorological networks in

1960’s for its monitoring were taken.

• The snow surveys were carried out during

1961 to 1968 in Mangla Basin to forecast

flows into the Mangla Dam.

Page 3: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The

Upper Indus Basin

Page 4: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The

Upper Indus Basin Glaciers

Page 5: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The

Studies by WAPDA in 70’s and 80’s

• During 1975 – 1978 Landsat imageries were

used by WAPDA to investigate into the water

resources of Pakistan. Very good correlation

between depletion of UIB snow cover area with

increasing UIB Flows during snowmelts period

was established.

• During 1985-1989, to understand the cryoshpere and hydrologic conditions of UIB, ground based research was carried out by WAPDA in collaboration with Canadian and UK Universities on its Pakistan Snow and Ice Hydrology Project Phase-I.

Page 6: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The

Studies by WAPDA Cont…

• Mass-Balance of selected glaciers of Karakoram and

Himalayas were carried out.

• Avalanche studies in Kunhar Basin including hydrology

of avalanches were also carried out.

• Ken Hewitt with WAPDA Staff studied potential Glacial

Lakes sites in Upper Indus Basin

• During 1989 Dr. Gordon Young carried out

sedimentation studies of Batura and Passu Glacier,

Central Hunza, with the students of University of

Manchester and WAPDA staff.

• Ablation gradient of Passu glacier for year 1988 and

1989 was also studied during this period.

Page 7: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The

Snow Sampling – Shark Col Snow Pit (5660 m)

Page 8: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The

Preparation for Stake Survey

Page 9: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The

MIAR GLACIER,HUNZA-KARAKORAM

Page 10: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The

Depth Profile of Miar Glacier - 1989 (using Radio-echo soundings)

Page 11: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The

Research Studies Some outcomes

• The bulk of all UIB precipitation occurs in an altitudinal zone of 2500 – 6000 m elevation.

• The elevation of maximum precipitation is about 5000m in the Western Karakorams and 6000m in Eastern Karakorams.

• Precipitation is in the order of 1000 – 1800 mm of Snow Water Equivalent

• Most of the UIB glaciers are fed by snow avalanching and are Debris Covered

• Active melting zone of glaciers is between 3500 to 4800 meters above sea level.

Page 12: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The

Pakistan Snow and Ice Hydrology Project -II

• On the findings of 1985-1989 another Phase - I second

phase of PSIHI was initiated in 1991 and continued till

1997.

• In this phase 20 High Altitude weather stations in the

elevation zone of 2200 to 4800 meters a.s.l. were

installed in Upper Indus Basin

• The data from these stations is being collected and

transmitted to Lahore Forecasting Centre through

Meteorburst Communication System since 1993.

• A hydrologic Model from the University of British

Columbia Vancouver, Canada was obtained and

calibrated for the hydrologic conditions of Upper Indus

Basin.

Page 13: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The

PSIHP-II • The UBC Watershed model is being used for

developing and issuing flow forecasts to the Water Managers of the country since 2004.

• In this operational phase Seasonal (Kharif and Rabi) and Short Term (10-Daily) flow forecasts of River Indus at Tarbela Reservoir, River Jhelum at Mangla Reservoir and that of River Kabul at Nowshera are prepared and issued.

• The forecasts are used by IRSA and WAPDA Authority for water management of Indus River System and optimum production of Hydropower.

Page 14: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The
Page 15: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The

15

TYPICAL DCP STATION

SENSORS INSTALLED

• Temperature

• Precipitation

• Relative Humidity

• Solar Radiation

• Snow Water Equivalent

• Wind (Speed; Direction)

Khunjerab (4710masl)

•Wind

•Temperature &

Relative Humidity

•Solar Radiation •Precipitation

•Snow Water

Equivalent

Page 16: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The

Propylene Glycol Filling in Snow Pillow

Page 17: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The

Snow Water Equivalent- DCP Station DEOSAI (3910 m.a.s.l.)

0

100

200

300

400

500

600

700

1-N

ov

8-N

ov

15-N

ov

22-N

ov

29-N

ov

6-D

ec

13-D

ec

20-D

ec

27-D

ec

3-J

an

10-J

an

17-J

an

24-J

an

31-J

an

7-F

eb

14-F

eb

21-F

eb

28-F

eb

6-M

ar

13-M

ar

20-M

ar

27-M

ar

3-A

pr

10-A

pr

17-A

pr

24-A

pr

1-M

ay

8-M

ay

15-M

ay

22-M

ay

29-M

ay

5-J

un

12-J

un

19-J

un

26-J

un

Sn

ow

wa

ter

eq

uiv

ale

nt(

mm

)

2007-2008

2008-2009

2009-2010

2010-2011

2011-2012

Page 18: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The

Automatic Weather Station - Shogran

Page 19: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The

SWE confirmation at SHOGRAN

Page 20: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The

Upper Indus Basin - Percent of Snow Covered Area (2005)

58 59

64

61

42

37

19

12

17

28

31

41

0

10

20

30

40

50

60

70

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Percen

t

Page 21: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The

Temperature Change at WAPDA Weather Station KhunjerabPeriod: 1995 - 2010 , Elevation 4710 m.a.s.l

2.582.45

3.01

0.75 0.82

0.10

-1.56

-0.56

-1.56

0.57

1.63

1.17

-2

-1

0

1

2

3

4

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Tem

pera

ture

Ch

nag

e (

deg

ree c

elc

ius)

Overall Observation:

Over all temperature increase = 0.78 °C

Day time temperature increase = 0.54 °C

Night time temperature increase = 1.02 °C

Summer temperatute decrease = -1.80 °C

Page 22: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The
Page 23: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The
Page 24: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The
Page 25: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The
Page 26: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The
Page 27: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The
Page 28: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The

Passu Outlet River Levels

0

0.2

0.4

0.6

0.8

1

1.2

1.4

1.63

/18

/20

11

3/2

5/2

01

1

4/1

/20

11

4/8

/20

11

4/1

5/2

01

1

4/2

2/2

01

1

4/2

9/2

01

1

5/6

/20

11

5/1

3/2

01

1

5/2

0/2

01

1

5/2

7/2

01

1

6/3

/20

11

6/1

0/2

01

1

6/1

7/2

01

1

Riv

er

Le

vels

(m

)

Q = 41.5 cms

Page 29: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The

Climate Change Studies in WAPDA

• In Collaboration with the University of Colorado, Boulder, USA WAPDA studied Impact on the flows of River Indus due to Climate Change 1991.

• Dr. James Wescoat was the Principal investigator in this study.

• UBC Watershed Model was used to generate future flow scenarios.

• This study using GCM’s from Goddard Institute of Space Sciences (GISS) and Geophysical Fluid Dynamics Lab (GFDL) predicted 3.2°C and 4.7°C increase in temperature respectively by doubling CO2 from 1991 Level shown change in total annual river inflows by 11% to 16%

Page 30: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The

WAPDA new Initiative

Monitoring of Upper Indus

Basin Glaciers for Water

Resources Management in

Wake of Climate Change

Page 31: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The

Objectives

• Glacier Monitoring and Research Centre

(GMRC) has been established within

WAPDA

• Conduct Mass Balance Studies of 5 Major

Upper Indus Basin (UIB) Glaciers

• Monitoring and Mapping of 52 Nos. Large

and Medium size UIB Glaciers for their

Snout Movement

Page 32: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The

Objective Continued….

• Forecasting of Future Water Availability from

UIB using Remote Sensing, GIS, Digital

Elevation and Glacier Melt Models using

different Climate Scenarios

• Installation of 6 New High Altitude Automatic

Meteorological Stations in Upper Indus Basin

• Setting up of Remote Sensing and GIS Lab in

GMRC Lahore.

Page 33: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The

Project Cost & Implementation Period

• Project is C4 component of Tarbela 4th

Extension Hydropower Project

• Implementation Six Years

Period July 2012 – June 2018

• Project Cost USD 6.000 Million

Page 34: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The

Major Activities

• Recruitment of Additional Staff

• Hiring of Glacier Experts and Incremental Staff

• Training (Local, Foreign and On the Job) of Staff on Remote Sensing

,GIS, Digital Elevation Model and Glacier Melt Models

• Application of RS, GIS, DEM and Glacier Melt models on UIB

Glaciers for Estimation of Future Water Availability

• Construction of Offices at Lahore and Skardu

• Rehabilitation of Existing High Altitude Data Collection Network and

installation 6 new Stations

• Procurement of Field Investigation Equipment; AWS; ARLS;

Computer Hardware, Software, Vehicles etc.

Page 35: WATER AND POWER DEVELOPMENT AUTHORITY ... D_ Hashimi_WAPDA...Upper Indus Basin cryoshpere and establish Hydrometeorological networks in 1960’s for its monitoring were taken. •The