WATER DEMAND CALCULATION

Facilities OccupancyPer Capita Water Requirement 135 ltrs/day

Domestic (LD) Flushing (LD) Total (LD)Tower A (1BHK)=216units 1080 97200 48600 145800Tower B (2BHK) +(3BHK)=144 720 64800 32400 97200Tower C 2BHK) +(3BHK)=180 900 81000 40500 121500Total

2700243000 121500 364500

243 121.5 364.5Gardening (5252x 3.5) 18 18Sewage Generation (80 % Domestic + 100 % Flushing) 316STP Capacity (KLD) 373

Page 3: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

WATER BALANCE

Gardening18 KLD

CMWSSB Sewer160KLD

Total water Demand365 KLD

Sewage Generation

316 KLD

STP Design Capacity373 KLD

Treated Water (95%)300 KLD

Recycle waterFlushing Purposes

121.5 KLD

Fresh water Demand(CMWSSBwater Supply)

243 KLD

Page 4: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard
Page 5: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard
Page 6: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard
Page 7: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard
Page 8: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard
Page 9: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard
Page 10: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard
Page 11: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard
Page 12: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard
Page 13: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard
Page 14: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard
Page 15: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard
Page 16: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

1

SEWAGE TREATMENT PLANT

Technical Specification

Client

M/S. Alliance Mall

Chennai

Contractor

M/s. Hubert Enviro Care Systems (p) ltd

Chennai – 83

Description

For Approval

P.O. No.

DD-AM-STP-TS-01Doc. No.

0Rev.

25.10.13Date

CRHPrepared by

JRMC.E.O

CRChecked by

Page 17: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

2

Technical Specification for Sewage Treatment Plant

1.0 Project & Business Objectives

M/S. Hubert Enviro Care Systems (P) Ltd seeks to provide the best technology for

the supply of Sewage treatment plant.

2.0 Scope of Work

The Scope of our work includes as follows

Design & detailed Engineering

Fabrication & Supply of all electromechanical equipments

Erection of all equipments

Testing & Commissioning of all equipments

Note: All Civil Works are under Client’s scope.

3.0 Design Basis:

STP

Plant Capacity - 400 KLD

Operating hours - 24 hrs

Plant flow rate - 16.6 cum/hr

Design flow rate - 17 cum/hr

UF

Design capacity - 400 KLD

Operating Hours - 24 hrs

Plant Flow Rate - 16.6 cum/hr

Design Flow Rate - 17 cum/hr

Page 18: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

3

4.0 Quality logistics:

MBBR Technology

S.No Description Unit STP

Inlet

STP

OutletUF

Outlet

Standards

1 pH 7 - 8 6.5 – 7.5 6.5 -7.5 6.5 – 8.5

2 TSS mg/l 200 - 250 < 20 < 1 < 30

3 BOD mg/l 350 - 400 < 20 < 10 < 20

4 COD mg/l 400 - 500 < 100 < 100 < 250

5.0 Battery Limit:

1. Sewage Inlet & outlet is under clients scope

2. Incomer Electrical power - 415 Volts and 50 Hz

3. Power incomer to our panel is under Client’s scope

4. Cabling for Panel to the individual equipments is under Contractor’s scope

5. Construction Water & Power is under Client’s scope.

6. Site clearance & handing over of the site to contractor is under Client’s scope.

6.0 Connectivity

Inlet Port : 100 mm

Outlet port : 100 mm

7.0 Codes & Standards:

All design; fabrication, inspection, and testing of the plant will be done with respect

to the latest Indian Standards. Incase of non-availability of standards, good

engineering practice will be adopted.

Standards to be followed:

Plain & reinforced cement concrete – IS 456: 2000

Concrete structure for the storage of liquids – IS 3370: 1981-88

Pressure vessels – ASME SEC VIII

Pumps – IS 5120

Page 19: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

4

Others – Available IS standards.

Incase of non-availability of standards, good engineering practice will be

adopted.

9.0 Process description:

MBBR Technology

The sewage generated from the various sources will be collected in the collection

tank through the bar screen chamber in order to remove the floating materials and

particle size greater than 15mm. The Screened sewage is then led to the aeration

tank.

In the aeration tank, air is diffused through special type of diffusers to oxidize the

organic matters with the help of air blower & diffuser arrangement. Biological

treatment takes place through MBBR media. Then the overflow from aeration tank

is sent to the Clarifier tank for settling. The bioflocs formed in the aeration tank will

be settled at the bottom of the Clarifier tank through Clarifier rake mechanism and

the settled sludge will be pumped to the sludge holding tank through the return

sludge pump. From sludge holding tank, the sludge will be fed to filter press unit

for dewatering purpose through screw pumps.

The clarified overflow will be collected in the Clarified water tank from where it is

pumped to the Pressure Sand Filter, Activated Carbon Filter through Filter feed

pump for the removal of suspended solids, organic matter and odour. The filtered

water is stored in the filtered water tank / UF feed tank.

The filtered water will then be fed to the UF unit through UF feed pump. UF

permeate water will be used for flushing & gardening. UF backwash & cleaning are

done at regular intervals in order to prevent the membranes from chocking and

scaling of the membrane.

Page 20: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

5

TECHNICAL SPECIFICATIONS

OF

CIVIL WORKS

Page 21: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

6

SEWAGE TREATMENT PLANT

Specification of Collection Tank (UG)

Client : M/S. Alliance Mall, Chennai

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Tank Data1 Quantity 1 No2 Capacity 139 Cum3 Length 11.5 m4 Width 5.5 m5 Liquid depth 2.2 m6 Total Height 3.5 m7 Invert Level 1m below FGL8 MOC RCC - M309 Wall Thickness As per the structural design

10 Raft Thickness As per the structural design11 PCC As per the structural design12 Base Reinforcement Details As per the structural design13 Wall Main Reinforcement Details As per the structural design14 Wall Distributer Reinforcement

DetailsAs per the structural design

15 Plastering CM 1:316 Plastering Thickness 12 mm17 Submersible Pump Pit 1.5m x 0.5m x 0.5m

Adequacy calculation

Volume of Collection tank V - 139 cum

Plant Flow Rate Q - 17 cum/hr

Retention time T - V / Q

- 139 /17

- 8.1 hrs

Standard retention hrs for Collection tank is 6 hrs – 8 hrs

Provided retention hrs is > or = Standard retention hrs.

Hence adequate

Page 22: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

7

SEWAGE TREATMENT PLANT

Specification of Screen Chamber (UG)

Client : M/S. Alliance Mall, Chennai

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Tank data1 Quantity 1 No2 Capacity 0.54 cum3 Length 1.5 m4 Width 0.8 m5 Liquid depth 0.45 m6 Depth 1.6 m7 Wall Thickness As per the structural design8 MOC RCC9 Base Reinforcement As per the structural design

10 Wall Reinforcement As per the structural design11 Plastering CM 1:312 Plastering Thickness 12 mm

Adequacy calculation

Volume of Screen Chamber V - 0.54 cum

Plant Flow Rate Q - 17 cum/hr

Retention time T - V / Q

- 0.54 /17

- 0.032 hrs

- 1.9 min

Standard retention hrs for Collection tank is 1 min – 5 min

Provided retention hrs is > or = Standard retention hrs.

Hence adequate

Page 23: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

8

SEWAGE TREATMENT PLANT

Specification of Aeration Tank (AG)

Client : M/S. Alliance Mall, Chennai

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Tank Data1 Quantity 1 No2 Capacity 211.2 cum3 Length 12 m4 Width 5.5 m5 Liquid depth 3.2 m6 Total Height 3.5 m7 MOC RCC - M308 Wall Thickness As per the structural design9 Raft Thickness As per the structural design

10 PCC As per the structural design11 Base Reinforcement As per the structural design12 Wall Main Reinforcement As per the structural design13 Wall Distributer Reinforcement As per the structural design14 Plastering CM 1:315 Thickness of Plastering 12 mm

Adequacy calculation

Volume of Aeration tank V - 211.2 cum

Plant Flow Rate Q - 17 cum/hr

Retention time T - V / Q

- 211.2 /17

- 12.42 hrs

Standard retention hrs for Aeration tank is 8 hrs – 12 hrs

Provided retention hrs is > or = Standard retention hrs.

Hence adequate

Page 24: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

9

SEWAGE TREATMENT PLANT

Specification of Clarifier Tank (AG)

Client : M/S. Alliance Mall, Chennai

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Tank Data1 Quantity 1 No2 Capacity 66.52 cum3 Diameter 5.5 m4 Liquid Depth 2.8 m5 Total Height 3.5 m6 MOC RCC – M307 Wall Thickness As per the structural design8 Raft Thickness As per the structural design9 PCC As per the structural design

10 Base Reinforcement Details As per the structural design11 Wall Main Reinforcement Details As per the structural design12 Wall Distributer Reinforcement

DetailsAs per the structural design

13 Plastering CM 1:314 Thickness of Plastering 12 mm

Adequacy calculation

Volume of Clarifier tank V - 66.52 cum

Plant Flow Rate Q - 17 cum/hr

Retention time T - V / Q

- 66.52 /17

- 3.91 hrs

Standard retention hrs for Clarifier tank is 3 hrs – 3.5 hrs

Provided retention hrs is > or = Standard retention hrs.

Hence adequate

Page 25: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

10

SEWAGE TREATMENT PLANT

Specification of Sludge Holding tank (AG)

Client : M/S. Alliance Mall, Chennai

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Tank Data1 Quantity 1 No2 Capacity 22.5 cum3 Length 1.5 m4 Width 5.5 m5 Liquid Depth 3 m6 Total Height 3.5 m7 MOC RCC – M308 Wall Thickness As per the Structural design9 Raft Thickness As per the Structural design

10 PCC As per the Structural design11 Base Reinforcement Details As per the Structural design12 Wall Main Reinforcement Details As per the Structural design13 Wall Distributer Reinforcement

DetailsAs per the Structural design

14 Plastering CM 1:315 Thickness of Plastering 12 mm

Adequacy calculation

Volume of Sludge Holding tank V - 22.5 cum

Plant Flow Rate Q - 17 cum/hr

Retention time T - V / Q

- 22.5 /17

- 1.32 hrs

Standard retention hrs for Sludge holding tank is 1 hrs – 1.5 hrs

Provided retention hrs is > or = Standard retention hrs.

Hence adequate

Page 26: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

11

SEWAGE TREATMENT PLANT

Specification of Clarified Water Tank (AG)

Client : M/S. Alliance Mall, Chennai

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Tank Data1 Quantity 1 No2 Capacity 33 cum3 Length 2.5 m4 Width 5.5 m5 Liquid Depth 2.4 m6 Total Height 3.5 m7 MOC RCC - M308 Wall Thickness As per the structural design9 Raft Thickness As per the structural design

10 PCC As per the structural design11 Base Reinforcement Details As per the structural design12 Wall Main Reinforcement Details As per the structural design13 Wall Distributer Reinforcement

DetailsAs per the structural design

14 Plastering CM 1:315 Thickness of Plastering 12 mm

Adequacy calculation

Volume of Clarified Water tank V - 33 cum

Plant Flow Rate Q - 17 cum/hr

Retention time T - V / Q

- 33 /17

- 1.94 hrs

Standard retention hrs for Clarified water tank is 1.5 hrs – 2 hrs

Provided retention hrs is > or = Standard retention hrs.

Hence adequate

Page 27: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

12

SEWAGE TREATMENT PLANT

Specification of Filtered Water Tank / UF Feed Tank

Client : M/S. Alliance Mall, Chennai

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Tank Data1 Quantity 1 No2 Capacity 99 cum3 Length 6 m4 Width 5.5 m5 Liquid Depth 3 m6 Total Height 3.5 m7 MOC RCC - M308 Wall Thickness As per the structural design9 Raft Thickness As per the structural design

10 PCC As per the structural design11 Base Reinforcement Details As per the structural design12 Wall Main Reinforcement Details As per the structural design13 Wall Distributer Reinforcement

DetailsAs per the structural design

14 Plastering CM 1:315 Thickness of Plastering 12 mm

Adequacy calculation

Volume of Filtered Water tank V - 99 cum

Plant Flow Rate Q - 17 cum/hr

Retention time T - V / Q

- 99 /17

- 5.8 hrs

Standard retention hrs for Filtered Water tank is 4 hrs – 6 hrs

Provided retention hrs is > or = Standard retention hrs.

Hence adequate

Page 28: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

13

SEWAGE TREATMENT PLANT

Specification of UF Permeate Tank

Client : M/S. Alliance Mall, Chennai

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Tank Data1 Quantity 1 No2 Capacity 99 cum3 Length 6 m4 Width 5.5 m5 Liquid Depth 3 m6 Total Height 3.5 m7 MOC RCC - M308 Wall Thickness As per the structural design9 Raft Thickness As per the structural design

10 PCC As per the structural design11 Base Reinforcement Details As per the structural design12 Wall Main Reinforcement Details As per the structural design13 Wall Distributer Reinforcement

DetailsAs per the structural design

14 Plastering CM 1:315 Thickness of Plastering 12 mm

Adequacy calculation

Volume of UF Permeate tank V - 99 cum

Plant Flow Rate Q - 17 cum/hr

Retention time T - V / Q

- 99 /17

- 5.82 hrs

Standard retention hrs for UF Permeate tank is 4 hrs – 6 hrs

Provided retention hrs is > or = Standard retention hrs.

Hence adequate

Page 29: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

14

TECHNICAL SPECIFICATIONS

OF

ELECTROMECHANICAL

WORKS

Page 30: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

15

SEWAGE TREATMENT PLANT

Specification of Raw Sewage Transfer Pump

Client : M/S. Alliance Mall, ChennaiContractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai

Sl.No Description SpecificationPump data

1 Quantity 2 No (1W+1S)2 Type Submersible Nonclog3 Capacity 17 cum/hr4 Head 15 m5 Speed 2900 rpm6 Seal Gland Packing7 Pump Delivery Size 50 NB8 Motor rating 2 HP9 Phase 3 phase

10 Voltage / Frequency 415 v +/- 10% , 50 Hz +/- 10%11 Class of insulation F12 Model 1500 CW13 MOC CI14 Make Kirloskar / eq.

Page 31: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

16

SEWAGE TREATMENT PLANT

Specification of Bar Screen

Client : M/S. Alliance Mall, Chennai

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Screen data1 Quantity 1 No2 Opening size 15 mm3 Size of Flat 25 x 5mm.4 Width 800 mm5 Height 1600 mm6 MOC MS – Epoxy7 Make HECS

Page 32: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

17

SEWAGE TREATMENT PLANT

Specification of Air Blower

Client : M/S. Alliance Mall, Chennai

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Air Blower Data1 Quantity 2 No (1W + 1S)2 Type Twin Lobe Rotary3 Capacity 500 cum/hr4 Pressure 0.5 kg/cm25 MOC CI6 Model 67 AC7 Size 80 mm8 Make Kay / eq.

Motor Data9 Quantity 2 No (1W + 1S)

10 Type TEFC Squirrel Cage Induction11 MOC CI12 Speed 1440 rpm13 Voltage / Frequency 415 V / 50 Hz14 Motor Rating 20 HP15 Power Supply 3 Phase16 Make Kirloskar / eq.

Adequacy calculation

Assume O2 requirement = 2 kg of O2/ 1 kg of BOD

1kg of BOD / 2 kg of O2

Assume BOD for sewage = 400 mg/l = 0.40 kg/m3

BOD Load = 400 x 0.40

= 160 kg of BOD/day

O2 requirement = 160 x 2

= 320 kg of O2/day

Oxygen transfer @ 16% of SOTR = 320 / (0.16 x 0.23x 0.65 x 0.95)

= 320 / 0.023 = 13913.04

Page 33: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

18

α = 0.65; β = 0.95

Density = 1.16 => 13913.04 / 1.16 = 11994 m3/day

Air requirement = 11994 / 24 = 499.75 m3/hr

Therefore 500 m3/hr (1 + 1) each for aeration tank, the air flow rate is adequate.

Page 34: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

19

SEWAGE TREATMENT PLANT

Specification of Diffusers

Client : M/S. Alliance Mall, Chennai

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Coarse Bubble Diffuser Data1 Quantity 10 No2 Type Tubular Coarse bubble3 Diameter 90 mm Dia4 Length 1000 mm5 MOC EPDM6 Location Collection tank7 Make HECS

Fine Bubble Diffuser Data8 Quantity 40 No9 Type Tubular Fine bubble

10 Diameter 63 mm Dia11 Length 1000 mm12 MOC EPDM13 Location Aeration tank14 Make HECS

Adequacy calculation:

Blower capacity = 500 cum/hr

Air flow rate per diffuser = 10 m3/hr

Therefore no. of diffusers required = 500 / 10 = 50 no

No. of diffusers provided = 50 no

Hence it’s adequate.

Page 35: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

20

SEWAGE TREATMENT PLANT

Specification of MBBR Media

Client : M/S. Alliance Mall, Chennai

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Media Data1 Quantity 1 Lot2 Type Moving Bed Bio Reactor3 Surface area 250 m2 / m34 MOC PVC5 Location Aeration tank6 Accessories SS mesh at the outlet of the aeration

tank to avoid the escape of media7 Make HECS

Page 36: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

21

SEWAGE TREATMENT PLANT

Specification of Clarifier Rake Mechanism

Client : M/S. Alliance Mall, Chennai

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Feed Well data1 Quantity 1 no2 Type Central driven3 Feed well diameter 800 mm4 Feed well Height 1500 mm5 MOC of Feed Well MS – Epoxy6 Supports MS Angle / Channel7 Make HECS

Rake Mechanism8 Quantity 1 No (5.5 m diameter)9 Structure Channel / Angles

10 MOC of Rake MS Epoxy11 Accessories Rubber Squeezes, Bolt, nuts etc12 Make HECS

Drive Head data13 Quantity 1 No14 Drive Head diameter 600 mm15 Ratio 50 : 116 MOC CI

Gearbox data17 Quantity 1 No18 Type Foot Mounted19 Ratio 70 : 120 MOC CI21 Make Elecon / eq.

Motor data22 Quantity 1 No23 Type TEFC Squirrel Cage Induction24 MOC CI25 Rating 2 HP26 Power Supply 3 Phase27 Voltage / Frequency 415 V / 50 Hz28 Make Kirloskar / eq.29 Accessories Love jaw Coupling, Gear Sprockets ,

Chain with links

Page 37: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

22

SEWAGE TREATMENT PLANT

Specification of Return Sludge Pump

Client : M/S. Alliance Mall, ChennaiContractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai

Sl.No Description SpecificationPump data

1 Quantity 2 No (1W + 1S)2 Type Centrifugal Nonclog3 Capacity 5 cum/hr4 Head 12 - 15 m5 Speed 2760 rpm6 Model SP ‘O’7 MOC CI8 Make Kirloskar / eq.

Motor data9 Motor type TEFC Squirrel Cage Induction

10 Motor rating 1 HP11 Phase 3 phase13 Voltage / Frequency 415 v +/- 10% , 50 Hz +/- 10%14 MOC CI15 Make Kirloskar / eq.

Page 38: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

23

SEWAGE TREATMENT PLANT

Specification of Screw Pump

Client : M/S. Alliance Mall, ChennaiContractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai

Sl.No Description SpecificationPump data

1 Quantity 1 No2 Type Single Screw Single Stage3 Capacity 3 cum/hr4 Head 50 m5 Speed 325 rpm6 MOC of Rotor SS 3047 MOC of Stator EPDM8 Make Heliflow / eq.

Motor data9 Motor type TEFC Squirrel cage induction type

10 Motor rating 3 HP11 Phase 3 phase12 Voltage / Frequency 415 v +/- 10% , 50 Hz +/- 10%13 MOC CI14 Make Kirloskar / eq.

Page 39: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

24

SEWAGE TREATMENT PLANT

Specification of Filter Press Unit

Client : M/S. Alliance Mall, Chennai

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Filter Press Unit data1 Quantity 1 No2 Type Manual Hydraulic3 Capacity 3 cum/hr4 Operating Pressure 5 Kg/cm25 MOC of Structure MS6 No of Plates 107 No. of Chambers 98 Size 470mm x 470mm9 MOC of Plates PP

10 Make Swarna Sankara / Isha / eq.

Page 40: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

25

SEWAGE TREATMENT PLANT

Specification of Hypo Dosing System

Client : M/S. Alliance Mall, ChennaiContractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai

Sl.No Description SpecificationPump data

1 Quantity 1 No2 Type Electronic metering type3 Capacity 0 – 10 lph4 Pressure 2 ksc5 MOC PP6 Rating 60 W7 Make Prominent / eq.

Tank data8 Quantity 1 No9 Type Cylindrical vertical

10 Capacity 200 ltrs11 MOC HDPE12 Make Sintex / eq.

Page 41: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

26

SEWAGE TREATMENT PLANT

Specification of Filter Feed Pump

Client : M/S. Alliance Mall, ChennaiContractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai

Sl.No Description SpecificationPump data

1 Quantity 2 No (1W +1S)2 Type Centrifugal Monobloc3 Capacity 17 cum/hr4 Head 30 m5 MOC CI6 Speed 2760 rpm7 Model KDS 538++8 Make Kirloskar / eq.

Motor data9 Type TEFC Squirrel Cage Induction type

10 Motor rating 5 HP11 Phase 3 phase12 Voltage / Frequency 415 v +/- 10% , 50 Hz +/- 10%13 MOC CI14 Make Kirloskar / eq.

Page 42: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

27

SEWAGE TREATMENT PLANT

Specification of Pressure Sand filter

Client : M/S. Alliance Mall, Chennai

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Vessel data1 Quantity 1 no2 Type Vertical pressure vessel3 Capacity 17 cum/hr4 Diameter 1500 mm5 HOS 1800 mm6 MOC MS-Epoxy7 Shell Thickness 6 mm8 Dish Thickness 8 mm9 Working pressure 2.5 kg/cm2

10 Design Pressure 3.2 Kg/cm211 Test Pressure 6 Kg/cm212 Make HECS

Frontal Piping data13 Size 100 NB14 Accessories Flanges, Elbow, Tee15 MOC MS16 Type of Valves Butterfly Valves17 Size of Valves 100 NB / 40 NB18 Make of Pipes Jindal / eq.19 Make of Valves Intervalve / eq.

Media Details20 25 – 50mm Pebbles 100 mm21 12 – 25mm Pebbles 100 mm22 6 – 12 mm Pebbles 200 mm23 3 - 6 mm Pebbles 200 mm24 Coarse Sand 350 mm25 Fine Sand 500 mm

Page 43: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall, Chennai

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

28

Pressure Sand Filter:

Flow rate Q : 17 cum/hr

Filtration rate for PSF (V) : 10 m3/m2 hr

Q : A x V

A : 17 / 10

: 1.7 SQ.M

D2 : 1.7 X 4 / 3.14

: 2.16

D : 1.47 M

Diameter provided is 1.5 m

Hence adequate

Page 44: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

1

SEWAGE TREATMENT PLANT

Technical Specification

Client

M/S. Alliance Mall Developers,

Coimbatore

Contractor

M/s. Hubert Enviro Care Systems (p) ltd

Chennai – 83

Description

For Approval

P.O. No.

DD-AMD-STP-TS-01Doc. No.

0Rev.

25.07.13Date

CRPrepared by

JRMC.E.O

CRChecked by

Page 45: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

2

Technical Specification for Sewage Treatment Plant

1.0 Project & Business Objectives

M/S. Hubert Enviro Care Systems (P) Ltd seeks to provide the best technology for

the supply of Sewage treatment plant.

2.0 Scope of Work

The Scope of our work includes as follows

Design & detailed Engineering

Fabrication & Supply of all electromechanical equipments

Erection of all equipments

Testing & Commissioning of all equipments

Note: All Civil Works are under Client’s scope.

3.0 Design Basis:

STP

Plant Capacity - 207 KLD

Operating hours - 24 hrs

Plant flow rate - 8.625 cum/hr

Design flow rate - 9 cum/hr

4.0 Quality logistics:

MBBR Technology

S.No Description Unit STP Inlet STP Outlet Standards

1 pH 7 - 8 6.5 – 7.5 6.5 – 8.5

2 TSS mg/l 200 - 250 < 20 < 30

3 BOD mg/l 350 - 400 < 20 < 20

4 COD mg/l 400 - 500 < 100 < 250

Page 46: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

3

5.0 Battery Limit:

1. Sewage Inlet & outlet is clients scope

2. Incomer Electrical power - 415 Volts and 50 Hz

3. Power incomer to our panel is under client’s scope

4. Cabling for Panel to the individual equipments is under Contractor’s scope

5. Construction Water & Power is under Client’s scope.

6. Site clearance & handing over of the site to contractor is under Client’s scope.

6.0 Connectivity

Inlet Port : 100 mm

Outlet port : 100 mm

7.0 Codes & Standards:

All design; fabrication, inspection, and testing of the plant will be done with respect

to the latest Indian Standards. Incase of non-availability of standards, good

engineering practice will be adopted.

Standards to be followed:

Plain & reinforced cement concrete – IS 456: 2000

Concrete structure for the storage of liquids – IS 3370: 1981-88

Pressure vessels – ASME SEC VIII

Pumps – IS 5120

Others – Available IS standards.

Incase of non-availability of standards, good engineering practice will be

adopted.

9.0 Process description:

MBBR Technology

The sewage generated from the various sources will be collected in the collection

tank through the bar screen chamber in order to remove the floating materials and

particle size greater than 15mm. The Screened sewage is then led to the aeration

tank.

Page 47: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

4

In the aeration tank, air is diffused through special type of diffusers to oxidize the

organic matters with the help of air blower & diffuser arrangement. Biological

treatment takes place through MBBR media. Then the overflow from aeration tank

is sent to the Clarifier tank for settling. The bioflocs formed in the aeration tank will

be settled at the bottom of the Clarifier tank through Clarifier rake mechanism and

the settled sludge will be pumped to the sludge holding tank through the return

sludge pump. From sludge holding tank, the sludge will be fed to filter press unit

for dewatering purpose through screw pumps.

The clarified overflow will be collected in the Clarified water tank from where it is

pumped to the Pressure Sand Filter, Activated Carbon Filter through Filter feed

pump for the removal of suspended solids, organic matter and odour. UV dosing is

given for disinfection purpose. The filtered water is stored in the treated water tank

from where it is usde for gardening purpose.

Page 48: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

5

TECHNICAL SPECIFICATIONS

OF

CIVIL WORKS

Page 49: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

6

SEWAGE TREATMENT PLANT

Specification of Collection Tank (UG)

Client : M/S. Alliance Mall Developers, Coimbatore

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Tank Data1 Quantity 1 No2 Capacity 72.16 Cum3 Length 8.2 m4 Width 4 m5 Liquid depth 2.2 m6 Total Height 3.5 m7 Invert Level 1m below FGL8 MOC RCC - M309 Wall Thickness As per the structural design

10 Raft Thickness As per the structural design11 PCC As per the structural design12 Base Reinforcement Details As per the structural design13 Wall Main Reinforcement Details As per the structural design14 Wall Distributer Reinforcement

DetailsAs per the structural design

15 Plastering CM 1:316 Plastering Thickness 12 mm17 Submersible Pump Pit 1.5m x 0.5m x 0.5m

Adequacy calculation

Volume of Collection tank V - 72.16 cum

Plant Flow Rate Q - 9 cum/hr

Retention time T - V / Q

- 72.16 /9

- 8.02 hrs

Standard retention hrs for Collection tank is 6 hrs – 8 hrs

Provided retention hrs is > or = Standard retention hrs.

Hence adequate.

Page 50: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

7

SEWAGE TREATMENT PLANT

Specification of Screen Chamber (UG)

Client : M/S. Alliance Mall Developers, Coimbatore

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Tank data1 Quantity 1 No2 Capacity 0.324 cum3 Length 1.2 m4 Width 0.6 m5 Liquid depth 0.45 m6 Depth 1.6 m7 Wall Thickness As per the structural design8 MOC RCC9 Base Reinforcement As per the structural design

10 Wall Reinforcement As per the structural design11 Plastering CM 1:312 Plastering Thickness 12 mm

Adequacy calculation

Volume of Bar Screen Chamber V - 0.324 cum

Plant Flow Rate Q - 9 cum/hr

Retention time T - V / Q

- 0.324 /9

- 0.036 hrs

- 2.16 mins

Standard retention hrs for Bar Screen chamber is 1 min – 5 mins

Provided retention hrs is > or = Standard retention hrs.

Hence adequate.

Page 51: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

8

SEWAGE TREATMENT PLANT

Specification of Aeration Tank (AG)

Client : M/S. Alliance Mall Developers, Coimbatore

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Tank Data1 Quantity 1 No2 Capacity 108.8 cum3 Length 8.5 m4 Width 4 m5 Liquid depth 3.2 m6 Total Height 3.5 m7 MOC RCC - M308 Wall Thickness As per the structural design9 Raft Thickness As per the structural design

10 PCC As per the structural design11 Base Reinforcement As per the structural design12 Wall Main Reinforcement As per the structural design13 Wall Distributer Reinforcement As per the structural design14 Plastering CM 1:315 Thickness of Plastering 12 mm

Adequacy calculation

Volume of Aeration tank V - 108.8 cum

Plant Flow Rate Q - 9 cum/hr

Retention time T - V / Q

- 108.8 /9

- 12.1 hrs

Standard retention hrs for Aeration tank is 8 hrs – 12 hrs

Provided retention hrs is > or = Standard retention hrs.

Hence adequate.

Page 52: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

9

SEWAGE TREATMENT PLANT

Specification of Clarifier Tank (AG)

Client : M/S. Alliance Mall Developers, Coimbatore

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Tank Data1 Quantity 1 No2 Capacity 35.19 cum3 Diameter 4 m4 Liquid Depth 2.8 m5 Total Height 3.5 m6 MOC RCC – M307 Wall Thickness As per the structural design8 Raft Thickness As per the structural design9 PCC As per the structural design

10 Base Reinforcement Details As per the structural design11 Wall Main Reinforcement Details As per the structural design12 Wall Distributer Reinforcement

DetailsAs per the structural design

13 Plastering CM 1:314 Thickness of Plastering 12 mm

Adequacy calculation

Volume of Clarifier tank V - 35.19 cum

Plant Flow Rate Q - 9 cum/hr

Retention time T - V / Q

- 35.19 /9

- 3.9 hrs

Standard retention hrs for Clarifier tank is 3 hrs – 3.5 hrs

Provided retention hrs is > or = Standard retention hrs.

Hence adequate.

Page 53: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

10

SEWAGE TREATMENT PLANT

Specification of Sludge Holding tank (AG)

Client : M/S. Alliance Mall Developers, Coimbatore

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Tank Data1 Quantity 1 No2 Capacity 12 cum3 Length 1 m4 Width 4.0 m5 Liquid Depth 3 m6 Total Height 3.5 m7 MOC RCC – M308 Wall Thickness As per the Structural design9 Raft Thickness As per the Structural design

10 PCC As per the Structural design11 Base Reinforcement Details As per the Structural design12 Wall Main Reinforcement Details As per the Structural design13 Wall Distributer Reinforcement

DetailsAs per the Structural design

14 Plastering CM 1:315 Thickness of Plastering 12 mm

Adequacy calculation

Volume of Sludge holding tank V - 12 cum

Plant Flow Rate Q - 9 cum/hr

Retention time T - V / Q

- 12 /9

- 1.33 hrs

Standard retention hrs for Sludge Holding tank is 1 hrs – 1.5 hrs

Provided retention hrs is > or = Standard retention hrs.

Hence adequate.

Page 54: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

11

SEWAGE TREATMENT PLANT

Specification of Clarified Water Tank (AG)

Client : M/S. Alliance Mall Developers, Coimbatore

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Tank Data1 Quantity 1 No2 Capacity 19.2 cum3 Length 2 m4 Width 4 m5 Liquid Depth 2.4 m6 Total Height 3.5 m7 MOC RCC - M308 Wall Thickness As per the structural design9 Raft Thickness As per the structural design

10 PCC As per the structural design11 Base Reinforcement Details As per the structural design12 Wall Main Reinforcement Details As per the structural design13 Wall Distributer Reinforcement

DetailsAs per the structural design

14 Plastering CM 1:315 Thickness of Plastering 12 mm

Adequacy calculation

Volume of Clarified water tank V - 19.2 cum

Plant Flow Rate Q - 9 cum/hr

Retention time T - V / Q

- 19.2 /9

- 2.13 hrs

Standard retention hrs for Clarified water tank is 1.5 hrs – 2 hrs

Provided retention hrs is > or = Standard retention hrs.

Hence adequate.

Page 55: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

12

SEWAGE TREATMENT PLANT

Specification of Treated Water Tank

Client : M/S. Alliance Mall Developers, Coimbatore

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Tank Data1 Quantity 1 No2 Capacity 48 cum3 Length 4 m4 Width 4 m5 Liquid Depth 3 m6 Total Height 3.5 m7 MOC RCC - M308 Wall Thickness As per the structural design9 Raft Thickness As per the structural design

10 PCC As per the structural design11 Base Reinforcement Details As per the structural design12 Wall Main Reinforcement Details As per the structural design13 Wall Distributer Reinforcement

DetailsAs per the structural design

14 Plastering CM 1:315 Thickness of Plastering 12 mm

Adequacy calculation

Volume of Treated Water tank V - 48 cum

Plant Flow Rate Q - 9 cum/hr

Retention time T - V / Q

- 48 /9

- 5.33 hrs

Standard retention hrs for Treated water tank is 4 hrs – 6 hrs

Provided retention hrs is > or = Standard retention hrs.

Hence adequate.

Page 56: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

13

TECHNICAL SPECIFICATIONS

OF

ELECTROMECHANICAL

WORKS

Page 57: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

14

SEWAGE TREATMENT PLANT

Specification of Raw Sewage Transfer Pump

Client : M/S. Alliance Mall Developers, CoimbatoreContractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai

Sl.No Description SpecificationPump data

1 Quantity 2 No (1W+1S)2 Type Submersible Nonclog3 Capacity 9 cum/hr4 Head 15 - 20 m5 Speed 2900 rpm6 Seal Gland Packing7 Pump Delivery Size 50 NB8 Motor rating 2 HP9 Phase 3 phase

10 Voltage / Frequency 415 v +/- 10% , 50 Hz +/- 10%11 Class of insulation F12 Model 1500 CW13 MOC CI14 Make Kirloskar / eq.

Page 58: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

15

SEWAGE TREATMENT PLANT

Specification of Bar Screen

Client : M/S. Alliance Mall Developers, Coimbatore

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Screen data1 Quantity 1 No2 Opening size 15 mm3 Size of Flat 25 x 5mm.4 Width 600 mm5 Height 1600 mm6 MOC MS – Epoxy7 Make HECS

Page 59: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

16

SEWAGE TREATMENT PLANT

Specification of Air Blower

Client : M/S. Alliance Mall Developers, Coimbatore

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Air Blower Data1 Quantity 2 No (1W + 1S)2 Type Twin Lobe Rotary3 Capacity 300 cum/hr4 Pressure 0.6 kg/cm25 MOC CI6 Model 65 AC7 Size 80 mm8 Make Kay / eq.

Motor Data9 Quantity 2 No (1W + 1S)

10 Type TEFC Squirrel Cage Induction11 MOC CI12 Speed 1440 rpm13 Voltage / Frequency 415 V / 50 Hz14 Motor Rating 15 HP15 Power Supply 3 Phase16 Make Kirloskar / eq.

Adequacy calculation

Assume O2 requirement = 2 kg of O2/ 1 kg of BOD

1kg of BOD / 2 kg of O2

Assume BOD for sewage = 400 mg/l = 0.40 kg/m3

BOD Load = 207 x 0.40

= 82.8 kg of BOD/day

O2 requirement = 82.8 x 2

= 165.6 kg of O2/day

Oxygen transfer @ 16% of SOTR = 165.6 / (0.16 x 0.23x 0.65 x 0.95)

= 165.6 / 0.023 = 7200

Page 60: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

17

α = 0.65; β = 0.95

Density = 1.16 => 7200 / 1.16 = 6206.9 m3/day

Air requirement = 6206.9 / 24 = 258.62 m3/hr

Therefore 300 m3/hr (1 + 1) each for aeration tank, the air flow rate is adequate.

Page 61: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

18

SEWAGE TREATMENT PLANT

Specification of Diffusers

Client : M/S. Alliance Mall Developers, Coimbatore

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Coarse Bubble Diffuser Data1 Quantity 8 No2 Type Tubular Coarse bubble3 Diameter 90 mm Dia4 Length 1000 mm5 MOC EPDM6 Location Collection tank7 Make HECS

Fine Bubble Diffuser Data8 Quantity 22 No9 Type Tubular Fine bubble

10 Diameter 90 mm Dia11 Length 1000 mm12 MOC EPDM13 Location Aeration tank14 Make HECS

Adequacy calculation:

Blower capacity = 300 cum/hr

Air flow rate per diffuser = 10 m3/hr

Therefore no. of diffusers required = 300 / 10 = 30 nos

No. of diffusers provided = 30 nos

Hence it’s adequate.

Page 62: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

19

SEWAGE TREATMENT PLANT

Specification of MBBR Media

Client : M/S. Alliance Mall Developers, Coimbatore

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Media Data1 Quantity 1 Lot2 Type Moving Bed Bio Reactor3 Surface area 450 m2 / m34 MOC PVC5 Location Aeration tank6 Accessories SS mesh at the outlet of the aeration

tank to avoid the escape of media7 Make HECS

Page 63: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

20

SEWAGE TREATMENT PLANT

Specification of Clarifier Rake Mechanism

Client : M/S. Alliance Mall Developers, Coimbatore

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Feed Well data1 Quantity 1 no2 Type Central driven3 Feed well diameter 800 mm4 Feed well Height 1500 mm5 MOC of Feed Well MS – Epoxy6 Supports MS Angle / Channel7 Make HECS

Rake Mechanism8 Quantity 1 No (4 m diameter)9 Structure Channel / Angles

10 MOC of Rake MS Epoxy11 Accessories Rubber Squeezes, Bolt, nuts etc12 Make HECS

Drive Head data13 Quantity 1 No14 Drive Head diameter 450 mm15 Ratio 50 : 116 MOC CI

Gearbox data17 Quantity 1 No18 Type Foot Mounted19 Ratio 70 : 120 MOC CI21 Make Elecon / eq.

Motor data22 Quantity 1 No23 Type TEFC Squirrel Cage Induction24 MOC CI25 Rating 2 HP26 Power Supply 3 Phase27 Voltage / Frequency 415 V / 50 Hz28 Make Kirloskar / eq.29 Accessories Love jaw Coupling, Gear Sprockets ,

Chain with links

Page 64: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

21

SEWAGE TREATMENT PLANT

Specification of Return Sludge Pump

Client : M/S. Alliance Mall Developers, CoimbatoreContractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai

Sl.No Description SpecificationPump data

1 Quantity 2 No (1W + 1S)2 Type Centrifugal Nonclog3 Capacity 3 cum/hr4 Head 12 - 15 m5 Speed 2760 rpm6 Model SP ‘O’7 MOC CI8 Make Kirloskar / eq.

Motor data9 Motor type TEFC Squirrel Cage Induction

10 Motor rating 1 HP11 Phase 3 phase13 Voltage / Frequency 415 v +/- 10% , 50 Hz +/- 10%14 MOC CI15 Make Kirloskar / eq.

Page 65: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

22

SEWAGE TREATMENT PLANT

Specification of Screw Pump

Client : M/S. Alliance Mall Developers, CoimbatoreContractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai

Sl.No Description SpecificationPump data

1 Quantity 1 No2 Type Single Screw Single Stage3 Capacity 2 cum/hr4 Head 50 m5 Speed 325 rpm6 MOC of Rotor SS 3047 MOC of Stator EPDM8 Make Heliflow / eq.

Motor data9 Motor type TEFC Squirrel cage induction type

10 Motor rating 2 HP11 Phase 3 phase12 Voltage / Frequency 415 v +/- 10% , 50 Hz +/- 10%13 MOC CI14 Make Kirloskar / eq.

Page 66: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

23

SEWAGE TREATMENT PLANT

Specification of Filter Press Unit

Client : M/S. Alliance Mall Developers, Coimbatore

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Filter Press Unit data1 Quantity 1 No2 Type Manual Hydraulic3 Capacity 2 cum/hr4 Operating Pressure 5 Kg/cm25 MOC of Structure MS6 No of Plates 87 No. of Chambers 78 Size 470mm x 470mm9 MOC of Plates PP

10 Make Swarna Sankara / Isha / eq.

Page 67: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

24

SEWAGE TREATMENT PLANT

Specification of Filter Feed Pump

Client : M/S. Alliance Mall Developers, CoimbatoreContractor : M/S. Hubert Enviro Care Systems (P) Ltd., Chennai

Sl.No Description SpecificationPump data

1 Quantity 2 No (1W +1S)2 Type Centrifugal Monobloc3 Capacity 9 cum/hr4 Head 30 m5 MOC CI6 Speed 2760 rpm7 Model KDS 335++8 Make Kirloskar / eq.

Motor data9 Type TEFC Squirrel Cage Induction type

10 Motor rating 3 HP11 Phase 3 phase12 Voltage / Frequency 415 v +/- 10% , 50 Hz +/- 10%13 MOC CI14 Make Kirloskar / eq.

Page 68: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

25

SEWAGE TREATMENT PLANT

Specification of Pressure Sand filter

Client : M/S. Alliance Mall Developers, Coimbatore

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Vessel data1 Quantity 1 no2 Type Vertical pressure vessel3 Capacity 9 cum/hr4 Diameter 1100 mm5 HOS 1500 mm6 MOC MS-Epoxy7 Shell Thickness 6 mm8 Dish Thickness 8 mm9 Working pressure 2.5 kg/cm2

10 Design Pressure 3.2 Kg/cm211 Test Pressure 6 Kg/cm212 Make HECS

Frontal Piping data13 Size 65 NB14 Accessories Flanges, Elbow, Tee15 MOC MS16 Type of Valves Butterfly Valves17 Size of Valves 65 NB / 40 NB18 Make of Pipes Jindal / eq.19 Make of Valves Intervalve / eq.

Media Details20 25 – 50mm Pebbles 100 mm21 12 – 25mm Pebbles 100 mm22 6 – 12 mm Pebbles 100 mm23 3 - 6 mm Pebbles 100 mm24 Coarse Sand 250 mm25 Fine Sand 450 mm

Page 69: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

26

Pressure Sand Filter:

Flow rate Q : 9 cum/hr

Filtration rate for PSF (V) : 10 m3/m2 hr

Q : A x V

A : 9 / 10

: 0.9 SQ.M

D2 : 0.9 X 4 / 3.14

: 1.146

D : 1.07 M

Diameter provided is 1100 mm

Hence adequate

Page 70: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

27

SEWAGE TREATMENT PLANT

Specification of Activated Carbon filter

Client : M/S. Alliance Mall Developers, Coimbatore

Contractor : M/S. Hubert Enviro Care Systems (P) Ltd., ChennaiS.No Description Specification

Vessel data1 Quantity 1 no2 Type Vertical pressure vessel3 Capacity 9 cum/hr4 Diameter 1100 mm5 HOS 1500 mm6 MOC MS-Epoxy7 Shell Thickness 6 mm8 Dish Thickness 8 mm9 Working pressure 2.5 kg/ cm2

10 Design Pressure 3.2 kg/ cm211 Test Pressure 6 kg/ cm212 Make HECS

Frontal Piping data13 Size 65 NB14 Accessories Flanges, Elbow, Tee15 MOC MS16 Type of Valves Butterfly Valves17 Size of Valves 65 NB / 40 NB18 Make of Pipes Jindal / eq.19 Make of Valves Intervalve / eq.

Media Details20 25 – 50mm Pebbles 100 mm21 12 – 25mm Pebbles 100 mm22 6 – 12 mm Pebbles 100 mm23 3 - 6 mm Pebbles 100 mm24 Coarse Sand 250 mm25 Activated Carbon 450 mm

Page 71: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

M/S. Alliance Mall Developers, Coimbatore

Hubert Enviro Care Systems (p)Ltd( An ISO 9001 – 2000 Company )

28

Activated Carbon Filter:

Flow rate Q : 9 cum/hr

Filtration rate for ACF (V) : 10 m3/m2 hr

Q : A x V

A : 9 / 10

: 0.9 SQ.M

D2 : 0.9 X 4 / 3.14

: 1.146

D : 1.07 M

Diameter provided is 1100 mm

Hence adequate

Page 72: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

PROZONE RESIDENTIALAT COIMBATORE

S. No. Load DescriptionQty.

1BHKQty.

2BHKQty.

3BHK

UnitLoad(kW)

Diversityfactor

TCL 1 BHK(kW)

TCL 2BHK (kW)

TCL 3 BHKTYPE (kW)

MD 1 BHK(kW)

MD 2 BHK(kW)

MD 3 BHK(kW)

1 Light points 5 9 11 0.04 0.6 0.20 0.36 0.44 0.12 0.22 0.262 Light Points Wall 4 7 10 0.025 0.6 0.10 0.18 0.25 0.06 0.11 0.153 C. Fan 4 5 6 0.08 0.6 0.32 0.40 0.48 0.19 0.24 0.294 Ex. Fans 2 3 4 0.06 0.2 0.12 0.18 0.24 0.02 0.04 0.055 6A Half Point 3 4 5 0.1 0.2 0.30 0.40 0.50 0.06 0.08 0.106 6A socket 7 11 14 0.1 0.4 0.70 1.10 1.40 0.28 0.44 0.567 16A Socket 2 2 2 0.5 0.3 1.00 1.00 1.00 0.30 0.30 0.308 16A Fridge 1 1 1 0.75 0.3 0.75 0.75 0.75 0.23 0.23 0.239 20 A geyser pt. 1 2 3 2 0.2 2.00 4.00 6.00 0.40 0.80 1.20

1/6ELECTRICAL LOAD CALCULATION

9 20 A geyser pt. 1 2 3 2 0.2 2.00 4.00 6.00 0.40 0.80 1.20

10Air Conditioningunits

2 3 4 1.2 0.4 2.40 3.60 4.80 0.96 1.44 1.92

11 Telephone Point 2 3 4 - - - - - - - -12 Data Point 1 1 2 0.25 1 0.25 0.25 0.50 0.25 0.25 0.5013 TV Point 2 3 4 0.2 0.6 0.40 0.60 0.80 0.24 0.36 0.48

Total 8.54 12.82 17.16 3.11 4.49 6.04

Say 9 13 17 3 4.5 6

1/6ELECTRICAL LOAD CALCULATION

Page 73: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

PROZONE RESIDENTIALAT COIMBATORE

Sr. no DescriptionTotalFlats

TCL/Flat(kW)

TCL allFlats(kW)

MD/Flat (kW)

MD all Flats(kW)

1 1 BHK 216 9 1944 3 648TOTAL 216 1944 648

Sr. No. Area DescriptionArea inSq.ft.

Unit Watts/Sq. Ft.Total

ConnectedLoad (kW)

DiversityTotal Max.

DemandLoad

Total Loadon DG

Total Loadon DG @

1 Lift lobby 3617 1 3.6 0.6 2.2 2.22 Staircase 8830 0.36 3.2 0.6 1.9 1.93 Passage 16372 1 16.4 0.6 9.82 9.84 PHE Load 1 38 0.5 19.0 0.05 Lifts 3 15 45 0.5 23 23

For Internal Area

Common Area Calculation

2/6ELECTRICAL LOAD CAL.-TOWER A

5 Lifts 3 15 45 0.5 23 23

106 55 36

2050 kW703 kWTotal Demand Load

Total Load For Common area Load In kW

Load CalculationTotal Connected Load

2/6ELECTRICAL LOAD CAL.-TOWER A

Page 74: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

PROZONE RESIDENTIALAT COIMBATORE

Sr. no DescriptionTotalFlats

TCL/Flat(kW)

TCL allFlats(kW)

MD/Flat (kW)

MD all Flats(kW)

1 2 BHK 72 13 936 4.5 3242 3 BHK 72 17 1224 6 432

TOTAL 144 2160 756

Sr. No. Area DescriptionArea inSq.ft.

UnitWatts/Sq.

Ft.

TotalConnectedLoad (kW)

DiversityTotal Max.

Demand LoadTotal Load

on DG

1 Lift lobby 6555 1 6.6 0.6 3.9 3.92 Staircase 10511 0.36 3.8 0.6 2.3 2.33 Passage 12400 1 12.4 0.6 7.44 7.44 PHE Load 1 33 0.5 16.5 0.0

For Internal Area

Common Area Calculation

3/6ELECTRICAL LOAD CALCULATION- TOWER B

4 PHE Load 1 33 0.5 16.5 0.05 Lifts 4 15 60 0.5 30 30

116 60 44

2276 kW816 kWTotal Demand Load

Total Load For Common area Load In kW

Load CalculationTotal Connected Load

3/6ELECTRICAL LOAD CALCULATION- TOWER B

Page 75: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

PROZONE RESIDENTIALAT COIMBATORE

Sr. no DescriptionTotalFlats

TCL/Flat(kW)

TCL allFlats(kW)

MD/Flat (kW)

MD all Flats(kW)

1 2 BHK 72 13 936 4.5 3242 3 BHK 108 17 1836 6 648

TOTAL 180 2772 972

Sr. No. Area DescriptionArea inSq.ft.

UnitWatts/Sq.

Ft.

TotalConnectedLoad (kW)

DiversityTotal Max.

Demand LoadTotal Load

on DG

1 Lift lobby 6781 1 6.8 0.6 4.1 4.12 Staircase 10172 0.36 3.7 0.6 2.2 2.23 Passage 16469 1 16.5 0.6 9.88 9.94 PHE Load 1 40 0.5 20.0 0.0

For Internal Area

Common Area Calculation

4/6ELECTRICAL LOAD CALCULATION - TOWER C

3 Passage 16469 1 16.5 0.6 9.88 9.94 PHE Load 1 40 0.5 20.0 0.05 Lifts 5 15 75 0.5 38 38

142 74 54

2914 kW1046 kWTotal Demand Load

Total Load For Common area Load In kW

Load CalculationTotal Connected Load

4/6ELECTRICAL LOAD CALCULATION - TOWER C

Page 76: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

PROZONE RESIDENTIALAT COIMBATORE

Sr. No. Area DescriptionArea inSq.ft.

UnitWatts/S

q. Ft.

TotalConnecte

d Load(kW)

Diversity

TotalMax.

DemandLoad

Total Loadon DG

1 Fire Fighting Load 1 136 0 0.0 0.02 STP Load 1 126 0.5 63.0 63.03 External Lighting Load 1 10 0.5 5.0 5.04 Basement Lighting Load 53448 0 0.5 27 0.5 13.4 13.45 Stilt Floor Parking Load 53499 0 0.5 27 0.5 13.4 13.4

272 95 95

Common Area Calculation

Total Load For Common area LoadIn kW

5/6ELECTRICAL LOAD CALCULATION- OTHER COMMON LOAD

272 95 95Total Load For Common area Load

In kW

5/6ELECTRICAL LOAD CALCULATION- OTHER COMMON LOAD

Page 77: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

PROZONE RESIDENTIALAT COIMBAOTRE

A1 2050 kW2 703 kW3 2276 kW4 816 kW5 2914 kW6 1046 kW7 272 kW8 95 kW9 7512 kW

10 2660 kW11 0.812 2128 kW13 3192 kVADemand Load

Transformer Calculation

Summary

Total Connected Load for Common LoadMaximum Demand for Common Load

Consider Overall Load FactorTotal Demand Load

Maximum Demand for TOWER C

TOTAL CONNECTED LOAD FOR PROJECTTOTAL MAXIMUM DEMAND LOAD FOR PROJECT

Total Connected Load for TOWER AMaximum Demand for TOWER ATotal Connected Load for TOWER BMaximum Demand for TOWER BTotal Connected Load for TOWER C

6/6SUMMARY- ELECTRICAL LOAD

13 3192 kVA14

15 500 kVA

16 7 Nos.

17 91 %

18

2

2.1 228 KW2.2 286 KVA

357 KVA

Demand LoadTransformer Calculation

DG set Calculation

Total load on DG

Proposed Transformer of 500 KVA x 7 Nos.

Total Transformers Required

% Loading on Transformers

Maximum permissible transformer size

Consider [email protected]

Proposed DG set is 400 KVA (Considered firefighting load)

Consider @ 80% Loading

6/6SUMMARY- ELECTRICAL LOAD

Page 78: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

POWER SAVING CALCULATION SHEET

Sr.No. Description TotalDemand Load Total CountedLoad

% Saving

1 Rehab B-1 1200 435 9.122 Rehab B-3C #REF! 478 #REF!3 Rehab B-6 #REF! 591 #REF!

#REF!

Power Saving Sheet For all Buildings

Total

1/28POWER SAVING CAL. 1/28POWER SAVING CAL.

Page 79: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

Sr. no DescriptionTotal No. ofFixtures/Flat

No. offlourescent tubelights considered

per flat

No. ofincandescent

bulbsconsidered per

flat

No. of Flats

Lighting load/FlatLighting

load for allflats

Lightingload/Flat

Lighting load for allflats

Tower A1 1BHK Flats 9 5 4 216 280 60480 161 34776

Total for Flats 216 280 60480 161 34776

Type of Light Lighting loadType of

LightLighting load

1 Lift Lobby 3617 40 W 1680 20W 840 422 Staircases 8830 40 W 1680 9W 378 423 Passage 16372 40 W 7920 15W 2970 1984 Refuge Area 40 W 0 20W 0 0

28819 11280 4188 282

36 kW

21 kW

TOTAL

Sr. no Description Area in Sq.ftNo. of

Fixtures

Details using 40W ConventionalTube Lights and 20Wincandescent bulbs

Details using 25W Energyefficient T5 lights withElectronic Ballast and 9W CFLconsidered for this project forpower saving

POWER SAVING CALCULATIONS FOR TOWER A

POWER SAVING BY USING LED / T5 LIGHTS FOR ALL AREAS

Internal Flat Lighting

Common Areas

Details for Flourescent Tube Lights Details with using LED lightsconsidered for this peoject

For Flats (Considering 60% diversity)

Note: For Internal flat lighting, we have considered the Energyefficient Lighting fixtures to be used with electronic ballastsagainst conventional flouroscent tube lights with conventionalballasts. This will save upto 50% of energy utilised for lightfixtures. For Common areas we have considered LED light fixturesagainst conventional T5 light fittings.

Total Lighting Load usingconventional lights

Total Lighting Load usingpower saving lights

Page 80: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

290 kW /day

167 kW /day

11 kW

4 kW

135 kW /day

50 kW /day

Sr. no Description TCL in kWMD using inconventionalLifts

Powerconsumption

per day in kWH(@ 3 hr.)

MD usingLifts withVFD andAPFC panel

Power consumptionper day in kWH

1 Lifts 45 27 81 18.9 56.7

Power saving by using VFD and APFC Panel on Lifts

Note: For Internal flat lighting, we have considered the Energyefficient Lighting fixtures to be used with electronic ballastsagainst conventional flouroscent tube lights with conventionalballasts. This will save upto 50% of energy utilised for lightfixtures. For Common areas we have considered LED light fixturesagainst conventional T5 light fittings.

Consumption per day usingconventional lights (@ 8

hous)Consumption per day using

power saving lights (@ 8hous)

For Common AreasTotal Lighting Load using

flourescent lightsTotal Lighting Load using LED

lightsConsumption per day using

flourescent lights (@ 12hous)

Consumption per day usingLED lights (@ 12 hous)

Page 81: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

Sr. no TCL in kWMD using in

conventionalmanner

Powerconsumption perday in kWH (@

6hr.)

TCL in kWMD usingVFD and

APFC panel

Power consumptionper day in kWH

1 38 19 114 38 13.3 79.8

Sr. no TCL in kW MD in kWPower

consumption perday in kWH

TCL in kW MD in kWPower consumption

per day in kWH

1 126 126 2520 126 100.8 2016

DescriptionConnectedLoad (kW)

Demand Load(kW)

AssumedOperative Hours

/ day

PowerConsumptio

n / day(kWH)

No. of days of usagein an year

PowerConsumption / year

(kWH)Using MH lamps(150W)

10 10 12 120 365 43800

Using LED lamps(45W)

3.0 3.0 12 36 365 13140

TotalConsumption

Using SolarPower

Using MH lamps(150W)

10 10 12 120 275 33000

Using LED lamps(45W) consideredfor this project

3.0 3.0 12 36 275 9900

Power saving by using VFD and APFC Panel on Water Pumps with 90% EfficiencyUsing Water pumps with 60 % Effeiciency Using VFD and APFC Panel on Water Pumps with

Power saving by using MBBR type STP with VFDUsing Conventional type STP Using MBBR Type STP with VFD

ENERGY SAVING FOR EXTERNAL LIGHTING

Page 82: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

Tower No. of unitsNo. of

Geysers perunit

TCL per unit(2kW per Geyser)

TCL For Totalunit (2kW per

Geyser)

PowerConsumption / day (inkWH for 1Hr / Day)

Power Consumptionper Year on UtilityPower (365 days)

PowerConsumption for 50 %

ofrequirement per Yearon Utility

Power

PowerConsumption for50 % of

requirement perYear on

SolarPower (40

days)1BHK 216 1 2 432 129.6 47304 23652 3110.4

Total 216 1 2 432 129.6 47304 23652 3110.423652 kWH3110.4 kWH

Sr. No. Tower No. of unitsNo. of Geysers

per unit

TCL per unit(2kW perGeyser)

PowerConsumption / day (inkWH for 1Hr / Day)

Power Consumption/ day on solar water

(in kWH for 1 Hr /Day)

PowerConsumption per Year

on UtilityPower (365

days)

PowerConsumption perYear on

SolarPower(275days)

1 1 BHK 216 1 2 432 163 157680 44772Total 216 1 2 432 163 157680 44772

157680 kWH44772 kWH

28 %Sr.No. Description Area (sq.ft.) Usable Area kW 50% (kW) Required (kW)

1Tower 1 (Terrace)

6512 3256 326 163 432

POWER SAVING CALCULATIONS WITH SOLAR WATER HEATERS

Total Power Consumption per year on Utility PowerTotal Power Consumption per year with Solar Power

Note: We have considered solar water heating for only 50 % of Hot water requirement as per availability of clear space onTerrace level

POWER SAVING CALCULATIONS WITH SOLAR WATER HEATERS

Total Power Consumption per year on Utility PowerTotal Power Consumption per year on Solar Power

Power saving with Solar water heaters

Page 83: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

1Common Lighting-(parking +common areas)

4 49406 18343 31063

2Internal FlatLighting

21 105961 60928 45033

3VFD and APFCPanel on Lifts

56.7 29565 20696 8870

4VFD and APFCPanel on 90%Effcient Water

79.8 41610 29127 12483

5MBBR type STPwith VFD

100.8 919800 735840 183960

7 External Lighting 10 43800 9900 33900

8Water Heating onSolar

163 157680 44772 112908

TOTAL 435 1347822 919605 428217

1200

1200

435

765

Differencein power

consumption in kWh

POWER SAVING SUMMARY

Total Demand Load

Power Consumption in kWH/ day

TotalConsumption /year by usingEnergy saving

measures

Total Un Counted load (where enregy saving not

tried)

Total Counted load ( whereenregy saving tried)

Sr.No DescriptionMaximumDemand in

(kW)

Powerconsumption/year withoutEnergy saving

measures kWh

765

4696974

4268756

428217

9.1 %

Difference

Percentage Saving

Total Un Counted load (where enregy saving not

tried)

Consumption in kWH / year(Without Energy saving

measuresConsumption in kWH / year

(With Energy savingmeasures

Page 84: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

Sr. no DescriptionTotal No. ofFixtures/Flat

No. of flourescenttube lights

considered per flat

No. of incandescentbulbs considered per

flat

No. ofFlats

Lightingload/Flat

Lightingload for all

flats

Lightingload/Flat

Lighting load for allflats

Tower B1 2 BHK Flats 16 9 7 72 500 36000 288 207362 3 BHK Flats 21 11 10 72 640 46080 365 26280

Total for Flats 144 1140 82080 653 47016

Details using 40WConventional TubeLights and 20Wincandescent bulbs

Details using 25W Energyefficient T5 lights withElectronic Ballast and 9W CFLconsidered for this project forpower saving

POWER SAVING CALCULATIONS FOR Tower B

POWER SAVING BY USING LED / T5 LIGHTS FOR ALL AREAS

Internal Flat Lighting

Common Areas

Sr. no Description Area in Sq.ftNo. of

Fixtures

Type of Light Lighting loadType of

LightLighting

load2 Lift Lobby 6555 40 W 3360 20W 1680 844 Staircases 10511 40 W 3360 9W 756 845 Passage 12400 40 W 5040 15W 1890 1266 Refuge Area 40 W 0 20W 0

29466 11760 4326 294

49 kW

28 kW

394 kW /day

Common Areas

Details for Flourescent Tube Lights Details with usingLED lights considered

For Flats (Considering 60% diversity)

Note: For Internal flat lighting, we have considered theEnergy efficient Lighting fixtures to be used with electronicballasts against conventional flouroscent tube lights withconventional ballasts. This will save upto 50% of energyutilised for light fixtures. For Common areas we haveconsidered LED light fixtures against conventional T5 lightfittings.

Total Lighting Load usingconventional lights

Total Lighting Load usingpower saving lights

Consumption per day usingconventional lights (@ 8

hrs.)

TOTAL

Page 85: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

226 kW /day

12 kW

4 kW

141 kW /day

52 kW /day

Note: For Internal flat lighting, we have considered theEnergy efficient Lighting fixtures to be used with electronicballasts against conventional flouroscent tube lights withconventional ballasts. This will save upto 50% of energyutilised for light fixtures. For Common areas we haveconsidered LED light fixtures against conventional T5 lightfittings.

Consumption per day usingpower saving lights (@ 8 hrs.)

For Common AreasTotal Lighting Load using

flourescent lights

Total Lighting Load using LEDlights

Consumption per day usingflourescent lights (@ 12 hrs.)

Consumption per day usingLED lights (@ 12 hrs.)

Power saving by using VFD and APFC Panel on Lifts

Sr. no Description TCL in kWMD using in

conventional Lifts

Power consumptionper day in kWH (@ 3

hrs.)

MD usingLifts withVFD and

APFCpanel

Powerconsumpt

ion perday inkWH

1 Lifts 60 30 90 21 63

Power saving by using VFD and APFC Panel on Lifts

Page 86: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

Sr. no TCL in kWMD using in

conventionalmanner

Powerconsumption perday in kWH (@ 6

hrs.)

TCL in kW

MD usingVFD and

APFCpanel

Powerconsumpt

ion perday inkWH

1 33 33 198 33 19.8 79.2

Sr. no TCL in kW MD in kW

Powerconsumption perday in kWH (@ 20

hrs.)

TCL in kW MD in kW

Powerconsumpt

ion perday inkWH

1 110 110 2200 110 88 1760

Using Conventional type STP Using MBBR Type STP with VFD

Power saving by using VFD and APFC Panel on Water Pumps with 90% EfficiencyUsing Water pumps with 60 % Effeiciency Using VFD and APFC Panel on Water Pumps

Power saving by using MBBR type STP with VFD

ENERGY SAVING FOR EXTERNAL LIGHTING

Description

Connected Load(kW)

Demand Load(kW)

Assumed OperativeHours / day

Power Consumption /day (kWH)

No. ofdays ofusage inan year

PowerConsumption / year

(kWH)

Using MHlamps(150W)

3 3 12 36 365 13140

Using LEDlamps(45W)

1.5 1.5 12 18 365 6570

ENERGY SAVING FOR EXTERNAL LIGHTING

Page 87: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

Tower No. of unitsNo. of

Geysers perunit

TCL per unit (2kWper Geyser)

TCL For Total unit (2kWper Geyser)

PowerConsumption / day(in kWH

for 1 Hr /Day)

PowerConsumpt

ion perYear onUtilityPower

(365 days)

PowerConsumption for 50 %

ofrequirement per Yearon Utility

Power

PowerConsumption for 50

% ofrequirement perYear on

SolarPower (40

days)2 BHK 72 2 4 288 86.4 31536 15768 2073.63 BHK 72 3 6 432 129.6 47304 23652 3110.4Total 144 5 10 720 216 78840 39420 5184

39420 kWH5184 kWH

POWER SAVING CALCULATIONS WITH SOLAR WATER HEATERS

Total Power Consumption per year on Utility PowerTotal Power Consumption per year with Solar Power

Note: We have considered solar water heating for only 50 % of Hot water requirement as per availability of clear space onTerrace level

Sr. No. Tower No. of unitsNo. of Geysers per

unitTCL per unit (2kW per

Geyser)

PowerConsumption / day(in kWH

for 1 Hr /Day)

PowerConsumption / dayon solarwater (inkWH for 1Hr / Day)

PowerConsumption per Yearon Utility

Power (365days)

PowerConsumpt

ion perYear on

SolarPower

(275 days)

1 2 BHK 72 2 4 288 107 105120 294252 3 BHK 72 3 6 432 107 157680 29425

Total 144 5 10 720 214 262800 58850262800 kWH58850 kWH

22 %

Note: We have considered solar water heating for only 50 % of Hot water requirement as per availability of clear space onTerrace level

POWER SAVING CALCULATIONS WITH SOLAR WATER HEATERS

Total Power Consumption per year on Utility PowerTotal Power Consumption per year on Solar Power

Power saving with Solar water heaters

Page 88: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

Sr.No. Description Area (sq.ft.) Usable Area kW 50% (kW)Required

(kW)

1 Tower B (Terrace) 8557 4279 428 214 720

1Common Lighting-(parking +common areas)

4 51509 18948 32561

2Internal FlatLighting

28 143804 82372 61432

3VFD and APFCPanel on Lifts

63 32850 22995 9855

4

VFD and APFCPanel on 90%Effcient WaterPumps

79.2 72270 28908 43362

Total Consumption /year by using Energysaving measures

Difference inpowerconsumpt

POWER SAVING SUMMARY

Sr.No DescriptionMaximumDemand in(Kw)

Powerconsumption/year

without Energysaving measures

4

VFD and APFCPanel on 90%Effcient WaterPumps

79.2 72270 28908 43362

5MBBR type STPwith VFD

88 803000 642400 160600

7 External Lighting 2 13140 6570 6570

8 Water Heating 214 262800 58850 203950TOTAL 478 1379373 861043 518330

#REF!

#REF!

478Total Counted load ( whereenregy saving tried)

Total Demand Load

Power Consumption in kWH/ day

Page 89: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

#REF!

#REF!

#REF!

518330

#REF! %

Difference

Percentage Saving

Total Un Counted load (where enregy saving not

tried)

Consumption in kWH / year(Without Energy saving

measuresConsumption in kWH / year

(With Energy savingmeasures

Page 90: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

Sr. no DescriptionTotal No. ofFixtures/Flat

No. offlourescenttube lightsconsidered

per flat

No. ofincandesce

nt bulbsconsidered

per flat

No. of Flats

Lightingload/Flat

Lightingload forall flats

Lightingload/Flat

Lightingload forall flats

Tower C

Details using 40WConventional Tube

Lights and 20Wincandescent bulbs

Details using 25WEnergy efficient T5

lights with ElectronicBallast and 9W CFLconsidered for thisproject for power

POWER SAVING CALCULATIONS FOR Tower C

POWER SAVING BY USING LED / T5 LIGHTS FOR ALL AREAS

Internal Flat Lighting

Tower C1 2 BHK Flats 16 9 7 72 500 36000 288 207362 3 BHK Flats 21 11 10 108 640 69120 365 39420

Total forFlats

180 1140 105120 653 60156

Sr. no Description Area in Sq.ftNo. of

Fixtures 144Type of

LightLighting

loadType of

LightLighting

load 1801 Lift Lobby 6781 40 W 3360 20W 1680 842 Staircases 10172 40 W 3360 9W 756 843 Passage 16469 40 W 7840 15W 2940 196

4 Refuge Area 40 W 0 20W 0

33422 14560 5376 364TOTAL

Common AreasDetails for Flourescent

Tube LightsDetails with using LEDlights considered for

Page 91: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

63 kW

36 kW

505 kW /day

289 kW /day

15 kW

Consumption per dayusing conventional

lights (@8 hrs.)Consumption per day

using power saving lights(@8 hrs.)

Total Lighting Load usingflourescent lights

For Flats (Considering 60% diversity)

Note: For Internal flat lighting, we haveconsidered the Energy efficient Lighting fixturesto be used with electronic ballasts againstconventional flouroscent tube lights withconventional ballasts. This will save upto 50%of energy utilised for light fixtures. ForCommon areas we have considered LED lightfixtures against conventional T5 light fittings.

Total Lighting Load usingconventional lights

Total Lighting Load usingpower saving lights

For Common Areas

Total Lighting Load usingLED lights

15 kW

5 kW

175 kW /day

65 kW /day

Total Lighting Load usingflourescent lights

Consumption per dayusing flourescent lights

(@ 12 hrs.)Consumption per dayusing LED lights (@ 12

hrs.)

Note: For Internal flat lighting, we haveconsidered the Energy efficient Lighting fixturesto be used with electronic ballasts againstconventional flouroscent tube lights withconventional ballasts. This will save upto 50%of energy utilised for light fixtures. ForCommon areas we have considered LED lightfixtures against conventional T5 light fittings.

Total Lighting Load usingLED lights

Page 92: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

Sr. no Description TCL in kWMD using inconventional Lifts

Powerconsumption per dayin kWH (@

3 hrs.)

MD usingLifts withVFD andAPFC panel

Powerconsumpt

ion perday inkWH

1 Lifts 75 37.5 112.5 26.25 78.75

Sr. no TCL in kWMD using inconventiona

l manner

Powerconsumption per day inkWH (@ 6

hrs.)

TCL in kWMD usingVFD and

APFC panel

Powerconsumpt

ion perday inkWH

Power saving by using VFD and APFC Panel on Lifts

Power saving by using VFD and APFC Panel on Water Pumps with 90% Efficiency

Using Water pumps with 60 % Using VFD and APFC Panel on

Sr. no TCL in kWMD using inconventiona

l manner

Powerconsumption per day inkWH (@ 6

hrs.)

TCL in kWMD usingVFD and

APFC panel

Powerconsumpt

ion perday inkWH

1 40 40 240 40 24 96

Sr. no TCL in kW MD in kW

Powerconsumption per day inkWH (@ 20

hrs.)

TCL in kW MD in kW

Powerconsumpt

ion perday inkWH

1 135 135 2700 135 108 2160

Power saving by using MBBR type STP with VFDUsing Conventional type STP Using MBBR Type STP with VFD

Page 93: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

Description

ConnectedLoad (kW)

DemandLoad (kW)

AssumedOperative

Hours / day

PowerConsumpti

on / day(kWH)

No. of daysof usage in

an year

PowerConsumption / year

(kWH)

Using MHlamps(150W)

3 3 12 36 365 13140

Using LEDlamps(45W)

1.5 1.5 12 18 365 6570

ENERGY SAVING FOR EXTERNAL LIGHTING

POWER SAVING CALCULATIONS WITH SOLAR WATER HEATERS

Tower No. of unitsNo. of

Geysers perunit

TCL per unit(2kW perGeyser)

TCL ForTotal unit(2kW perGeyser)

PowerConsumption / day (inkWH for 1Hr / Day)

PowerConsumpt

ion perYear onUtilityPower

(365 days)

PowerConsumption for 50

% ofrequireme

nt perYear onUtilityPower

PowerConsumption for 50

% ofrequireme

nt perYear on

SolarPower (40

days)2 BHK 72 2 4 288 86.4 31536 15768 2073.63 BHK 108 3 6 648 194.4 70956 35478 4665.6Total 180 5 10 936 280.8 102492 51246 6739.2

51246 kWH6739.2 kWHTotal Power Consumption per year with Solar Power

POWER SAVING CALCULATIONS WITH SOLAR WATER HEATERS

Total Power Consumption per year on Utility Power

Note: We have considered solar water heating for only 50 % of Hot water requirement as per

Page 94: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

Sr. No. Tower No. of unitsNo. of

Geysers perunit

TCL perunit (2kW

per Geyser)

PowerConsumption / day (inkWH for 1Hr / Day)

PowerConsumption / dayon solarwater (inkWH for 1Hr / Day)

PowerConsumpt

ion perYear onUtilityPower

(365 days)

PowerConsumpt

ion perYear on

SolarPower

(275 days)

1 2 BHK 72 2 4 288 130 105120 357502 3 BHK 108 3 6 648 135 236520 37125

Total 180 5 10 936 265 105120 35750105120 kWH35750 kWH

Power saving with Solar water heaters

POWER SAVING CALCULATIONS WITH SOLAR WATER HEATERS

Total Power Consumption per year on Utility PowerTotal Power Consumption per year on Solar Power 35750 kWH

34 %

Sr.No. Description Area (sq.ft.) Usable Area kW 50% (kW)Required

(kW)

1Tower C(Terrace) 10603 5301 530 265 936

1CommonLighting-(parking +

5 63773 23547 40226

2Internal FlatLighting

36 184170 105393 78777

Power saving with Solar water heaters

TotalConsumpti

Differencein power

POWER SAVING SUMMARY

Total Power Consumption per year on Solar Power

Sr.No Description MaximumDemand in

Powerconsumptio

Page 95: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

3VFD andAPFC Panelon Lifts

78.75 41063 28744 12319

4

VFD andAPFC Panelon 90%EffcientWaterPumps

96 87600 35040 52560

5MBBR typeSTP with VFD

108 985500 788400 197100

6ExternalLighting

2 13140 6570 6570

7WaterHeating

265 105120 35750 693707WaterHeating

265 105120 35750 69370

TOTAL 591 1480366 1023444 456922

#REF!

#REF!

591

#REF!

#REF!#REF!

#REF!

#REF! %Percentage Saving

Total Counted load (

Total Demand Load

Power Consumption in

Difference

Total Un Counted load (

Consumption in kWH /Consumption in kWH /

Page 96: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

Sr. No. TowerNo. ofunits

No. ofGeysersper unit

TCL perunit (2kW

perGeyser)

PowerConsumption /day (in kWH for

1 Hr / Day)

PowerConsumption /

day on solarwater (in kWHfor 1 Hr / Day)

PowerConsumption per

Year on UtilityPower (365 days)

Power Consumptionper Year on SolarPower (275 days)

1 A (1BHK) 216 1 2 129.6 163 47304 44825B (2BHK) 72 2 4 86.4 31536B (3BHK) 72 3 6 129.6 47304C (2BHK) 72 2 4 86.4 31536C (3BHK) 108 3 6 194.4 70956

Total 540 11 22 626.4 228636 176550228636 kWH176550 kWH

POWER SAVING CALCULATIONS WITH SOLAR WATER HEATERS

Total Power Consumption per year on Utility PowerTotal Power Consumption per year on Solar Power

Power saving with Solar water heaters

265

214 58850

728753

2

176550 kWH77 %

Total Power Consumption per year on Solar PowerPower saving with Solar water heaters

Page 97: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

Sr. no

DescriptionTotal No. ofFixtures/Flat

No. offlourescenttube lightsconsidered

per flat

No. ofincandescent

bulbs consideredper flat

No. of Flats

Tower A1 1BHK Flats 9 5 4 2162 2 BHK Flats 16 9 7 1443 3 BHK Flats 21 11 10 180

Total for Flats 540

POWER SAVING CALCULATIONS FOR TOWER A

POWER SAVING BY USING LED / T5 LIGHTS FOR ALL AREAS

Internal Flat Lighting

Common Areas

Sr. no

Description Area in Sq.ft

Details for Flourescent TubeLights

Details with using LED lightsconsidered for this peoject

Type of Light Lighting loadType of

Light1 Lift Lobby 16953 40 W 8400 20W2 Staircases 29513 40 W 8400 9W3 Passage 45241 40 W 20800 15W

91707 37600

149 kW

85 kW

1189 kW /day

681 kW /day

Common Areas

Sr. no

Description Area in Sq.ft

Details for Flourescent TubeLights

Details with using LED lightsconsidered for this peoject

TOTAL

For Flats (Considering 60% diversity)

Note: For Internal flat lighting, we have considered the Energyefficient Lighting fixtures to be used with electronic ballastsagainst conventional flouroscent tube lights with conventionalballasts. This will save upto 50% of energy utilised for light fixtures.For Common areas we have considered LED light fixtures againstconventional T5 light fittings.

Total Lighting Load usingconventional lights

Total Lighting Load using powersaving lights

Consumption per day usingconventional lights (@ 8 hous)

Consumption per day usingpower saving lights (@ 8 hous)

For Common Areas

Page 98: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

38 kW

14 kW

451 kW /day

167 kW /day

Sr. no

Description TCL in kWMD using inconventionalLifts

Powerconsumption perday in kWH (@ 3

hr.)

MD usingLifts withVFD andAPFC panel

1 Lifts 120 72 216 50.4

Power saving by using VFD and APFC Panel on Water Pumps with 90% Efficiency

Note: For Internal flat lighting, we have considered the Energyefficient Lighting fixtures to be used with electronic ballastsagainst conventional flouroscent tube lights with conventionalballasts. This will save upto 50% of energy utilised for light fixtures.For Common areas we have considered LED light fixtures againstconventional T5 light fittings.Total Lighting Load using

flourescent lightsTotal Lighting Load using LED

lights

Consumption per day usingflourescent lights (@ 12 hous)

Consumption per day using LEDlights (@ 12 hous)

Power saving by using VFD and APFC Panel on Lifts

Using Water pumps with 60 % Effeiciency Using VFD and APFC Panel on Water Pumps with

Sr. no

TCL in kWMD using in

conventionalmanner

Powerconsumption

per day inkWH (@

6hr.)

TCL in kWMD usingVFD and

APFC panel

1 111 55.5 333 111 38.85

Sr. no

TCL in kW MD in kW

Powerconsumption

per day inkWH

TCL in kW MD in kW

1 126 126 2520 126 100.8

Sr. No.

DescriptionConnectedLoad (kW)

DemandLoad (kW)

AssumedOperative Hours

/ day

PowerConsumptio

n / day(kWH)

1Using MH lamps

(150W)10 10 12 120

Using Water pumps with 60 % Effeiciency Using VFD and APFC Panel on Water Pumps with

Power saving by using MBBR type STP with VFDUsing Conventional type STP Using MBBR Type STP with VFD

ENERGY SAVING FOR EXTERNAL LIGHTING

Page 99: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

2Using LED lamps (45W) 3.0 3.0 12 36

3 Total Consumption

Using Solar Power

4

Using MH lamps(150W)

10 10 12 120

5

Using LED lamps (45W)considered for this

project3.0 3.0 12 36

Sr. No.

Tower No. of unitsNo. of

Geysers perunit

TCL per unit(2kW perGeyser)

PowerConsumption / day (inkWH for 1Hr / Day)

POWER SAVING CALCULATIONS WITH SOLAR WATER HEATERS

Sr. No.

Tower No. of unitsNo. of

Geysers perunit

TCL per unit(2kW perGeyser)

PowerConsumption / day (inkWH for 1Hr / Day)

1 1 BHK 216 1 2 4322 2 BHK 144 2 4 5763 3 BHK 180 3 6 1080

Total 540 6 12 2088

Sr.No.Description Area (sq.ft.) Usable Area kW 50% (kW)

1 Tower A (Terrace) 6512 3256 326 1631 Tower B (Terrace) 8557 4279 428 2141 Tower C(Terrace) 10603 5301 530 265

1Common Lighting-

(parking + commonareas)

14 164688 60838 103850

Total Power Consumption per year on Utility PowerTotal Power Consumption per year on Solar Power

Power saving with Solar water heaters

POWER SAVING SUMMARY

Sr.No

DescriptionMaximumDemand in

(kW)

Powerconsumption

/yearwithoutEnergy

TotalConsumption /year by usingEnergy saving

measures

Differencein power

consumption in kWh

Page 100: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

2 Internal Flat Lighting 85 433935 248693 185242

3VFD and APFC Panel on

Lifts151.2 78840 55188 23652

4VFD and APFC Panel on

90% Effcient WaterPumps

233.1 121545 85082 36464

5MBBR type STP with

VFD100.8 919800 735840 183960

7 External Lighting 10 43800 9900 33900

8 Water Heating on Solar 642 762120 176496 585624

TOTAL 1236 2524728 1372037 1152692

2822

2822

Total Demand Load

Power Consumption in kWH /day

2822

1236

1586

9471573

8318882

1152692

12.2 %

Difference

Percentage Saving

Total Un Counted load ( whereenregy saving not tried)

Consumption in kWH / year(Without Energy saving

measures

Consumption in kWH / year(With Energy saving measures

Power Consumption in kWH /day

Total Counted load ( whereenregy saving tried)

Page 101: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

Lighting load/FlatLighting

load for allflats

Lightingload/Flat

Lighting load for allflats

280 60480 161 34776500 72000 288 41472640 115200 365 65700

1420 247680 814 141948

Details using 40W ConventionalTube Lights and 20Wincandescent bulbs

Details using 25W Energyefficient T5 lights withElectronic Ballast and 9W CFLconsidered for this project forpower saving

POWER SAVING CALCULATIONS FOR TOWER A

POWER SAVING BY USING LED / T5 LIGHTS FOR ALL AREAS

Internal Flat Lighting

Common AreasDetails with using LED lightsconsidered for this peoject No. of

FixturesLighting load

4200 2101890 2107800 520

13890 940

Common AreasDetails with using LED lightsconsidered for this peoject No. of

Fixtures

Note: For Internal flat lighting, we have considered the Energyefficient Lighting fixtures to be used with electronic ballastsagainst conventional flouroscent tube lights with conventionalballasts. This will save upto 50% of energy utilised for light fixtures.For Common areas we have considered LED light fixtures againstconventional T5 light fittings.

Page 102: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

Power consumptionper day in kWH

151.2

Power saving by using VFD and APFC Panel on Water Pumps with 90% Efficiency

Note: For Internal flat lighting, we have considered the Energyefficient Lighting fixtures to be used with electronic ballastsagainst conventional flouroscent tube lights with conventionalballasts. This will save upto 50% of energy utilised for light fixtures.For Common areas we have considered LED light fixtures againstconventional T5 light fittings.

Power saving by using VFD and APFC Panel on Lifts

Using VFD and APFC Panel on Water Pumps with

Power consumptionper day in kWH

233.1 111

Power consumptionper day in kWH

2016

No. of days of usagein an year

PowerConsumptio

n / year (kWH)

365 43800

Using VFD and APFC Panel on Water Pumps with

Power saving by using MBBR type STP with VFDUsing MBBR Type STP with VFD

ENERGY SAVING FOR EXTERNAL LIGHTING

Page 103: WATER DEMAND CALCULATION - Welcome to …environmentclearance.nic.in/writereaddata/online/EC/20042015FJYZ7... · 3.0 Design Basis: STP Plant Capacity ... 8 MOC RCC -M30 ... Standard

365 13140

275 33000

275 9900

Power Consumption/ day on solar water

(in kWH for 1 Hr /Day)

PowerConsumption per Yearon Utility

Power (365days)

PowerConsumpt

ion perYear on

SolarPower

(275 days)

POWER SAVING CALCULATIONS WITH SOLAR WATER HEATERS

Power Consumption/ day on solar water

(in kWH for 1 Hr /Day)

PowerConsumption per Yearon Utility

Power (365days)

PowerConsumpt

ion perYear on

SolarPower

(275 days)

163 157680 44772214 210240 58832265 394200 72892

641.8035 762120 176496762120 kWH176496 kWH

23 %

Required (kW)

432576

1080