Page 1: Water Infrastructure Group

DESIGNBUILDOPERATEMAINTAIN

DESIGNBUILDOPERATEMAINTAIN

Page 2: Water Infrastructure Group

OUR BUSINESS MODEL IS ALIGNED TO THE NEEDS OF OUR CUSTOMERS

Page 3: Water Infrastructure Group

Barwon

Surbiton

Campaspe

Eastern

Mangawhai

VirginiaSydneyWaterContract

Country Towns Project

WHC

Christies Beach

Riverland

Townsville

Dalby

Harding Dam

Perth

WI Group Geographical coverage

Over 30 project sites7 offices

Monkey Mia

6MH

Auckland

Christchurch

BCI

Page 4: Water Infrastructure Group

DESIGNBUILDOPERATEMAINTAIN

DESIGNBUILDOPERATEMAINTAIN

Page 5: Water Infrastructure Group

DESIGN

• WI Group draws on its people to provide high level technical input and design management

• Retains technical capability to support WI Group business units and projects

• Draws on WI Groups relationships and utilisation of specialist Consultants

• Some of the staff have 20 plus years of specialised water industry design experience

• WI Group maintains a design and detailing group

Page 6: Water Infrastructure Group

Specialist/Technical capability

• Water and wastewater treatment

• Biosolids drying facilities

• Class A recycling facilities and schemes

• Chemical dosing systems

• Membrane plants (large and modularised)

• Pipeline rehabilitation

• Pipeline systems

• Wastewater schemes

• Mechanical/Electrical/Process Equipment

Page 7: Water Infrastructure Group

DESIGNBUILDOPERATEMAINTAIN

DESIGNBUILDOPERATEMAINTAIN

Page 8: Water Infrastructure Group

BUILD

• DB, DBF, B, D

• Projects from $200k to $50m

• Provision of Funding options

• Fabrication facility in Adelaide

• Dedicated project teams

• Onsite project delivery and factory fabrication of modular units

• Risk assessment & mitigation approach

• Pipeline rehabilitation (pressure, sewer, drainage)

• Mechanical/Electrical/Process equipment

• Virginia Pipeline Scheme

• Eastern Irrigation Scheme

• Campaspe Water Reclamation Scheme

• Barwon Bio solids Project

• Macquarie Settlement Pipeline

• Moura Recycling plant

• Adelaide Desal Pilot plant

• Mangawhai Wastewater scheme

Page 9: Water Infrastructure Group

DESIGNBUILDOPERATEMAINTAIN

DESIGNBUILDOPERATEMAINTAIN

Page 10: Water Infrastructure Group

OPERATIONS

• Virtual Control Room• 24/7- 3 to 25 year

concessions• Performance standards• Training• Technical Support• IMS approach• MEX- maintenance

management• Sampling/Testing• Emergency

procedures and equipment

• Virginia Pipeline Scheme

• Eastern Irrigation Scheme

• Campaspe Water Reclamation Scheme

• Barwon Biosolids Scheme

• Mangawhai EcoCare Scheme

• Surbiton Class A Water Recycling

• Adelaide Desal Pilot Plant

Page 11: Water Infrastructure Group

DESIGNBUILDOPERATEMAINTAIN

DESIGNBUILDOPERATEMAINTAIN

Page 12: Water Infrastructure Group

MAINTAIN

• CCTV and sewer cleaning contracts – 600 km/yr

• Manhole rehabilitation

• Pipeline joint and coating repair

• Pumping station fit outs (equipment and OH&S)

• Replacement and updating mechanical/electrical and chemical dosing facilities

• Specialist valve rehabilitation

Page 13: Water Infrastructure Group

AWARDS

• 2012 Australian Concrete Repair Association Award for Excellence for Rehabilitation of Six Maintenance Holes

• 2012 Institute of Public Works NSW Engineering Excellence Award for Innovation in Water Supply and Wastewater – Operations for Eurobodalla Northern Water Treatment Plant

• 2012 Australian Water Association National Water Industry Safety Excellence Award for BOOS rehabilitation project

• 2011 Australian Water Association Infrastructure Project Innovation Finalist for the Dalby Class A+ Wastewater Recycling Treatment Plant

• 2011 Australasian Society for Trenchless Technology Rehabilitation Project of the Year Award for the Bondi Ocean Outfall Sewer rehabilitation project

• 2011 Australian Water Association Water Industry Safety Excellence Award High Commendation for NSOOS Gore Creek and Burns Bay Aqueduct Rehabilitation Project

• 2011 Australian Water Association Program Innovation Award Finalist for Virginia Pipeline Scheme

Page 14: Water Infrastructure Group

AWARDS

• 2010 Institute of Public Works Engineering Excellence Award for Water Projects up to $5 million for the Dalby Class A+ Wastewater Recycling Treatment Plant

• 2010 Australian Concrete Repair Association Award for Excellence for Moreton Bay Sewer Maintenance Hole Rehabilitation Project

• 2010 WateReuse Association Awards Finalist in the International Project category for the Virginia Pipeline Scheme

• 2010 United Nations Association of Australia World Environment Day Awards Finalist in the Excellence in Sustainable Water Management Award category for the Virginia Pipeline Scheme

• 2010 Engineering Excellence Awards Finalist in the South Australian Environment and Sustainability category for the Virginia Pipeline Scheme

• 2010 Civil Contractors Federation Earth Awards Finalist in New South Wales Category Two Projects $5 million to $15 million

Page 15: Water Infrastructure Group

AWARDS

• 2009 United Nations World Environment Day Award for Excellence in Sustainable Water Management for the Surbiton Park Class A Recycled Water Plant

• 2009 Institute of Public Works Engineering Australia (NSW) Engineering Heritage Award for Hay St Stormwater Channel Relining Project

• 2006 International Water Association Project Innovation Award for the Eastern Irrigation Scheme

• 2006 Australian Concrete Repair Association Repairer of the Year for the SWOOS rehabilitation project

• 2006 Engineers Australia (NSW) High Commendation for Project Management for the SWOOS rehabilitation project

• 2006 WorkCover NSW High Commendation for Best Workplace OHS Management System for the SWOOS rehabilitation project

• 2005 Engineers Australia Excellence Award for Environment and Sustainability for the Campaspe Water Reclamation Scheme

Page 16: Water Infrastructure Group

Over $100 million invested in schemes delivering 25 GL/year of recycled water

Over $100 million invested in schemes delivering 25 GL/year of recycled water

Page 17: Water Infrastructure Group

Delivering over 40% of Australia’s Class A recycled water for agricultural and residential use

Delivering over 40% of Australia’s Class A recycled water for agricultural and residential use

Page 18: Water Infrastructure Group

CURRENT PROJECTS

Page 19: Water Infrastructure Group

NSOOS Rehabilitation ProjectInternal rehabilitation of Burns Bay & Gore Creek Aqueducts for the Sydney Water Wet Weather Alliance

NSOOS Rehabilitation ProjectInternal rehabilitation of Burns Bay & Gore Creek Aqueducts for the Sydney Water Wet Weather Alliance

Page 20: Water Infrastructure Group

BCI IRRIGATION PROJECT60km of Polyethylene pipelines, Canterbury Plains New ZealandBCI IRRIGATION PROJECT60km of Polyethylene pipelines, Canterbury Plains New Zealand

Page 21: Water Infrastructure Group

BOOS REHABITATION PROJECTInternal Rehabilitation of 900m of the Bondi Ocean Outfall Sewer for Sydney Water

BOOS REHABITATION PROJECTInternal Rehabilitation of 900m of the Bondi Ocean Outfall Sewer for Sydney Water

Page 22: Water Infrastructure Group

EUROBODALLA Water Treatment PlantD&C Water Treatment Plant for Eurobodalla Shire Council – managed by NSW Public Works

EUROBODALLA Water Treatment PlantD&C Water Treatment Plant for Eurobodalla Shire Council – managed by NSW Public Works

Page 23: Water Infrastructure Group

VIRGINIA PIPELINE SCHEMEOne of the world’s largest high quality water recycling schemesVIRGINIA PIPELINE SCHEMEOne of the world’s largest high quality water recycling schemes

Page 24: Water Infrastructure Group

CAMPASPE WATER RECLAMATION SCHEME 2005 Excellence Award for Environment and Sustainabilitypresented by Engineers Australia (Victoria)

CAMPASPE WATER RECLAMATION SCHEME 2005 Excellence Award for Environment and Sustainabilitypresented by Engineers Australia (Victoria)

Page 25: Water Infrastructure Group

EASTERN IRRIGATION SCHEME2006 Project Innovation Award for Design presented by the International Water Association

EASTERN IRRIGATION SCHEME2006 Project Innovation Award for Design presented by the International Water Association

Page 26: Water Infrastructure Group

SURBITON PARK CLASS A RECYCLED WATER PLANT 2009 United Nations Association of Australia World Environment Day Award for Excellence in Sustainable Water Management

SURBITON PARK CLASS A RECYCLED WATER PLANT 2009 United Nations Association of Australia World Environment Day Award for Excellence in Sustainable Water Management

Page 27: Water Infrastructure Group

BARWON WATER BIOSOLIDS MANAGEMENT PROJECTAustralia’s first thermal biosolds drying facilityBARWON WATER BIOSOLIDS MANAGEMENT PROJECTAustralia’s first thermal biosolds drying facility

Page 28: Water Infrastructure Group

Leading the way with MBR technology

Water Infrastructure Group supplies over 40% of Australia’s Class A recycled water for residential and irrigation use. The group is also leading the way in the use of advanced membrane bioreactor technology to provide decentralised, high quality water recycling solutions for municipal and private projects.

Page 29: Water Infrastructure Group

LEADING THE WAY WITH MBR TECHNOLOGYMBR plant for Byron Shire Council at Bangalow, NSW with a capacity of 850 kL/day dry weather flow that replaced the existing sewage treatment plant

LEADING THE WAY WITH MBR TECHNOLOGYMBR plant for Byron Shire Council at Bangalow, NSW with a capacity of 850 kL/day dry weather flow that replaced the existing sewage treatment plant

Page 30: Water Infrastructure Group

LEADING THE WAY WITH MBR TECHNOLOGY1.1 ML/d MBR dry weather flow plant for Banana Shire Council in Moura, Queensland

LEADING THE WAY WITH MBR TECHNOLOGY1.1 ML/d MBR dry weather flow plant for Banana Shire Council in Moura, Queensland

Page 31: Water Infrastructure Group

Nightcap STP Bangalow Nightcap STP Bangalow

Page 32: Water Infrastructure Group

WATER INFRASTRUCTURE REFURBISHMENTS AND REPLACEMENTS

DN1000 Dam Outlet Regulating Valve Replacement, Erhard Needle Valve, Site Service

WATER INFRASTRUCTURE REFURBISHMENTS AND REPLACEMENTS

DN1000 Dam Outlet Regulating Valve Replacement, Erhard Needle Valve, Site Service

Page 33: Water Infrastructure Group

SA WATER RIVERLAND PROJECTManufacture, assembly and testing of sixteen membrane filtration skids for nine Riverland townships

SA WATER RIVERLAND PROJECTManufacture, assembly and testing of sixteen membrane filtration skids for nine Riverland townships

Page 34: Water Infrastructure Group

SOUTHERN AND WESTERN SUBURBS OCEAN OUTFALL SEWER REHABILITATION44,000m2 underground concrete culvert refurbishmentthe largest sewer rehabilitation project in Australia for Sydney WaterJoint Venture : ETE, McConnell Dowell, Tyco Water

SOUTHERN AND WESTERN SUBURBS OCEAN OUTFALL SEWER REHABILITATION44,000m2 underground concrete culvert refurbishmentthe largest sewer rehabilitation project in Australia for Sydney WaterJoint Venture : ETE, McConnell Dowell, Tyco Water

Page 35: Water Infrastructure Group

HARDING DAM WATER TREATMENT PLANT KARRATHA WADesign and build plant and buildingsHARDING DAM WATER TREATMENT PLANT KARRATHA WADesign and build plant and buildings

Page 36: Water Infrastructure Group

ADELAIDE DESAL PILOT PLANT Design and build 500KLD plant, launched Dec 2008, 1 year contract to operate and maintain

ADELAIDE DESAL PILOT PLANT Design and build 500KLD plant, launched Dec 2008, 1 year contract to operate and maintain

Page 37: Water Infrastructure Group

MACQUARIE SETTLEMENT PIPELINE Private irrigation scheme for 17 customers using surplus water sourced from Hydro Tasmania

MACQUARIE SETTLEMENT PIPELINE Private irrigation scheme for 17 customers using surplus water sourced from Hydro Tasmania

Page 38: Water Infrastructure Group

CCTV, ROOT CUTTING & ANCILLARY SERVICES 4yr contract for all Sydney Water Area of Operations, including Blue Mts & Wollongong – over 1600km of pipelines & over 1500 manholes

CCTV, ROOT CUTTING & ANCILLARY SERVICES 4yr contract for all Sydney Water Area of Operations, including Blue Mts & Wollongong – over 1600km of pipelines & over 1500 manholes

Page 39: Water Infrastructure Group

CURED IN PLACE LINING 5 consecutive 1 yr contracts totalling over 30km of pipelines at Nowra-Culburra beach and Greenwell Point

CURED IN PLACE LINING 5 consecutive 1 yr contracts totalling over 30km of pipelines at Nowra-Culburra beach and Greenwell Point

Page 40: Water Infrastructure Group

TAYLORS LAKE – OUTLET AUGMENTATION Modification of the Taylors Lake Outlet as part of the Wimmera Mallee Pipeline Project

TAYLORS LAKE – OUTLET AUGMENTATION Modification of the Taylors Lake Outlet as part of the Wimmera Mallee Pipeline Project

Page 41: Water Infrastructure Group

RYDE PUMPING STATION Refurbishment of the 1500 diameter twin suction mainsRYDE PUMPING STATION Refurbishment of the 1500 diameter twin suction mains

Page 42: Water Infrastructure Group

BERKELEY CARRIER – LINING REPAIRSRepair five types of defects identified in the traverse reportBERKELEY CARRIER – LINING REPAIRSRepair five types of defects identified in the traverse report

Page 43: Water Infrastructure Group

MANGAWHAI COMMUNITY SEWERAGE PROJECTSewerage scheme and wastewater treatment plant for a peak population of 15000 people

MANGAWHAI COMMUNITY SEWERAGE PROJECTSewerage scheme and wastewater treatment plant for a peak population of 15000 people

Page 44: Water Infrastructure Group

NSOOS REHABILITATION PROJECTContract for internal rehabilitation of two aqueducts at Gore Creek (90m) and Burns Bay (160 m)

NSOOS REHABILITATION PROJECTContract for internal rehabilitation of two aqueducts at Gore Creek (90m) and Burns Bay (160 m)

Page 45: Water Infrastructure Group

LEONORA DESAL PLANT Chlorine Modules, SAF Pipework, CIP & Flushing System LEONORA DESAL PLANT Chlorine Modules, SAF Pipework, CIP & Flushing System

Page 46: Water Infrastructure Group

EDUCTION TRUCK An example of Water Infrastructure Group’s equipmentEDUCTION TRUCK An example of Water Infrastructure Group’s equipment

Page 47: Water Infrastructure Group

KOORABYE DESALINATION PLANT 40m3/day brackish water desalination plant to produce potable water for a remote aboriginal community in the Kimberley Region.

KOORABYE DESALINATION PLANT 40m3/day brackish water desalination plant to produce potable water for a remote aboriginal community in the Kimberley Region.

Page 48: Water Infrastructure Group

EDENHOPE REVERSE OSMOSIS PLANTContainerised 0.5ML/day Reverse Osmosis Plant EDENHOPE REVERSE OSMOSIS PLANTContainerised 0.5ML/day Reverse Osmosis Plant

Page 49: Water Infrastructure Group

IN-HOUSE FABRICATION OF CONTAINERISED PLANTSMembrane plants for water and wastewater treatment IN-HOUSE FABRICATION OF CONTAINERISED PLANTSMembrane plants for water and wastewater treatment

Page 50: Water Infrastructure Group

DELIVERING A SUSTAINABLE FUTURE