WATER & SEWER SERVICING REPORT Point Rd, Tuncurry
Prepared for Tuncurry Point Pty Ltd
16 JANUARY 2018
![Page 2: WATER & SEWER SERVICING REPORT Point Rd, Tuncurry · The 100mm mains will connect to existing mains in Recreation Lane, Point St and Bay St and the proposed 150mm main to form a loop](https://reader034.vdocument.in/reader034/viewer/2022050410/5f8775427910a278c672e184/html5/thumbnails/2.jpg)
WATER & SEWER SERVICING REPORT Point Rd, Tuncurry
17127 | Ver.2 | 16/01/2018
Prepared by:
WALLACE PLUMBING & FIRE DESIGN P/L
PO Box 850
Warners Bay, NSW 2282
T: +61 02 4929 4109
Client Manager: Shaun Wallace
Report Number: 17127
Version / Date: Ver.2 16/01/2018
Prepared for:
TUNCURRY POINT PTY LTD
Client Contact: Gregor Millson
![Page 3: WATER & SEWER SERVICING REPORT Point Rd, Tuncurry · The 100mm mains will connect to existing mains in Recreation Lane, Point St and Bay St and the proposed 150mm main to form a loop](https://reader034.vdocument.in/reader034/viewer/2022050410/5f8775427910a278c672e184/html5/thumbnails/3.jpg)
WATER & SEWER SERVICING REPORT Point Rd, Tuncurry
17127 | Ver.2 | 16/01/2018
Important Note
This document is to be submitted to the Mid Coast Council for approval as the servicing strategy for the subject area.
Upon approval the document shall become the property of the Mid Coast Council. The document may only be used for
the purposes for which it was commissioned and in accordance with the Terms of Engagement for the commission.
Unauthorised copying or use of this document in any form whatsoever is prohibited.
Apart from fair dealing for the purposes of private study, research, criticism, or review as permitted under the Copyright
Act, no part of this report, its attachments or appendices may be reproduced by any process without the written consent
of Wallace Plumbing & Fire Design Pty Ltd (“WPFD” or “we”). All enquiries should be directed to WPFD.
We have prepared this report for Tuncurry Point Pty Ltd (“Client”) for the specific purpose for which it is supplied
(“Purpose”). This report is strictly limited to the purpose including the facts and matters stated within it and is not to be
used, directly or indirectly, for any other application, purpose, use or matter.
In preparing this report WPFD has made certain assumptions. We have assumed that all information and documents
provided to us by the Client or as a result of a specific request or enquiry were complete, accurate and up-to-date. Where
we have obtained information from a government register or database, we have assumed that the information is
accurate. Where an assumption has been made, we have not made any independent investigations with respect to the
matters the subject of that assumption. As such we would not be aware of any reason if any of the assumptions were
incorrect.
This report is presented without the assumption of a duty of care to any other person (“Third Party”) (other than the
Client). The report may not contain sufficient information for the purposes of a Third Party or for other uses. Without the
prior written consent of WPFD:
(a) this report may not be relied on by a Third Party; and
(b) WPFD will not be liable to a Third Party for any loss, damage, liability or claim arising out of or incidental to a
Third Party publishing, using or relying on the facts, content, opinions or subject matter contained in this report.
If a Third Party uses or relies on the facts, content, opinions or subject matter contained in this report with or without the
consent of WPFD, WPFD disclaims all risk from any loss, damage, claim or liability arising directly or indirectly, and
incurred by any third party, from the use of or reliance on this report.
In this note, a reference to loss and damage includes past and prospective economic loss, loss of profits, damage to
property, injury to any person (including death) costs and expenses incurred in taking measures to prevent, mitigate or
rectify any harm, loss of opportunity, legal costs, compensation, interest and any other direct, indirect, consequential or
financial or other loss.
Document Status
Version Purpose of Document Orig Review Review Date
1 DA Approval Ian Murphy Shaun Wallace 22.12.2017
2 DA Approval Ian Murphy Shaun Wallace 16.01.2018
Approval for Issue
Name Signature Date
Shaun Wallace
16.01.2018
![Page 4: WATER & SEWER SERVICING REPORT Point Rd, Tuncurry · The 100mm mains will connect to existing mains in Recreation Lane, Point St and Bay St and the proposed 150mm main to form a loop](https://reader034.vdocument.in/reader034/viewer/2022050410/5f8775427910a278c672e184/html5/thumbnails/4.jpg)
WATER & SEWER SERVICING REPORT Point Rd, Tuncurry
17127 | Ver.2 | 16/01/2018
Contents
TERMS AND ABBREVIATIONS ............................................................................................................ 1
1.0 INTRODUCTION ........................................................................................................................... 2
1.1 Location ............................................................................................................................. 2
1.2 Proposed Development .................................................................................................... 2
1.3 Methodology ...................................................................................................................... 2
2.0 WATER ......................................................................................................................................... 3
2.1 Design Water Demands .................................................................................................... 3
2.2 Infrastructure Description ................................................................................................ 4
2.3 Capital and Replacement Costs ...................................................................................... 4
2.4 Computer Modelling ......................................................................................................... 4
1.1.2 Average Day Flow Analysis ...................................................................................... 4
1.1.3 Peak Day Flow Analysis ........................................................................................... 5
1.1.4 Peak Instantaneous Demand Analysis ..................................................................... 5
1.1.5 Fire Flow Analysis ..................................................................................................... 5
3.0 SEWER ......................................................................................................................................... 6
3.1 Sewerage Loading Assessment ...................................................................................... 6
3.2 Infrastructure Description ................................................................................................ 7
3.3 Capital and Replacement Costs ...................................................................................... 7
4.0 CONCLUSION .............................................................................................................................. 8
Appendices
Appendix 1 Water Infrastructure
Appendix 2 Sewer Infrastructure
Appendix 3 Water Modelling
![Page 5: WATER & SEWER SERVICING REPORT Point Rd, Tuncurry · The 100mm mains will connect to existing mains in Recreation Lane, Point St and Bay St and the proposed 150mm main to form a loop](https://reader034.vdocument.in/reader034/viewer/2022050410/5f8775427910a278c672e184/html5/thumbnails/5.jpg)
WATER & SEWER SERVICING REPORT Point Rd, Tuncurry
17127 | Ver.2 | 16/01/2018 1
Terms and Abbreviations
AHD Australian Height Datum
MCC Mid Coast Council
MCW Mid Coast Water
RL Reduced Level
RPS RPS Australia East Pty Ltd
WPFD Wallace Plumbing & Fire Design Pty Ltd
WWPS Wastewater Pump Station
![Page 6: WATER & SEWER SERVICING REPORT Point Rd, Tuncurry · The 100mm mains will connect to existing mains in Recreation Lane, Point St and Bay St and the proposed 150mm main to form a loop](https://reader034.vdocument.in/reader034/viewer/2022050410/5f8775427910a278c672e184/html5/thumbnails/6.jpg)
WATER & SEWER SERVICING REPORT Point Rd, Tuncurry
17127 | Ver.2 | 16/01/2018 2
1.0 Introduction
Wallace Plumbing & Fire Design P/L has been commissioned by Tuncurry Point Pty Ltd to prepare a water &
sewer servicing report to support the Development Application (DA) for Lot 2 DP1196454 & Lot 164
DP655650 Point Rd Tuncurry. This report addresses the provision of water & sewer services to the proposed
development.
Proposed development of the site will require the construction of water & sewer reticulation mains to provide
services that comply with Mid Coast Council (MCC) requirements.
1.1 Location
The subject site has street frontages and road access to Point Road, Taree Street, Recreation Lane and Bay
Street.
The site encompasses an area of approximately 6.1 hectares.
The land is zoned (c) High Density Residential and 2(a) Low Density Residential.
1.2 Proposed Development
It is proposed to undertake a community title subdivision of the site and construct 59 x townhouses, 26 x
studio units & 360 x 3BR apartments.
1.3 Methodology
Consultation has been undertaken with Mid Coast Water to determine appropriate connection points to the
existing water & sewer systems to provide adequate services to the proposed development.
Computer modelling of the proposed water system has been completed using EPANet and sizing of the
sewer system has been determined using empirical methods.
![Page 7: WATER & SEWER SERVICING REPORT Point Rd, Tuncurry · The 100mm mains will connect to existing mains in Recreation Lane, Point St and Bay St and the proposed 150mm main to form a loop](https://reader034.vdocument.in/reader034/viewer/2022050410/5f8775427910a278c672e184/html5/thumbnails/7.jpg)
WATER & SEWER SERVICING REPORT Point Rd, Tuncurry
17127 | Ver.2 | 16/01/2018 3
2.0 Water
Mid Coast Water (MCW) has provided preliminary advice that indicates that reticulated water can be
provided to the site by extension of mains from existing MCW watermains in Point Road, Taree Street,
Recreation Lane and Bay Street.
The provision of water infrastructure to service the site requires the construction of a 150mm main
connecting to the existing water system in Taree St. The watermains servicing the site will be interconnected
with other existing mains in Point Rd, Recreation Lane and Bay St creating a robust water system for the
area.
2.1 Design Water Demands
To estimate design flows, values from the Water Services Association of Australia (WSAA) Water Supply Code
of Australia WSA03-2002-2.3 MidCoast Water Version have been adopted. Theoretical loadings have been
determined and are expressed in terms of equivalent tenements. An ET is the theoretical water demand for an
average residential allotment. The criteria used to determine the theoretical water design flows are summarised
below:
Average Day Demand for new residential properties in the Mid Coast Council LGA = 205 kL/yr
Average Day Demand (L/s) = 0.0065/ET
Peak Day Demand (L/s) = ADD x PDD Factor
Peak Day Factor – 3
Peak Instantaneous Demand (L/s) = 0.04/ET
Unaccounted Water = 13% of Average Day Demand
Design flows based on the potential lot yield are shown in Table 2.1.
Table 2.1 Total Theoretical Water Loadings
Estimated ET
Average Day Demand (L/s)
95th % Peak Day Demand
Peak Day Demand (L/s)
Peak Instantaneous Demand
Unaccounted Water (L/s)
59 Townhouses
59 0.384 1.065 1.121 2.360 0.050
26 Studio Units
17.42 0.113 0.314 0.331 0.697 0.015
360 x 3BR Apartments
241.2 1.568 4.468 4.703 9.64 0.204
Total 317.62 2.065 5.885 6.195 12.705 0.269
Preliminary computer modelling indicates that the proposed 150mm watermain has adequate capacity to
meet residential demand and to provide fireflows for the proposed lots.
![Page 8: WATER & SEWER SERVICING REPORT Point Rd, Tuncurry · The 100mm mains will connect to existing mains in Recreation Lane, Point St and Bay St and the proposed 150mm main to form a loop](https://reader034.vdocument.in/reader034/viewer/2022050410/5f8775427910a278c672e184/html5/thumbnails/8.jpg)
WATER & SEWER SERVICING REPORT Point Rd, Tuncurry
17127 | Ver.2 | 16/01/2018 4
2.2 Infrastructure Description
Servicing of the development site requires the construction of approximately 265m x 150 & 645m x 100mm
watermain.
The 150mm main will connect to an existing 200mm main in Taree St and extend into the site to provide the
apartment blocks a frontage. The 150mm main is required to meet fireflow demands of the unit
developments.
The 100mm mains will connect to existing mains in Recreation Lane, Point St and Bay St and the proposed
150mm main to form a loop through the development site.
There is only one short length (approximately 50m x 100mm) of dead end main.
A plan indicating the existing water infrastructure and proposed watermain extensions are shown in
Appendix 2.
2.3 Capital and Replacement Costs
Preliminary capital costs have been estimated using data collected by WPFD and verified by quantity
surveyors.
265m x 150mm watermain = $55,000
645m x 100mm watermain = $97,000
Total = $152,000
The provision of reticulation mains to service the project site will be funded by the developer.
2.4 Computer Modelling
Pipe sizing has been confirmed with computer modelling using ‘EPANET 2.0’. The EPANET software has
been developed by the Water Supply & Water Resources Division in the National Risk Management
Research Laboratory of the US Environmental Protection Agency.
Table 1 Mid Coast Council Water System Criteria
Maximum Pressure – Average Day (kPa)
Maximum Pressure – Peak Day (kPa)
Minimum Pressure – Peak Day (kPa)
Minimum Pressure – Under Fire Flow Conditions at the Fire Flow Site
Minimum Pressure – Under Fire Flow Conditions Elsewhere
900 900 250 Positive head
Positive head
A map of the proposed network model is included in Appendix 4.
1.1.2 Average Day Flow Analysis
Average Day flow analyses have been completed using ‘EPANET 2.0’ and tabulated results are attached as
Appendix 4. To simulate maximum expected pressures in the proposed water network assumed Average
Day Maximum HGL values were applied at each of the boundary connection points.
![Page 9: WATER & SEWER SERVICING REPORT Point Rd, Tuncurry · The 100mm mains will connect to existing mains in Recreation Lane, Point St and Bay St and the proposed 150mm main to form a loop](https://reader034.vdocument.in/reader034/viewer/2022050410/5f8775427910a278c672e184/html5/thumbnails/9.jpg)
WATER & SEWER SERVICING REPORT Point Rd, Tuncurry
17127 | Ver.2 | 16/01/2018 5
These results indicate that all proposed lots within the study area will be provided with pressures that do not
exceed 900kPa on an Average Day.
1.1.3 Peak Day Flow Analysis
Peak Day flow analysis have been completed using ‘EPANET 2.0’ and tabulated results are attached as
Appendix 4. To simulate minimum and maximum expected pressures in the proposed water network
assumed Peak Day Minimum HGL values were applied at each of the boundary connection points.
These results indicate that all proposed lots within the study area will be provided with pressures above
450kPa on a the Peak Day.
Maximum pressures on a Peak Day do not exceed 60m.
1.1.4 Peak Instantaneous Demand Analysis
Peak Instantaneous Demand analysis have been completed using ‘EPANET 2.0’ and tabulated results are
attached as Appendix 4. To simulate minimum and maximum expected pressures in the proposed water
network assumed Peak Day Minimum HGL values were applied at each of the boundary connection points.
These results indicate that all proposed lots within the study area will be provided with pressures above 428
kPa at Peak Instantaneous Demand.
1.1.5 Fire Flow Analysis
Fire flow analysis has been completed using Peak Day flows in the ‘EPANET 2.0’ model. Minimum fire flow
pressures were determined using the assumed Peak Day Minimum HGL values. Relevant fire flows were
applied at each node in the model.
The analyses indicate that positive head in the network is achieved at each node.
![Page 10: WATER & SEWER SERVICING REPORT Point Rd, Tuncurry · The 100mm mains will connect to existing mains in Recreation Lane, Point St and Bay St and the proposed 150mm main to form a loop](https://reader034.vdocument.in/reader034/viewer/2022050410/5f8775427910a278c672e184/html5/thumbnails/10.jpg)
WATER & SEWER SERVICING REPORT Point Rd, Tuncurry
17127 | Ver.2 | 16/01/2018 6
3.0 Sewer
MCW has provided preliminary advice that indicates that reticulated sewerage services can be provided to
the proposed development site by connecting sewer mains into existing systems. There are 225mm &
150mm sewermains traversing the development site. These mains provide points of connection to some of
the proposed lots while servicing of the remainder of the proposed lots can be achieved by the installation of
junctions or the extension of 150mm mains to provide points of connection.
Sewermains servicing the development site drain to two existing wastewater pump stations (WWPS).
Capacity of the WWPS to service the proposed development is to be confirmed by MCW.
3.1 Sewerage Loading Assessment
Design flows for development in the study area have been estimated using values in the HWC Water & Sewer
Design Manual to determine theoretical loadings in equivalent tenements (ET). An ET is the theoretical
sewage flow from an average residential lot. The criteria used to determine theoretical sewer design flows are
summarised below:
Average Dry Weather Flow (ADWF) = 0.011l/s per ET
Peak Dry Weather Flow (PDWF) = ADWF x ‘r’
Storm Allowance = 0.058 l/s per ET (Gravity)
Peak Wet Weather Flow (PWWF) = PDWF + SA
Note: ‘r’ factor is from an empirical relationship based on ET.
The calculated loadings and design flows to be used in this study are summarised in Table 3-1:
Table 3-1: Theoretical Gravity Sewer Flows
Development Yield ADWF r PDWF SA PWWF
(ET) (L/s) (L/s) (L/s) (L/s)
59 Townhouses 59 0.65 3.56 2.31 3.42 5.73
26 Studio Units 17.42 0.19 4.00 0.77 1.01 1.78
360 x 3BR Apartments
241.2 2.65 2.83 7.50 13.99 21.48
Total 370.42 3.49 2.71 9.46 18.42 27.88
![Page 11: WATER & SEWER SERVICING REPORT Point Rd, Tuncurry · The 100mm mains will connect to existing mains in Recreation Lane, Point St and Bay St and the proposed 150mm main to form a loop](https://reader034.vdocument.in/reader034/viewer/2022050410/5f8775427910a278c672e184/html5/thumbnails/11.jpg)
WATER & SEWER SERVICING REPORT Point Rd, Tuncurry
17127 | Ver.2 | 16/01/2018 7
3.2 Infrastructure Description
Servicing of the development site requires the construction of approximately 440m x 150mm reticulation
sewermains.
The proposed sewer system will connect to the existing sewer network in various locations.
Plans showing existing and proposed sewer infrastructure to service the development is attached as
Appendix 3.
3.3 Capital and Replacement Costs
Preliminary capital costs have been estimated using data collected by WPFD and verified by quantity
surveyors.
440m x 150mm gravity sewer main = $120,000
The provision of reticulation mains to service the proposed subdivision will be funded by the developer.
![Page 12: WATER & SEWER SERVICING REPORT Point Rd, Tuncurry · The 100mm mains will connect to existing mains in Recreation Lane, Point St and Bay St and the proposed 150mm main to form a loop](https://reader034.vdocument.in/reader034/viewer/2022050410/5f8775427910a278c672e184/html5/thumbnails/12.jpg)
WATER & SEWER SERVICING REPORT Point Rd, Tuncurry
17127 | Ver.2 | 16/01/2018 8
4.0 Conclusion
Liaison with Mid Coast Council staff and investigation by WPFD indicates that the proposed development
can be provided with adequate water and sewer services by the extension of mains from the existing
networks in and around the site.
![Page 13: WATER & SEWER SERVICING REPORT Point Rd, Tuncurry · The 100mm mains will connect to existing mains in Recreation Lane, Point St and Bay St and the proposed 150mm main to form a loop](https://reader034.vdocument.in/reader034/viewer/2022050410/5f8775427910a278c672e184/html5/thumbnails/13.jpg)
WATER & SEWER SERVICING REPORT Point Rd, Tuncurry
17127 | Ver.2 | 16/01/2018
Appendix 1
Water Infrastructure
![Page 14: WATER & SEWER SERVICING REPORT Point Rd, Tuncurry · The 100mm mains will connect to existing mains in Recreation Lane, Point St and Bay St and the proposed 150mm main to form a loop](https://reader034.vdocument.in/reader034/viewer/2022050410/5f8775427910a278c672e184/html5/thumbnails/14.jpg)
EXISTINGWWPS
EXISTINGWWPS
WATEREXISTING 100 WATER
EXISTING 375 WATER
EXISTING 600 WATER
PROPOSED 100 WATER
PROPOSED 150 WATER
DWG No
PROJECT No ISSUE
SHEET OF SHEETSSIZE
A1
WATER STRATEGY FORPROPOSED MASTER PLAN
LOT 2, DP 1196454 & LOT 164, DP 655650,POINT ROAD, TUNCURRY 1 2
Copyright "This document and the information show shall remain the property of Wallace Plumbing & Fire Design Pty Ltd.
The document may only be used for the purpose for which it was supplied and in accordance with theterms of engagement for the commission. Unauthorised use of this document in any way is prohibited."
0 20 40 6010
SCALE IN METRES AT ORIGINAL REDUCTION RATIO
020 0
1:1000SCALE:
LONG SECTION:H :V :
DATUM:
CROSS SECTION:H :V :
N/AN/A
N/AN/A
AHD
DATE OF SURVEY:SURVEY:
DESIGNED:
APPROVED:
DATE OF PLAN:DRAWN:
DATE APPROVED:
DATE LAST SAVED:19.01.18
10.11.17
--
S.W 22.12.17
I.M
M.M
--
RE
VIS
ION
S
No. DATE REVISION DETAILS BY
CLIENT: TITLE:
DA APPROVAL ISSUE
THIS IS A COLOURED PLAN.REPRODUCTION IN COLOUR ONLY.
17127-------
A 11.11.17 ORIGINAL ISSUE S.W.
CTUNCURRY POINT PTY LTD
IMPORTANT NOTES1. This plan was prepared for the sole purposes of the client for the specific purpose of producing a design plan. This plan is strictly limited to the Purpose and does notapply directly or indirectly and will not be used for any other application, purpose, use or matter. The plan is presented without the assumption of a duty of care to anyother person (other than the Client) ("Third Party") and may not be relied on by Third Party.2. Wallace Plumbing & Fire Design Pty Ltd will not be liable (in negligence or otherwise) for any direct or indirect loss, damage, liability or claim arising out of or incidentalto: A. Third Party publishing, using or relying on the plan;
B. Wallace Plumbing & Fire Design Pty Ltd relying on information provided to it by the Client or a Third Party where the information is incorrect, incomplete, inaccurate,out-of-date or unreasonable;
C. Any inaccuracies or other faults with information or data sourced from a Third Party;D. Wallace Plumbing & Fire Design Pty Ltd relying on surface indicators that are incorrect or inaccurate;E. The Client or any Third Party not verifying information in this plan where recommended by Wallace Plumbing & Fire Design Pty Ltd;F. Lodgement of this plan with any local authority against the recommendation of Wallace Plumbing & Fire Design Pty Ltd;G. The accuracy, reliability, suitability or completeness of any approximations or estimates made or referred to by Wallace Plumbing & Fire Design Pty Ltd in this plan.
3. Without limiting paragraph 1 or 2 above, this plan may not be copied, distributed, or reproduced by any process unless this note is clearly displayed on the plan.
4. Scale shown is correct for the original plan and any copies of this plan should be verified by checking against the bar scale.5. The title boundaries as shown hereon were not marked at the time of survey and have been determined by plan dimensions only and not by field survey.6. Any service line unless otherwise noted has been plotted from the records of relevant authorities where available. Prior to any demolition, excavation or construction onthe site, the relevant authority should be contacted for possible location of further underground services and detailed locations of all service
WPFD
WALLACE PLUMBING & FIRE DESIGN PTY LTDABN 96 154 894 954Suite 10, 87 King Street, Warners Bay, NSW Australia 2282PO Box 850, Warners Bay, NSW Australia 2282T +61 2 4929 4109E [email protected] W www.wpfd.com.au
B 22.12.17 DA APPROVAL ISSUE S.W.
C 16.01.18 RE-ISSUED DA APPROVAL ISSUE S.W.
![Page 15: WATER & SEWER SERVICING REPORT Point Rd, Tuncurry · The 100mm mains will connect to existing mains in Recreation Lane, Point St and Bay St and the proposed 150mm main to form a loop](https://reader034.vdocument.in/reader034/viewer/2022050410/5f8775427910a278c672e184/html5/thumbnails/15.jpg)
WATER & SEWER SERVICING REPORT Point Rd, Tuncurry
17127 | Ver.2 | 16/01/2018
Appendix 2
Sewer Infrastructure
![Page 16: WATER & SEWER SERVICING REPORT Point Rd, Tuncurry · The 100mm mains will connect to existing mains in Recreation Lane, Point St and Bay St and the proposed 150mm main to form a loop](https://reader034.vdocument.in/reader034/viewer/2022050410/5f8775427910a278c672e184/html5/thumbnails/16.jpg)
SS
SS
S
S
S
S
S
S
S
S
S
S
SS
S
S
S
S
S
S
S
S
EXISTINGWWPS
EXISTINGWWPS
SEWEREXISTING 150 SEWER
EXISTING 225 SEWER
PROPOSED 150 SEWER
TO BE ABANDONED
S S EXISTING SEWER RISING MAIN
DWG No
PROJECT No ISSUE
SHEET OF SHEETSSIZE
A1
SEWER STRATEGY FORPROPOSED MASTER PLAN
LOT 2, DP 1196454 & LOT 164, DP 655650,POINT ROAD, TUNCURRY 2 2
Copyright "This document and the information show shall remain the property of Wallace Plumbing & Fire Design Pty Ltd.
The document may only be used for the purpose for which it was supplied and in accordance with theterms of engagement for the commission. Unauthorised use of this document in any way is prohibited."
0 20 40 6010
SCALE IN METRES AT ORIGINAL REDUCTION RATIO
020 0
1:1000SCALE:
LONG SECTION:H :V :
DATUM:
CROSS SECTION:H :V :
N/AN/A
N/AN/A
AHD
DATE OF SURVEY:SURVEY:
DESIGNED:
APPROVED:
DATE OF PLAN:DRAWN:
DATE APPROVED:
DATE LAST SAVED:19.01.18
10.11.17
--
S.W 22.12.17
I.M
M.M
--
RE
VIS
ION
S
No. DATE REVISION DETAILS BY
CLIENT: TITLE:
DA APPROVAL ISSUE
THIS IS A COLOURED PLAN.REPRODUCTION IN COLOUR ONLY.
17127-------
A 11.11.17 ORIGINAL ISSUE S.W
CTUNCURRY POINT PTY LTD
IMPORTANT NOTES1. This plan was prepared for the sole purposes of the client for the specific purpose of producing a design plan. This plan is strictly limited to the Purpose and does notapply directly or indirectly and will not be used for any other application, purpose, use or matter. The plan is presented without the assumption of a duty of care to anyother person (other than the Client) ("Third Party") and may not be relied on by Third Party.2. Wallace Plumbing & Fire Design Pty Ltd will not be liable (in negligence or otherwise) for any direct or indirect loss, damage, liability or claim arising out of or incidentalto: A. Third Party publishing, using or relying on the plan;
B. Wallace Plumbing & Fire Design Pty Ltd relying on information provided to it by the Client or a Third Party where the information is incorrect, incomplete, inaccurate,out-of-date or unreasonable;
C. Any inaccuracies or other faults with information or data sourced from a Third Party;D. Wallace Plumbing & Fire Design Pty Ltd relying on surface indicators that are incorrect or inaccurate;E. The Client or any Third Party not verifying information in this plan where recommended by Wallace Plumbing & Fire Design Pty Ltd;F. Lodgement of this plan with any local authority against the recommendation of Wallace Plumbing & Fire Design Pty Ltd;G. The accuracy, reliability, suitability or completeness of any approximations or estimates made or referred to by Wallace Plumbing & Fire Design Pty Ltd in this plan.
3. Without limiting paragraph 1 or 2 above, this plan may not be copied, distributed, or reproduced by any process unless this note is clearly displayed on the plan.
4. Scale shown is correct for the original plan and any copies of this plan should be verified by checking against the bar scale.5. The title boundaries as shown hereon were not marked at the time of survey and have been determined by plan dimensions only and not by field survey.6. Any service line unless otherwise noted has been plotted from the records of relevant authorities where available. Prior to any demolition, excavation or construction onthe site, the relevant authority should be contacted for possible location of further underground services and detailed locations of all service
WPFD
WALLACE PLUMBING & FIRE DESIGN PTY LTDABN 96 154 894 954Suite 10, 87 King Street, Warners Bay, NSW Australia 2282PO Box 850, Warners Bay, NSW Australia 2282T +61 2 4929 4109E [email protected] W www.wpfd.com.au
B 22.12.17 DA APPROVAL ISSUE S.W.
C 16.01.18 RE-ISSUED DA APPROVAL ISSUE S.W.
![Page 17: WATER & SEWER SERVICING REPORT Point Rd, Tuncurry · The 100mm mains will connect to existing mains in Recreation Lane, Point St and Bay St and the proposed 150mm main to form a loop](https://reader034.vdocument.in/reader034/viewer/2022050410/5f8775427910a278c672e184/html5/thumbnails/17.jpg)
WATER & SEWER SERVICING REPORT Point Rd, Tuncurry
17127 | Ver.2 | 16/01/2018
Appendix 3
Water Modelling
![Page 18: WATER & SEWER SERVICING REPORT Point Rd, Tuncurry · The 100mm mains will connect to existing mains in Recreation Lane, Point St and Bay St and the proposed 150mm main to form a loop](https://reader034.vdocument.in/reader034/viewer/2022050410/5f8775427910a278c672e184/html5/thumbnails/18.jpg)
![Page 19: WATER & SEWER SERVICING REPORT Point Rd, Tuncurry · The 100mm mains will connect to existing mains in Recreation Lane, Point St and Bay St and the proposed 150mm main to form a loop](https://reader034.vdocument.in/reader034/viewer/2022050410/5f8775427910a278c672e184/html5/thumbnails/19.jpg)
Average Day Demand
Network Table - Nodes at 0:00 Hrs
Elevation Base Demand Demand Head Head Pressure Pressure
Node ID m LPS LPS m kPa m kPa
Resvr 1 50 #N/A -1.16 50 490 0 0
Junc 11 3.2 0.344 0.17 49.97 489.706 46.77 458.346
Junc 10 3.2 0.344 0.17 49.97 489.706 46.77 458.346
Junc 12 3.2 0.344 0.17 49.97 489.706 46.77 458.346
Junc 9 3.2 0.344 0.17 49.97 489.706 46.77 458.346
Junc 6 3.2 0 0 49.98 489.804 46.78 458.444
Junc 8 3.2 0 0 49.98 489.804 46.78 458.444
Junc 19 3.2 0 0 49.98 489.804 46.78 458.444
Junc 7 3.2 0 0 49.98 489.804 46.78 458.444
Junc 21 3.2 0 0 49.98 489.804 46.78 458.444
Junc 18 3.2 0 0 49.98 489.804 46.78 458.444
Junc 20 3.2 0 0 49.98 489.804 46.78 458.444
Junc 5 3.2 0 0 49.98 489.804 46.78 458.444
Junc 14 3.2 0.344 0.17 49.98 489.804 46.78 458.444
Junc 17 3.2 0 0 49.98 489.804 46.78 458.444
Junc 13 3.2 0.344 0.17 49.98 489.804 46.78 458.444
Junc 4 3.2 0.344 0.17 49.99 489.902 46.79 458.542
Junc 16 3.2 0 0 50 490 46.8 458.64
Junc 15 3.2 0 0 50 490 46.8 458.64
Junc 3 3.2 0 0 50 490 46.8 458.64
Junc 2 3.2 0 0 50 490 46.8 458.64
![Page 20: WATER & SEWER SERVICING REPORT Point Rd, Tuncurry · The 100mm mains will connect to existing mains in Recreation Lane, Point St and Bay St and the proposed 150mm main to form a loop](https://reader034.vdocument.in/reader034/viewer/2022050410/5f8775427910a278c672e184/html5/thumbnails/20.jpg)
Peak Day Demand
Network Table - Nodes at 0:00 Hrs
Elevation Base Demand Demand Head Head Pressure Pressure
Node ID m LPS LPS m kPa m kPa
Resvr 1 50 #N/A -7.03 50 490 0 0
Junc 11 3.2 1.005 1 49.22 482.356 46.02 450.996
Junc 10 3.2 1.005 1 49.22 482.356 46.02 450.996
Junc 12 3.2 1.005 1 49.23 482.454 46.03 451.094
Junc 9 3.2 1.005 1 49.29 483.042 46.09 451.682
Junc 6 3.2 0 0 49.34 483.532 46.14 452.172
Junc 8 3.2 0 0 49.39 484.022 46.19 452.662
Junc 19 3.2 0 0 49.39 484.022 46.19 452.662
Junc 7 3.2 0 0 49.41 484.218 46.21 452.858
Junc 21 3.2 0 0 49.41 484.218 46.21 452.858
Junc 18 3.2 0 0 49.43 484.414 46.23 453.054
Junc 20 3.2 0 0 49.45 484.61 46.25 453.25
Junc 5 3.2 0 0 49.49 485.002 46.29 453.642
Junc 14 3.2 1.005 1 49.52 485.296 46.32 453.936
Junc 17 3.2 0 0 49.52 485.296 46.32 453.936
Junc 13 3.2 1.005 1 49.54 485.492 46.34 454.132
Junc 4 3.2 1.005 1 49.71 487.158 46.51 455.798
Junc 16 3.2 0 0 49.88 488.824 46.68 457.464
Junc 15 3.2 0 0 49.96 489.608 46.76 458.248
Junc 3 3.2 0 0 49.97 489.706 46.77 458.346
Junc 2 3.2 0 0 49.99 489.902 46.79 458.542
![Page 21: WATER & SEWER SERVICING REPORT Point Rd, Tuncurry · The 100mm mains will connect to existing mains in Recreation Lane, Point St and Bay St and the proposed 150mm main to form a loop](https://reader034.vdocument.in/reader034/viewer/2022050410/5f8775427910a278c672e184/html5/thumbnails/21.jpg)
Peak Instantaneous Demand
Network Table - Nodes at 0:00 Hrs
Elevation Base Demand Demand Head Head Pressure Pressure
Node ID m LPS LPS m kPa m kPa
Resvr 1 50 #N/A -14.82 50 490 0 0
Junc 11 3.2 2.117 2.12 46.89 459.522 43.69 428.162
Junc 10 3.2 2.117 2.12 46.91 459.718 43.71 428.358
Junc 12 3.2 2.117 2.12 46.92 459.816 43.72 428.456
Junc 9 3.2 2.117 2.12 47.17 462.266 43.97 430.906
Junc 6 3.2 0 0 47.38 464.324 44.18 432.964
Junc 8 3.2 0 0 47.57 466.186 44.37 434.826
Junc 19 3.2 0 0 47.58 466.284 44.38 434.924
Junc 7 3.2 0 0 47.65 466.97 44.45 435.61
Junc 21 3.2 0 0 47.67 467.166 44.47 435.806
Junc 18 3.2 0 0 47.74 467.852 44.54 436.492
Junc 20 3.2 0 0 47.8 468.44 44.6 437.08
Junc 5 3.2 0 0 47.98 470.204 44.78 438.844
Junc 14 3.2 2.117 2.12 48.1 471.38 44.9 440.02
Junc 17 3.2 0 0 48.1 471.38 44.9 440.02
Junc 13 3.2 2.117 2.12 48.19 472.262 44.99 440.902
Junc 4 3.2 2.117 2.12 48.85 478.73 45.65 447.37
Junc 16 3.2 0 0 49.51 485.198 46.31 453.838
Junc 15 3.2 0 0 49.84 488.432 46.64 457.072
Junc 3 3.2 0 0 49.87 488.726 46.67 457.366
Junc 2 3.2 0 0 49.98 489.804 46.78 458.444