watershed management proposal afghanistan

29
Watershed Management Proposal Afghanistan Wardak watershed July 2013

Upload: others

Post on 14-Jan-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Watershed Management Proposal Afghanistan

Watershed Management

Proposal

Afghanistan Wardak watershed

July 2013

Page 2: Watershed Management Proposal Afghanistan

The Policy Wolves

Jose Felix Pinto – Bazurco

Carlotta Ridolfi

Cesar Hakizimana

Simon Charré

Adrian Ward

Seyam Habibi

Page 3: Watershed Management Proposal Afghanistan

Outline of Presentation Watershed characteristics Other projects in the area Current status of watershed & its services Challenges for the watershed Vulnerability towards watershed management Outline of our integrated WMP Implementation Sustainability Costs & other resource requirements

Page 4: Watershed Management Proposal Afghanistan

Watershed Characteristics Location

Page 5: Watershed Management Proposal Afghanistan
Page 6: Watershed Management Proposal Afghanistan

Location: Afghanistan

Geography: Mountain Area (1900m elevation)

Population: 66,800 (47% Female)

Agriculture Type: Orchard 70%, wheat, corn (and other vegetable)

Geological Data: To be obtained

Economy: Agriculture and Livestock (~80%), remittances from Kabul

Water Source: Karez 70%, River 30% (+snow and rain)

Total Number of Karezes: 25 (to be repaired)

Land Cover: Dry mountain, grazing and agriculture

Temperature: Winter -20C Summer 30C

6

Watershed Characteristics Biophysical & Landuse

Page 7: Watershed Management Proposal Afghanistan

Watershed Characteristics Community distribution

Page 8: Watershed Management Proposal Afghanistan

Karez Wells Underground Canal

Watershed Characteristics

Page 9: Watershed Management Proposal Afghanistan

Karez Wells Underground Canal

Watershed Characteristics

Page 10: Watershed Management Proposal Afghanistan

Other projects in the area

• Social outreach programme (community empowerment)

• Afghanistan stabilization initiative (improving linkages between afghan army and communities)

Page 11: Watershed Management Proposal Afghanistan

11

Current Status of watershed

Reduced access to water (Karez blocked)

High potential for increasing water availability

Traditional community based water rights not adapted to a fair and equal water distribution

Over dependency on agricultural production, lack of alternative livelihoods

95 percent of agricultural production sold in the market (raw product)

High rate of poverty

Page 12: Watershed Management Proposal Afghanistan

12

Challenges for watershed

CHALLENGES

Karezez are not

Cleaned Over Dependency

on Agriculture & Livestock

No Alternative Livelihood Programs

Community Conflicts

upon water rights

Traditional Water Rights

Seasonal Floods

Over Grazing

Only Males are

Responsible for

Economic Activities

Lack of Irrigation

Water

Distance From

Drinking Water

Source

Page 13: Watershed Management Proposal Afghanistan

13

Vulnerability towards watershed management

Population growth (carrying capacity)

Unbalanced use of water

Inter-households conflicts related to water rights

Economic dependency on one source of income (horticulture)

Increased pasture degradation and related erosion

Page 14: Watershed Management Proposal Afghanistan

14

WMP – Proposed Interventions GOAL: To enhance livelihoods through integrated and sustainable

watershed management

Objective One:

To improve water Resources and Irrigation

networks.

Objective Two:

To develop sustainable alternative livelihood

programs.

Objective Three:

Formalize the institutional context at community

level (Community Development Councils) and

empower women

Cross Cutting

Objective

• Addressing

cultural barriers

and tensions

• Promoting

the

development a

friendly society

Page 15: Watershed Management Proposal Afghanistan

Objective One:

To improve water Resources and Irrigation networks.

1 • Karez Cleaning (Well and Tunnel Canal)

2 • Reservoir Construction

3 • Irrigation System Improvement

4 • Karez Protection from floods (gabions, terraces, super passages)

5 • Water Right/Policy Improvement

6 • Watershed Maintenance Plan

7 • Water Wells

8 • Agriculture diversification

9 • Improve productivity through the introduction innovative agricultural technologies

10 • Storage facilities

11 • Improving value chain management

Page 16: Watershed Management Proposal Afghanistan

16

• Capacity Building

• Community Contribution

• Alternative Livelihood Programs

• Community Small Grants

• Community Development Councils (CDCs)

• Community Mobilization

Objective Two

To develop sustainable alternative livelihood programs.

Page 17: Watershed Management Proposal Afghanistan

Alternative Livelihood Programs

Female Focused

Jam Processing

Home Based Tailoring

Poultry Kitchen

Gardening

Cross Cutting

Micro Hydropower

Solar House System

Processing workshops

Male Focused

Carpentry Fruit

Harvesting Harvesting

Fruit Packaging

Employment Opportunities

Alternative livelihoods

Page 18: Watershed Management Proposal Afghanistan

Objective Three

Formalize the institutional context at community level (Community

Development Councils) and empower women

• Community mobilization

• Community awareness raising

• Community development councils

• PRA

• Participatory approach toward policy improvement (CDCs and elderly involved)

• Water fee establishment based on a per liter price trust fund

• Development of a maintenance plan

Community institutions

• Establishment of women associations (CDCs)

• Providing women with alternative sources of income

Women empowerment

Page 19: Watershed Management Proposal Afghanistan

Cross Cutting Objective

• Creating Women Association

• Involving women in household Economy

• Literacy and Capacity Building Trainings

• Sensitize communities on issues of current water rights

• Promote a transition towards more equitable and inclusive water rights

Addressing cultural barriers and tensions

• Creation of recreation places for children and families

• Organizing inter community social and cultural events

Promoting and developing a friendly society

Page 20: Watershed Management Proposal Afghanistan

WMP – Partnerships

• Ministry of agriculture, irrigation and livestock

• Ministry of rural development

• Ministry of women affairs

• Department of risk management

National Government

• Provincial government

• District government

• CDCs

• NGOs (aecom, etc.)

• Farmers cooperatives

Local government

Page 21: Watershed Management Proposal Afghanistan

21

Community

Mobilization

CDC Elections

PRA Need

Assessment

Technical

Assessment Commun

ity Contribu

tion

Grant Award

Ground activities

Exit strategy

Monitoring/

Supervision

START

WMP Implementation

Policy

improvement

Page 22: Watershed Management Proposal Afghanistan

Sustainability/exit strategy of the WMP

• Pilot study for baseline assessment of

ground water reservoir/geological survey

• Community ownership

• Trust fund

• Multi stakeholder involvement

• Establishment sustainability plan with

nothing

Page 23: Watershed Management Proposal Afghanistan

7. Costs & other resource requirements

Sector Cost in USD

Watershed Management 550,000

Alternative Livelihood Programming 700,000

Institutionalization 200,000

Youth and Recreation 300,000

Geological Assessment 200,000

Community Contribution 150,000

Operation costs 200,000

Total Estimated Budget 2,300,000 USD

Page 24: Watershed Management Proposal Afghanistan
Page 25: Watershed Management Proposal Afghanistan
Page 26: Watershed Management Proposal Afghanistan
Page 27: Watershed Management Proposal Afghanistan
Page 28: Watershed Management Proposal Afghanistan
Page 29: Watershed Management Proposal Afghanistan

Thank you