waterways summer issue

48
www.waterways.org.uk waterways KEEPING OUR WATERWAYS ALIVE Summer 2009 | ISSUE 224 WATERWAYS OF THE FUTURE Restoration special WHO NEEDS AN ENGINE? Canoeing on canals News & Views From around the network Get Dirty with WRG Summer canal camp programme Events 2009 All the rallies and festivals

Upload: the-inland-waterways-association

Post on 26-Mar-2016

232 views

Category:

Documents


2 download

DESCRIPTION

The magazine of the Inland Waterways Association

TRANSCRIPT

Page 1: Waterways Summer Issue

www.waterways.org.ukwaterwaysKeeping Our WaterWays alive

Summer 2009 | ISSUE 224

WaterWayS OF tHe FUtUreRestoration special

WHO NEEDS AN ENGINE?Canoeing on canals

News & ViewsFrom around the network

Get Dirty with WRGSummer canal camp programme

Events 2009All the rallies and festivals

COVER Summer.indd 2 21/4/09 11:40:16 am

Page 2: Waterways Summer Issue

Telephone: (01327) 842577 Fax: (01327) 843964Whilton Locks, Nr Daventry, Northants, NN11 2NH

No.1 For Brokerage and Sales• Large selection of Narrowboats in stock• Four page colour brochure on every boat we sell• Each boat has its own web page on our web site• Our marina is centrally located and easy to reach• Our sales staff are dedicated, professional and friendly• We have over 400 satisfi ed customers a year who use our brokerage service

Free valuation anywhere on the waterways systemTurn your boat into cash as we buy them too!

New Sales Offi ce now open at Wigrams Turn Marina. Telephone: (01926) 815333

Email: [email protected]

MARINA OPEN 7 DAYS A WEEK

whilton copy.indd 1whilton copy.indd 1 21/4/09 09:39:5721/4/09 09:39:57

Page 3: Waterways Summer Issue

SUMMER 2009

A non-profit distributing company limited by guarantee (612245), Registered as a Charity (No. 212342)

Founded: 1946, Incorporated 1958

Registered Office: Island House, Moor Road, Chesham, HP5 1WATel: 01494 783453E-mail: [email protected] site: www.waterways.org.ukChief Executive – Neil Edwards, Operations & Information Systems Manager – David Forrester Finance Manager – Helen Elliott-Adams l IWA may not agree with opinions expressed in Waterways but encourages publication as a matter of interest. Nothing printed may be construed as policy or an official announcement unless stated, otherwise the Association accepts no liability for any matter in the magazine. Although every care is taken with advertising matters no responsibility whatsoever can be accepted for any matter advertised.

WATERWAYS EDITOR:Keith Goss Tel: 01283 742951E-mail: [email protected]

ART EDITOR: Liane HuntADVERTISEMENT MANAGER:Tony Preston Tel: 01283 742965E-mail: [email protected]

ADVERTISING DESIGN: Jill Brown E-mail: [email protected]

ADVERTISING PRODUCTION: Samantha LloydE-mail: [email protected]

EDITORIAL BOARD: Gillian Smith, Jo Gillbertson, Neil Edwards, Keith Goss, Peter Johns

REPROGRAPHICS: Waterways World Ltd, 151 Station Street, Burton-on-Trent, Staffordshire, DE14 1BG. Printed in England by Warners (Midlands) PLC, Bourne, Lincsl Articles may be reproduced provided permission is obtained and acknowledgement made. ISSN 0969-0654

6 NEwS Newsandviewsfrom aroundthewaterway network

14 GEt DiRty with wRG HelptheWaterway RecoveryGroup thissummer

18 REStoRatioN UpDatE FromtheLiverpoolLink, theGranthamCanaland theFensWaterwayLink

24 who NEEDS aN ENGiNE? Gocanoeingonthe canalsandrivers

28 watERwayS of thE fUtURE Whichcanalsarebeing restoredandwhenwill theyreopen

36 CUttiNGS Whatthepresshave hadtosayaboutthe worldofthewaterways

38 EvENtS Aroundupofthis year’smajorrallies andfestivals

41 iNbox Readers’letters

44 DiRECtoRy Who’swhoatTheInland WaterwaysAssociation

CovER piCtURE: Canoeists look on as a hire boat enters Ashford Tunnel on the Brecon & Abergavenny Canal – which is now once again open throughout.

Contents

IWA WATERWAYS SUMMER 2009 ISSUE

I wrote last tIme of the impact of the recession and the ongoing funding crisis facing our waterways. our hope is that the updating of the Waterways for Tomorrow document, accompanied by some hard facts about the tremendous benefits that each pound of support from users and government brings to the local and national economy, will help to secure long term stable funding. however, this may take some years to establish.

the case for the waterways does not appear to be a hard concept to sell and the funding sought from their ‘owner’, the State, is relatively modest when compared to other demands. it is a particularly convincing case when benefits of 15 to 30 times are measured from the result of every pound of support. Despite this position, the consequences of under funding remain as they have for many years. Unlike the early days of our campaigning, there are no calls today to fill in or close waterways. however, those which are navigable are under-funded and there seems no appetite within central government’s policies to expand the network through actively supporting restoration rather than merely not hampering it. the challenge of restoration is being taken up by many restoration groups and the more encouraging signs come when this is in partnership with local authorities and the whole community.

i encourage users of bw waterways to attend one of the 14 customer forums outlined on page 8 or to pass on your views to your local branch contact so that they can be raised. i would expect these to be interesting meetings, past ones have been.

Struggling waterway businesses include pubs, long used to the challenges of operating in a classically seasonal market. Some sections of waterway are impacted by the fact that around 40 pubs are closing every week so a previously popular pub appearing in waterway guide books and acting as a destination for a walk or cruise is found to be closed. perhaps this is a consequence of the survival of the fittest principle, which is apt when the 200th anniversary of Darwin’s birth is being celebrated, but the situation is not helped when large pub groups ultimately own so many pubs with licensees working hard to pay unrealistic rents that do not reflect the current market situation.

Let us not forget the good news, reported elsewhere in this issue, that the brecon & abergavenny Canal’s breach has been repaired and the canal is reopened, the Liverpool Link is open and the restoration of the Droitwich Canals is proceeding well so should usable by next year. the olympic site is the focus of much work that will leave a lasting waterway legacy. the increase in overseas visitors to our waterways that i predicted in the last issue seems to be borne out by recent figures from hire operators.

CLivE HEndErSon

naTionaL CHairman’S CoLumn

26 / IWA WATERWAYS / spring 2008 IWA WATERWAYS / summer 2009 / 01

38 2009 watERway EvENtS

Robi

n Sm

ithet

t

Contents/Column.indd 3 21/4/09 11:41:08 am

Page 4: Waterways Summer Issue

Untitled-1 1Untitled-1 1 21/4/09 09:43:4421/4/09 09:43:44

Page 5: Waterways Summer Issue

4 / IWA WATERWAYS / Summer 2009

CHANDLERYWe offer a wide and ever expanding range of products

with a fitting service available

BOATYARD SERVICESFor surveying, blacking, painting and repairs.

Mechanical and electrical work to the highest standard.

DAYBOAT HIREEnjoy a trip on the picturesque Oxford canal

for groups of up to 12.

HIRE FLEETOur well known 21 boat hire fleet is independently

inspected by Visit Britain. Boats are available for short breaks, weekly hire – or longer!

Rose Narrowboats LtdFosse Way

Stretton-under-FosseNr Rugby, WarwickshireCV23 0PU 01788 832449

www.rose-narrowboats.co.uk

p004 copy.indt 1p004 copy.indt 1 21/4/09 09:49:4121/4/09 09:49:41

Page 6: Waterways Summer Issue

Untitled-1 1Untitled-1 1 21/4/09 09:56:3021/4/09 09:56:30

Page 7: Waterways Summer Issue

06 / IWA WATERWAYS / summer 2009 IWA WATERWAYS / summer 2009 / 07

nEWS

Following 18 months of

repair work following a serious

breach at Gilwern, the Brecon &

Abergavenny Canal is once again

open throughout. At a ribbon

cutting ceremony – part of a family

fun day - at Goytre Wharf, near

Abergavenny on 29th March,

Waterways Minister Huw Irranca-

Davies declared the canal officially

open. Also present were Welsh

Assembly First Minister Rhodri

Morgan and British Waterways’

general manager Julie Sharman.

“This waterway is an important

feature of the local community,”

said Ms Sharman. “After 18

challenging months, and an

investment of £8.5m, we are

delighted to stage this celebration

to thank the local communities for

their patience and support during

a difficult spell in the canal’s

history.”

EFFEctivE From 1st April, the

Bridgewater Canal is now being

operated independently of the

Manchester Ship Canal Company

by a new Peel (Land and property)

Company, The Bridgewater Canal

Company Limited. Peel Holdings

state that the restructuring of

the Bridgewater Canal “will give

greater autonomy to the new

company ensuring that they can

invest in the long term future of

the historic waterway “.

The new contact details

for the company are: The

Bridgewater Canal Company

Limited, Peel Dome, The Trafford

Centre, Manchester M17 8PL

(Tel: 0161 629 8334, www.

bridgewatercanal.co.uk).

Mon & Brec open AgAin

GREEn LIGhT foR G&S LIGhTSthE traFFic light system for the movable bridges on the gloucester & sharpness canal was switched off in november 2007 following research which suggested that there were fewer accidents at road traffic junctions not controlled with lights, as people took greater care for their own safety. this move proved unpopular with regular users of the canal who complained that turning off the control lights had in fact had a negative impact on water safety. Furthermore, it was regarded by many as merely a cost-cutting exercise on the canal on the part of Bw. however, following an investigation by tony stammers, Bw’s head of health & safety, it was agreed that turning off the lights had not improved safety and they were restored to use on 2nd march.

reinstatement of the bridge control lights on the canal was welcomed by iwa gloucester & hereford branch chairman martin turner, who had campaigned vigorously for that outcome. he also expressed satisfaction that explanatory literature concerning the use of the lights had been improved, with an agreed system put in place to stop boaters jumping the red lights.

BridgewAter cAnAl chAnge

iwa has givEn its 2009 award

for ‘Parliamentarian of the Year’

to David Drew, MP for Stroud. The

award was made at an exclusive

dinner at the House of Commons

on 31st March, held on behalf of

IWA and hosted by Bob Laxton

MP. Also in attendance were the

Waterways Minister, Huw Irranca-

Davies MP and Anne McIntosh MP,

Shadow Minister, as well as many

leading MPs from all the major

parties. All the MPs present had

made significant contributions to

the well-being of the waterways

during the past year, and there

were several leading contenders for

the prestigious award.

In Presenting the Award to David

Drew, Clive Henderson, national

chairman of IWA said :

“David has shown dogged

determination not to let severe

difficulties and setbacks cause a

major strategic restoration within

his constituency to falter, and

has given support and guidance

to his local authority and local

trust, and helped rescue what

might initially have seemed a lost

cause. He has attended all the

adjournment debates, and worked

furiously behind the scenes to bring

many elements together, being

a willing ear to IWA concerns.

He has also been generous in

his support of the waterways in

general, by chairing the two select

committee investigations into British

Waterways, the reports from which

have helped inform the debate on

the future of the waterways and

funding, and in doing so promoted

waterways in the minds of

Parliament and ministers; he has not

just helped support the cause of the

Cotswold Canals restoration, but of

all waterways in general.”

David Drew receiving his award from national chairman clive henderson.

IWA AWARd foR dAvId dREW

CRomfoRd CAnAL WoRkSthE cromForD canal is to benefit from an £850,000 improvement and

repairs works programme. The work will include renovating the footbridge

at Whatstandwell railway station, structural repairs to retaining walls on the

canal, tree felling to encourage more wildlife and repairs to the boiler at the

ancient Leawood pump house.

Derbyshire County Council has secured a grant of over £400,000 from

the East Midlands Development Agency to carry out the work. This is to be

combined with £279,000 from the council and money from Network Rail and

canal volunteers, to allow the extensive maintenance programme to begin.

A section of the canal towpath is currently closed as investigations take

place at the railway aqueduct.

RovInG mooRInGS PLAn dRoPPEdBritish watErways has abandoned plans to trial ‘roving’ mooring permits on the Kennet & avon canal. the controversial scheme had been suggested to free boaters without a permanent mooring from the restrictions of a continuous cruising licence. it would have allowed them, on payment of a premium on their licence, to moor within a limited area. the trial was to have been undertaken on the stretch of the K&a between Devizes and Bath.

however, the scheme met with strong opposition when it was announced in a consultation document last year and Bw has put the plans on hold indefinitely, both on the K&a and on the wider network.

Brecon’s theatre Basin on the fully reopened Brecon & abergavenny canal.

News.indd 6 21/4/09 11:42:12 am

Page 8: Waterways Summer Issue

06 / IWA WATERWAYS / summer 2009 IWA WATERWAYS / summer 2009 / 07

summer NEWS In accordance with Article 71 of IWA’s Articles

of Association, notice is hereby given that the Annual

General Meeting of the Association will be held on

Saturday 26th September 2009 at 2pm. The venue

for the meeting will be at the Council Chamber,

Milton Keynes Civic Offices, 1 Saxon Gate East,

Central Milton Keynes MK9 3HQ. Full details of

the meeting will be provided in the next edition of

Waterways.

Nominations to stand as an elected trustee should

be received at IWA’s Head Office (addressed

to the Company Secretary) at least 85 days before

the date of the AGM (ie by Friday 3rd July). In

accordance with Article 43, any member can submit

a nomination, which should be accompanied by

confirmation from the nominee that they are

willing to be elected as a trustee of the Association.

Nominations should be accompanied by a brief

biography, autobiography or statement not

exceeding 400 words, for publication as part of any

ballot paper with the notice convening the AGM to

be issued with the next edition of Waterways.

Many of IWa’s longstanding

region chairmen have announced

that they intend to retire from

their posts this year. IWA is, as a

consequence, looking for ‘new

blood’ to replace them. As a

result of the changes in IWA’s

structure, region chairmen will, in

future, be directly elected by the

members of the regions that they

will represent, by postal ballot to

be issued in the August edition

of Waterways magazine.

Applications are requested

from any IWA member who

would be willing to be elected

to the position of region

chairman, by 3rd July. Applicants

need to get another member

in the region to write in with

a nomination (there is no set

wording) to the Chief Executive

at Head Office, IWA, Island

House, Moor Road , Chesham,

HP5 1WA; and state which

particular region is being

stood for, and submit a short

supporting statement of not

more than 400 words.

IWA is looking for dynamic,

enthusiastic leaders who have

a passion for the waterways

and who are able to provide

inspiration, motivation and

support to branches and

members. An ability to manage

and coordinate activities in their

region is also required.

Region chairmen are

automatically ex-officio trustees

of the Association, and will be

required to undertake the duties

inherent with that position,

including participation in strategy

and policy formulation, and the

attendance of at least seven

Saturday meetings per year. Good

communication skills are therefore

essential, and the availability

of broadband communications

facilities are also desirable.

Terms of office will vary initially

between one and three years,

although no region chairman

should normally hold office for

longer than six years continuously.

If you would like to discuss

the possibility of standing as a

region chairman, please contact

Neil Edwards, chief executive,

on 01494 783 453 or Clive

Henderson, national chairman, on

01564 783 672 for an informal

conversation.

The full procedures for election

of region chairmen and region

byelaws etc are available at

www.waterways.org.uk/Library/

IWAGoverningDocuments.

Your IWA NEEdS You!

2009 AnnuAl GEnERAl MEETInG DRoITWIch MARInA PlAnWith construction work on the Droitwich Junction Canal virtually complete, Wychavon District Council has approved plans for a 238-berth marina on land adjacent to the canal at Westfield Farm, off Hanbury Road. Planning approval was given, subject to the resolution of some minor concerns expressed by the Environment Agency, and work is expected to start almost immediately so that the marina is ready when the canal opens next spring.

IWa Is to support ‘The Green

Blue’ environmental awareness

initiative, by including environmental

considerations in its prestigious

‘Lionel Munk Award’, which is

made to the boat builder who in

addition to meeting the normal

criteria for standards of comfort and

construction, can also demonstrate

what they have done to minimise

environmental impact in their build.

Boat builders entering for the

award at the IWA National Festival

this year, which is to be held over

August Bank Holiday weekend at

Ratcliffe-on-Soar, Nottinghamshire,

will each be asked to submit a

list of environmental measures

that have been included in the

build. Judges will then nominate

five boats based on construction,

design, value for money fit

out, innovation, and these

environmental considerations.

The five nominees will each be

handed a framed certificate for

each boat to display during the

show indicating that they are a

‘nominated boat’.

Clive Henderson, IWA’s National

Chairman, said, “We are delighted

to be able to support The Green

Blue in this way. IWA believes

that being more environmentally

friendly starts with the boat builder

introducing measures such as the

use of timber from sustainable

sources, eliminating water pollution

from fuel and oil spills and using

a hull design which reduces wash

and propulsion energy. A number

of boat builders are already

introducing eco-measures into

the build in response to growing

demand from the boating public.

By highlighting environmental

measures through the award, IWA

will demonstrate that improving

boating sustainability is key

to a sustainable future for the

waterways”.

For more information please

contact Peter Bolt (IWA National

Festival Awards Officer) on 0151

678 9300 or e-mail peter.bolt@

waterways.org.uk.

IWA’S ‘LIoNEL MuNk’ AWArd goES grEEN

coMMunITY PAYbAck on ThE Guoffenders on community

orders are to be put to work

clearing the towpath along

the Grand Union Canal. The

Community Payback Initiative

was launched in Hayes on

26th February by the Mayor of

Hillingdon and will be used as an

example of best practice to show

other London boroughs how their

local environment could benefit

from the scheme. The project

involves offenders removing

rubbish, foliage and cleaning up

graffiti from the canal area which

will open up the towpaths and

make it a more pleasant area for

residents to enjoy.

London Probation is working

closely with Hillingdon Council to

make sure the project is completed

to the council’s specifications.

British Waterways London

is supporting the scheme by

providing floating hoppers to allow

for easy transportation of rubbish

and foliage cleared by offenders.

News.indd 7 21/4/09 11:43:00 am

Page 9: Waterways Summer Issue

British WaterWays has

announced that it is arranging

£120 million of investment over the

next three years in a project aimed

at generating enough renewable

energy to power thousands of

homes. It has signed a partnership

with The Small Hydro Company,

which develops hydro-electricity

installations. The new project plans

to develop 25 hydro-electricity

schemes along British Waterways’

network, including the Severn and

the Trent.

BW says that building the plants

would create 150 construction jobs,

and generate 210,000 mega watt

hours of renewable energy a year,

which would be enough to power

about 40,000 homes and save

170,000 tonnes of carbon dioxide

a year. Planning permission is being

sought for the first five schemes, to

be built next to weirs and dams on

the Trent and on the rivers Aire, Ouse

and Don in Yorkshire. BW said that it

was also exploring ways of harnessing

hydropower on the Severn. Further

energy may be generated from the

supply of water into canals from

some of BW’s 90 reservoirs.

It is thought that waterways

being considered for the scheme

would be river navigations rather

than canals, as these retain a

natural flow.

The project is to be funded with

a £120 million investment from

Climate Change Capital, a £1.1

billion investment fund focused

on renewable energy technology.

The cash will be spent over the

next three years, installing turbine

equipment and other infrastructure

to generate and distribute about

40 megawatts of power, starting

in 2010. Passages for fish will

be built into the infrastructure

where necessary. The Small

Hydro Company will now start a

programme of local consultation

and will seek environmental

and planning consents, with the

aim of having the first schemes

running in 2010 to help meet

the government’s 2010 hydro

renewable targets.

BW announced in 2008 a plan

to use riverbanks to build 50

wind turbines that would have

the capacity to generate 100

megawatts of renewable electricity.

Any income generated from these

schemes would be reinvested in

the maintenance of the waterways.

About 40 per cent of the United

Kingdom’s renewable electricity

is provided by hydropower but

there have been few large schemes

constructed since the 1980s.

08 / IWA WATERWAYS / summer 2009 IWA WATERWAYS / summer 2009 / 09

nEWS

Major award for foxton British waterways directors SEEk CuSTomER VIEWS

British Waterways directors

Simon Salem (marketing &

customer service), and Vince

Moran (customer operations)

are to host a series of customer

forums with boaters, anglers,

walkers, and other canal

users. The regional meetings

are intended for BW to give a

brief update on financing and

management issues affecting

the waterways before answering

questions and garnering

customer views and opinions

about waterway priorities.

The 14 regional forums

will take place between May

and September and follow

similar sessions held by BW

chief executive Robin Evans

last year. The first meeting

is scheduled to take place at

Crick Boat Show on 24th May.

The full list of events will be

available on BW’s website:

www.britishwaterways.co.uk/

meetings.

a numBer of well-deserving

projects have won honours

at this year’s Waterways

Renaissance Awards, run by

The Waterways Trust and

British Urban Regeneration

Association. The ten categories

of entry saw a diverse range

of projects recognised for their

achievements in revitalising the

inland waterways.

An award for Outstanding

Achievement (Historic

Environment Category) went to

the Foxton Locks and Inclined

Plane project: a well-deserved

accolade after five years of

development of the 20-acre

historic site beside the Leicester

Section of the Grand Union

Canal which has become a key

regional tourism destination.

The five-year project costing

£3.8m was led by British

Waterways on behalf of the

Foxton Locks Partnership, and

involved the installation of new

viewing areas and upgrading 3

kilometres of paths. Additional

interpretation panels were

put in place and there were

substantial engineering works

too, including refurbishment of

the bottom canal basin, clearing

and re-profiling of the inclined

plane slope, and relining and

rewatering of 200 metres of the

upper canal arm. The site has

also benefited from a new pub/

restaurant, café, improved road

access and more extensive car

parking.

Other winners included the

Montgomery Canal Restoration –

Aston Nature Reserve Extension

(Natural Environment Category),

Bringing the Leeds & Liverpool

Canal to Life, Chorley (Education

& Learning) and Kirkintilloch

Canal Festival 2008 (Recreation

& Tourism).

hydro-electricity Power on Bw waterways

Gunthorpe Weir on the river trent.

News.indd 8 21/4/09 11:43:28 am

Page 10: Waterways Summer Issue

08 / IWA WATERWAYS / summer 2009 IWA WATERWAYS / summer 2009 / 09

Summer NEWS

Widespread local concern

remains regarding recent

unauthorised infilling in an historic

Black Country canal basin, the base

for Les Allen the BCN boat-builder in

the latter half of the 20th century.

Haulage firm Joseph Holloway Ltd,

which used to operate canal boats

as well as lorry haulage, was told

to stop work at Valencia Wharf,

Churchbridge, Oldbury, after piling

rubble into it without permission.

The firm has applied for

permission to continue the work.

It wishes to fill in the canal basin

with crushed concrete, brick

hardcore and stone, so that it can

add an extra 5,000 sq ft of lorry

parking space at the company’s

premises. The application states that

filling in the basin will add much

needed space for manoeuvring and

parking lorries and trailers, making

vehicle movements safer and more

efficient. There will be no increase

in vehicle numbers as a result and

the mouth of the basin will remain

as an historical feature, according to

the report.

This has sparked protests from

canal enthusiasts including IWA,

the Birmingham Canal Navigations

Society and the Residential Boat

Owners Association who want

to see the site, which dates back

to 1769, preserved as a tourist

attraction whilst continuing to

maintain canal heritage. Waterway

interests are concerned that

planners may allow, subject to

conditions, the canal basin to

be filled in with ecologically safe

materials, and that the firm’s

application for permission to

continue the work would be

recommended for approval.

However, it is understood that a

decision on the application has been

deferred pending an inspection visit

by Sandwell MBC councillors.

PlAnnIng ConTRovERSY AT oldbuRY

IN BRIEF From 1st April a late payment charge of £150 has applied for any

British Waterways boat licence which is more than one month out

of date. In these instances BW will issue a revised renewal notice to

the customer which will include the additional fee. The charge has

been introduced in order to encourage boaters to renew their licence

promptly, thereby improving BW’s ability to process payments. BW say

the money generated from the late payment charge will be used to

offset licence enforcement costs.

The Broads Bill has now finished its passage through the Lord’s Select

committee; it is expected that it will receive its third and final reading

after the Easter parliamentary recess.

Newly announced figures from British Waterways indicate that

the number of people visiting BW waterways is up on last year.

BW measures numbers of visitors in a typical two week period,

which during 2008 rose over 6% from 3.2 million to 3.4 million

people. Waterway users are also visiting more often with the number

of individual visits rising 7% from 245.3 million in 2007 to 262.6

million in 2008. Visitor numbers are considered an important indicator

of the value of the waterways as a local resource for communities up

and down the country in discussions with central and local government

regarding funding.

The 22nd World Canals Conference will be based in Novi Sad, Serbia

and will take place from 20th-27th September. The overall theme of

the conference will be raising awareness and improving the economic

performance of waterways, especially those in Eastern Europe and Asia.

The 2009 updated version of the popular Launderette List has been

produced by the Aylesbury Canal Society. It is, for the first time,

available from IWA Sales, Island House, Moor Road, Chesham HP5

1WA (01494 7834530) or visit www.iwashop.com. The price is £4.50

including postage. Alternatively, copies may be obtained from the

‘welcome boat’ at Aylesbury Basin.

British Waterways has installed anti-vandal paddles on locks 14,15,16

and 17 on the Northampton Arm of the Grand Union Canal. The locks

are operated with a standard BW key.

New moorings have been provided at the upstream limit of navigation

on the Little Ouse. Managed by the Great Ouse Boating Association,

the 48 hour moorings are situated at Santon Downham Bridge, some

161/2 miles above the river’s confluence with the Great Ouse.

devon county council, which

owns and manages the Grand

Western Canal Country Park, has

allocated £375,000 capital funding

over the next four years, for works

on culverts and the creation of a

reed bed. A total of £335,000

is earmarked for comprehensive

surveying, cleaning and repairs

of the canal’s 30 culverts, most

of which are siphon culverts with

difficult vehicle access. The Council

envisages that, due to the access

issues, its bridge maintenance

team will organise the majority of

the cleaning using enclosed access

teams rather than jetting machines.

Meanwhile, some £40,000 has

been earmarked for the creation of

a new silt trap and reed bed system

to reduce silt and nutrient inputs

at a point where a stream enters

the canal.

A separate capital bid for

£240,000 for the construction of a

new visitor centre at Tiverton Canal

Basin has also been given approval,

subject to evidence that the scheme

is deliverable and that additional

external funding can be obtained.

gRAnd WESTERn ImPRovEmEnTS

StRaBaNE CaNal CloSuREstrabane canal is likely to remain closed for at least another year. The

gates of the canal have remained locked since 2007, when Strabane Council

highlighted numerous flaws in the work carried out by Strabane Lifford

Development Commission, the body tasked with completing the £1.3m

restoration project; since then little progress has been made.The snag list

includes the removal of an unstable ramp, loose stonework and repairs to

drainage. The cost of bringing the project right up to standard could be as

much as £300,000. Following a heated debate the Council has decided to

await the results of an audit.Chr

is D

anie

ls

tiverton canal basin on the Grand Western canal.

News.indd 9 21/4/09 11:43:44 am

Page 11: Waterways Summer Issue

10 / IWA WATERWAYS / summer 2009 IWA WATERWAYS / summer 2009 / 11

nEWS

SAvE WATER on ThE K&A British WaterWays has asked boaters to help conserve water on the

Kennet & Avon Canal following a pump failure. The main water source

for the canal is from an abstraction on the Avon near Claverton. This

water is supplemented by a number of other smaller feeders along the

87 miles of the canal and is then recycled using a back pumping scheme.

A pump failure at Bradford-on- Avon, next to the most heavily used lock

on the canal, and the largest pump in the chain, has led to the need to

conserve water until the repairs can be carried out.

BW operates two pumps at Bradford-on-Avon. With one of them out

of use BW cannot get the water from below the lock pumped back up to

the upper wharf as quickly as necessary. As well as sharing locks, boaters

are asked to make sure that all lock paddles are fully lowered to prevent

unnecessary leakage and that local signs and advice are followed.

Trolley Talkaccording to British Waterways, it costs a total of £150,000 per annum

for its staff to recover thousands of abandoned shopping trolleys from

the nation’s canals and rivers. In a new ‘get tough’ policy, BW is calling to

account the UK’s biggest retailers, and has opened a new trolley hotline to

allow members of the public to report sightings of abandoned trolleys in

the water. Information provided will be used to help recover trolleys, to map

‘hotspot’ areas, and to identify a league table of the nation’s least and most

environmentally responsible retailers. As an incentive, BW will be presenting

a ‘Golden Trolley’ award later in the year to the retailer showing best

environmental management of its trolleys, while an ‘Off Your Trolley’ award

will go to the least environmentally responsible retailer.

To report abandoned trolleys in BW waters call the trolley hotline on

01923 201120 or visit www.britishwaterways.co.uk/trolley.

the shropshire Union fly-

boat Saturn took part in a notable

event at Frankton locks on the

Montgomery Canal on 17th January

when IWA’s Shrewsbury District

& North Wales Branch installed

a plaque to commemorate the

conversion of her fellow Shroppie

fly-boat Cressy at Welsh Frankton

in 1929. Cressy was, of course,

subsequently made famous by the

voyages of L.T.C. Rolt recorded in

his book Narrow Boat.

When the Shropshire Union

company finished carrying in 1921

Cressy was bought from them

– among a number of boats - by

millers A & A Peate of Maesbury

on the Montgomery Canal, who

continued using narrowboats

until February 1934. Before this,

however, Cressy was bought by John

Beech, the boatbuilder who owned

the Frankton dock, as a change-

boat. Beech then converted her -

fitting a steam engine – and sold her

to Tom Rolt’s uncle, Kyrle Willens.

In 1939 she passed into Rolt’s

hands and his well-documented

life aboard her led to the writing

of Narrow Boat, the book that was

largely responsible for creating the

post-World War II revival of interest in

the waterways and the founding of

The Inland Waterways Association.

The plaque – mounted on

the towpath side tail wing wall

of Lock 3 – was unveiled by

Tom Rolt’s widow Sonia, an IWA

vice president and one of the

‘Idle Women’ of wartime service

fame on the canals. Sonia gave

an interesting speech and later

wanted to get aboard Saturn and

into what were to her the familiar

surroundings of a back cabin.

With the assistance of Sue

and Mike Lambourne, who now

own the original boatyard site,

it was possible to photograph

Saturn in exactly the same location

as Cressy was pictured when she

came off the dock 80 years ago.

The occasion was further enhanced

by the presence of Crick and Hope

Grundy. The Grundy family were

pioneer IWA campaigners and kept

their original cruiser at Frankton.

Crick and his late brother Martin

were among the very last people

to navigate Frankton Locks before

they became derelict, whilst Hope

worked on Saturn during her hotel

boat days.

SaTurn aT FrankTon

Bradford-on-avon Lock.

Wat

erw

ay Im

ages

News.indd 10 21/4/09 11:44:04 am

Page 12: Waterways Summer Issue

10 / IWA WATERWAYS / summer 2009 IWA WATERWAYS / summer 2009 / 11

HERE AND THERE…

PlEASE SEND ANY NEWS AND vIEWS oN INlAND WATERWAYS fREIgHT To DaviD Hilling c/o iWa HeaD office

INlAND WATERWAYS fREIgHT

ECONOMIC CRISIS 

On many European waterways (Rhine, Mosel, Neckar, Elbe, Danube) 

2008 was a good year but our suggestion (Waterways, Spring 2008) 

that 2009 could  be a ‘significant’ year might well be true but for the 

wrong reasons!

 In European inland shipping circles, including Britain, there is growing 

concern regarding the likely adverse effect of the global economic crisis 

on the demand for  waterborne freight. On some waterways, the Rhine 

in particular,  there is considerable containerised general cargo traffic but 

this seems likely to decline. Indicative of a wider trend was a reported 

16% fall in Felixstowe’s  January 2009 year-by-year traffic.

On many waterways, and certainly those of the UK, a high 

proportion of traffic  comprises construction materials of various types 

– aggregates, cement, steel sections, timber – and the building industry 

has already showed marked decline. It seems quite possible that 2009 

will not show the increases in traffic that might otherwise have been 

expected and we can but hope that Olympic site traffic really does 

expand rapidly to make up for a drop elsewhere.

 

LOSS OF COASTAL BULK SHIPPINGIWa’s FreIght grOup has always adopted the view that Britain’s 

domestic waterborne freight should be considered as an integrated whole, 

embracing inland, coastal and short-sea shipping. Indeed, the distinction 

is often far from clear – the Thames barge or the Severn trow often 

appeared in all three roles as did the operators of smaller river-sea ships.

 The advent of the river-sea ship with its full sea-going capability but 

dimensions facilitating penetration of inland waterways was purposeful 

recognition of the logic of combining the functional roles. The number 

of river-sea ships increased dramatically and they are to be seen in ports 

large and small, coastal and inland. British firms became involved in the 

building of such ships (Cockrane, Selby; Cook, Wivenhoe; Yorkshire 

Drydock, Hull) and operating them. At a peak, over 20 companies  

operated short-sea ships including names such as Crescent, Carisbrook, 

Everard, Lapthorn, Rix, Union Transport, Whitaker and Willie. The number 

of builders and operators declined greatly in recent years.

 Lapthorn’s ‘Hoo’ fleet of low-profile ships, mainly at the smaller 

end of the scale at 1,200 to 1,400  deadweight, could be seen at 

Thames wharves, in London’s docks, at Trent wharves and ports such as 

Littlehampton, Fowey and Mistley to name but a few. Until December 

2008 the former Lapthorn ships, most of them shorn of their distinctive 

‘Hoo’ prefix names, had been acquired and were being operated by 

Coastal Bulk Shipping and it is with great sadness that this company has 

now ceased trading, citing problems deriving from reduced demand, 

weakness of sterling and inherited pension fund liabilities.

On the Manchester Ship Canal 

75 tonnes of paving slabs were 

taken by barge from Liverpool 

to Salford Quays for surfacing 

on the Media City UK site – a 

development to house creative 

and digital activities including 

the BBC. This, like the King’s 

Place, London, development 

demonstrates the logic of using 

water transport for construction 

sites alongside waterways. It is 

reported that 400 containers will 

be moved on the MSC this year.

 On the Thames the Green 

Barge Company’s Green Hannah 

has been used to transport a 

250-tonne transformer from 

Tilbury to Bow Creek close to 

the destination site at a West 

Ham electricity substation. The 

Green Hannah returned with 

the transformer that had been 

replaced. Again the use of barges 

for abnormal indivisible loads 

makes sense where the origins 

and destinations are adjacent to 

waterways. 

CARRY oN loBBYINgIt Is gOOd to learn that both 

the Commercial Boat Operators 

Association (CBOA) and Freight 

by Water (ex Sea & Water) have 

been busy lobbying. In the case 

of CBOA, jointly with British 

Waterways, two senior officials 

of the DfT’s Freight and Logistics 

Division were taken to inspect 

aspects of water freight activity in 

the Yorkshire region. At Whitwood, 

Lafarge staff were on hand for the 

arrival and start of unloading of 

450 tonnes of aggregates from the 

Trent, whilst at Castleford there 

was the opportunity to discuss 

lock instability problems. The 

visitors were then taken to Leeds 

to see the site at which trial barge 

shipments of steel sections from a 

Trent wharf were unloaded for ASD 

Metal Services which is keen to 

continue using water transport but 

with problems of wharf provision 

at Stourton. On a second day there 

were visits to oil terminals at Fleet 

and Rotherham

 Also during March, Francis 

Power, the executive director 

of Freight by Water, and acting 

chairman Mike Garratt had a 

“highly constructive” meeting 

with the shipping minister, 

Mr Jim Fitzpatrick MP. Issues 

raised included the lack of 

acknowledgement of the potential 

of waterborne freight across the 

DfT and the lack of resources 

currently available for BW’s 

maintenance of its commercial 

waterways. The minister agreed 

to encourage greater emphasis 

on use of water transport by the 

sustainable freight team and in 

response to the low take-up of 

grants for water freight asked FbW 

to submit members ideas for a 

more user-friendly mechanism for 

‘buying lorry miles off the road’.

 After 15 months as chairman 

of FbW, Mike Garratt has stood 

down and his place has been taken 

by Tim Lowry. FbW’s new offices 

are at 35/37 Grosvenor Gardens, 

London SW1W OBS, telephone 020 

7953 4042.

a transformer being loaded onto the Green Hannah at tilbury.

News.indd 11 21/4/09 11:44:16 am

Page 13: Waterways Summer Issue

IWA FREIGHTnEWs

12 / IWA WATERWAYs / summer 2009 IWA WATERWAYs / summer 2009 / 11

Problems are still being

experienced at Salters Lode Lock

on the Middle Level Navigations in

Norfolk. Although a new guillotine

gate was lifted into position in

mid November last year, the lock

has remained closed since the

commencement of the stoppage.

Salters Lode is situated at the

junction of Well Creek and the tidal

Great Ouse and is unusual in that

boats lock up and down through

this gate into and out of the tidal

river, with only a limited time

allowance either side of high tide. Its

purpose is to control navigation to

the tidal estuary, as well as providing

flood protection to properties in the

local area.

A reopening of the lock had been

scheduled to take place shortly before

Christmas. However, once the new

gate was in place, technical problems

were discovered within the hydraulic

operating mechanism. Contractors for

the Middle Level Commissioners have

been trying to rectify the problems

since January.

The environmenT agency

used a giant crane to dredge the

River Nene as part of a six-week

clean-up operation to improve the

town’s flood defences. The silt

taken out of the Nene near the

Carlsberg factory in Northampton

was used to improve flood

defences in other areas of the

town. Instead of removing the

silt and sending it to landfill,

workers put it onto barges and

then transported it downriver

before using it to shore up the

raised earth flood defences near

Bedford Road.

Problems at salters lode

MonTGoMERY GuIdEThe Friends of the Montgomery Canal have compiled a guide giving advice on access for the disabled along the 35-mile length of the canal. The guide was produced as a result of an enquiry from a wheelchair user wanting to visit this part of mid Wales on holiday, and who wanted to see something of the canal whilst in the area.

Designed with the assistance of British Waterwayss, the guide includes appropriate access information, along with suitable facilities located nearby. It may be downloaded from the ‘Friends’ section of the Montgomery Canal website at www.montgomerycanal.co.uk or is available, upon receipt of a large stamped address envelope, from Freda Davies, Villas Cottage, Hope, Welshpool SY21 8HF (Tel: 01938 552817).

NeNe dredgiNg

a new scheme has been

announced to encourage young

volunteers onto the canals of

the North West. Set up by British

Waterways and The Waterways

Trust, the project aims to get young

people to help out in four main areas:

conservation; recording the natural

environment; historic interpretation;

and canal customer services.

The work will cover the

Shropshire Union, Macclesfield,

Peak Forest, Rochdale, Ashton and

Leeds & Liverpool canals. Young

volunteers will also be sought to

assist at the National Waterways

Museum at Ellesmere Port.

As well as the practical benefits

resulting from the work, it is hoped

that the scheme will change young

people’s attitudes to waterways – as

well as changing the attitude of

waterway users to young people.

The costs of setting up the

project, thought to be in the region

of £300,000, will be met by a grant

from ’V’, the youth volunteering

organisation, and the Bank of

America. The initial grant is for a

two year period, but it is confidently

predicted that the initiative will

continue beyond that time.

YounG VolunTEERs souGHT In THE noRTH WEsT

BEAsTIE spoTTInG on THE WATERWAYs briTish waTerways launched its sixth annual wildlife survey on 3rd

April. Visitors to the waterways, whether aboard a boat or land based,

are invited to go ‘beastie spotting’ and record sightings of anything seen,

whether birds, mammals, fish, insects – indeed anything that moves!

To help people get started, BW has produced a guide to what wildlife

can be found along the nation’s canals and rivers, including information

on bumblebees and tips on how to support them. BW ecologists, and the

Bumblebee Conservation Trust, will use the records of sightings to build

up a comprehensive picture of those species that are doing well and ones

which need support.

Running alongside the survey is a photography and drawing competition

for adults and children, with prizes up to £100 on offer. To find out more and

to download a wildlife survey guide, visit www.waterscape.com/wildlifesurvey.

John

Sul

ly

lowering a new gate into place at salters lode in november last year.

burscough on the leeds & liverpool canal – one of the

waterways set to benefit from young volunteers.

News.indd 12 21/4/09 11:44:35 am

Page 14: Waterways Summer Issue

IWA WATERWAYS / Summer 2009 / 13

Keeping things simple.We don’t just supply Adverc Battery Management systems and alternator controllers. Our twenty-six years experience has gone into making life on-board easier. So let us show you how to get the best from a twin alternator set-up, for example.

Just as important, why not integrate this into a ONEbox concept, having AC & DC consumer functions embracing a host of components: switches, breakers, fuses, solenoids, buss bars, split-charging, low voltage protection, an inverter and mains charger facility, even a galvanic isolator and DCM monitor. We make a range of standard systems but are just as happy to supply a bespoke version. Simply hook it up – job done! Reduce fi tting out time by up to 75%, saving you money. We’ve done the hard work, saving hours spent in fi tting out your boat and increasing reliability of on-board power systems.Other components in the system can feature:

Adverc Battery Management (with a 5 year warranty).

After twenty-six years and approaching 20,000 unit sales, Adverc is still the simplest and most reliable alternator controller available.

No gimmicks or fancy claims, just fast, effective, complete & safe battery charging. A must for twin alternator confi gurations. 5 year warranty and, of course, British made.

DCM MkIII Monitor.

The most underated product in the Adverc portfolio. Simplicity itself, a unit which can check and diagnose faults in your charging system. It can save you fuel by informing you when to start and stop charging – no need for ampere-hours.

Galvanic Isolator.Question: Do you need one?

Answer: Only if you (and perhaps your neighbour) rely on shore-power to provide a mains supply on the boat and you wish to preserve your boat and perhaps your health! The easy way to tackle galvanic corrosion. 50 Amp rated. EC/73/23/EEC, 89/336/EEC & ISO13297 compliant.

OSCA-PA highly effi cient DC-DC Charger. Suitable for charging auxiliary batteries from a donor battery when no mains power is available and the engine is running.

OSCA-P units are suitable for many applications, including bowthrusters, etc and reduce the need for large diameter heavy cables.

Further details on all of the above are available on our website www.adverc.co.uk. or give us a call for a hard copy

Remember we also supply Alternators, Mains Chargers, Cables, Solar Panels, Batteries, Inverters, Combis, Low Voltage Protection and much more. Almost all of our equipment is British made, with an unrivalled twenty-six years of technical know-how and customer support always freely available. Adverc - worth that bit extra!

ADVERC BM Ltd., 245 Trysull Road, Merry Hill, Wolverhampton, West Midlands WV3 7LG

Tel: 01902 380494 Fax: 01902 380435e-mail: [email protected] www.adverc.co.uk

p013.indd 1p013.indd 1 21/4/09 09:59:0521/4/09 09:59:05

Page 15: Waterways Summer Issue

Get dirty with WRG

WATERWAY RECOVERY GROUP

14 / IWA WATERWAYS / summer 2009 IWA WATERWAYS / summer 2009 / 15

Robi

n Sm

ithet

t

Dirty WRG.indd 14 21/4/09 11:45:15 am

Page 16: Waterways Summer Issue

Looking back on 2008, Waterway Recovery Group had another very successful year with 1,200 volunteers contributing over 5,000 working days towards

the restoration of the derelict canals of England and Wales. WRG ran over 20 week-long canal camps throughout the year, along with over 50 weekend digs being run by WRG’s regional groups around the country, from Sussex to Lancashire, Essex to Devon. An equally varied and exciting programme of camps has been scheduled for 2009.

WRG’s canal camps are a unique volunteering opportunity and volunteers can learn new skills to improve and widen their future employment opportunities, such as bricklaying, the use of lime mortar and using specialist excavation and construction machinery, as well as taking the chance to be part of a team that really make a huge difference to the waterways. The price is £49 per person per week including food and accommodation.

Canal: Montgomery CanalLocation: ShropshireDates: 20th- 27th June; 27th June- 4th July Work: Last year WRG helped transplant and restore the aquatic vegetation of a new section of the canal. In 2009 work continues working on the next section of channel restoration and providing soft bank protection. Work may involve laying clay matting liner, in preparation for rewatering the next section of canal, or undertaking stone wall construction at Crickheath Wharf, the terminus for the next length of canal restoration.

Canal: Basingstoke CanalLocation: SurreyDates: 27th June- 4th July; 4th – 11th July Work: The Basingstoke Canal was constructed to continue the development of the agricultural trade of central Hampshire and Surrey. Construction of the canal took nearly six years, beginning in 1778 and included the building of 29 locks, as well as a 1,230-yard long tunnel through Greywell Hill. The canal eventually became derelict after many years of neglect but in the early 1970s restoration work began and now the canal is navigable again. Improvement work still continues on the canal and this year WRG will be involved in a multitude of tasks including the provision of a pipeline to provide the canals with a reliable water supply.

Canal: Wilts & Berks CanalLocation: WiltshireDates: 4th-11th July (Pewsham Lock); 25th July – 1st August (Seven Locks)Work: The Wilts & Berks is one of the most ambitious canal restoration projects in Britain. In July WRG will be returning to Seven Locks, to continue the restoration of the brick-built locks that carried the canal up a hillside west of Wootton Bassett. The summer also sees WRG

go to a brand new site at Pewsham Lock, with a wide variety of exciting work planned including a full lock clearance and rebuilding of a culvert under the canal!

Canal: Cotswold CanalsLocation: GloucestershireDates: 11th- 18th July (Eisey Lock); 18th-25th July (Eisey Lock) 25th July – 1st August (Gough’s Orchard); 1st - 8th August (Gough’s Orchard); 8th- 15th August (Gough’s Orchard); 15th – 22nd August (Gough’s Orchard)Work: In 2009, WRG will continue the work started in 2008 with a major effort to restore Gough’s Orchard Lock. The work will utilise a wide variety of restoration skills, but will focus on rebuilding the lock walls, undertaking repairs to the lock bridge, towpath and landing stages and replacing the by-wash. After two years establishing the site at Eisey Lock, this year will see a complete rebuild of the main lock chamber walls and top cill - a fantastic chance to learn or improve your brick-laying skills!!

Canal: Monmouthshire CanalLocation: South WalesDates: 11th-18th July; 18th- 25th July; 24th – 31st OctoberWork: At Rogerstone, just outside Newport, the Crumlin Branch of the canal plunges down the hillside in the spectacular Fourteen Locks Flight. In 2010 the Inland Waterways Association’s Trailboat Festival is going to be held on the Crumlin Branch of the canal so this years’ camps will play an important part in making the festival a success. Work will include the raising of a footbridge and extending the slipway to be used during the festival. There will also be stonework and volunteers will have the opportunity to be trained in the use of lime mortar.

Canal: Ipswich & Stowmarket NavigationLocation: SuffolkDates: 11th- 18th July; 8th-15th AugustWork: The River Gipping was made navigable by the construction of the Ipswich & Stowmarket Navigation in 1790-3, but in the early 1930s the locks fell into dereliction. Two locks have now been restored and in 2008 WRG started work on Baylham Lock demolishing, rebuilding and strengthening the lock’s structure. This year will see our volunteers moving into the lock chamber for major rebuild of the main chamber walls.

Canal: Herefordshire & Gloucestershire CanalLocation: HerefordshireDates: 25th July – 1st August; 1st -8th AugustWork: An ideal site for a slipway has been identified at Aylestone Park on the outskirts of Hereford which will provide access for boats so that the local community can enjoy navigating already restored parts of the canal. The aim is to build the slipway within just two weeks so the work will consist of excavating the location of the slipway, concreting the different sections of ramp and completing the side walls.

Canal: Chesterfield CanalLocation: DerbyshireDates: 15th- 22nd AugustWork: Restoration on this canal is now much advanced with much of it open to navigation. WRG’s job for 2009 is to construct a wash wall to protect the new bank at Renishaw Narrows. Work will include foundations in steel mesh and concrete and then blockwork to build the wall.

Canal: Grand Western Canal Location: DevonDates: 24th- 31st OctoberWork: The work for the October camp is going to be at Nynhead Lift, a historic vertical lift constructed by James Green from 1831-8. The lift was designed to raise small rectangular wooden tub boats 24ft from the canal to the aqueduct above. There will be plenty of scrub bashing, fencing and the possibility of erecting a timber barricade with access door across the carriageway under arch. There may also be the chance to start work at Lowdwells Lock.

In addition to the above, volunteers are needed help WRG make vital preparations for the major waterway festival of the year. From 24th August to 3rd September WRG will be involved in setting up IWA’s National Festival & Boat Show beside the River Soar at Redhill, Nottinghamshire. Volunteers will assist with the build up, erecting marquees, display stands and fencing, and when the event opens will help to entertain and educate the public, provide site services and much more. This 10-day camp costs £70 and includes food and accommodation.

Furthermore, well over 50 weekend digs will be held throughout England and Wales. Anyone is welcome to volunteer for a Canal Camp or weekend dig; the only restriction is that they must be over 18 and under 70 years of age. No previous skills or experience are required. An information pack detailing opportunities to join in waterway restoration work all over the country, including the 2009 Canal Camps brochure, is available free of charge from Waterway Recovery Group, Island House, Moor Road, Chesham, HP5 1WA Tel: 01494 783 453, e-mail: [email protected]. Alternatively visit www.wrg.org.uk for further information and a look back at what WRG has already achieved.

14 / IWA WATERWAYS / summer 2009 IWA WATERWAYS / summer 2009 / 15

MAIN PICTURE: The delightful Herefordshire & Gloucestershire Canal will host two camps this year. This is Over Basin, restored by WRG a few years ago, where a trip boat operates in the summer months.

TOP INSET: Having fun during last year’s Droitwich camp.

BOTTOM INSET: WRG in action on the Chelmer & Blackwater Navigation.

Robi

n Sm

ithet

t

Dirty WRG.indd 15 21/4/09 11:45:34 am

Page 17: Waterways Summer Issue

16 / IWA WATERWAYS / Summer 2009

Widebeam, Trad, Tug or Cruiser style

The easy fit ‘S’ window system

Simple, Stylish, Slimline, Safe, Secure

Email: [email protected]

Features:■ Unique patented locking catch and support■ Quick easy fitting no screw holes■ Easy clamp in operation by one person■ Quick exchange of glass for security blanks■ Individually decorated panels to fit livery■ Slim profile - no protusions for easy window dressing

Safety shutters easily fitted from inside the boatSee our new secondary glazing system now available

Worcester Marine Windows Ltd Unit 10, Three Springs Trading Estate, Vincent Road, Worcester WR5 1BW

01905 358800

p016.indd 1p016.indd 1 21/4/09 10:03:2221/4/09 10:03:22

Page 18: Waterways Summer Issue

IWA WATERWAYS / Summer 2009 / 17

p017.indd 1p017.indd 1 21/4/09 10:05:1821/4/09 10:05:18

Page 19: Waterways Summer Issue

18 / IWA WATERWAYS / summer 2009 IWA WATERWAYS / summer 2009 / 19

RESTORATION

Liverpool Linked at LastThe long awaiTed official opening of the Liverpool Link was performed by British Waterways chairman Tony Hales on 25th March. A party of VIPs travelled along the link from the new lock in Princes Dock aboard the Haskayne-based community boat Pride of Sefton. The vessel travelled to Pier Head where its arrival was greeted by cheering crowds.

The 1.4 mile, £20m Liverpool Link enables boats to cruise from the western terminus of the Leeds & Liverpool Canal, via the Stanley Dock Branch, right into the heart of the city, past the ‘Three Graces’ buildings and into Albert Dock, before mooring in adjacent Salthouse Dock.

Cotswold Progress

a new canal company has been set up to enable the restoration of the Cotswold Canals between Stonehouse and Brimscombe Port – classified as Phase 1 when British Waterways was engaged in the project. The Stroud Valleys Canal Company has acquired the route of the canal, plus any other land deemed necessary for the completion of restoration. Negotiations are well advanced, and include the route of the old Stroudwater Navigation from Saul to Wallbridge, the Thames & Severn Canal between Wallbridge and Brimscombe, and land at Brimscombe Port.

The new company, which came officially into being on 26th March, is limited by guarantee and will hold charitable status. Interests are held by Stroud District Council as lead partner, the Cotswold Canals Trust and each of the landowners who vested their property in the company.

Meanwhile, teams of volunteers who have spent almost a year restoring Brimscombe Port walls celebrated their achievement at a special event marking completion of the restoration project on 22nd January. The project to restore Brimscombe Port walls won an £80,000 grant from ITV’s People’s Millions Lottery programme in November 2007, after thousands of local people voted for the project.

Local residents, people who use the towpath and children from Brimscombe Primary School have all lent a hand in the restoration process. A large number of volunteers took part in the masonry skills training and helped repair the two-hundred year-old stone walls. Volunteers included groups from the Cotswold Canals Trust, Nelson Trust and Leyhill Open Prison.

In addition to restoring the walls, an interpretation display has also been provided to tell the story of the Port. The walls are almost the only visible remains of Brimscombe Port, so securing their future is considered to be an important step for protecting the heritage of the area. Brimscombe was a major transhipment port on the Thames & Severn Canal and the walls were covered in dense vegetation with several trees growing out of the top. This was a last chance to save the walls which had not been touched for over 70 years after the canal closed in 1933.

1] The official opening of the Liverpool Link.

2] The press boat departing from the new Princes Lock.

3] Emerging from the Link’s second tunnel under Pier Head Gardens.

4] Entering the Link’s third and final tunnel under the new Museum of Liverpool.1

2

3 4

Mar

tin C

lark

Mar

tin C

lark

Mar

tin C

lark

Mar

tin C

lark

RestorationUpdate.indd 18 21/4/09 11:46:18 am

Page 20: Waterways Summer Issue

18 / IWA WATERWAYS / summer 2009 IWA WATERWAYS / summer 2009 / 19

RESTORATION UPDATE

Wilts & Berks setBack  

A proposAl to create a restored section of the Wilts & Berks Canal through Cricklade and a green corridor linking the town with Swindon has been shelved because of a lack of available public funds. Promoters of the Cricklade Country Way scheme were forced to revise their plans after the project failed in a bid for a £25 million Big Lottery Fund award in 2007. Revised plans have now been submitted to Wiltshire Council for approval from planners.

The project’s ultimate goal is still to reopen a section of the Wilts & Berks Canal, revive a bygone steam railway and link up a national cycle trail as well as creating a 50-hectare country park between the two towns. However, the revised plans now indicate that the canal will terminate a quarter of a mile outside of Cricklade at the same point as the railway line. In addition to problems with funding, English Heritage also objected to the scheme because of the archaeological threat to the town’s ancient scheduled monument within its historic Saxon walls.

Boston lock PartyBoston lock, the first part of a £100m project to create the Fens Waterway Link, was officially opened by TV presenter Michaela Strachan on 20th March. VIPs were carried in two boats – a river patrol craft and a Spalding water taxi – and were led out of the lock by a Lincolnshire Fire & Rescue Service vessel carrying a television crew. A large and enthusiastic crowd lined the bank to witness the three boats sailing through the lock to the Haven before returning to the new moorings above the lock.

The £8.5m project, funded by Lincolnshire County Council, the European Regional Development Fund and the East Midlands Development Agency, has seen the installation of steel gates at the new Black Sluice Lock, permitting navigation onto the Forty Foot drain for the first time in 40 years. The gates will also act as a flood defence.

Once completed, the Fens Waterways Link will be the largest waterway enhancement project in Europe and will open up 149 miles of Fenland cruising waters, linking the cathedral cities of Lincoln, Peterborough and Ely.

Following A £100,000 legacy to IWA, Woolsthorpe Top Lock on the Grantham Canal has been saved.

When a large crack developed in the offside wall of the lock chamber, British Waterways’ solution was to install Acrow-type props to stabilise the brickwork to prevent it collapsing. However, the long-term cost of hire for the props proved prohibitive, and BW looked at alternative solutions. 

Meetings of BW with the Grantham Canal Society and the Grantham Canal Partnership early last year resulted in the ultimatum that if proposals to rebuild the lock, or take over the cost of props, were not forthcoming then the lock would be filled in at the end of March 2008. Volunteers were concerned that, once infilled, the lock would be even more expensive to repair when funding became available.

Fortunately, IWA received news that it had been left £100,000 from the estate of the late Fredrick Woodman. 

IWA East Midlands region chairman John Baylis then put a rescue package forward, using the legacy as part funding. However, BW was concerned that, unless IWA could prove that it had sufficient money to complete a full restoration, then the lock would be demolished.

IWA and the Grantham Canal Society immediately started a campaign to obtain further guarantees of funding to complete the rebuilding, and started to get quotations from building companies capable of completing the work. This ultimately resulted in the appointment of Morrison Construction, and work began just before Christmas last year.

At the end of March, all major civil engineering works at the lock were complete, and contractors had vacated the site. Land surrounding the lock will now be left to stabilise before landscaping work is carried out; an appropriate commemorative event to Frederick Woodman will then be staged.

WoolsThorPE lock rEsTorED – ThANkS TO IWA lEgAcY

John

Sul

ly

John

Bay

lis

RestorationUpdate.indd 19 21/4/09 11:46:38 am

Page 21: Waterways Summer Issue

20 / IWA WATERWAYS / summer 2009 IWA WATERWAYS / summer 2009 / 17

RESTORATION

London’s Lost RiveRs Some of London’S “lost rivers”, which for centuries have been used as open drains, covered over in concrete, hidden behind high walls and even built over, are to benefit from ambitious plans to uncover them.

Under the plan, 92 projects will be announced covering 14 different waterways in London, at least seven of which have been buried by history, including the Effra, which rises in Crystal Palace and flows north to the Thames at Vauxhall, the Ravensbourne in south-east London, the Wandle in Croydon, and two tributaries of the Lee near the 2012 Olympic site in east London.

The Environment Agency, which will lead the work, hopes to uncover at least 15km (nine miles) of river in the next six years. The full list adds up to double that length, while other schemes are still being proposed. The Environment Agency estimates that 70% of London’s 600km river network is concreted, covered over, interrupted by weirs or otherwise modified. Some can only be glimpsed in odd places, such as a tunnel through Sloane Square tube station carrying the Westbourne, or guessed at from local road names such as Fleet Street or Spring Path.

During the 20th century huge improvements were made to water quality, but the lack of natural features to offer cover for wildlife means the rivers are often still ‘ecologically poor’, according to the Environment Agency. Restoration of London’s rivers began in the mid-1980s; since then 15km have been completed. Full restoration of some stretches has included the recovery of the once-lost Quaggy River through Sutcliffe Park in south-east London. The park was also restored as a flood plain to protect local homes and businesses in the event of heavy rains. Other projects are defined as “rehabilitation”, usually adding natural features such as gravels or reed beds into the existing modified channel.

The next phase will speed up the rate of restoration, and target tougher schemes in built-up and often socially deprived areas. Many projects will also incorporate improved flood defences to cope with climate change, habitat schemes and urban regeneration along with features to encourage local people to use parks more, including dipping ponds and education areas. The full cost can be as much as £500,000 a kilometre, though they are often lower, and are to be paid for by a funding cocktail comprising the EA, environmental charities and private developers. EA believes recent restorations have attracted more visitors to riverbanks and nearby parks, as well as leading to a reduction in anti-social behaviour, the return of fish such as chub and dace, and birdlife, such as kingfishers. More information is available at www.therrc.co.uk/lrap.php.

LeiceSterShire county counciL project leaders now believe that it is likely that funding problems which have delayed work on the restoration of a waterway may be overcome. The Ashby Canal restoration is approaching a critical juncture, with a decision on a bid for funding expected within the next few weeks.

Meanwhile, work has begun to extend the current head of navigation on the Ashby Canal at Snarestone by 100 yards. Although a short extension, the project is regarded as a significant step towards restoring the canal back to Moira, where a 11/2-mile isolated section has already been reopened. This contains the only lock on the canal, required due to mining

subsidence in the area.The start of the work was

officially launched on 26th February by Leicestershire County Council chairman Tony Kershaw and Ashby Canal Association chairman Audrey Boston. The project is to be managed by British Waterways, with the work likely to be carried out by BW’s newly appointed omnibus contractors May Gurney.

In a separate development, plans have been agreed for a wildlife conservation area by the River Mease at Measham. The county council’s development control and regulatory board will shortly meet on to consider plans for a water storage lake, also to be used for recreation, to the east of Measham.

ExtEnding thE Ashby

the maSter pLan for Daventry’s new marina and canalside development is set to go out to public consultation. Daventry District Council’s strategy group is thought likely to approve draft plans for the Site Three development on the Eastern Way playing fields, after hearing a presentation from the companies that prepared it. The design

includes layouts for a canal and marina scheme that would see a waterway created from Eastern Way going out of the town, around Daventry Country Park and out to the existing Grand Union Canal.

The report going before the committee states the canal’s design is still being worked on, but that investigations along the route are complete, and

£75,000 worth of funding for designing a boat lift has been secured. The plans would see a marina built on land next to Daventry Country Park by the new Eastern Way roundabout, extending into the new waterside development. Councillors have said the development, complete with water; will be built even if the canal isn’t. The buildings along

the waterfront and around the marinas are expected to be a mix of homes, along with commercial office space and leisure facilities, potentially including a hotel and cinema. If approved by the committee, the draft master plan will be opened to public comments before a formal outline planning application is made, probably towards the end of 2009.

grAnd Union CAnAl - DAvENTRY ARm

Looking towards the current head of navigation on the Ashby Canal at Snarestone.

RestorationUpdate.indd 20 21/4/09 11:46:51 am

Page 22: Waterways Summer Issue

IWA WATERWAYS / Summer 2009 / 21

Narrowboat holidays on the Monmouthshire and Brecon Canal. Gentle cruising through the

spectacular Brecon Beacons National Park. Modern fleet of 2/6 berth narrowboats,

competitvely priced. Pets welcome,

short breaks available.

country craft

Tel: 01874 730850Web: www.countrycraftnarrowboats.co.uk

p021.indd 1p021.indd 1 21/4/09 11:49:5321/4/09 11:49:53

Page 23: Waterways Summer Issue

IWA WATERWAYS / Summer 2009 / 23

Saul Junction Marina

Unique and attractive locationAt the junction of the

Gloucester & Sharpness Canal and The Stroudwater Canal

Wide variety of cruising availableHigh quality facilities block.

Minutes from M5 (J.13)Competitive rates held for 2009

To reserve a mooring or make enquiries call the marina

Tel – 01452 740043 Email – [email protected]

www.saulmarina.co.uk

We offer lock free cruising on our well appointed2-7 berth narrowboats.Boatyard services include:

Diesel • Gas • Solid Fuel • Pump-out • Moorings

For a free colour brochureTel/fax: 01772 769183

Website: www.arlen-hireboats.co.ukor call in and see us at Ashton Basin, Tulketh Brow, Preston, PR2 2SD

p023.indd 1p023.indd 1 21/4/09 14:16:1321/4/09 14:16:13

Page 24: Waterways Summer Issue

Who needs an engine?

CANOEING ON THE WATERWAYS

The sport and recreation of canoeing has played an important – and often overlooked – role in the story of the

inland waterway network. For many youngsters, especially those growing up in deprived urban areas, the local canoe club has given them a positive introduction to the world of canals, which are thus perceived as not just somewhere to hang out, get into mischief or dump rubbish, but a place to have fun, increase fitness and realise potential. The first tentative visit to the neighbourhood club is, in some cases, the beginning of a lifelong interest in waterways.

There is certainly no shortage of clubs in the Midlands, those on the Wyrley & Essington Canal, on the Staffs & Worcs Canal on the outskirts of Wolverhampton

and at Coventry Basin being three thriving examples. London has scores of clubs – at Richmond, Tower Hamlets, Battersea, Chiswick etc, plus the well known Regent’s Canoe Club at City Road Basin on the Regent’s Canal. Liverpool has, among others, its Liverpool Canoe Club on the Leeds & Liverpool Canal at Lydiate, whilst Manchester, Leeds and Sheffield all have clubs which welcome absolute beginners.

The sport’s governing body is the British Canoe Union, which has 60,000 individual and club based members throughout the UK. BCU estimates that some two million people take to the water in a canoe every year: on canals, in the sea, on upland rivers offering spectacular white water and on lowland rivers and lakes. Membership of BCU has risen by almost 7% over the last five years and canoeing is considered to be the fastest growing leisure/sporting activity in the country.

24 / IWA WATERWAYS / summer 2009 IWA WATERWAYS / summer 2009 / 25

Mercia canoe clubThe Mercia Canoe Club is perhaps a typical example of an inner city canoe club. It is in fact a division of the Coventry Canal Society and is based in one of the historic warehouses at Coventry Basin, at the terminus of the canal. All ages and abilities are welcomed, from complete beginners and those just wanting to have some fun, right through to those seeking specialist coaching. MCC coaches all possess nationally recognised coaching, water safety and first aid qualifications.

The club has a full range of paddles, canoes and kayaks available and can provide all necessary safety equipment, such as buoyancy aids and helmets. There is a choice between open, stable kayaks for anyone to use, shorter more dynamic boats and flat water racing and touring kayaks.

Saturday sessions are held at the Canal Basin, Unit 1 Canal Warehouse, Leicester Row, Coventry, starting at 2pm. It is possibl to pay on a per session basis, before deciding to take out full membership.

For further details contact Mercia Canoe Club chairman Nigel Wooltorton, telephone 07833 705806 or visit www.merciacanoeclub.org.uk.

Canoeing in the rain on the River Wreake in Leicestershire.

Canoes.indd 24 21/4/09 11:47:46 am

Page 25: Waterways Summer Issue

24 / IWA WATERWAYS / summer 2009 IWA WATERWAYS / summer 2009 / 25

The RiveRs Access cAmpAignThe British Canoe Union is actively engaged in the Rivers Access Campaign, not only on behalf of canoeists but all members of the public. This campaign is being supported by IWA.

The legal situation in England and Wales is different to most other countries in the world, where canoeists are generally able to paddle along large and small non-tidal rivers without seeking permission, as the beds of these rivers are not privately owned. Under these more open and fairer regimes, there is little, if any, conflict between land ownership, angling and navigation interests, each having rights to use the water.

BCU makes the following points: only 2% of rivers in England and Wales have public access; the public has no access to 65,000 kilometres of rivers in England and Wales; nearly all the most beautiful inland rivers are inaccessible to the public; whoever owns the land along the river (the riparian owner) also owns the property rights to the river bed; if a river doesn’t have a public right of navigation and you don’t have consent from the riparian owner, you are committing trespass by paddling or even wading in it; canoeing is an increasingly popular activity and is an affordable means of getting out on the water for everyone, including young people and the retired; providing greater access to rivers will result in a healthier and fitter nation.

Following the passing of the Countryside Rights of Way Act, giving the public wider access to the countryside and the ’right to roam’, it is considered iniquitous that swimmers and canoeists are still denied access to the majority of the nation’s rivers. Or, as Outdoor Enthusiast Magazine commented in an editorial, “Whose rivers are they anyway?”, before going on to say, “The frustration lies in the fact that at a time when obesity levels have risen to an unprecedented level and the government is encouraging more active lifestyles, this unique resource remains out of bounds”.

Anyone wishing to learn more about the Rivers Access Campaign should contact BCU, John Dudderidge House, Adbolton Lane, West Bridgford, Notts NG2 5AS, Tel: 0115 982 1100, or visit www.riversaccess.org.

Raising awaRenessCanoeing activity has done much to raise public awareness of canals undergoing restoration, and to promote use of isolated reopened sections on waterways where restoration is continuing elsewhere. A good example is on the Ashby Canal’s northernmost section, at Conkers Basin, Moira and Moira Furnace, the latter being the venue for this year’s IWA National Trailboat Festival over the Spring Bank Holiday. The westernmost section of the Chesterfield Canal is well used by paddlers and nowhere is more popular with canoeists than the restored lengths of the Wey & Arun Canal in West Sussex. Then there are the northern reaches of the Lancaster Canal, the Grantham and the Cromford, and many more; show us an isolated section of waterway, and we’ll show you canoes aplenty.

Meanwhile, the Montgomery Canal restoration project has benefited greatly from the staging of the Montgomery Dinghy Dawdle & Meander, organised annually by the Shropshire Union Canal Society with the assistance of the Friends of the Montgomery Canal, and supported by IWA. The event involves all manner of unpowered craft, including canoes, dinghies and even coracles, travelling along the canal, the craft being carried across lowered road crossings as necessary. Always well attended, the Dinghy Dawdle is a major fundraising and publicity success story for the Montgomery Waterway Restoration Trust. This year’s event is to be staged on 7th June on the southern section of the canal between Garthmyl (Penllywn Lodges) and Freestone Lock, Aberbechan. (For full details visit www.montgomerycanal.co.uk.)

Join a club!Anyone wishing to try their hand at canoeing is strongly recommended to join a local group or club - it’s safer, more fun and enables the basic skills to be mastered quickly. Activity holidays often include canoeing and these provide a pleasant and practical introduction to the sport. In addition, BCU organise a number of regional events aimed at beginners, where it is possible to talk to experienced paddlers – and then have a go out on the water. For a full list of canoeing clubs contact the relevant national organisation: www.canoe-england.org.uk; www.welsh-canoeing.org.uk; www.canoescotland.com; www.cani.org.uk. Alternatively, contact British Canoe Union, 18 Market Place, Bingham, Nottingham NG13 8AP, telephone 0845 370 9500, or visit www.bcu.org.uk.

ABOVE: The Montgomery Dinghy Dawdle is always a popular event.

BELOW: Coping with some ‘white water’ on the River Wye.

Youngsters enjoying the restored northern section of the Ashby Canal at Moira Furnace.

Canoes.indd 25 21/4/09 11:48:08 am

Page 26: Waterways Summer Issue

SUBSCRIPTION OFFERI would like to subscribe to Waterways World

PERSONAL DETAILSTitle Initials Surname Address Postcode Tel Email

GIFT RECIPIENT’S DETAILSTitle Initials Surname Address Postcode Tel

PAYMENT DETAILSDirect Debit ■■ £37.80 every 12 issues (saving 10%) please send me

my first FREE Waterways World Annual 2009

I understand that I can cancel my subscription at any time.Please retain the Direct Debit guarantee at the bottom

THE DIRECT DEBIT GUARANTEE - TO BE RETAINED BY THE PAYEE - This guarantee is offered by all Banks and Building Societies that take part in the Direct Debit scheme. The efficiency and security of the scheme is monitored and protected by your own Bank or Building Society. If the amounts to be paid or the payment dates change Waterways World Ltd will notify you at least 10 days in advance of your account being debited or as otherwise agreed. If an error is made by Waterways World Ltd or your Bank or Building Society you are guaranteed a full and immediate refund from your branch of the amount paid. You can cancel a Direct Debit at any time by writing to your Bank or Building Society. Please also send a copy of the letter to us. Direct Debits can ONLY be paid through a Bank or Building Society.

Direct Debit Instruction

To the Manager

Address

Postcode

Account in the name of

Direct Debit (uk only) Instruction to your bank or building society to pay by direct debit

DateBanks & Building societies may not accept Direct debit Instructions for some types of accounts INSTRUCTIONS TO YOUR BANK OR BUILDING SOCIETY. Please pay Direct Debits from the account detailed in the instruction subject to the safeguards assured by the Direct Debit Guarantee. I understand that this instruction may remain with Waterways World and if so, details will be passed electronically to my Bank or Building Society.

ORIGINATORS ID NUMBER 80 - 96 - 42 Reference (Office Use)

Branch Sort Code Account Number

Please complete and return to Waterways World at the address below.Name and full postal address of Bank/Building Society

Signature

Faxed/photocopied Direct Debit forms cannot be accepted - please send original

Cheque or Credit Card■■ 6 months - £18.90 (save 10%)*■■ 1 year - £37.80 (save 10%)*■■ 2 years - £75.60 (save 10%)*■■ I enclose a UK£ cheque/postal order for

payable to Waterways World ■■ Please debit my Visa/MasterCard/Switch/Delta card

(Charged in the name of WW Magazines)*UK prices only - please call +44(0)1283 742970 for overseas rates

■■■■■■■■ ■■■■■■■■ ■■■■■■■■ ■■■■■■■■

■■■■■■■■ Security Code ■■■■■■Expiry Date / Valid From / Issue(Switch) Signature Date

Media Code: IWA/pg/summer09

Complete this form & return to:Waterways World, Reader Services, 151 Station Street, Burton on Trent, Staffordshire, DE14 1BG.Or call 01283 742970 or fax to 01283 742957■■ Tick if you prefer not to receive occasional mailings of interest to Waterways World readers.

subs.indd 1subs.indd 1 21/4/09 10:55:0121/4/09 10:55:01

Page 27: Waterways Summer Issue

IWA WATERWAYS / Summer 2009 / 27

Available from 30-70ft, Trad, Semi Trad & Cruiser options, primed and blacked, polished/gold windows/port holes throughout, fl oor & ballast, fully battened & spray foamed,

Isuzu engine to suit size of boat, 4 mushroom vents, steel half glazed front doors, gas lockers, water tank, pole & plank rack, centre mooring ring. e.g. 50’ Cruiser £24, 950.00 inc vate.g. 57’ Cruiser £26, 950.00 inc vat57’ Cruiser Sailaway stock available now

Available from 30-70ft, Trad, Semi Trad & Cruiser options. Fully coach painted, 2 colours & a coach line, fully lined out

with a choice of oak, ash or maple, 2 ½ bulk heads, all hard wood trims & cappings, all 12 volt ring main tails, all timber coated in 2 pac lacquer, bathroom, galley & central heating options available. e.g. 50’ Cruiser £34, 053.00 inc vate.g. 57’ Cruiser £36, 000.00 inc vat

57’ standard & reverse layout, Trad, Semi Trad & Cruiser options good quality fi t out with oak, ash or maple options, fi xed double berth, good sized shower

room with shower cubicle, vanity unit & cassette toilet, good sized lounge with TV unit & solid fuel stove, Pull-man/L shaped dinette, galley with cooker, fridge & hob, generous storage spaces, choice of curtains, carpets & upholstery, tiles, work surfaces & paint. 57’ standard layout £57,950.0058’ standard layout £58,950.00

sailaway basic sailaway lined fully fi tted

57’ Reverse Layout

57’ Standard Layout

Come along and see us at the Crick Boat Show

New Boat Sales & Brokerage. Boats wanted, cash waiting

p027.indd 1p027.indd 1 21/4/09 11:00:5521/4/09 11:00:55

Page 28: Waterways Summer Issue

WATERWAYS OF THE FUTURE

Waterways of the Future

We report elsewhere in this issue on the opening of the nation’s newest canal,

the 1.4 mile, £20m plus Liverpool Link which enables boats to cruise from the Leeds & Liverpool Canal right into the heart of this vibrant maritime city. Also just opened is Boston Lock, the first stage towards creating the Fens Waterways Link, whilst the Droitwich Canals will restore the connection between the Worcester & Birmingham Canal and the river Severn by the spring of next year. Add to these exciting developments the significant progress being made on the Ashby, Cotswolds and Chesterfield canals, to name just three examples, and it is tempting to conclude that a Golden Age of canal restoration is upon us. But the reality is, of course, less clear cut as Britain’s deep recession and credit crunch cast a deep shadow over all walks of life, including canal funding and restoration.

Where it all beganThe modern era of waterway restoration began in earnest on the Lower Avon, which had become largely unnavigable during World War II and was purchased by Douglas Barwell in 1949 for just £1,500. He established the Lower Avon Navigation Trust (LANT) to restore and maintain the river up to Evesham, a project successfully completed by 1965. It is fair to say that LANT set a pattern for voluntary restoration schemes that has been followed time and time again over the intervening years. Between 1961-64 the long derelict southern Stratford Canal was restored under the leadership of David Hutchings, who then turned his attention to the Upper Avon between Evesham and Stratford, completing the necessary works by 1974. The Avon Ring, which many of us take for granted today, was once more open to navigation.

Meanwhile, another early success story saw thousands of volunteers working to clear tons of junk and debris from the Ashton and Lower Peak Forest canals, which British

28 / IWA WATERWAYS / summer 2009 IWA WATERWAYS / summer 2009 / 29

What will Britain’s inland waterway map look like in 50 years time? How many more miles of canal will have been added to the network by then? KEITH GOSS peers into his crystal ball to seek some answers

WRG volunteers at work on the Lichfield Canal.

Bob

Will

iam

s

Waterways of the future.indd 28 21/4/09 11:50:13 am

Page 29: Waterways Summer Issue

Waterways of the Future

28 / IWA WATERWAYS / summer 2009 IWA WATERWAYS / summer 2009 / 29

Waterways had wanted to close in the 1960s but were vigorously opposed by IWA and the Peak Forest Canal Society. The volunteers’ sterling efforts over a number of years lead to the reopening of these two canals by 1974 and the Cheshire Ring – one of today’s most popular cruising circuits – was back in business.

Reopening of the entire Kennet & Avon Navigation between Reading and Bristol took place in 1990, thanks to tireless campaigning, fundraising and physical restoration work by IWA and the Kennet & Avon Canal Society over a period of some 35 years. The Huddersfield Canal was officially reopened throughout in 2001, followed by the Rochdale Canal a year later. In both cases, seemingly insurmountable obstacles, both political and physical, had been overcome and a new North Pennine Ring created.

OngOing RestORatiOn schemesFrom the Wey & Arun Canal in West Sussex to the northern reaches of the Lancaster Canal in Cumbria, from the Montgomery Canal in mid Wales to the river Stour on the Essex/Suffolk border, there are scores of restoration projects underway throughout the land. And each is unique, in terms of the engineering challenges faced, the funding issues involved and the potential for use after completion. Moreover ownership varies too: many waterways under restoration are under the control of BW, others come under the remit of the Environment Agency, some are owned by local authorities and others by private individuals. The

unifying factor, however, is that all involve the dedicated commitment of teams of volunteers, from IWA and other bodies, working to see the waterway in question fully restored for public use.

Choosing just ten major schemes to highlight here is clearly an invidious task, but the following represent a purely personal choice.

ashby canal. The Ashby Canal once ran from Marston Junction near Bedworth to Moira in Derbyshire, but mining-induced subsidence resulted in the closure of the northernmost eight miles of canal beyond Snarestone. Supported by Leicestershire County Council, the Ashby Canal Association is promoting full restoration. Target date: 2012. (IWA’s National Trailboat Festival is this year taking place at Moira Furnace over the Spring Bank Holiday weekend – see page 38).

chesterfield canal. The Chesterfield Canal is currently navigable for some 34 miles from the river Trent to the collapsed Norwood Tunnel, and for five miles from its western terminus at

The ResToRaTion ManWith all due respect to Douglas Barwell, saviour of the Lower Avon, and to Graham Palmer and other Waterway Recovery Group stalwarts, no-one

has thus far contributed more to the waterway restoration movement than the legendary David Hutchings. Known to many as The Restoration Man, his dynamic leadership and engineering skills were the prime factors in the restoration of the Stratford Canal (completed in 1964) and the Upper Avon (reopened in 1974). Furthermore, his charisma and unbridled enthusiasm for the waterways inspired countless others to follow in his wake.

An architect with Coventry City Council, he announced his arrival on the waterway scene by organising, at short notice, the IWA Coventry Rally in 1957, an event which proved to be an unqualified success. He also found time, during the Stratford project, to play a role in the Stourbridge campaign.

David died in April 2005 but will live on in the hearts of all canal restorers – and all those who have come to love the Stratford Canal and the Warwickshire Avon.

Above: Moira Furnace on a restored section of the northern Ashby Canal.

Below: Boating near Fladbury on the beautiful Lower Avon.

Below right: Excavating a new channel at Renishaw on the Chesterfield Canal.

Hugh

Pot

ter

Waterways of the future.indd 29 21/4/09 11:50:40 am

Page 30: Waterways Summer Issue

Chesterfield to Staveley. Restoration is planned in three phases: from Staveley to Killamarsh; around a housing estate built along the line of the canal at Killamarsh; and the final challenge for the restorers – the issues relating to Norwood Tunnel. The Chesterfield Canal Partnership is working on plans to overcome this obstacle and a target date of 2020 would not seem too unrealistic. (IWA’s National Campaign Rally is this year being staged at Kiveton Park near Rotherham, close to the tunnel, also over Spring Bank Holiday – see page 38).

Cotswold Canals. The Cotswold Canals comprise the Stroudwater Navigation and the Thames & Severn Canal; together they provided a link between the Gloucester & Sharpness Canal at Saul Junction and the river Thames at Lechlade, the route traversing some of the most beautiful scenery in southern England. Considerable engineering challenges need to be overcome.Nevertheless, the Cotswold Canals Trust – one of the largest and most efficient canal trusts in the country – is aiming at the completion of Phase 1a by 2012.

Droitwich Canals. Almost there! Thanks to the dedicated work of the Droitwich Canals Trust, IWA, Waterway Recovery Group and others, restoration of the Droitwich Barge Canal and the Droitwich Junction Canal is virtually complete, with the official reopening planned for Spring 2010. This will restore the link between the Worcester & Birmingham Canal at Hanbury and the river Severn at Hawford, thus creating a new 21-mile cruising ring through unspoilt Worcestershire countryside.

Lichfield & Hatherton Canals. Well known actor and waterway enthusiast David Suchet has thrown his full backing behind this scheme, which aims to restore the link between the Coventry Canal at Huddlesford and the Staffs & Worcs Canal at Calf Heath. Its completion would give ready access from the mainstream Midland canals to the quiet waters of the northern Birmingham Canal Navigations. Much has already been achieved but this remains a long term project, with a possible opening date of 2030.

Manchester Bolton & Bury Canal. The Manchester Bolton & Bury Canal ran from the river Irwell in Salford to Bolton and Bury – a distance of some

WATERWAYS OF THE FUTURE

30 / IWA WATERWAYS / summer 2009

Top: A restored section of the Stroudwater Navigation at Oil Mills, Ebley.

Above: New staircase locks on the Droitwich Junction Canal.

Left: Restoration work underway on the Montgomery Canal way back in the 1970s. The project continues…

Davi

d Jo

wet

t

Wat

erw

ay Im

ages

Waterways of the future.indd 30 21/4/09 11:50:56 am

Page 31: Waterways Summer Issue

IWA WATERWAYS / summer 2009 / 31

The delightful Wey & Arun Canal near Drungewick

Lane Bridge in West Sussex.

15 miles. This was not one of the early restoration projects, but has come up strongly on the rails, with an active canal society promoting its cause and a strong measure of support from BW. In September last year, the completion of the first restored section was celebrated when a narrowboat entered the new deep entrance lock at Middlewood, Salford. There remains a number of obstacles to restoration and progress towards completion will depend on funding – but ultimate success is surely only a matter of time.

Monmouthshire Canal. The project calls for the Monmouthshire Canal to be restored down from Five Locks Basin, Cwmbran to a connection with the river Usk near Newport; the picturesque Crumlin Arm is also undergoing restoration. Plenty of locks on the main line have been restored, and excellent progress is being made on the Crumlin Arm, thanks at least in part to successful WRG Canal Camps. With parts of the line lost to road building in Cwmbran and Newport, the scheme must be regarded as a long term one, with a target date of 2020.

Montgomery Canal. For many enthusiasts, this is THE restoration project they most want to see completed, simply because the prize is so great: 35 miles of canal from Frankton Junction on the Llangollen Canal to Newton in mid Wales, through some of the most sublime scenery imaginable. The waterway was abandoned in 1936 and restoration has been in progress for over 30 years. So why is it taking so long, particularly in view of the fact that comparatively few major engineering problems stand in the way? The answer, at least in part, is that the canal is designated as a Site of Special Scientific Interest for much of its length. Restoration plans have, therefore, had to incorporate a wealth of measures to safeguard the survival of these life-forms. Nevertheless, the canal is open from Frankton to south of Maesbury, as is an isolated 11-mile section from Berriew to Ardleen, centred on Welshpool. Possible reopening date: 2025.

Wey & Arun Canal. ‘London’s lost Route to the Sea’ ran for 23 miles from the river Wey at Shalford

near Guildford to the river Arun at Pallingham, north west of Pulborough. Land access, ownership issues and engineering difficulties stand in the way of restoring this link, but the Wey & Arun Canal Trust is an accomplished and professional body which has already achieved much, including the reopening of 11 locks, rebuilding of 24 bridges and restoration of two of the waterway’s three aqueducts. Possible reopening date: 2030.

Wilts & Berks Canal. Definitely a long term project, this is the restoration scheme facing the biggest challenges of all. The waterway once ran from the Kennet & Avon Canal near Trowbridge to the Thames at Abingdon, but was officially closed in 1914. Much of the canal has been infilled and built over in parts of Swindon, Melksham and Abingdon. Undaunted, the Wilts & Berks Canal Trust continues to press on, restoring numerous isolated locks and bridges. In 2006 an IWA grant of £60,000 paid for the construction of a new length of waterway connecting the canal to the Thames near Abingdon. (Optimistic) target date: 2050.

Hugh

Pot

ter

Waterways of the future.indd 31 21/4/09 11:51:12 am

Page 32: Waterways Summer Issue

32 / IWA WATERWAYS / summer 2009 IWA WATERWAYS / summer 2009 / 33

There are, of course, numerous other projects underway, all deserving of mention, but space precludes us from doing so. The Grantham and Cromford projects could arguably be described as ‘just outside the top ten’.

New waterways uNder coNstructioN…or plaNNedNot content with restoring canals and rivers which have fallen out of use, voluntary groups including IWA, with the help of statutory bodies, have also turned their attention to the construction of brand new waterways. We depict the opening of the liverpool link and progress on the Fens waterway link on pages 18-20, but there are a number of other schemes in the pipeline too. The Higher avon has long been mooted, being an extension of the navigable length of Shakespeare’s Avon to provide a link with the Grand Union Canal at Warwick, although opposition from wealthy landowners has prevented any progress thus far. The Bedford & Milton Keynes waterway

is being promoted as an exciting project which would see a new canal linking the Grand Union Canal at Milton Keynes with the Great Ouse at Bedford, serving at the same time as the core of a linear water park. Other proposals include a daventry arm off the Grand Union Canal, the leven Navigation in Scotland which would connect Loch Lomond to the Clyde estuary, the ouseburn waterway on Tyneside, the rother link in the East Midlands and the wissey Navigation extension in West Norfolk.

oNes For tHe FutureThere is, it seems, no limit to the enthusiasm and appetite for waterway restoration on the part of IWA and waterway society members throughout the land. In addition to all the above projects, there are also well researched proposals to restore a host of other waterways, ranging from the Bradford Canal in West Yorkshire to the Portsmouth & Arundel Canal in Hampshire/West Sussex, from the Swansea Canal in South Wales to the Horncastle Navigation in Lincolnshire.

WATERWAYS OF THE FUTURE

IWA’s commItment to restorAtIonOne of the principal stated aims of IWA is to advocate the restoration of derelict inland waterways throughout the British Isles. Its restoration objectives are: to secure support for restoration from local communities, local authorities, navigation authorities and funding agencies; secure human and financial resources for restoration; obtain legislation documents etc from Government and its agencies that are favourable to restoration; achieve high quality sustainable restoration suitable for navigation and other public use, with adequate provision for future maintenance to appropriate standards.

To these ends, IWA makes grants of up to £15,000 to organisations promoting the restoration of navigable or formerly navigable inland waterways. Applications from bodies promoting new navigable waterways are also considered. Over the years hundreds of thousands of pounds have been paid out in grants, enabling many restoration projects to be successfully concluded.

Opposite page: One of the first narrowboats to use the Liverpool Link passing the Liver Building on 25th March.

Below: Approaching Boston Lock during the official opening celebrations on 20th March.

John

Sul

ly

Waterways of the future.indd 32 21/4/09 11:51:37 am

Page 33: Waterways Summer Issue

32 / IWA WATERWAYS / summer 2009 IWA WATERWAYS / summer 2009 / 33

John

Dav

idso

n

John

Sul

ly

Waterways of the future.indd 33 21/4/09 11:52:08 am

Page 34: Waterways Summer Issue

34 / IWA WATERWAYS / summer 2009 IWA WATERWAYS / summer 2009 / 31

A Continuing SAgAOn occasions, waterways restored and reopened in a blaze of glory subsequently fall into decline again, requiring voluntary groups to come to the rescue once more. Nowhere provides a better example of this than the Basingstoke Canal, which was reopened in 1991 following a largely volunteer-led restoration by the Surrey & Hampshire Canal Society, supported by IWA and others, and financed by Surrey and Hampshire county councils. The Basingstoke Canal has been bedevilled by water supply and other problems almost ever since, resulting in summertime closures in some years, and further work is continuing to install back pumping along the canal, financed through voluntary fund raising and grants, with much of the work carried out by WRG.

Another case study is the Chelmer & Blackwater Navigation in Essex, taken over by IWA subsidiary Essex Waterways Ltd in 2005; the waterway had by then fallen into a serious state of disrepair. Since then an ongoing programme of maintenance has seen a comprehensive upgrading of the waterway’s infrastructure, with much of the work undertaken by IWA and other volunteers. WRG’s 2008 ‘Bonfire Bash’ brought about further improvements to the navigation.

Funding the reStorAtion projeCtSFunding for restoration comes from a number of sources. In certain circumstances BW finances some of the work (although recent DEFRA funding cuts have seen this support diminish and, in at least one example, promised money has been withdrawn). In urban areas, government grant aid may be available for the reclamation of derelict land (a good example being the Liverpool Link works); European Union funding is also forthcoming, mainly for inner city projects. Enlightened local

authorities also provide support, as (less often) do private companies through sponsorship. IWA and waterway societies provide not just finance but expertise and practical assistance.

Latterly the Heritage Lottery Fund has made relatively large grants to waterway restoration projects, including one of £28m to enable water supply problems on the Kennet & Avon Canal to be resolved. More recently, the Forth & Clyde-River Carron scheme in Scotland benefited from a Big Lottery Fund grant of £25m, much of the money being used to construct an impressive boat lift featuring two 30-metre high ‘Kelpie’ horse heads.

Clearly, difficult financial times lie ahead, and canal restoration is unlikely to be at the top of the priority list for cash-strapped government departments or local authorities. Nevertheless, we’ve been here before, enduring fiscal problems and recessions in the 1970s, ‘80s and ‘90s, and yet restoration projects continued through those decades – indeed in many instances they thrived. So the probability is that they will continue to prosper.

An expAnded network So what will the waterway network look like in 2060? It’s always dangerous to make rash predictions, especially in these increasingly uncertain economic times. But who, in 1960, would have foreseen that today we would be boating around the Cheshire and Avon rings, as well as along the Kennet & Avon, Caldon, Huddersfield and Rochdale canals, to name just a few restoration success stories. So let’s look forward confidently to the day when we can cruise the Monmouthshire Canal down to Newport, boat through the Cotswolds on the Thames & Severn Canal and, perhaps best of all, turn off the Llangollen Canal at Frankton Junction and head down the Montgomery Canal to Newtown. After all, it doesn’t hurt to dream.

WATERWAYS OF THE FUTURE

Get Involved…wIth wRGWaterway Recovery Group co-ordinates volunteers to work on a range of waterway projects around the country. Its regional groups typically spend one weekend a month working at a site, whilst week-long camps are also staged during the summer months. These have been enormously successful in recent times, a series of camps achieving the complete restoration of Hanbury Locks on the Droitwich Junction Canal. Indeed, it is unlikely that the waterway network would exist in its current form without the contribution of WRG over the years. As well as offering lots of hard (and occasionally dirty) work, WRG camps are renowned for fun and camaraderie. For full details of how to become involved call Jenny Black on 01494 783453 or visit www.wrg.org.uk. In the meantime, a full list of this year’s Canal Camps is published on pages 14-15 of this issue.

A solitary canoeist enjoying a restored section of the Montgomery Canal – but how long before the entire waterway is restored?

The Basingstoke Canal has had a troubled recent past.

Diet

er Je

bens

Waterways of the future.indd 34 21/4/09 11:52:25 am

Page 35: Waterways Summer Issue

IWA WATERWAYS / Summer 2009 / 35

M & R Controls (UK) LimitedTop Quality INVERTEK Pure Sine Wave Inverters

Manufactured by Rich Electric

Pure sine wave inverters from 150 wattto 3000 watt with built in “UPS” on all

high frequency models. Top quality reliable products at competitive pricing.

DAI 3000 U12 £893.55 inc vat

Combination units also available! Inverter – Charger – UPS – Solar – DC Input

Fully programmable power management system. 3000 watt, 12 volt with 140 amp 4 stage charger.1500 watt, 12 volt with 70 amp 4 stage charger.Combi 3 – 3000 watt, 12 volt £1195.43 inc vat

THE FUTURE IS GREEN…!10, 20, 40 & 100 Watt monocrystaline panelsNew 100 Watt only 1316 x 544 x 35 mm..!!!!300 watt “fold away” system available soon!

Solar regulators from low cost to PWM. 100 watt monocrystaline £333.50 inc vat

Want to discuss a full system? No obligation quotations available! Give us a call on 01773 875795 (9am to 9pm)Email: [email protected]

Full technical details and user manuals available for download – www.rich-electric.com

p035.indd 1p035.indd 1 21/4/09 11:12:1321/4/09 11:12:13

Page 36: Waterways Summer Issue

“Minister launches new scheme” exulted the Daventry Express in February. This was on the occasion of a visit by Iain Wright, Junior Housing Minister, to the town. He “met officials from WNDC [West Northants Development Corporation] and Daventry District Council who talked about the plans for the redevelopment of the town”. The interesting thing about this, so far as IWA is concerned, is that these plans include the construction of a new branch canal to Daventry from the Braunston Summit of the Grand Union. A Press release from Daventry District Council issued in February told us that “Funding has been secured for an innovative project to design a boat lift that could form part of a planned new canal arm

WaterwayCUTTINGS

WATERWAY CUTTINGS

DAVID BLAGROVE TAKES A LIGHT-HEARTED LOOK AT WHAT THE PAPERS HAVE HAD TO SAY

36 / IWA WATERWAYS / summer 2009 IWA WATERWAYS / summer 2009 / 37

for Daventry. Daventry Council has received £75,000 from Northamptonshire Enterprise Ltd for an options study and outline design of the boat lift.” The Daventry Post reported with the headline: “Canal at heart of Leisure scheme” and pointed out that “The basins and canal will be the centre point of a new flexible layout, creating a natural linkage between a number of planned town centre redevelopments as part of Daventry district council’s Masterplan”. The Express also told its readers in another issue that “Money for the canal project is watertight”, meaning that it was ring fenced within the Council’s coffers. So let’s hope that this may prove to be part of the silver lining to the cloud of recession.

Meanwhile, up in what I still obstinately continue to refer to as “The West Riding”, there have been positive developments on the local waterways. Prince Charles Himself, no less, visited Sowerby Bridge last Autumn and, according to the Yorkshire Post (I’ll bet you were wondering when I’d get round to quoting that august journal!) “The Wharfside at Sowerby Bridge…was once where a disused canal came to a grinding halt and shadows of dilapidated buildings flickered in its murky waters. There would have been little outcry if it had been levelled. [Oh yes? Somehow I can’t see IWA’s local branch letting it go that easily.] But that was more than 20 years ago when the Prince of Wales first visited the rundown waterfront. When he returned triumphantly at the end of November 2008 he was able to make a proud boast: “It has become the catalyst for regenerating the whole of Sowerby Bridge”. The [Halifax] Evening Courier carried the story of the Prince’s visit on its front

page and showed a picture of him stepping aboard a narrow boat being fitted out at the wharf and reported on how he was introduced to the various stalwarts who have set up businesses round the wharves and basins. And at Wakefield the Post ran a feature about the “£100m Wakefield Waterfront Project” and gave a potted history of the Calder & Hebble Navigation into the bargain. Echoing this, no less a paper than The Times ran a “Focus Report” stating that “Reinvention of the canal system brings prosperity to inner city heartlands”. Of course all credit was given to the British Waterways Board (formed in 1962 as a result of pressure from outside, not least from IWA) and no mention was made either of IWA (formed in 1946) or of the immense part played by volunteers over the years. Robin Evans was quoted as saying “In the past 20 years the waterways have been completely transformed – they have reinvented themselves”. Something else seems to have been reinvented here: history.

A PRINCELY TALEBoAT LIfT foR DAvENTRY?

More good news from Northamptonshire, in which IWA Northampton Branch has played a significant part, was brought by the (Northampton) Chronicle & Echo, which revealed that the same West Northamptonshire Development Corporation had granted funding of “more than £1.8 million…into plans to create a marina at Beckets Park in the centre of Northampton”. Old stagers will doubtless remember this as the site of a most successful National Rally back in 1971. It was hoped way back then that the rally and subsequent events in the park, which occupies the north bank of the Nene, would stimulate a revival of interest in the river by the town authorities, but little has been done in the intervening 38 years in spite of much prodding from IWA

Northampton Branch. Hopefully this not only spells a revival of interest locally, but a major rethink on the value of the River Nene and the Northampton Arm as essential links in this scheme. At the other end of the Nene, so to speak, the Lincolnshire Free Press carried a feature last Autumn headed “Search begins for marina site” This referred to the current project to link the Nene with the Witham across the Lincolnshire fens, and the article went on to say “The search for a suitable location for a multi-million pound boating marina in Spalding will start [in 2009]. The marina will form part of the Environment Agency’s Fens Waterways Link which aims to open up 150 miles of waterways for tourism, recreation and the environment”.

NEW MARINA AT NoRThAMpToN

The IWA National Rally of 1971 at Beckets Park, Northampton.

Wat

erw

ay Im

ages

Waterway Cuttings.indd 36 21/4/09 11:53:08 am

Page 37: Waterways Summer Issue

Still in the south, Fleet News revealed that “A scheme to find extra money for the upkeep of the Basingstoke Canal may fall at the first hurdle because the groups being asked for the cash have not been able to agree on how much to chip in. The difficulties raising the funds mean the canal could fall into deeper disrepair and… the Surrey and Hampshire Canal Society worry that boats will soon be unable to use it”. This is all very worrying generally, although the Autumn 2008 edition of The Hub, a magazine devoted to cycling matters, tells us that “Woking is the only town in the South East to be awarded Cycling Town status by Cycling England. Woking will be

given £1.82 million over 3 years” subject to local authority match funding”. The magazine goes on to say “This additional funding also means that the Basingstoke Canal project can continue, and we hope to improve the surface of the full 8 miles between Pirbright Bridge and the Wey navigation”. I suspect the Basingstoke problems have had a similar root to those that have affected the Rochdale Canal in the past. Few boats have as yet managed to use the canal, so the benefits of regular boating use are not apparent to the local authorities. Looking on the bright side, you should be able to lockwheel up the Basingstoke Locks pretty well in future!

36 / IWA WATERWAYS / summer 2009 IWA WATERWAYS / summer 2009 / 37

CUTTINGS PLEASESend all your waterway cuttings to

David Blagrove at IWA Head Office, Island House, Moor Road, Chesham HP5 1WA

The Bath Chronicle told us a sad story of lost or perhaps deliberately bungled opportunity under the headline “River Consultation slammed as a farce”. IWA Avon & Wiltshire branch chairman, John Webb, has been involved since 2002 with Bath Council’s River Corridor Study Group “to help shape a new planning blueprint for the [Bath] Western Riverside”, a dismal area of old gasworks and derelict factories beside the Avon downstream of the city. In 2005 though, after many meetings and

so-called “consultations”, things began to go wrong. “The whole thing ground to a halt, with us being fobbed off and kept in the dark as to what, if anything was happening” Eventually the group was told that the study had been abandoned. Mr Webb “concludes: As an exercise in public consultation this whole business has developed into a frustrating and time-wasting farce. Honeyed words as a substitute for a detailed statement as to what is expected simply do not work”.

LOCKWHEELINGUP THE BasINGsTOKE

MISSING THE BOAT AT BATH

We have mentioned before (Spring and Summer 2008 Waterways) the ongoing rumpus over land on the canal bank at Preston that BW wishes to either sell or rent to people who have cultivated it for some years past. Now the (Preston) Evening Post tells us “For a 12-foot square chunk of premium land in a ritzy part of London you might expect a four figure bill. But while the 116 people living on the banks of the Lancaster Canal …may live on the west side of Preston, they are certainly not in the West End”. The paper goes on to explain that “they have been told to buy the land

they have looked after for many years. They will have to fork out £1,000 for any piece of land under 50 sq m, £1,500 for anything over that and £2,000 for anything 101 sq m or above plus a £500 legal fee and VAT on top”. Later in the article, “Preston MP Mark Hendrick blasted the moves as “an outrageous money-making exercise” and said he had advised residents to get independent valuations”. One might merely add that the “MP and local councillors got involved in 2007 when BW sent out bills for the land after years of not collecting rent.” Further comment here seems superfluous.

sHamELEss PrOfITEErING

At Derby the saga of the footbridge (or to be more pedantically correct the horse bridge) that carries the Trent towpath over the river near Shardlow rumbles on its Dickensian way. Last Autumn the Derby Evening Telegraph stated that “A footpath that was closed to the public six years ago for bridge repairs will reopen next year…It will reopen on December 2, 2009 at the latest after repairs” Well Ho! Ho! Ho! to all that, because the same paper now tells us (in March 2009) that “The fate of plans to rebuild a bridge demolished six years ago will be decided at a public inquiry.” The whole sad story of this Jarndyce-v-Jarndyce-type saga is too long to go into here. The bare bones are that the bridge became unsafe in 2003; Mr Elf and Mr Safety demanded

that it be closed and knocked down by its owners, BW. A plan to rebuild it further upstream was halted because adjoining owners refused to sell the land, so Derbyshire County Council issued a compulsory purchase order. This is now going to a public inquiry. The original plan would have supposedly saved the local taxpayer about £500,000. Now “the cost of the new bridge has risen to £1.2m because of the delays to the project”. Other less controversial but nonetheless disturbing news from that quarter of the globe was reported by both the Derby Evening Telegraph and the Yorkshire Post following a collision last autumn between a trailer load of slurry and Bridge 20 on the Trent & Mersey Canal near Stenson. “Fertiliser” said the Telegraph “was dumped

in the Trent and Mersey Canal at Stenson…when a tractor and trailer tried to cross a brick bridge running over the waterway. Part of the bridge, which is on a private road between two farmer’s fields collapsed as the vehicle passed over it. This caused the trailer to swing round and disconnect from the tractor before crashing into the canal below.” Fortunately BW

were on the ball and caught the spill before any great damage was done to the water quality, but the bridge was a listed structure, so we can expect yet another long-drawn out episode before all is completely put right. The Yorkshire Post added the information that “bridge debris had to be lifted before boats in nearby marinas could get through.”

DOuBlE TROuBlEIN DERBY

Wat

erw

ay Im

ages

Waterway Cuttings.indd 37 21/4/09 11:53:28 am

Page 38: Waterways Summer Issue

38 / IWA WATERWAYS / summer 2009 IWA WATERWAYS / summer 2008 / 39

EVENTS

MAY

1st-4thIWA Northampton Branch Boat GatheringFun and frolics beside the River Nene at Becket’s Park, Northampton. This event is gaining in popularity year by year.01604 862988, e-mail [email protected].

2nd-3rdLoughborough Canal and Boat FestivalJo Swift, 01509 635827.

2nd-3rdNorbury Junction Rallywww.sncanal.org.uk.

2nd-4thIWA Canalway CavalcadeLittle Venice, London.This exciting, colourful event has been taking place since 1983. Organised by IWA Festivals, it represents a fabulous day (or more) out by the water. The theme of this year’s Cavalcade will be ‘Waterway Wonders’, as the Seven Wonders of the Waterways are celebrated in style. Other attractions will include a pageant of decorated boats, trade show, musicians, boat trips, procession of historic boats, Morris dancers and much more besides. A wonderful day out for the entire family in the heart of the capital city.07876 597941, www.waterways.org.uk.

8th-10thNottingham Yacht Club Boat Gathering01427 874109, [email protected].

9thSouth Pennine Boat Club RallyBattyeford Lock, Calder & Hebble Navigation.01924 491320, www.southpennineboatclub.co.uk

9thWey & Arun Grand Loxwood Openingwww.weyandarun.co.uk.

16th-17thRickmansworth Waterway FestivalRickmansworth Aquadrome and Batchworth Lock.01923 778382, www.rwt.org.uk.

17thLlanymynech Montgomery Canal Discover Day01691 830094, www.montgomerycanal.co.uk.

22nd-24thFolk, Boats and Beer EventCrooke Cruising Club, Wigan.01942 525409, [email protected].

22nd-25thFBCC RallyLymm Cruising Club, Bridgewater Canal. Entry fee £16.01925 754346.

23rd-24thBrookwood Boat RallyBasingstoke Canal.01252 617364, [email protected].

23rd-24thStaffordshire & Worcestershire Canal GatheringBratch Locks, Wombourne.Chris Dyche, 01384 375582.

23rd-25thCrick Boat Showwww.crickboatshow.co.uk.

23rd-25thTring Canal Festival07801 280426, www.wendoverarmtrust.co.uk.

23rd-25thIWA National Campaign RallyKiveton Park.This year’s Campaign Festival is to be staged at Kiveton Park, near Rotherham, on the summit level of the Chesterfield Canal. IWA wants to build support for the work of the Chesterfield Canal Partnership in its plans to replace the collapsed Norwood Tunnel with a surface route and thereby reconnect Kiveton Park to those parts of the canal that are already restored, and the parts of the

canal already under restoration in Derbyshire. A further aim is to promote the Partnership’s plans for a new navigable link between the Chesterfield Canal and the Sheffield & South Yorkshire Navigation. The event will comprise a large range of activities both on the water and along the towpath.www.kiveton2009.com.

24th-25thIWA National Trailboat FestivalAshby Canal, Moira Furnace.The IWA National Trailboat Festival will be held at the impressive Moira Furnace, at the heart of the National Forest, on a recently restored section of the Ashby Canal. A wide range of entertainment has been booked by the Ashby Canal Trust, organiser of the event. Entertainment includes a historic re-enactment group, birds of prey, bands and a variety of children’s entertainment. The Moira Furnace Museum will be open as part of the festival, and there will be a chance to see the restored canal at Moira, including the first full-size lock on the Ashby Canal. Live steam, Morris dancing, boats, displays, refreshments and a bar will add to the event.Geoff Pursglove 01530 273956, www.ashbycanaltrust.co.uk,

Norwood Tunnel on the Chesterfield Canal marks the current end of the navigable route from the Trent. IWA’s National Campaign Festival is to be staged at nearby Kiveton Park.

The Canalway Cavalcade at Little Venice, organised by IWA Festivals, is one of the most colourful, cosmopolitan events of the year.

John

Low

er

Briti

sh W

ater

way

s, Lo

ndon

Events.indd 38 21/4/09 11:54:01 am

Page 39: Waterways Summer Issue

38 / IWA WATERWAYS / summer 2009 IWA WATERWAYS / summer 2008 / 39

EVENTS 200923rd-25thGathering of Boats at SnarestoneA gathering of boats to coincide with the Trailboat Festival at Moira. 01455 614816, www.ashbycanal.org.uk.

30th-31stOdiham Boat RallyColt Hill, Basingstoke [email protected].

30th-31stEtruria Canals Festival01782 233144, [email protected].

30th-31stBCN Marathon Challenge01922 428644.

JUNE

5th-7thBeale Park Thames Boat Showwww.bealeparkboatshow.co.uk.

6th-7thLeicester Riverside Festival0116 238 5082, www.leicester.gov.uk/festivals.

7thDinghy Dawdle and MeanderMontgomery Canal.01686 640479, www.montgomerycanal.co.uk.

12th-14thRussell Newbery Members’ RallyShackerstone, Ashby Canal.01452 415420/01543 432079, www.russellnewbery.co.uk/Register.

20th-21stGardner Engine RallyPark Head, Dudley.01949 869004, www.gardnerengineforum.co.uk.

27th-28thBCNS RallyTitford Pumphouse, Engine Street, Oldbury.0121 422 4373, www.bcn-society.co.uk.

27th-28thBraunston Working Boat Rallywww.braunstonmarina.co.uk

JULY

3rd-5thStratford River Festival01789 299011, www.stratfordriverfestival.co.uk.

5thMarple Locks Festivalwww.marplelocks.org.uk.

11th-12thLeeds Waterfront Festivalwww.visitleeds.co.uk.

25thLinslade Canal Festivalwww.leightonlinslade-tc.gov.uk.

AUGUST

1st-2ndBristol Harbour Festival0117 9031484, www.bristol-city.gov.uk.

15thPelsall Boat Gathering0121 241 9310, [email protected].

11th-18thBCNS Explorer Cruise0121 355 6351, [email protected].

29th-31stIWA National FestivalRedhill, Ratcliffe-on-Soar.The major festival of the year, the IWA National Festival & Boat Show, is being staged on the broad waters of the river Soar, allowing access to widebeam craft from the river Trent and all points North East. By mid March in excess of 200 craft had already booked in and it is confidently predicted that the 350 capacity will be reached. A good selection of historic craft are expected to attend and there will be all manner of entertainment on offer, including a gymnastic team, falconry displays, Morris dancers, folk and jazz bands etc. There will be plenty to amuse the children too, such as the ever popular Wild Over Waterways (WOW) activities. Trade stands and lots of refreshment tents complete the usual successful formula. All proceeds from the event go to waterway restoration schemes in the area – be sure to support IWA’s major event of 2009. 0844 800 6583, www.waterways.org.uk.

SEPTEMBER

5th-6thShackerstone Family FestivalAshby Canal.07767 400894, www.shackerstonefestival.co.uk.

19thHuddlesford Boat Gatheringwww.lhcrt.org.uk

19th-20thWhitchurch Boat RallyWhitchurch Arm, Llangollen Canal.01948 830447, www.whitchurchwaterway.org.

OCTOBER

17th-18thStourbridge Navigation Trust Open WeekendChris Dyche, 01384 375582.

30th-31stBCNS Bonfire Rallywww.bcn-society.co.uk

DECEMBER

12thCarols & Illuminated Boat FestivalCanal Museum, Stoke Bruerne.www.friendsofcanalmuseum.org.uk.

It’s that tIme of year agaIn – wIth the ‘rally season’ kIckIng off In earnest In

may. a full lIst of events Is publIshed here, wIth contact detaIls (phone, e-maIl

and, where applIcable, websIte) so you can go ahead and plan your waterway

outIngs well In advance.

Boats galore at last year’s National Festival & Boat Show at Autherley Junction. The 2009 ‘National’ will take place at Redhill Marina on the River Soar in Nottinghamshire.

Wat

erw

ay Im

ages

Events.indd 39 21/4/09 11:54:19 am

Page 40: Waterways Summer Issue

Waterside Pubs - The best pubs on the inland waterways

This book contains 150 of the best waterside pubs in England and Wales. Most of these can be reached by car but if you can, visit by boat or canoe, or walk or cycle along the towpath to them. However you get there, enjoy!Other main features of this book include - detailed maps to locate pubs, other pubs worth trying and pub facts.

160 pages 147 colour photos 26 maps £14.99

The Last Number Ones Edited By Hugh Potter

An inspiring, historic read, encapsulating the working lives of two charming, unforgettable characters. The ‘Number Ones’ were the proud elite of boat people who owned and operated their own cargo-carrying narrowboats. The term probably originated from boat gauging registers where there was a column for ‘fleet number’.

100 pages, pbk £19.99 + Free CD ROM of original BBC interviews

PRACTICAL BOOKS by Graham Booth

Narrowboat PlanningThis clearly laid out book provides ideas, inspiration, technical solutions and photographs to help you make the best use of the space in your boat.

Includes 18 case studies of boats from 35 to 70ft 112 pages Pbk £14.99

The Narrow-boat Builder’s BookThis complete guide explains every stage of fitting out a narrowboat and includes

comprehensive lists of shell builders, diesel engine manufacturers and anextensive supplier list. 136 pages 180 colour photosPbk £14.99

The Inland Boat Owner’s Book3rd Edition

All you need to know about boat

ownership on the inland waterways136 pages 180 colour photos Pbk £14.99

HISTORY BOOKSTHE REGENT’S CANAL London’s Hidden WaterwayAlan Faulkner A meticulously detailed history of this once commercially important waterway which served the industries and businesses in north London for 150 years. 184 pages hbk 96 b/w photos 14 colour photos 6 maps £24.99

PRECIOUS CARGO Fifty Years of Hotel BoatsRobin Smithett From tentative beginnings in the late 1950s to a thriving industry today.128 pages hbk 18 b/w photos 23 colour photos £19.99

JAMES BRINDLEY Canal PioneerChristine Richardson Following the events that shaped Brindley’s life and career, we see the millwright’s apprentice develop into the nationally renowned engineer, who created the pio-

neering canals that form the heart of today’s network. 136 pages hbk /pbk 40 maps 36 b/w illustrations Hardback £29.95 Paperback £14.99

Order from The Inland Waterways Association Bookshop Call 01923 711114 or visit www.iwashop.com

Windlass in My BeltJohn Thorpe

An autobiographical and evocative tale of a young boy’s journey into manhood set against the background of the Midland canal system in the 1950s and 60s. An enduring passion begins with early family trips and his parent’s purchase of a canalside cottage at Stoke Bruerne. It tells of his acceptance into the canal community and gives a vivid account on life on and journeys in, a working boat. An eulogy to friendship and the lost world of working boats

296 pages, pbk £14.99

Back in stock

iwa books.indd 1iwa books.indd 1 21/4/09 11:11:0821/4/09 11:11:08

Page 41: Waterways Summer Issue

LETTERS

IWA WATERWAYS / summer 2009 / 41

inboxDo you have something to say about IWA or Waterways?It’s your magazine so please write and tell us your views. We will aim to publish responses to any letters that ask questions about any aspect of IWA policy or decision-making.Please write to The Editor, Waterways, c/o IWA, Island House, Moor Road, Chesham HP5 1WA or e-mail [email protected]

The View from essex IWA ANNUAL SUBSCRIPTION RATES

Adult, single £27.00Joint/Family £34.00

Details of all other rates are available from IWA Head Office – see the Directory on page 44.

I had not realised when I joined the committee and took on the task of editing the newsletter that the Chelmsford Branch of IWA is unique, as it covers the area containing the Chelmer & Blackwater Navigation. This is run by Essex Waterways Ltd, a subsidiary of IWA.

I soon set about making a few changes and improving on my first edition. Re-naming ‘newsletter’ to ‘magazine’ freed it up to have a broader remit and I have followed a few principles to try to make the offering successful. The main one is enabling access. This is not just being able to open the envelope when it plops through the post box! It means thinking of ways to present the material so that people will want to read it.

Luckily for me, the main contributors from Essex Waterways Ltd, WRG and the IWA committee all write excellent articles. Readers have been kept up to date regarding work being completed on the navigation. I have included details of the monthly talks on the huge variety of inland waterway related topics that always have a good turnout. In pitch blackness I manage to write notes which, to my surprise, are more legible than normal! I have also given an airing to topics such as the proposed sale of lock houses on the Thames, British Waterways funding, mooring and licence fees, diesel derogation etc.

The other aspect that is important to the magazine is the provision of photographs and the regular contributors demonstrate much skill in this department.

Now, also, my camera goes where I go. This year I have managed to visit a number of the places that have featured in the articles including the Severn, Thames, Wey & Arun, Great Ouse, Little Ouse, Shropshire Union, Oxford Canal, Grand Union, Kiel Canal and of course not forgetting the Chelmer & Blackwater. Sognefjord, Aurlandsfjord, Ruskildedjord, Oslofjord, River Warnow, Lake Malaren, the Great Belt, the Winter Canal, Moika and Neva are still waiting in the wings, and I feel that an article about the Vikings is soon to be born.

Realising the importance of maintaining and improving membership levels, we are designing a pull-out section to given to a friend, along with a copy of the IWA membership application form. Additional copies are to be placed in local libraries and sent to other organisations that may have people with similar interests.

I keep hearing about how the IWA is seen as being an organisation just for boaters, particularly of the narrowboat breed, who are rather long in the tooth. The general public seems to take for granted that there will be attractive, safe and well maintained waterways when they want to walk, fish, canoe, sail and bird watch along their length. Few seem to remember that it isn’t naturally that way. In the main it is a man-made environment that needs to be cared for. Anything we can do to change that perception would be good. Wendy Hodkinson,Editor, Chelmsford Branch Newsletter

D. B

urro

ws

Don’T excluDe Yorkshire!I read with interest Keith Goss’s article entitled ‘Broads, Lakes, Rivers & Canals’ in the Spring 2009 issue of Waterways. I just wonder why he didn’t mention that you can travel downstream from West Stockwith Lock to Keadby Lock at the start of the Stainforth & Keadby Canal, from where you can cruise the Yorkshire waterways. Why oh why are boaters only told about the Fossdyke and the Chesterfield canals, lovely though they are, when after another few miles travel on the Trent they can visit the canals of Yorkshire and the North East? I feel the north-south divide setting in.Helen Goodinson, via e-mail

Rebuke accepted Ms Goodinson and we shall endeavour to include more material on the waterways of Yorkshire and the North East in future issues. In the meantime, we’re publishing a photo of the Stainforth & Keadby Canal as a statement of intent – Ed.

Wen

dy H

odki

nson

Wish you were here? The beautiful Chelmer & Blackwater Navigation as featured in the new look Chelmsford Branch Newsletter.

A narrowboat passing a gas-fired power station at Keadby on the Stainforth & Keadby Canal.

Inbox.indd 41 21/4/09 11:54:50 am

Page 42: Waterways Summer Issue

LETTERS

Sexy WRGI have noted the popularity of the WRG camps but I now realise what must be a well kept secret. On page 21 of the Spring issue of Waterways, I note that the young lady with the wheelbarrow and shovel is working for “SEX WATERWAYS LTD”. No wonder WRG camps are so popular!Kerry Schofield, Derby

Well spotted Kerry, none of the editorial team was as eagle-eyed as you. We publish a full schedule of 2009 Canal Camps in this issue – just in case you’re tempted to join the fun… and hard work too of course – Ed.

Happy CRuiSinGI am writing in response to Chris Durham’s perceptive and amusing summation of the ‘hierarchy of the waterways’ in the Spring 2009 magazine. I cannot help but agree with much of what he says. My own feeling is that the one group doing the greatest disservice to our waterways, causing the most severe damage to the long-held traditions of friendship and camaraderie, are what a boating friend of mine once referred to as ‘the Jaguar on the motorway’ brigade - what Chris calls the ‘gin palaces’. You know the ones I mean - the overly-shiny, not-very-old boat steered by a man in a finely-tailored shirt who contemptuously ignores your greeting, with the well-coiffeured wife wearing soft gloves who tells you ‘we don’t like sharing locks in case you scratch our paint’. They may have the money, but whatever happened to the courtesy?

And, speaking as the captain of a pair of ex-working boats, I do take

the point in regard to these craft. Anyone who boats the system at all regularly will have come up against certain operators of such boats with just that attitude he complains of - one pair in particular spring to my mind, but I will refrain from identifying them - if I needed to! But I hope in all sincerity that our pair do not fall into that category. I am talking of the Nutfield and the Raymond, owned and operated by the charity ‘The Friends Of Raymond’. We travel the Grand Union route frequently, to get to and from various festivals and events, with the odd foray further afield, and it is my wish and instruction to our crews that we must at all times proceed with all due consideration for other users. That isn’t to say we never get in people’s way - a pair of these old boats isn’t the easiest thing to manoeuvre - but we try not to. And sometimes we do need to be able to overtake slow-moving boats - we may not

be carrying a load any more, but we do usually have somewhere to be, and a time by which we need to be there! I hope, though, that we cause others the absolute minimum of inconvenience, even then.

I took over the captaincy twelve months ago - if anyone reading this has reason to have taken exception to the way these boats have been handled since then, or indeed does so in the future, I would be only too pleased to hear from them - you can come and remonstrate with me personally at any of the events we attend.

As Chris says, happy cruising to you all, and stay relaxed. I look forward to exchanging a ‘How d’yer do’ with you along the way.Steve Miles, via e-mail

Thank you to all the other readers who have written to us on this topic. Space constraints preclude us from publishing them all – Ed.

42 / IWA WATERWAYS / summer 2009 IWA WATERWAYS / summer 2009 / 43

I have been encouraged by the letter from Stan Holland, published in the Spring issue of Waterways, to write down the speech I intended to make when I, too, was awarded a Richard Bird Medal for my services to IWA. Unfortunately, I was somewhat overcome (as he was) by the emotion of the occasion – and completely forgot what I had planned to say!

Audrey and I first discovered the Shropshire Union and Llangollen canals about 30 years ago when visiting friends in the Ceiriog Valley. Our daughter, Mary, was about 10 years old at the time and insisted on walking the towpath through Chirk Tunnel where we saw, for the first time in our lives, holidaymakers in narrowboats. We looked into the brightly lit boats, and to our amazement saw tables and chairs, beds and gas cookers, instead of coal or some other cargo which I thought they would be carrying.

I saw the excited look on my daughter’s face and said “Would you like to do that?” to which she replied “Oh! Yes please, Daddy”. So we looked at holiday advertisements, found out about narrowboat hire, and the next year we were cruising over the aqueduct and through that same Chirk Tunnel.

We so enjoyed our first holiday that we wanted to visit another canal, and soon our canal holiday became an annual event. But then, already being motor-caravanners, we started to look out for the other canals we

could see on our maps, but which did not feature in the holiday brochures. We were in for another surprise – and nothing like as pleasant this time. When you go for a hire boat cruise you rarely see any dereliction, because you can only cruise on a navigable canal. You may pass a few derelict wharves and empty factories, but there is nothing to impede your progress along the canal.

Imagine our dismay when, for the first time, we stood at the top of the then totally derelict Caen Hill flight on the Kennet & Avon Canal. We cried. We had no idea that this was the state of many of our canals at that time (and sadly still is for some of them). Our next thought was “there must be something we can do about this.”

We saw a canal magazine, and bought it. Inside we read about IWA, and decided to join. We lived in Kent at the time so there was not the option of a canal society. We became active members of the Kent & East Sussex Branch and started to take part in national events as well.

So started the long sequence of participation in the activities of IWA, which those who were present at the 2008 AGM heard read out by John Fletcher. I can only say, along with Stan Holland, how much I have enjoyed my involvement over the years, and pay tribute to the many delightful and enthusiastic friends I have met on the waterways.Arthur Page, via e-mail

LeSt We foRGet

Inbox.indd 42 21/4/09 11:55:05 am

Page 43: Waterways Summer Issue

In response to the continuing debate about the future for our waterways, I submit that British Waterways is another bureaucratic disaster to rival British Gas, British Steel, British Coal etc. BW was set up as a mindless Board in the late 1940s, its sole purpose being to let the waterways fill in and rot away. With all the nationalised industries sold off, BW still goes floundering on, always trying to project an expensive, polished, changed image.

There are two tiers of directors. The board has ten directors who charge fees totalling £192,717 in 2008. There are nine executive directors with collective salaries of £2,021,124 p.a. When adding to this figure annual bonuses and benefits totalling £810,898, the cost to the taxpayer and canal users becomes staggering. And then there’s the pensions that will continue on for years…

The Prime Minister currently receives an annual salary of £186,000 to run the country, whilst BW’s chief executive gets

£279,613 to run the waterways and that’s without consideration for bonuses, benefits and a £65,000 a year pension which is rising. Out of the 19 Directors we look to for their expertise in running our canal system, only one, Mr Bower, does actually have his own boat which, presumably, he must use. There is Mr E. Prescott who apparently claims to have had 45 years’ experience of fishing on the canals. Apart from one other board member who had some involvement with Coventry Council, all the others have neither experience nor interests in the important business that they are highly paid to direct.

For the board of 19 directors to have to engage and pay an outside company, who knew no more of the waterways than they do, to advise them on running a business that they themselves are highly paid to do, reflects the bureaucratic failure of BW’s boards over the last 60 years.

The general attitude of those who are supposed to be looking after such a valuable, historical and industrial structure is reflected in their attendance at important committee meetings throughout last year: Maggie Carver attended once; Eric Preston attended once; Pommy Sarwall attended once; Prof. G. Flemming did not attend any.

Following a Government reshuffle last year, we now have a new Waterways Minister (Huw Irranca-Davies) who again unfortunately has no knowledge of our canal system. However, he has suggested that he will be taking a canal boat holiday in the spring.

Sadly, under the ‘democratic dictatorship’ that we now live with, our cherished, historical waterways have become the ‘soft golden plum for the boys’. It is we, the canal users, with the guiding hand of IWA and the supportive assistance of our canal magazines and their towpath telegraph system, who are left to address and put right our canal system for the benefit of all. The waterways belong to us and should be maintained by us, not by expensive bureaucrats without the necessary knowledge or expertise.

A good guide to running the waterways can be taken from the Chelmer & Blackwater Navigation, which is under the control of Essex Waterways Ltd (a subsidiary of IWA), whilst the Wey & Arun Canal restoration project is another pointer to good practice, being undertaken by knowledgeable volunteers – not those who have let the system deteriorate in the first place.Jack Domane, via e-mail

Bureaucratic Disaster are you looking for a crew?Over the years, friends and I have hired narrowboats, and thoroughly enjoyed exploring various routes (including part of the Trent & Mersey, the Caldon, the South Pennine Ring and the Four Counties Ring). This year I would like to join a crew and am at this stage free virtually anytime, to go anywhere. I am prepared to pay my share of the costs.

I wonder if through Waterways, you are able to perhaps match me up with a group searching for another crew member to make up numbers.Colleen Field, Uxbridge

Volunteers at work beside the Wey & Arun Canal. This restoration project benefits from not being under the jurisdiction of British Waterways.

The Autumn 2009 issue of Waterways will be published in August 2009. Editorial copy closing date is 1st July 2009.

42 / IWA WATERWAYS / summer 2009 IWA WATERWAYS / summer 2009 / 43

W&A

CT

reasons to Be cHeerfulIt was a dark and dismal mid winter’s morning when I received my Spring 2009 issue of Waterways. The radio was telling tales of economic doom and gloom, there was strife in Afghanistan and Pakistan, and the long-suffering England cricket team was ignominiously losing the Test series in the West Indies. What a tonic it was, therefore, to open Waterways and read the item ‘Broads, Lakes, Rivers & Canals’, with its superb collection of photographs. I especially enjoyed the view of Lake Coniston with the steam yacht and canoe heading down the lake, the photo of the fishing boat on the Caledonian Canal at Banavie, and the picture of the small boats at Arundel in West Sussex – a town I know well.

It was interesting to read the interview with new IWA chairman Clive Henderson. His love and knowledge of canals, and his commitment to the cause, shone through in the replies he gave to the questions posed.

Most of all though I was enthused by the ‘Restoration Update’ piece. How encouraging it was to read of the various schemes making good progress towards completion – and of the dedication and enthusiasm of IWA and canal society members working so hard to protect and expand the waterway network. Thank you to everyone involved in the restoration movement.Simon Ireland, via e-mail

There is more good news to report in this issue, with the opening of the Liverpool Link and Boston Lock – see ‘Restoration Update ‘on pages 18-20. And should you feel inspired enough to join a WRG working party, a full list of this summer’s Canal Camps is published on pages 14-15 – Ed.

Inbox.indd 43 21/4/09 11:55:23 am

Page 44: Waterways Summer Issue

47 / IWA WATERWAYS / autumn 2008 IWA WATERWAYS / summer 2009 / 44

DIRECTORYDIRECTORY

HEAD OFFICEIsland House, Moor Road, Chesham HP5 1WA . Tel: 01494 783453 e-mail: [email protected] Website: www.waterways.org.uk

Vice Presidents: Harry Arnold, David Blagrove, Chris Coburn MBE, David Court OBE, Brian Dice OBE, David Fletcher CBE, Illtyd Harrington JP, David Hilling MBE, Tony Hirst OBE, James Hoseason OBE, John Humphries OBE, The Viscountess Knollys DL OBE, The Earl of Shannon, Sonia Rolt, Audrey Smith OBE, David Suchet OBE, Sheila Suchet, Paul Wagstaffe MBE, David Wain OBE

All Trustees and National Committees can be contacted via Head Office. Board of Trustees: Clive Henderson (Chairman), John Baylis, Doug Beard, Derek Bradley, Ray Carter, Les Etheridge (Deputy Chairman), John Fletcher, Peter Kelly, Mike Palmer, John Pomfret, John Reeve, Paul Roper, Gillian Smith, Roger Squires (Deputy Chairman), Paul Strudwick, Vaughan Welch (Deputy Chairman), Ian West

Finance Committee: Les Etheridge (Chairman). contact via Head Office. David Carrington, Mike Dyer, John Fletcher, Tony Harrison, Gordon Harrower, Mike Palmer, Nick Parker, Gillian Smith, Ian West, Alan Wiffen, Kerry Williamson

Navigation Committee: Roger Squires (Chairman). Tel: 0207 232 0987. [email protected] John Baylis (Deputy Chairman), Derek Bradley, Ian Fletcher, Steve Connolly, Peter Kelly, John Pomfret, John Reeve, Vaughan Welch

Restoration Committee: Vaughan Welch (Chairman). Tel: 0121 477 9782. [email protected] Chris Birks, Geraint Coles, Tony Harrison, Tony Hinsley, Martin Ludgate, Keith Noble (Deputy Chairman), Paul Roper, Andy Screen (Deputy Chairman), Luke Walker

Promotions and Communications Committee: Jerry Sanders (Chairman). Tel: 01283 716 158. [email protected] Arnold, Helen Bedingfield, John Bedingfield, Ray Carter, Madeline Dean, Elizabeth Payne, Jim Shead, Gillian Smith, Frank Wallder, Vaughan Welch, Helen Whitehouse

Waterway Recovery Group: Mike Palmer (Chairman). Tel: 01564 785293. [email protected]

Inland Waterways Enterprises Limited Board of Directors: Les Etheridge (Chairman). Contact via Head Office Neil Edwards, John Fletcher, Ian West

IWA Festivals Division: Ian West (Chairman). Tel: 01564 230104. [email protected]

Inland Waterways Freight Group: John Pomfret (Chairman). Tel: 01788 891027. [email protected]

Hon. Consultant Engineers: Roy Sutton, BA Hons MICE, Tony Harrison, BSc (Hons), DHE, MICE. Tel: 01491 872380

Hon. Consultant Planner: Bob Dewey BA (Hons) MBA, MRTPI

IWA Committee for Wales: General secretary, Gerallt Hughes. Tel: 01341 250631.

Essex Waterways Limited Board of Directors: Roy Chandler (Chairman), Colin Davis, Neil Edwards, Jim Jenkins, John Pomfret. Navigation Manager: Colin Edmond

REGIONAL CONTACTS East Midlands Chairman: John Baylis. Tel: 01623 621208. [email protected] Eastern Chairman: Derek Bradley. Tel: 01353 661601. [email protected] London Chairman: Roger Squires. Tel: 020 72320987. [email protected] North East & Yorkshire Chairman: John Reeve. Tel: 01642 580350. [email protected] North West Chairman: Gillian Smith. Tel: 01257 463485. [email protected] South East Chairman: Paul Roper. Tel: 0118 9813381. [email protected] West Chairman: Peter Kelly. Tel: 01752 843556. [email protected] West Midlands Chairman: Clive Henderson. Tel: 01564 783672. [email protected]

BRANCH CONTACTS Avon & Wiltshire John Webb. Tel: 01225 836137. [email protected] Birmingham, Black Country & Worcestershire Vaughan Welch. Tel: 0121 4779782. [email protected] Stephen Foote. Tel: 01763 838936. [email protected] Jan Thurston. Tel:01702 529553. [email protected] Chester & District Margaret Pitney. Tel: 0151 6086487. [email protected] Chiltern Peter Winter. Tel: 01494 813338. [email protected] East Yorkshire Mrs Chris Stones. Tel: 01482 875894. [email protected] Glouc & Hereford Martin Turner. Tel: 01291 650605. [email protected] & Reading Mike Adams. Tel: 01483 773512. [email protected] Hertfordshire Michael Wright. Tel: 01727 860137. [email protected] Ipswich Charles Stride. Tel: 01728 831061. [email protected] Kent & East Sussex Roy Sutton. Tel: 01342 317569. Lee & Stort John Shacklock. Tel: 01992 465643. [email protected] Leicestershire David Hastie. Tel: 0116 2608027. [email protected] Lichfield Phil Sharpe. Tel: 01889 583330. [email protected] Penny Carnell. Tel: 01469 530138. [email protected] Manchester Steve Connolly. Tel: 01942 679310. [email protected] Merseyside & West Lancs Andrew Lawton. Tel: 01695 572389. [email protected] Middlesex Robin Bishop. Tel: 020 8452 2632. [email protected] Milton Keynes Peter Caswell. Tel: 07702 668924. [email protected] North & East London Roger Wilkinson. Tel: 0208 4589476. [email protected] North Lancashire & Cumbria Madeline Dean. Tel: 01257 231861. [email protected] Northampton Jan Andrews. Tel: 01604 858023. [email protected] Nottinghamshire & Derbyshire Contact via IWA Head Office. [email protected] Ron Heritage. Tel: 01869 277400. [email protected] Peterborough Nigel Long. Tel: 01733 553782. [email protected] Shrewsbury District & N Wales Dawn Aylwin. Tel: 01691 830403. [email protected] Solent & Arun Brendan Whelan. Tel: 01903 816012. [email protected] South London Lesley Pryde. Tel: 07787 360957. [email protected] South Wales Jeff Roberts. Tel: 01225 872095. [email protected] South Yorkshire & Dukeries Mavis Paul. Tel:0114 2683927. [email protected] Stoke on Trent Alison Smedley. Tel: 01538 385388. [email protected] Sue Roy. Tel: 01926 497845. [email protected] West Country Chris Jewell. Tel: 01288 352298. [email protected] West Riding Ian Moore. Telephone Alastair Furniss: 0113 2539401. [email protected]

pg 044 Directory.indd 44 21/4/09 11:55:47 am

Page 45: Waterways Summer Issue

IWA WATERWAYS / Summer 2009 / 45

Glebe Farm, Stockton, Southam, CV47 8JGTel: 01926 812134 Fax: 01926 810354

Email: [email protected]

A.B. TUCKEYA family business of 25 years’

experience providing a reliable, friendly and personal service to transport narrowboats by road, up to 70’ long and 25 tonnes in weight. We also have a 35 tonne and 70

tonne crane for hire.

T.R. Boat HandlingRYA Recognised Teaching Establishement

“The experience increased our knowledge & confi dence well above our expectations” Howard and Sue, Doncaster

The ideal present that lasts forever1,2 and 3 day RYA courses aboard our narrow boat or your own craft

RYA Inland Waterway Helmsman certifi cate for both beginners and the experienced from £95.00

Friendly and understanding instructor also ICC & CEVNI courses MCA Boat Master Grade 3

“Thank you for a fantastic day. Your guidance, gentle coaxing & patience got the best from both of us”

Sharon and Steve, Belper

Book your course now

Tel: Terry 01785 824012 Mob 07947 337492

p045.indd 1p045.indd 1 21/4/09 11:17:5821/4/09 11:17:58

Page 46: Waterways Summer Issue

48 / IWA WATERWAYS / Summer 2009

Email: [email protected] Website: www.webstersinsulation.com

Crow Tree Farm, Thorne Levels, Doncaster, South Yorkshire DN8 5TF

Webtherm Marine Spray Foam InsulationProper price, proper job

30

01405 8126820 8 0 0 5 8 1 2 4 7

WATERWAYS ADVERTISING Summer 2009

Index to AdvertisersA & K Insulation ........................................................... 22AB Tuckey ...................................................................... 45ABC Leisure Group ..................................................... 21Advanced Elements Kayaks ........................................ 27Adverc BM Ltd .............................................................. 13Arlen Hire Boats .......................................................... 23Bargee Bill ....................................................................... 48Blisworth Tunnel Narrowboats ................................ 48Botany Bay ..................................................................... 16Braunston Marina ............................................................5British Waterways ........................................................ 35Caldwells ........................................................................ 22Canal Cruising Co ........................................................ 35Canal Junction ............................................................... 35Castle Narrowboats .................................................... 22Channelglaze .................................................................. 22Church Minshull ..................................................... 17, 45Colecraft Engineering Ltd ........................................... 22Country Craft Narrowboats ..................................... 21Elite Furnishings ............................................................ 23

Fenland District Council ................................................4Fox’s Boats ..................................................................... 22GEOprojects .................................................................. 23Kingsground Narrowboats ......................................... 21Lee Sanitation ................................................................ 16M&R Controls ............................................................... 35Maestermyn Group ...................................................... 16Mel Davis ........................................................................ 17Mercia Marina ..............................................................IBCNarrowboat Buyers ..................................................... 45Navigators & General .................................................. 17Nottingham Boat Sales ...................................................3Orchard Marina ............................................................ 27Pennine Cruisers .............................................................4Powermaster Systems ................................................. 21Red Hill Marine ................................................................4Reeves Boatbuilders ..................................................... 16Riversdale Barge Co .................................................... 35Rose Narrowboats ..........................................................4Safeshore Marine .......................................................... 48

Saul Junction Marina .................................................... 23Shobnall Boat Services ................................................ 45Stephen Goldsbrough Boats ...................................... 35Swanley Bridge Marina ................................................ 13Tattenhall Marina .............................................................3Teddlesley Boat Co ..................................................... 21The Boat Shop .............................................................. 48The New Boat Co .................................................. OBCTingdene Marina ..............................................................2Towergate Mardon ...................................................... 13TR Boat Handling ......................................................... 45Troll Publishing .............................................................. 27Ventnor Farm Marina .................................................. 45Videoactive ........................................................................4Waterside Canal Craft ................................................ 21Websters Insulation ..................................................... 48Wharf House Narrowboats ...................................... 16Whilton Marina ........................................................... IFCWorcester Marine Windows .................................... 16

Waterways is distributed free to all members of the Association with a total readership of over 20,000. We offer a first class service to advertisers in every field connected with inland waterways, such as boating, hiring, insurance, building, publishing, catering chandlery

or brokerage.

To advertise in IWA Waterways please contact Tony Preston, Advertising Manager, 151 Station Street, Burton-Upon-Trent, Staffordshire, DE14 1BG. 01283 742 965 or [email protected]

p048.indd 1p048.indd 1 21/4/09 11:31:4421/4/09 11:31:44

Page 47: Waterways Summer Issue

Conveniently located on the Trent and Mersey Canal and close to the junction of the A38 and A50 in Derbyshire, Mercia Marina is set in 74 acres of unspoilt countryside. The Marina has been designed and built to offer boaters fi rst-class facilities for your enjoyment and recreations.

By retaining the natural profi le of Willington Lake and adding islands and promontories, the design deliberately creates a number of small marinas within the larger waterscape thereby providing moorers with the ambience of a small marina but with all the facilities and benefi ts of a large marina.

■ Easier boat manouvering due to large expanses of open water between pontoons

■ Extra-wide pontoons with full length jetties for your comfort and safety

■ Canal-side location so no problems from fl ooding rivers■ 240V/16A individually metered electricity to each berth, water

to all berths■ Car parking close to all pontoons■ 25 super berths with pontoons on each side■ CCTV and electrically operated security gates■ Three high quality amenity buildings with showers, toilets and

laundry facilities■ Chandlery/Shop, Workshop, Brokerage, Tea Rooms ■ Covered double dry dock available to DIYers■ Fuelling quay, pump out, Elsan disposal, etc.■ Independent repair and maintenance workshop■ Wireless internet throughout the site■ Natural setting and a nature reserve lake■ Easy walking distance of Willington and Findern, 10 minutes

drive to Derby, 15 minutes to M1, 25 minutes to Nottingham■ Near to Peak District National Park & Derbyshire Dales

To fi nd out more call 01283 703332or email [email protected]

OPEN 7 DAYS A WEEK

mercia.indd 1mercia.indd 1 21/4/09 14:44:5021/4/09 14:44:50

Page 48: Waterways Summer Issue

Untitled-1 1Untitled-1 1 21/4/09 11:32:5421/4/09 11:32:54