wavefront characterization campaign at paranal december 2007

27
WAVEFRONT CHARACTERIZATION CAMPAIGN AT PARANAL DECEMBER 2007 Using DIMM-MASS-GSM-MOSP-LuSci & SCIDAR ESO/LUAN/IAC/CTIO Joint effort 1 F O R O T - S a r d e n i a 1 5 - 1 8 S e p t e m b e r 2 0 0 8

Upload: nessa

Post on 14-Feb-2016

32 views

Category:

Documents


0 download

DESCRIPTION

Wavefront Characterization Campaign at Paranal December 2007. ESO/LUAN/IAC/CTIO Joint effort. Using DIMM-MASS-GSM-MOSP- LuSci & SCIDAR. The goals of the campaign. ELT-DS (EU-FP6) funds Understand the properties of the optical turbulence at ELT scales (which model for L0?) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Wavefront  Characterization Campaign at Paranal December 2007

FOROT-Sardenia 15-18 September 2008

1

WAVEFRONT CHARACTERIZATION CAMPAIGN AT PARANALDECEMBER 2007

UsingDIMM-MASS-GSM-MOSP-LuSci & SCIDAR

ESO/LUAN/IAC/CTIOJoint effort

Page 2: Wavefront  Characterization Campaign at Paranal December 2007

2

FOROT-Sardenia 15-18 September 200

8

THE GOALS OF THE CAMPAIGN ELT-DS (EU-FP6) funds Understand the properties of the optical

turbulence at ELT scales (which model for L0?)

Understand the transition from free air to telescope enclosure

Cross-correlate various instruments used in site surveys, establish confidence levels

Page 3: Wavefront  Characterization Campaign at Paranal December 2007

FOROT-Sardenia 15-18 September 200

8

3

Instruments’ baselines or diameters

2m

GSMMOSPSCIDARLUSCIMASSDIMM

8m

AO WFS: NACO Interferometry: AMBER

Kolmogorov / von Kàrmàn von Kàrmàn??

Nice & ESO ESO & ONERA ESO

Spatial scales at which turbulence is probed by different instruments

Page 4: Wavefront  Characterization Campaign at Paranal December 2007

FOROT-Sardenia 15-18 September 200

8

4

Instruments and expected parameters

MASS-DIMM (CN2(h), e0, t0)

LUSCI (CN2(h))

SCIDAR (CN2(h),v(h), e0, q0, t0)

MOSP (L0(h), CN2(h), e0)

DIMM (e0, t0)GSM (e0, L0, q0, t0)NACO (e0, L0, t0)AMBER (OPD, e0, L0)

CN2 : structure constantL0 : outer scaleV : wind speedε0 : seeing θ0 : isoplanatic angleτ0 : coherence time

Page 5: Wavefront  Characterization Campaign at Paranal December 2007

CORRECTION FROM GROUND (6M) TO ELT (50-100M)

Seeing conditions are monitored at lower height above ground Direct measurement of the

surface layer turbulence properties in the first 100m

Indirect estimations:UT-DIMM comparisonMASS-DIMM comparisonSLODAR-MASS-DIMM comparisonLuSci-MASS-DIMM-GSM

comparison

50-100m

DIMM UT ELT

6m

30m

?

Sym

posi

um o

n se

eing

, Kon

a M

arch

200

7 -

- S

lide

5

Page 6: Wavefront  Characterization Campaign at Paranal December 2007

FOROT-Sardenia 15-18 September 200

8

6

N

E

Cute-SCIDAR location at Paranal

The Paranal Astronomical Site Monitor is located on the platform, in a zone diametrically opposite to the Control Building, just behind the VST.

The CUTE-SCIDAR@AT4 is located on the platform, in VLTI J2 Station.

WHERE?

Page 7: Wavefront  Characterization Campaign at Paranal December 2007

FOROT-Sardenia 15-18 September 200

8

7

Cute-SCIDAR at Paranal (AT4 focus) for E-ELT Site Characterisation (Vázquez Ramió et al; The Messenger 132 – June 2008)

INSTRUMENT COMMISSIONED IN NOVEMBER 2007

Data collected during 20 nights between November and December 2007

December acquisitions included in the Navidad Campaign

Page 8: Wavefront  Characterization Campaign at Paranal December 2007

FOROT-Sardenia 15-18 September 200

8

8

Meteo, DIMM, GSM and MOSP, MASS and LuSci

Page 9: Wavefront  Characterization Campaign at Paranal December 2007

FOROT-Sardenia 15-18 September 200

8

9

DIMM, GSM and MOSP

SCIDAR-----

Page 10: Wavefront  Characterization Campaign at Paranal December 2007

FOROT-Sardenia 15-18 September 200

8

10

Synchronous acquisitions

Page 11: Wavefront  Characterization Campaign at Paranal December 2007

FOROT-Sardenia 15-18 September 200

8

11

GSM and MOSP (Borgnino & al, this conference)…& nearby buildings

Page 12: Wavefront  Characterization Campaign at Paranal December 2007

FOROT-Sardenia 15-18 September 200

8

12

LUSCI - J. Beckers, 1993 & this conference- P. Hickson, 2004 & this conference- A. Tokovinin SPIE 7013, 2008

Page 13: Wavefront  Characterization Campaign at Paranal December 2007

FOROT-Sardenia 15-18 September 200

8

13

MASS-DIMM on C11 tube and ASTELCO mount

Page 14: Wavefront  Characterization Campaign at Paranal December 2007

14

FOROT-Sardenia 15-18 September 200

8TURBULENCE PROFILES FROM MASS

The altitude weighting functions of MASS and SCIDAR are of different physical nature

Page 15: Wavefront  Characterization Campaign at Paranal December 2007

FOROT-Sardenia 15-18 September 200

8

15

Cute-SCIDAR@AT4 on VLTI J2 Station

- 300 m vertical resolution

- layers sensed between the ground (pupil) and 22.5 km above pupil (about 78 layers sensed each 25 seconds)

- Cn2 for each layer (GL +

FA)

- Isoplanatic Angle

Page 16: Wavefront  Characterization Campaign at Paranal December 2007

FOROT-Sardenia 15-18 September 200

8

16

SCIDAR real time analysis and first post-processing

Real time turbulence evolution including and excluding dome turbulence (see Fuensalida et al. 2008, MNRAS, 389, 731)Direct correlation with Seeing from other Profilers or Monitors, wind speed and wind directionRecombination of the turbulence profile in a “MASS-like” structure for immediate comparison

Page 17: Wavefront  Characterization Campaign at Paranal December 2007

17

FOROT-Sardenia 15-18 September 200

8RESULTS 2007-12-17

Page 18: Wavefront  Characterization Campaign at Paranal December 2007

18

FOROT-Sardenia 15-18 September 200

8RESULTS 2007-12-18

Page 19: Wavefront  Characterization Campaign at Paranal December 2007

19

FOROT-Sardenia 15-18 September 200

8RESULTS 2007-12-19

Page 20: Wavefront  Characterization Campaign at Paranal December 2007

20

FOROT-Sardenia 15-18 September 200

8RESULTS 2007-12-20

Page 21: Wavefront  Characterization Campaign at Paranal December 2007

21

FOROT-Sardenia 15-18 September 200

8RESULTS 2007-12-21

Page 22: Wavefront  Characterization Campaign at Paranal December 2007

22

FOROT-Sardenia 15-18 September 200

8RESULTS 2007-12-22

Page 23: Wavefront  Characterization Campaign at Paranal December 2007

23

FOROT-Sardenia 15-18 September 200

8RESULTS 2007-12-23

Page 24: Wavefront  Characterization Campaign at Paranal December 2007

24

FOROT-Sardenia 15-18 September 200

8RESULTS 2007-12-24

Page 25: Wavefront  Characterization Campaign at Paranal December 2007

FOROT-Sardenia 15-18 September 200

8

25

MASS vs Cute-SCIDAR “MASS-like” structure: X-Comparison

- 300 m vertical resolution

- layers sensed between the ground (pupil) and 22.5 km above pupil (about 78 layers sensed each 25 seconds)

- Cn2 for each layer (GL

+ FA)

- Isoplanatic Angle

Page 26: Wavefront  Characterization Campaign at Paranal December 2007

FOROT-Sardenia 15-18 September 200

8

26

MASS vs Cute-SCIDAR “MASS-like” structure: X-Comparison

Page 27: Wavefront  Characterization Campaign at Paranal December 2007

FOROT-Sardenia 15-18 September 200

8

27

MASS vs Cute-SCIDAR “MASS-like” structure: X-Comparison

- clocks from the two instruments are synchronized within few seconds

- data are 1 minute averages in one night

- Cute-SCIDAR averages are synchronized no more than ± 30 sec with respect to MASS data

more work needed!!!