Residents and businesses are invited to have their say on the proposed Ingenium Parc Masterplan which could potentially see the creation of over 2000 jobs for Darlington. www.darlington.gov.uk/ingeniumparc INGENIUM PARC CONSULTATION SUMMER 2017 We want to hear from you Through the development of the project, we want to seek your views on our plans for the area and try to address any key concerns prior to adoption. Please let us know what you think through: • www.darlington.gov.uk/ingeniumparc Attend the consultation event at Firthmoor Community Centre, between 4-7pm on Wednesday 13th September 2017 [email protected] Filling out the below section and returning to ‘Economic Projects Team, Town Hall, Darlington, DL1 5QT’. Please note that all comments need to be received by 26th September 2017 to give us time to make any changes and present the finalised plans to Cabinet in October 2017. ......................................................................... ......................................................................... ......................................................................... ......................................................................... ......................................................................... ......................................................................... ......................................................................... ......................................................................... ......................................................................... ......................................................................... ......................................................................... ......................................................................... Please continue on separate sheet if required. Masterplan A comprehensive masterplan is in development which will guide the future development of the site through outlining the various opportunities and constraints that the site presents alongside the ambitions of the Council to create an attractive environment and a great place to do business. This will be informed by many different pieces of information and this consultation is your opportunity to provide views. As part of this process we have commissioned a number of different pieces of work to help us understand the site. These include: Site analysis including habitats and ecology Heritage & Archaeology Highways & Transport Public rights of way Flood and water management Utilities and energy uses Design quality, phasing & construction Environmental considerations The outcomes from this consultation and the work mentioned above will inform the process and the final masterplan. Next Steps Once we receive your comments and the outcome of all the studies we will finalise a masterplan. We would aim to present this to the Council’s Cabinet in October 2017. If the masterplan is adopted we would then submit a Planning Application with a view to commencing works on Phase 1 early in 2018.

Upload: others

Post on 15-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: We want to Masterplan INGENIUM hear from you PARC€¦ · mentioned above will inform the process and the final masterplan. Next Steps Once we receive your comments and the outcome

Residents and businesses are invited to have their say on the proposed Ingenium Parc Masterplan which could potentially see the creation of over 2000 jobs for Darlington.

www.darlington.gov.uk/ingeniumparc

INGENIUM PARCCONSULTATION SUMMER 2017

We want to hear from youThrough the development of the project, we want to seek your views on our plans for the area and try to address any key concerns prior to adoption. Please let us know what you think through:

• www.darlington.gov.uk/ingeniumparc

• Attend the consultation event at Firthmoor Community Centre, between 4-7pm on Wednesday 13th September 2017

[email protected]

• Filling out the below section and returning to ‘Economic Projects Team, Town Hall, Darlington, DL1 5QT’.

Please note that all comments need to be received by 26th September 2017 to give us time to make any changes and present the finalised plans to Cabinet in October 2017.

.........................................................................

.........................................................................

.........................................................................

.........................................................................

.........................................................................

.........................................................................

.........................................................................

.........................................................................

.........................................................................

.........................................................................

.........................................................................

.........................................................................

Please continue on separate sheet if required.

MasterplanA comprehensive masterplan is in development which will guide the future development of the site through outlining the various opportunities and constraints that the site presents alongside the ambitions of the Council to create an attractive environment and a great place to do business.

This will be informed by many different pieces of information and this consultation is your opportunity to provide views. As part of this process we have commissioned a number of different pieces of work to help us understand the site. These include:

• Site analysis including habitats and ecology

• Heritage & Archaeology

• Highways & Transport

• Public rights of way

• Flood and water management

• Utilities and energy uses

• Design quality, phasing & construction

• Environmental considerations

The outcomes from this consultation and the work mentioned above will inform the process and the final masterplan.

Next StepsOnce we receive your comments and the outcome of all the studies we will finalise a masterplan.

We would aim to present this to the Council’s Cabinet in October 2017.

If the masterplan is adopted we would then submit a Planning Application with a view to commencing works on Phase 1 early in 2018.

Page 2: We want to Masterplan INGENIUM hear from you PARC€¦ · mentioned above will inform the process and the final masterplan. Next Steps Once we receive your comments and the outcome

Ingenium Parc will be the premier location for industrial development in Darlington is one of the top five priority Economic Growth projects for the Borough.

CumminsSalters Lane, leading to Yarm Road

Firt

hmoo

r

Maidendale Nature Reserve

Image is for illustrative purposes only

Cleveland Bridge

Phase 1

Phase 2

Phase 3

Ingenium Parc is a 40ha site accessed from Salters Lane via Yarm Road. To the south of Darlington’s Eastern Growth Zone, the site is currently adjoined by industrial, manufacturing and office uses and Maidendale Nature Reserve to the west.

With excellent transport links, the site is ideally placed to support the manufacturing, engineering and logistics/distribution sectors.

The site is identified as a strategic employment site (for B1, B2, B8 uses) in:

• Darlington’s Employment Land review (2009)

• Local Development Framework Core Strategy (2011)

• Interim Planning position statement (2016)

Ingenium Parc is currently being master planned to unlock its development potential. This is a long term vision spread across three distinct phases.

The first phase will be around eleven hectares, creating up to 1000 jobs by 2021.

Proposed work as part of phase 1 includes:• Yarm Road roundabout improvements

• Salters Lane South upgrade

• Installation of infrastructure and services (first 200m of road into the site to open phase 1 only).

Subject to approval, this work will start early next year with completion by the end of 2019.

First development plots will be available from 2019/20 and any businesses/investors interested in the site are asked to contact the Council’s Business Investment Team: