program Co-determination and climate action Guided factory tour in the context of COP23 in Bonn 08:30 Welcome & Departure in Bonn 09:30 bis 11:00 Visiting heat and power plant Niehl 3, Cologne Highly efficient Combined Cycle Gas Turbine plant, which was put into operation in April 2016 12:00 bis 13:00 Uhr Visiting Covestro AG, Dormagen Production plant for CO2-based polyols, which was put into operation in 2016 13:30 bis 14:30 Lunch 15.00 bis 16:30 Uhr Hydro Aluminium Rolled Products GmbH, Grevenbroich Aluminum factory, which company strategy provides CO2 neutral production by 2020 Language: English

Upload: others

Post on 04-Jan-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1:  · Web viewVisiting heat and power plant Niehl 3, Cologne Highly efficient Combined Cycle Gas Turbine plant, which was put into operation in April 2016 12:00 bis 13:00 Uhr Visiting

Co-determination and climate action Guided factory tour in the context of COP23 in BonnWednesday, 08. November 2017

program

08:30 Welcome & Departure in Bonn

09:30bis11:00

Visiting heat and power plant Niehl 3, Cologne Highly efficient Combined Cycle Gas Turbine plant, which was put into operation in April 2016

12:00bis13:00 Uhr

Visiting Covestro AG, DormagenProduction plant for CO2-based polyols, which was put into operation in 2016

13:30bis14:30

Lunch

15.00bis16:30 Uhr

Hydro Aluminium Rolled Products GmbH, GrevenbroichAluminum factory, which company strategy provides CO2 neutral production by 2020