webinar on grid connection of offshore wind farms

37
Grid connection of offshore wind farms FSR Webinar Series Florence, 25 September, 2012 Leonardo Meeus (Florence School of Regulation, European University Institute) THINK (http://think.eui.eu) Florence School of Regulation

Upload: vlerick-business-school-amp-florence-school-of-regulation

Post on 29-Nov-2014

767 views

Category:

Documents


7 download

DESCRIPTION

Grids are already developing offshore, and this development will continue even though at what pace and how they will develop is still uncertain. Indeed, there are different possible configurations for a future offshore grid: it can be a simple multiplication of standalone lines that provide each a single service (either connection of generation, or connection between transmission grids); or it can be a more integrated infrastructure like an offshore meshed grid that combines and interconnects dozens of offshore lines and generation units (hereafter combined solution).

TRANSCRIPT

Page 1: Webinar on grid connection of offshore wind farms

http://think.eui.eu

Grid connection of offshore wind farms FSR Webinar Series Florence, 25 September, 2012 Leonardo Meeus (Florence School of Regulation, European University Institute) THINK (http://think.eui.eu)

Florence School of Regulation

Page 2: Webinar on grid connection of offshore wind farms

http://think.eui.eu

Grid connection of offshore wind farms Why this topic? … the buzz

2

Page 3: Webinar on grid connection of offshore wind farms

http://think.eui.eu

Grid connection of offshore wind farms Why this topic? … EU context

3

Offshore wind technology • Expected to increase from 3 GW to about 40 GW by 2020 in Europe

Offshore grid connection • Tennet is investing 6 billion to connect offshore wind in North Germany • The UK is expected to invest 6-10 billion pounds

Page 4: Webinar on grid connection of offshore wind farms

http://think.eui.eu

4

Grid connection of offshore wind farms Why a webinar?

Page 5: Webinar on grid connection of offshore wind farms

http://think.eui.eu 5

Grid connection of offshore wind farms Webinar focus

Who should design and develop the grid connection?

Who should pay for the grid connection?

Who should be the regulator for the grid connection?

Page 6: Webinar on grid connection of offshore wind farms

http://think.eui.eu

First poll: Who should design and develop the grid connection of offshore wind farms? “choose a statement”

• A: Transmission System Operator (TSO) • B: Offshore wind farm developers (Generators) • C: Tender (Third parties)

6

Page 7: Webinar on grid connection of offshore wind farms

http://think.eui.eu

1. Who should design and develop the connection? Onshore

7

Connection regime • First-come-first-serve

Principles • Planning limited • Element of competition no

Importance of the principles • Onshore: limited • Offshore: important

Page 8: Webinar on grid connection of offshore wind farms

http://think.eui.eu

1. Who should design and develop the connection? Increasing cost and technology uncertainties (THINK, 2012)

8

-50

0

50

100

150

200

250

300

350

400

1990 1995 2000 2005 2010 2015 2020

Dist

ance

(km

)

Year Commissioned

HVACHVDC VSCMVAC

Page 9: Webinar on grid connection of offshore wind farms

http://think.eui.eu 9

1. Who should design and develop the connection? Offshore wind farms in Germany (THINK, 2012)

# Name of the

wind farm Country

Year commissione

d

Distance to shore (km)

Power (MW)

Voltage (kV) Transmission technology

1 Alpha Ventus Germany 2010 52.5 60 110 HVAC 2 Baltic 1 Germany 2010 16 48.3 150 HVAC 3 Breitling Germany 2006 0.5 2.5 - - 4 Ems Emden Germany 2004 0.6 4.5 - - 5 HVDC BorWin 1 Germany 2009 200 400 150 HVDC VSC 6 HVDC BorWin 2 Germany 2012 200 800 HVDC VSC 7 HVDC DolWin 1 Germany 2013 330 800 320 HVDC VSC 8 HVDC HelWin 1 Germany 2013 130 576 380 HVDC VSC 9 HVDC SylWin 1 Germany 2014 205 864 HVDC VSC

Total Germany 3500

Page 10: Webinar on grid connection of offshore wind farms

http://think.eui.eu

1. Who should design and develop the connection? Germany offshore

10

Connection regime • Connection obligation

Planning • Offshore electricity plugs

Element of competition • No

Page 11: Webinar on grid connection of offshore wind farms

http://think.eui.eu 11

1. Who should design and develop the connection? Offshore electricity plugs (Tennet)

Page 12: Webinar on grid connection of offshore wind farms

http://think.eui.eu 12

1. Who should design and develop the connection? Offshore electricity plugs (Elia homepage)

Page 13: Webinar on grid connection of offshore wind farms

http://think.eui.eu 13

1. Who should design and develop the connection? Offshore electricity plugs (ABB, Borwin alpha)

Page 14: Webinar on grid connection of offshore wind farms

http://think.eui.eu

1. Who should design and develop the connection? Offshore wind farms in Sweden (THINK, 2012)

14

# Name of the

wind farm Country

Year commissione

d

Distance to shore (km)

Power (MW)

Voltage (kV) Transmission technology

1 Utgrunden Sweden 2000 8 10.5 21 MVAC 2 Yttre Stengrund Sweden 2001 4 10 20 MVAC 3 Lillgrund Sweden 2007 7 110.4 130 HVAC 4 Bockstigen Sweden 1998 3 2.5 - - 5 Vanern Sweden 2009 7 30 - -

Page 15: Webinar on grid connection of offshore wind farms

http://think.eui.eu

1. Who should design and develop the connection? Sweden offshore

15

Connection regime • Generators design and develop their connection

Planning • No

Element of competition • Yes

Page 16: Webinar on grid connection of offshore wind farms

http://think.eui.eu

1. Who should design and develop the connection? Offshore wind farms in the UK (THINK, 2012)

16

# Name of the

wind farm Country

Year commissione

d

Distance to shore (km)

Power (MW)

Voltage (kV) Transmission technology

1 Beatrice UK 2007 23 10 33 MVAC 2 Blyth UK 2000 1.6 4 11 MVAC 3 Burbo Bank UK 2007 6.4 90 33 MVAC 4 Inner Dowsing UK 2009 5.9 97.2 33 MVAC 5 Kentish Flats 1 UK 2005 10.75 90 33 MVAC 6 Lynn UK 2009 5.9 97.2 33 MVAC 7 North Hoyle UK 2004 7.2 60 33 MVAC 8 Rhyl Flats UK 2009 8 90 33 MVAC 9 Scroby Sands UK 2004 2.3 60 33 MVAC

10 Barrow UK 2008 7.5 90 132 HVAC 11 Greater Gabbard UK 2008 26 504 132 HVAC 12 Gunfleet Sands UK 2010 7 172.8 132 HVAC 13 Robin Rigg UK 2010 8 180 132 HVAC 14 Thanet UK 2010 11.4 300 132 HVAC 15 Walney 1 UK 2011 14.4 183.6 132 HVAC

Total UK 1478

Page 17: Webinar on grid connection of offshore wind farms

http://think.eui.eu 17

1. Who should design and develop the connection? Offshore wind farms in the UK (National Grid, 2011)

Page 18: Webinar on grid connection of offshore wind farms

http://think.eui.eu

1. Who should design and develop the connection? UK model for offshore (Martin Crouch, 2011)

Connection regime • Offshore Transmission Owners (OFTO)

Page 19: Webinar on grid connection of offshore wind farms

http://think.eui.eu

1. Who should design and develop the connection? UK model for offshore

Connection regime • Offshore Transmission Owners (OFTO)

Planning • More planning being considered

Element of competition • Yes • Ofgem: not only technology innovation

Page 20: Webinar on grid connection of offshore wind farms

http://think.eui.eu 20

First poll: Who should design and develop the grid connection of offshore wind farms? To sum up

Alternative models A) TSO B) Generators C) Third party

Experiments with these models Germany Sweden UK

Planning

Element of competition

Page 21: Webinar on grid connection of offshore wind farms

http://think.eui.eu 21

First poll: Who should design and develop the grid connection of offshore wind farms? To sum up

Alternative models A) TSO B) Generators C) Third party

Experiments with these models Germany Sweden UK

Planning

Element of competition

Page 22: Webinar on grid connection of offshore wind farms

http://think.eui.eu 22

First poll: Who should design and develop the grid connection of offshore wind farms? To sum up

Alternative models A) TSO B) Generators C) Third party

Experiments with these models Germany Sweden UK

Planning

Element of competition

Page 23: Webinar on grid connection of offshore wind farms

http://think.eui.eu

Second poll: Who should pay for the grid connection of offshore wind farms? “choose a statement”

• A: Offshore wind farm developer (Generator) • B: Grid users (Transmission tariffs)

23

Page 24: Webinar on grid connection of offshore wind farms

http://think.eui.eu

2. Who should pay? Example (Auer, 2007)

24

Page 25: Webinar on grid connection of offshore wind farms

http://think.eui.eu

2. Who should pay? Deep charges

25

Page 26: Webinar on grid connection of offshore wind farms

http://think.eui.eu

2. Who should pay? Shallow charges

26

Page 27: Webinar on grid connection of offshore wind farms

http://think.eui.eu

2. Who should pay? Super shallow charges

27

Page 28: Webinar on grid connection of offshore wind farms

http://think.eui.eu

2. Who should pay? Assessing current practice

28

Importance of having a price signal • Decision to locate • Timing decision

Current practice • Germany: super shallow charges • Sweden: shallow charges • UK: super shallow, but with locational G-component

Relevance offshore • Constrained by concessions • Electricity pugs

Page 29: Webinar on grid connection of offshore wind farms

http://think.eui.eu 29

Second poll: Who should pay for the grid connection of offshore wind farms? To sum up

E.g. Germany Sweden UK

Planning

Element of competition

Price signal

Page 30: Webinar on grid connection of offshore wind farms

http://think.eui.eu

Third poll: Who should be the regulator for the grid connection of offshore wind farms? “choose a statement”

• A: National regulatory authorities • B: Regional or EU regulatory framework

30

Page 31: Webinar on grid connection of offshore wind farms

http://think.eui.eu 31

3. Who should be the regulator? Kriegers Flak

Page 32: Webinar on grid connection of offshore wind farms

http://think.eui.eu 32

3. Who should be the regulator? Standalone solution

Page 33: Webinar on grid connection of offshore wind farms

http://think.eui.eu 33

3. Who should be the regulator? Combined solution

Page 34: Webinar on grid connection of offshore wind farms

http://think.eui.eu 34

3. Who should be the regulator? Problems due to not aligned national regulatory frameworks

• E.g. Swedish TSO is not responsible for connection of offshore wind farms

• E.g. German TSO obligation makes cooperation difficult

• … (THINK, 2012)

Page 35: Webinar on grid connection of offshore wind farms

http://think.eui.eu 35

3. Who should be the regulator? Future could bring many more Kriegers Flak type of offshore grid projects

Page 36: Webinar on grid connection of offshore wind farms

http://think.eui.eu 36

Grid connection of offshore wind farms Answers to the three questions

Who should design and develop the grid connection?

Who should pay for the grid connection?

Who should be the regulator for the grid connection?

What matters is to have advanced connection planning, and an element of competition

Offshore wind developers should at least pay shallow charges

Offshore grids require collective action at regional or EU level

Page 37: Webinar on grid connection of offshore wind farms

http://think.eui.eu

Thank you very much for your attention [email protected] http://think.eui.eu

Florence School of Regulation

THINK reports (published 2011 - 2012)

1) Public Support of RD&D

2) Smart Cities

3) Energy Roadmap for 2050

4) Public Budget of EU Member States

5) Offshore Grids

6) Transmission Grid Tarification

7) Building refurbishment

8) Electricity Storage

Ongoing (to be published in 2013)

9) EU technology policy for 2050

10) CBA for infrastructure package