Period: 3/26/20 - 4/01/20
Community High School District 99
Master Facility Plan Implementation
Wight Construction Services2500 North Frontage RoadDarien, IL 60561
Weekly Construction Progress Report
![Page 2: Weekly Construction Progress Report › prod › 11165... · 2020-04-03 · 360° Pictures: 1st Floor Alley Art Gallery 1st Floor 2nd Floor Classroom East Entrance MEP/Fire Alarm/Fire](https://reader033.vdocument.in/reader033/viewer/2022042411/5f29618b229ce303d95effbf/html5/thumbnails/2.jpg)
Community High School District 99
Master Facility Plan Implementation
Downers Grove South High School
Phase B - Fine Arts Addition
360° Pictures: 1st Floor Alley Art Gallery 1st Floor 2nd Floor Classroom East Entrance
• MEP/Fire Alarm/Fire Sprinkler trades continue to work on rough-in and light fixtures.
• Ductwork insulation in progress.
• Continue framing for Demo Kitchen, in-wall insulation and started drywall on the 1st floor.
• Continue with curtain wall installation; currently working on pressure plates for cw frames.
• Completed steel stair installation.
• Poured the concrete topping on 2nd floor and stair treads and landings.
• Installed scaffold for brick installation.
![Page 3: Weekly Construction Progress Report › prod › 11165... · 2020-04-03 · 360° Pictures: 1st Floor Alley Art Gallery 1st Floor 2nd Floor Classroom East Entrance MEP/Fire Alarm/Fire](https://reader033.vdocument.in/reader033/viewer/2022042411/5f29618b229ce303d95effbf/html5/thumbnails/3.jpg)
Community High School District 99
Master Facility Plan Implementation
Downers Grove South High School
Phase B - Bleachers & Squad Rooms
• Dant Clayton continue working on visitor bleachers ramps and stairs.
• JWI mobilized back to DGS and will be starting the installation of risers/treads for bleachers.
![Page 4: Weekly Construction Progress Report › prod › 11165... · 2020-04-03 · 360° Pictures: 1st Floor Alley Art Gallery 1st Floor 2nd Floor Classroom East Entrance MEP/Fire Alarm/Fire](https://reader033.vdocument.in/reader033/viewer/2022042411/5f29618b229ce303d95effbf/html5/thumbnails/4.jpg)
Community High School District 99
Master Facility Plan Implementation
Downers Grove South High School
Phase C - Auditorium
• Completed removal/salvage of auditorium light fixtures and delivered them to DGN.
• Continued working on gas piping relocation in band hallway through ceramics room.
• Continued abatement of existing areas in preparation for new Phase C work. GBTA has beensupervising and monitoring work onsite.
• Continued working on Fire Alarm & Fire Sprinkler work to retrofit existing areas. Completed thenew Fire Department Connection.
• Started investigation of existing piping in Auditorium in preparation for selective demolition.
• Moved all remaining items in auditorium to storage trailer in preparation for demolition.
![Page 5: Weekly Construction Progress Report › prod › 11165... · 2020-04-03 · 360° Pictures: 1st Floor Alley Art Gallery 1st Floor 2nd Floor Classroom East Entrance MEP/Fire Alarm/Fire](https://reader033.vdocument.in/reader033/viewer/2022042411/5f29618b229ce303d95effbf/html5/thumbnails/5.jpg)
Community High School District 99
Master Facility Plan Implementation
Downers Grove South High School
Phase C - Learning Commons
• Compass continued layout of gridlines for the commons.
• Kane County Excavating mobilized to the site and started excavation for site utilities and newfoundations.
• Werner Nugent currently working on new underground sanitary line in new commons.
![Page 6: Weekly Construction Progress Report › prod › 11165... · 2020-04-03 · 360° Pictures: 1st Floor Alley Art Gallery 1st Floor 2nd Floor Classroom East Entrance MEP/Fire Alarm/Fire](https://reader033.vdocument.in/reader033/viewer/2022042411/5f29618b229ce303d95effbf/html5/thumbnails/6.jpg)
Community High School District 99
Master Facility Plan Implementation
Downers Grove North High School
Phase B - Gym, Kitchen, Alley, Multipurpose,and Gymnastics Loft Addition
360° Pictures: Main Gym Kitchen Multi-Purpose Room Gymnastics Room
• Overhead MEP rough in continues throughout the upper & lower levels as well as the gym area.
• Roofing is progressing and scheduled to be complete this week.
• Interior masonry walls continue to progress throughout kitchen/ servery area.
• Cold form metal framing in alley and 2nd floor rooms is near completion. Received drywalldelivery for 2nd floor.
• Re-routed dual temp piping in basement that was in conflict with stair landing leaving the gymarea.
• Continue to make punch throughs for windows in alley as well as 1st floor opening from southcorridor into alley.
• Cooler/ Freezers have been field measured and are slated for install in a few weeks.
![Page 7: Weekly Construction Progress Report › prod › 11165... · 2020-04-03 · 360° Pictures: 1st Floor Alley Art Gallery 1st Floor 2nd Floor Classroom East Entrance MEP/Fire Alarm/Fire](https://reader033.vdocument.in/reader033/viewer/2022042411/5f29618b229ce303d95effbf/html5/thumbnails/7.jpg)
Community High School District 99
Master Facility Plan Implementation
Downers Grove North High School
Phase B - Bleachers & Squad Rooms
• Home bleachers - Geo-piers have been completed and passed load test. Began excavating andpouring bleacher structure foundations.
• Visitor Bleacher – Excavating and pouring for bleacher additions.
![Page 8: Weekly Construction Progress Report › prod › 11165... · 2020-04-03 · 360° Pictures: 1st Floor Alley Art Gallery 1st Floor 2nd Floor Classroom East Entrance MEP/Fire Alarm/Fire](https://reader033.vdocument.in/reader033/viewer/2022042411/5f29618b229ce303d95effbf/html5/thumbnails/8.jpg)
Community High School District 99
Master Facility Plan Implementation
Downers Grove North High School
Phase C - Cafeteria, Culinary Arts, Commons,and Southeast Addition
• Continuing environmental abatement for spring break work and also completing abatementpreviously scheduled for summer.
• Working on installing duct runs in classrooms on 3rd floor.
• Continue to work on logistics plan with school on potential areas that could be worked on whileschool is closed.
360° Pictures: Servery Commons