weekly projects update - w/e 28th april

8
Weekly Waste Projects Update – week ending 28 th April 2016 Weekly Waste Projects Update: week ending 28 th April 2016 Source: AcuComm Business Database 01 New/Updated Projects Reported (w/e 28 th Apr 2016) Number Estimated Value (all projects) Estimated Value (new projects only) US$ millions US$ millions Anaerobic Digestion 3 40 2 Biofuel 7 571 412 Biogas 3 22 17 Gasification 3 92 25 Incineration (with energy recovery) 12 1,588 641 Incineration (without energy recovery) - - - Integrated/mixed facilities 3 286 - Landfill - - - MBT 1 24 - Other 2 2,809 - Recycling 7 170 128 Waste processing 3 125 - Total 44 5,726 1,226 In the week ended 28 th April 2016, AcuComm added 44 new or updated waste projects to our Business Database, worth an estimated US$5,726 million and waste capacity of just under 9.4 million tonnes. This takes the cumulative total to 4,025 active projects since 2013, with a total estimated investment value of US$297 billion. Biofuel 70.4% Recycling 21.9% Gasification 4.3% Biogas 3.0% Anaerobic Digestion 0.4% Est. Value of New Projects by Facility Type (w/e 28th Apr 2016) To find out more information about the projects and investments covered in this update, click here

Upload: acucomm

Post on 13-Apr-2017

894 views

Category:

Environment


0 download

TRANSCRIPT

Page 1: Weekly Projects Update - w/e 28th April

Weekly Waste Projects Update – week ending 28th

April 2016

Weekly Waste Projects Update: week ending 28th

April 2016 Source: AcuComm Business Database

01

New/Updated Projects Reported (w/e 28th Apr 2016)

Number

Estimated Value (all projects)

Estimated Value (new projects only)

US$ millions US$ millions

Anaerobic Digestion 3 40 2

Biofuel 7 571 412

Biogas 3 22 17

Gasification 3 92 25

Incineration (with energy recovery) 12 1,588 641

Incineration (without energy recovery) - - -

Integrated/mixed facilities 3 286 -

Landfill - - -

MBT 1 24 -

Other 2 2,809 -

Recycling 7 170 128

Waste processing 3 125 -

Total 44 5,726 1,226

In the week ended 28th April 2016, AcuComm added 44 new or updated waste projects to

our Business Database, worth an estimated US$5,726 million and waste capacity of just

under 9.4 million tonnes.

This takes the cumulative total to 4,025 active projects since 2013,

with a total estimated investment value of US$297 billion.

Biofuel

70.4%

Recycling

21.9%

Gasification

4.3%

Biogas

3.0%

Anaerobic Digestion

0.4%

Est. Value of New Projects by Facility Type (w/e 28th Apr 2016)

To find out more information about the projects and investments

covered in this update, click here

Page 2: Weekly Projects Update - w/e 28th April

Weekly Waste Projects Update – week ending 28th

April 2016

Weekly Waste Projects Update: week ending 28th

April 2016 Source: AcuComm Business Database

02

New/Updated Projects Reported (w/e 28th Apr 2016)

Number Capacity (tonnes) MW

Anaerobic Digestion 3 453,690 5

Biofuel 7 1,837,911 173

Biogas 3 109,800 8

Gasification 3 225,115 51

Incineration (with energy recovery) 12 3,429,719 815

Incineration (without energy recovery) - - -

Integrated/mixed facilities 3 1,189,334 70

Landfill - - -

MBT 1 65,000 -

Other 2 412,694 2

Recycling 7 1,013,952 0

Waste processing 3 628,175 -

Total 44 9,365,391 1,123

The total estimated waste capacity of projects reported on

in the past week is just under 9.4 million tonnes. WtE

incineration was the largest category, accounting for just

over 3.4 million tonnes.

The total estimated power generation from these projects

was 1,123 MW. WtE incineration was the largest category,

accounting for 815 MW.

Incineration (with

energy recovery)

36.6%

Biofuel

19.6%

Integrated/mixed

facilities

12.7%

Others

31.1%

Reported Capacity of Projects by Facility Type (w/e

28th Apr 2016)

To find out more information about the projects and investments

covered in this update, click here

Page 3: Weekly Projects Update - w/e 28th April

Weekly Waste Projects Update – week ending 28th

April 2016

Weekly Waste Projects Update: week ending 28th

April 2016 Source: AcuComm Business Database

03

New Projects Reported by Waste Types (w/e 28th Apr 2016)

Number Capacity (tonnes) MW

Animal 4 497,499 6

Clinical - - -

Construction/Demolition - - -

e-Waste - - -

Food 1 27,000 2

Gas - - -

Glass - - -

Hazardous - - -

Heat 1 140,156 0

Industrial - - -

Metals 1 50,000 -

MSW 13 4,049,808 185

Oil - - -

Organic (general/unspecified) 6 874,889 88

Other 2 193,572 -

Paper 1 24,000 -

Plant biomass (non-waste) 2 1,088,324 419

Plant biomass (waste) 5 1,024,864 278

Plastics - - -

Radioactive 1 384,694 -

Rubber - - -

Sewage/wastewater - - -

Wood 7 1,010,584 145

Total 44 9,365,391 1,123

Municipal Solid Waste and plant biomass were the

leading feedstocks in the past week, accounting for

4.0 million tonnes and 2.1 million tonnes

respectively. Wood accounted for a further 1.0

million tonnes.

MSW

43.2%

Plant biomass

(non-waste)

11.6%

Plant biomass (waste)

10.9%

Others

34.2%

Reported Capacity of Projects by Waste Type (w/e

28th Apr 2016)

To find out more information about the projects and investments

covered in this update, click here

Page 4: Weekly Projects Update - w/e 28th April

Weekly Waste Projects Update – week ending 28th

April 2016

Weekly Waste Projects Update: week ending 28th

April 2016 Source: AcuComm Business Database

04

New/Updated Projects, Country Coverage, (w/e 28th Apr 2016)

Projects

USA 9

UK 6

Finland 5

Canada 4

Spain 2

Sweden 2

China 2

Luxembourg 2

Japan 2

Others 10

Total 44

The leading countries in the past week were the

USA with nine projects, and the UK with six.

9

6

5

4

2 2 2 2 2

0 0

10

0

2

4

6

8

10

12

US

A

UK

Fin

lan

d

Can

ad

a

Sp

ain

Sw

ed

en

Ch

ina

Lu

xem

bo

urg

Jap

an

Oth

ers

Reported Projects by Country (w/e 28th Apr 2016)

To find out more information about the projects and investments

covered in this update, click here

Page 5: Weekly Projects Update - w/e 28th April

Weekly Waste Projects Update – week ending 28th

April 2016

Weekly Waste Projects Update: week ending 28th

April 2016 Source: AcuComm Business Database

05

Average Project Values by Facility Type

US$ millions

Anaerobic Digestion 23

Biofuel 97

Biogas 27

Gasification 154

Incineration (with energy recovery) 109

Incineration (without energy recovery) 65

Integrated/mixed facilities 182

Landfill 22

MBT 67

Other 112

Recycling 28

Waste processing 67

All Projects 74

Average Project Values by Feedstock Type

US$ millions

Animal 17

Clinical 32

Construction/Demolition 9

e-Waste 26

Food 18

Gas 49

Glass 14

Hazardous 80

Heat 25

Industrial 96

Metals 52

MSW 93

Oil 42

Organic (general/unspecified) 60

Other 69

Paper 84

Plant biomass (non-waste) 105

Plant biomass (waste) 80

Plastics 22

Radioactive 565

Rubber 34

Sewage/wastewater 42

Wood 86

All Projects 74

The average active waste project is worth US$74 million. There are naturally

wide variations in average project value, due to the size, duration and

complexity of different types of project. The figures on this page represent

our latest estimates, based on data from 2013 to the current week.

To find out more information about the projects and investments

covered in this update, click here

Page 6: Weekly Projects Update - w/e 28th April

Weekly Waste Projects Update – week ending 28th

April 2016

Weekly Waste Projects Update: week ending 28th

April 2016 Source: AcuComm Business Database

06

Top Five Projects, week ending 28th April 2016, by Estimated Value (US$ millions) Click the flag for more information on each project

1 Ukraine 2,684 Development of a nuclear waste storage facility.

2 Finland 325 Construction of a CHP plant running on biomass or waste.

3 Japan 257 Construction of a 245 tpd WtE facility.

4 UK 186 Construction of an integrated waste management facility.

5 Japan 152 Refurbishment of a waste-to-energy facility.

Top Five Projects, week ending 28th April 2016, by Reported Waste Capacity (tonnes)

1 UK 863,700 Construction of an integrated waste management facility.

2 China 821,250 Construction of a 50 MW WtE plant.

3 UK 450,000 Construction of a 450,000 tpa materials recovery and recycling facility.

4 China 441,650 Construction of a 25 MW WtE plant.

5 Finland 175,200 Multi-fuel WtE facility.

Top Five Projects, week ending 28th April 2016, by Reported Power Generation (MW)

1 Finland 386 Construction of a CHP plant running on biomass or waste.

2 Finland 145 Biomass plant improvement works.

3 China 50 Construction of a 50 MW WtE plant.

4 Luxembourg 40 Construction of a biomass cogeneration plant.

5 UK 33 Construction of an integrated waste management facility.

Page 7: Weekly Projects Update - w/e 28th April

Weekly Waste Projects Update – week ending 28th

April 2016

Weekly Waste Projects Update: week ending 28th

April 2016 Source: AcuComm Business Database

07