Welcome Portageville Bridge Project National Environmental Policy Act (NEPA) Public Scoping Meeting November 19, 2013 4:00 PM to 7:00 PM Genesee River Restaurant 134 North Main Street Mount Morris, NY Federal Lead Agency: Federal Highway Administartion (FHWA) State Lead Agency: New York State Department of Transportation (NYSDOT) Project Sponsor: Norfolk Southern Railway (NS)

Upload: others

Post on 08-Oct-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Welcome Portageville Bridge Project National Environmental ... · 11/11/2013  · Welcome Portageville Bridge Project National Environmental Policy Act (NEPA) Public Scoping Meeting

Wel

com

eP

ort

agev

ille

Bri

dg

e P

roje

ctN

atio

nal

Env

iron

men

tal P

olic

y A

ct (N

EPA

)

Pub

lic S

cop

ing

Mee

tin

g

Nov

emb

er 1

9, 2

013

4:00

PM

to 7

:00

PM

Gen

esee

Riv

er R

esta

uran

t

134

Nor

th M

ain

Str

eet

Mou

nt M

orri

s, N

Y

Fede

ral L

ead

Agen

cy:

Fed

eral

Hig

hway

Ad

min

ista

rtio

n (F

HW

A)

Stat

e Le

ad A

genc

y: N

ew Y

ork

Stat

e D

epar

tmen

t of T

ran

spor

tati

on (N

YSD

OT)

Proj

ect S

pons

or:

Nor

folk

Sou

ther

n R

ailw

ay (N

S)

Page 2: Welcome Portageville Bridge Project National Environmental ... · 11/11/2013  · Welcome Portageville Bridge Project National Environmental Policy Act (NEPA) Public Scoping Meeting

Project Location

SCALE

0 40 MILES

N

PROJECT LOCATION

Operating Rail Line (2008)

Norfolk Southern’s Southern Tier Route

Sour

ce:

New

Yor

k St

ate

Rail

Plan

, 20

09

Ridge

Chace

Oakland

Castile

Fairview

Tuscarora

Silver Lake

Portageville

Mount Morris

Coopersville

Brooks Grove

Silver Springs

39

39

36

70

19A

436

436

408

L i v i n g s t o nC o u n t y

W y o m i n gC o u n t y

WYO

MIN

G C

OUN

TY

LIVI

NGST

ON

COUN

TY

Silver Lake

Buck Run Creek

Silver Lake Outlet

Eastover Brook

Two Mile C

reek

Allens Creek

Damonsville Creek

Genesee River

Keshequa CreekGenesee River

Genesee River

KeshequaCreek

Tuscarora Creek

LetchworthState Park

Silver LakeState Park

Park R

d

Park R

d

River Rd

River Rd

Cree

k Rd

Cree

k Rd

Frost RdFrost Rd

Bego

le R

d

Bego

le R

d

Ridge Rd E

Ridge Rd E

Short Tract Rd

Short Tract Rd

E Lake RdE Lake Rd

East RdEast Rd

Mount

Morris

Nunda

Rd

Mount

Morris

Nunda

Rd

Hoagland Rd

Hoagland Rd

Barron Rd

Barron Rd

Oak

land

Rd

Oak

land

Rd

Mid

dle

Rese

rvat

ion

Rd

Mid

dle

Rese

rvat

ion

Rd

W Lake RdW Lake Rd

Sonyea Rd

Sonyea Rd

Dutch

Stre

et R

d

Dutch

Stre

et R

d

Tene

fly R

d

Tene

fly R

d

Swyers Rd

Swyers Rd

Jord

an R

d

Jord

an R

d

Alvo

rd R

d

Alvo

rd R

d

Highbanks RdHighbanks Rd

Sanford Rd

Sanford Rd

Swanson Rd

Swanson Rd

School Rd

School Rd

Hathaway Rd

Hathaway Rd

Guile RdGuile Rd

Schenck Rd

Schenck Rd

View RdView Rd

Rack

ett R

d

Rack

ett R

d

Pick

et L

ine

Rd

Pick

et L

ine

Rd

Uppe

r Res

erva

tion

Rd

Uppe

r Res

erva

tion

Rd

Broughton Rd

Broughton Rd

E Center Rd

E Center Rd

Denton Corners RdDenton Corners Rd

Dud

ley

Rd

Dud

ley

Rd

Gibson

ville

Rd

Gibson

ville

Rd

Gle

n Iri

s Rd

Gle

n Iri

s Rd

Gulley RdGulley Rd

Barber Rd

Barber Rd

Moyer Rd

Moyer Rd

Scip

io R

d

Scip

io R

d

Lowe

r Res

erva

tion

Rd

Lowe

r Res

erva

tion

Rd

Cole RdCole Rd

E Koy RdE Koy Rd

Kennedy Rd

Kennedy Rd

Presbyterian RdPresbyterian Rd

Sloc

um R

d

Sloc

um R

d

Hay RdHay Rd

Bennion Rd

Bennion Rd

Wea

ver R

d

Wea

ver R

d

Murray StMurray St

Park

Rd

W

Park

Rd

W

Fulle

r Rd

Fulle

r Rd

Penn

ycoo

k Rd

Penn

ycoo

k Rd Nor

folk

Sou

ther

nR

ight

-of-W

ay

Nor

folk

Sou

ther

nR

ight

-of-W

ay

Main

St

Main

St

M C

lark

Rd

M C

lark

Rd

Creveling Rd

Creveling Rd

W Center Rd

W Center Rd

Bolto

n Rd

Bolto

n Rd

Bills RdBills Rd

E Parade Grounds Rd

E Parade Grounds RdWildey Rd

Wildey Rd

John

son

Rd

John

son

Rd

S Main StS Main St

Griffith Rd

Griffith Rd

Cle

vela

nd R

dC

leve

land

Rd

Bailey Rd

Bailey Rd

Crapsey Rd

Crapsey Rd

Moffat Rd

Moffat Rd

Halvo

rsen

Rd

Halvo

rsen

Rd

Wildcat Rd

Wildcat Rd

Visi

tor C

ente

r Rd

Visi

tor C

ente

r Rd

Saint Helena Rd

Saint Helena Rd

Coun

ty L

ine

Rd

Coun

ty L

ine

Rd

Dygert Rd

Dygert Rd

Oak

Hill

Rd

Oak

Hill

Rd

Oaks RdOaks Rd

Dam

Site

Rd

Dam

Site

Rd

Williams Rd

Williams Rd

Sand Hill Rd

Sand Hill Rd

Hoeh

andl

e Rd

Hoeh

andl

e Rd

Portageville RdPortageville Rd

Water Street R

dW

ater Street Rd

River S

t

River S

t

Tallman RdTallman Rd

Paul

ine

Rd

Paul

ine

Rd

Coopersville Rd

Coopersville Rd

W Mill St

W Mill St

High Banks Camp RdHigh Banks Camp Rd

N M

ain

St

N M

ain

St

Finn

Rd

Finn

Rd

Lake

side A

ve

Lake

side A

ve

Unio

n Co

rner

s Rd

Unio

n Co

rner

s Rd

Handley Rd

Handley Rd

Devaney Rd

Devaney Rd

Pentagass Rd

Pentagass Rd

Halstead Rd

Halstead Rd

Hendershot Rd

Hendershot Rd

Pink

ney

Rd

Pink

ney

Rd

Lake Shore Dr

Lake Shore Dr

CCC RdCCC Rd

Ham

pton

Rd

Ham

pton

Rd

Andrus Rd

Andrus Rd

Liberty StLiberty St

Helena Rd

Helena Rd

Beechwood Ave

Beechwood Ave

E Cabin Rd

E Cabin Rd

Crossover Rd

Crossover Rd

St Helena Rd

St Helena Rd

Cot

tage

St

Cot

tage

St

Pres

byte

rian

Rd

Pres

byte

rian

Rd

N M

ain

StN

Mai

n St

Creek RdCreek Rd

Stat

e R

oute

19A

Stat

e R

oute

19A

Parking

Castile Entrance(Open All Year)

Perry Entrance(Open All Year)

Mount Morris Dam Entrance(Open All Year)

Mount Morris Entrance(Open All Year)

Portageville Entrance(Closed Winters) Parade Grounds Entrance

(Closed Winters)

GardeauOverlook

HighbanksTent & TrailerCamping

Mount Morris DamOverlook

Mount MorrisDam

HighbanksRecreation

and Park PoliceHeadquarters

St. HelenaPicnic Area

Tea Table

Swimming Pooland Cabins

Lower Falls

Middle FallsUpper Falls

Middle FallsPicnic Area

CouncilGrounds

Glen Iris Inn

InspirationPoint

Visitor Center

PortagevilleE Koy RdE Koy Rd

Halvo

rsen

Rd

Halvo

rsen

Rd

Portageville RdPortageville Rd

Finn

Rd

Finn

Rd

Portageville Entrance(Closed Winters)

Parade GroundsEntrance(Closed Winters)

Middle Falls

Upper Falls

CouncilGrounds

Glen Iris Inn

Parking

InspirationPoint

436

436

Middle FallsPicnic Area

Norfolk Southern

Right-of-W

ayN

orfolk Southern

Right-of-W

ay

Location of Projectin Letchworth State Park

SCALE

0 1 2 MILES

N

SEE INSET MAP FOR DETAILSEE INSET MAP FOR DETAIL

INSET MAP

Letchworth State Park

Railroad Tracks

County Boundary

Hiking Trail

Park Entrance

Picnic Area

Proposed Bridge Cabin

Lodging

Camping

Falls

Overlook

Dam

Project Location

Project Location

Location of Project in Letchworth State Park

Page 3: Welcome Portageville Bridge Project National Environmental ... · 11/11/2013  · Welcome Portageville Bridge Project National Environmental Policy Act (NEPA) Public Scoping Meeting

Current Train Routing over Portageville Bridge

N

Existing Condition

Purpose

Provide a modern rail crossing of the Genesee River for Norfolk

Southern on the Southern Tier route between Buffalo and

Binghamton, capable of carrying current industry standard freight

rail loads, to the greatest degree possible meeting FRA Class 4

speeds, while reducing ongoing maintenance efforts and costs.

Needs•The bridge is a critical component of Norfolk Southern’s

Southern Tier route.

•The bridge is at the end of its useful life as a freight rail

structure.

•The bridge requires continuous inspection and frequent

repair, which is dangerous to bridge maintainers.

•Because of its age and structural weakness, the bridge

imposes speed and weight restrictions on the entire

Southern Tier line.

•The bridge poses safety concerns for park users, who

trespass on the bridge to cross the Genesee River gorge.

Project Goals•Eliminate operational constraints along the Southern

Tier route caused by the existing Portageville Bridge;

•Reduce the need for ongoing maintenence and

concomitant costs;

•Optimize existing infrastructure and planned improve-

ments to the Southern Tier route as part of Norfolk

Southern’s overall operational strategy in New York and

in this region of the country;

•Minimize the risk of trespassing on the Portageville

Bridge by Letchworth State Park patrons.

Purpose and Need

Current Train Routing over Portageville Bridge

Page 4: Welcome Portageville Bridge Project National Environmental ... · 11/11/2013  · Welcome Portageville Bridge Project National Environmental Policy Act (NEPA) Public Scoping Meeting

Project Alternatives

NEPA requires consideration of a reasonable range of alternatives. Nine reasonable alternatives have been considered for the Portageville Bridge project.

Alternative 1 - No Action / Maintenance Alternative assumes that the existing Portageville Bridge would remain in service and would be subject only to required maintenance.

Alternative 2 - Repair / Retrofit Existing Bridge Alternative would temporarily close the existing bridge for rehabilitation activities and upgrade it to meet current and future freight transport needs.

Alternative 3 - New Bridge on Same Alignment would demolish the existing bridge and piers, and a new bridge would be constructed at the same location.

Alternative 4 - New Bridge on Parallel Alignment / Remove Existing Bridge consists of a new single-track railroad bridge approximately 75 feet south of the existing bridge. The existing bridge would be demolished once the new bridge is operational.

Alternative 5 - New Bridge on Parallel Alignment / Convey Existing Bridge would result in a single-track railroad bridge approximately75feetsouthoftheexistingbridge.Mostoftheexistingbridgewouldremainbutwouldnolongerserverailtraffic.

Alternative 6 - New Southern Alignment / Remove Existing Bridge would be a new, 4.5-mile rail line constructed outside of Letchworth State Park. The new route would include a new, one mile long bridge over the river, two, new overpasses, and other new grade-separated structures and at-grade crossings. The existing bridge would be removed.

Alternative 7 - New Southern Alignment / Convey Existing Bridge would be a new, 4.5-mile rail line constructed outside of Letchworth State Park. It would include a new, one mile long bridge over the river, two, new overpasses, and other new grade-separated structures and at-grade crossings. The existing bridge would not be removed.

Alternative 8 - Reroute Rail Traffic / Remove Existing Bridge would abandon the Southern Tier rail route and remove the existing rail bridge over the Genesee River.

Alternative 9 - Reroute Rail Traffic / Convey Existing Bridge would abandon the Southern Tier rail route. The existing bridge would not be removed.

181.-1-9

181.-1-8 181.-1-

1.21

181.-1-10.2180.-

2-5.1

181.-1-6

180.-2-4.1181.-1-2

181.-1-10.11

181.-1-5

180.-2-3.1180.-2-3.2 181.2-

1-47

181.-1-24 181.2-

1-57.1

180.-2-1.2

181.2-1-45

181.2-1-60

181.2-1-35.1181.-

1-12181.-1-13

181.-1-31.2181.-1-32

181.-1-20

181.-1-26.12

181.2-1-34.1

181.-1-17.2

181.-1-22

170.4-1-25.1181.2-1-27

181.-1-31.1

181.-1-19

170.-1-14.21

170.-1-14.22

170.-1-14.1 170.-1-13

170.-1-15.231

181.-1-17.1170.-1-16.2

181.2-1-46

169.-2-5

170.-1-11

170.-1-15.211

170.4-1-1

170.-1-17

170.-1-15.212

170.-1-15.22

170.-1-18

170.-1-15.1

170.-1-16.1

170.-1-20

170.-1-19.1

170.-1-8.2

170.-2-1

170.-1-21.2

170.-1-22.112

170.-1-21.1

170.-1-8.13

170.-1-22.111

170.-1-24

170.-1-31.2

170.-1-8.112

170.-1-31.3170.-1-25.2 170.-1-23.1 170.-1-

31.1

170.-1-32

170.-1-25.12170.-1-25.11

169.-2-2.2

170.-1-27.12 170.-

1-6.1

170.-1-27.112170.-

1-26.21

170.-1-36

170.-1-35

170.-1-26.112

169.-2-2.12

170.-1-26.12

170.-1-29.32

170.-1-28.1

170.-1-29.122

170.-1-29.113

170.-1-29.111

170.-1-29.121 170.-1-

29.31 170.-1-1.2169.-2-1.1

170.-1-4

170.-1-33.2

170.-1-34

170.-1-33.3

158.-2-2.1

159.-1-15.11

170.-1-2.21

170.-1-33.111

170.-1-2.22

159.-1-15.2

170.-1-3

159.-1-16

159.-1-18

159.-1-14.1

159.-1-20.2

159.-1-19

159.-1-20.1158.-2-1.2158.-

2-1.12

159.-1-22.111 159.-

1-11159.-

1-13.1

181.-1-26.11

181.-1-25

170.-1-8.12

170.-1-1.1

170.-1-6.1

41-1

-.18

151

-1-.

181

181.-1-20

170.-1-4

170.-1-33.12

159.-1-14.1

159.-1-21

181.-1-16

181.-1-23

181.-2-1-47

196.-1-13

196.-1-14.1

196.-1-16

196.-1-11.2

196.-1-11.1

196.-1-3

196.-1-10.1

195.-1-1.2

195.-1-1.11

195.-1-1.12

196.-1-1.1 196.-1-2.1

182.-1-14.1

182.-1-14.2

182.-1-12

182.-1-10.114

182.-1-10.113

182.-1-5.3

182.-1-10.2

182.-1-11181.-1-10.2

181.-1-10.11

181.-1-8.1

181.-1-9

182.-1-4.2

181.-1-11

182.-1-10.12

182.-1-10.112

181.-1-4.1181.-1-3.211

181.-1-2.2

182.-1-4.3

181.-1-2.1181.-1-3.1

182.-1-4.1

196.1-1-36.1

181.-1-6

182.-1-1

195.-1-1.2

196.-1-13

196.-1-14.1

196.-1-12

196.-1-13

181.1-1-3.221

181.-1-7

181.-1-5

EXISTINGBRIDGE

PARALLELALIGNMENTALTERNATIVE

SOUTHERNALIGNMENT

ALTERNATIVE

Letchworth State Park

Genesee River

Genesee River

Genes

ee R

iver

Genes

ee R

iver PortagevillePortageville

WYOMING COUNTYLIVINGSTON COUNTY

11.5.12

Project AlternativesFigure 3-1PORTAGEVILLE BRIDGE

0 750 1,500

Feet

N

Alternative 4, 5, 6, or 7

New Bridges Requiredfor Alternatives 6 and 7

Existing Railroad

Parcels

County Boundary

100-foot Buffer

Alternative was studied In SEQRA DEIS

Alternative was rejected in SEQRA DEIS

Page 5: Welcome Portageville Bridge Project National Environmental ... · 11/11/2013  · Welcome Portageville Bridge Project National Environmental Policy Act (NEPA) Public Scoping Meeting

NEPA Process

Next Steps

The SEQRA DEIS, which was published in November 2012, fully documented the potential

environmentalimpactsofthePortagevilleBridgeProjectandidentifiedmeasuresto

mitigate these impacts. The NEPA DEIS will build on the prior document, using as much

relevant information as possible. In addition the NEPA DEIS will:

• Identify and address public comments previously received on the SEQRA DEIS;

• Address public comments received during the NEPA scoping period;

• Address requirements of Section 106 of the National Historic Preservation Act;

• Identify mitigation commitments that have been developed in consultation with the

NewYorkStateOfficeofParks,Reacreation,andHistoricPreservationsincepublication

of the SEQRA DEIS;

• Identify a preferred alternative for the project;

• Address federal regulatory requirements pursuant to Executive Order 11988

(Floodplains) and Executive Order 11990 (Wetlands); and

• Address the requirements of Section 4(f) of the U.S. Department of Transportation Act.